FINDINGS OF FACT & DECISION
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of Atlantic Cellular/Cellular
One for conversion of a vacant 7,190 square foot building to
cellular telephone sales and service use at 3 Baldwin Avenue.
On the 14th of August 1990, the South Burlington Planning
Commission approved the above referenced site plan under Section
19.10 of the South Burlington Zoning Regulations based upon the
following findings:
1. Atlantic Cellular proposes to renovate the former Regal
Optical building on Baldwin Avenue for use as a cellular tele-
phone sales and service. The footprint of the building will be
changed with the addition of an entrance vestibule. Two (2) new
overhead doors will be added at the south end to accommodate
vehicle access to the interior for installing car phones.
2. Access/Circulation: Access is via one (1) 20 foot curb cut
on Baldwin Avenue to a 20 foot access drive. Circulation will be
adequate due to appropriate aisle widths in the parking area.
3. Setbacks/Coverage: The building is currently non -complying
along the front, east side and rear setbacks. Since this is an
existing condition, no variance is required. The front yard
coverage, as proposed is 22% (maximum allowed is 30%). Building
coverage is 26% (maximum allowed is 30%).
4. Parking: 14 parking spaces are required and 15 spaces are
being provided including 1 handicapped space. Size of parking
spaces and width of aisle meets minimum requirements.
5. Traffic: This property is in Zone 4 of the Traffic Overlay
District which allows 23 peak hour trip ends. Based on I.T.E.
trip rates, the use will generate 11 peak hour trip ends. The
property is located within the limits of the Shelburne Road
Traffic Impact Policy.
6. Landscaping: The proposed use requires $7,500 in new land-
scaping. The landscape plan shows Norway maple, Japanese Lilac
and Yew which meets the required value.
7. Sewer: The proposed use is estimated to generate a sewage
flow of 105 gpd.
DECISION & CONDITIONS
The Site Plan application of Atlantic Cellular One for conversion
of a vacant 7,190 square foot building to cellular telephone
sales and service use as depicted on a plan entitled, "Atlantic
Cellular Company, Cellular One, South Burlington, Vermont",
prepared by Brad Rabinowitz Architect and dated 6/27/90 is ap-
proved with the following stipulations:
1) The applicant shall post a $7,500, 3-year landscaping bond
prior to permit.
2) The applicant shall contribute $282 to the Shelburne Road
Intersection Improvement fund based on the 11 peak hour trip ends
to be generated by this project.
3) A sewer allocation of 105 gpd is granted. The applicant
shall pay the $2.50 per gallon fee prior to permit.
4) The plan shall be revised prior to issuance of a building
permit to show a manhole or inlet on Baldwin Avenue where the new
storm sewer is proposed to connect to the existing storm sewer.
This shall be approved by the City Engineer prior to permit.
5) A revised plan showing the new entryway addition shall be
submitted to the City Planner prior to obtaining the zoning
permit.
6) That exterior lighting be downcast luminaire.
7) That there be no outside storage.
8) A zoning permit shall be obtained within 6 months or this
approval is null and void.
Chairman er C erk,
South Burlington Planning Commission