Loading...
HomeMy WebLinkAboutSD-96-0001 - Decision - 0002 0004 Market StreetFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURL I NGTON S��- - o o v Re: Findings of Fact, application of Century Partners to amend an approved planned unit development consisting of 93,800 square feet of general office and shopping center use in three (3) buildings. The amendment consists of: 1) adding a 3,000 square foot 2-story office building (building "C") for a total of 96,800 square feet of general office and shopping center use, and 2) subdividing a 5.5 acre parcel into two (2) lots of 4.72 acres (lot #1) and 0.83 acres (lot #3), 100 Dorset Street and 2 Corporate Way. On the loth day of December, 1996, the South Burlington Planning Commission approved the request of Century Partners for revised final plat approval under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of amending an approved planned unit development consisting of 93,800 square feet of general office and shopping center use in three (3) buildings. The amendment consists of: 1) adding a 3000 square foot 2-story office building (building "C") for a total of 96,760 square feet of general office and shopping center use, and 2) subdivide a 5.5 acre parcel into two (2) lots of 4.72 acres (lot #1) and 0.83 acres (lot #3). The purpose of the subdivision is to create a separate lot for building "B" for financing purposes, similar to the Barnes and Nobel lot (lot #2). The sketch plan was reviewed on 10/22/96. 2. This property located at 100 Dorset Street and 2 Corporate Way lies within the Cl and CD1 Districts. It is bounded on the north by a commercial building used for personal service and retail, on the east by the Ramada Inn and undeveloped property, on the south by the Anchorage Motor Inn and Corporate Way, and on the west by Dorset Street. 3. Access/circulation: No access changes proposed. Access driveway location to the Ramada Inn does not line up with the location of the access approved on the Ramada Inn site on 11/26/96. Approving this plan will, in effect, disapprove the recent Ramada Inn site plan approved a couple of weeks ago. It was staff's opinion that either access location is adequate. Staff recommended that the Commission not get into the middle of this apparent disagreement between the landowners. Circulation on the site is adequate. 4. Coverage/setbacks at Phase II buildout: Cl District: Building coverage is 24% (maximum allowed is 30%). Overall coverage is 84% (maximum allowed is 70%). Front yard coverage along Dorset Street 1 is 79.6% (maximum allowed is 30%). CD1 District: Building coverage is 49.8% (maximum allowed is 90%). Overall coverage is 83.4% (maximum allowed is 90%). 5. The parking structure and proposed building "C" meet the setback requirements for the CD1 District. "Building "C" will be less than five (5) feet from the side lot line but will provide a fire wall as required under Section 14.402(a) of the zoning regulations. Proposed building "B" and some of the surface parking do not meet the setback requirements. The Commission as part of its 2/20/96 approval modified the setback requirements for building "B" and some of the surface parking. 6. Parking: A total of 455 spaces are required and 445 spaces are being provided. This represents an 10 space or 2.2% shortfall. The Planning Commission previously approved an 11 space or 2.5% parking waiver. 7. Landscaping: The revised final plat should include a revised landscaping plan showing the proposed office building. This plan was requested from the applicant but not submitted. 8. The applicant proposed to use some of their landscaping requirement for landscaping and streetscape improvements along Corporate Way. Staff supported this proposal. 9. F.A.R. The floor area ratio (F.A.R.) within the CD1 District is 0.23 (maximum allowed is 0.8). 10. Traffic: A total of 613 vte's were approved as part of the previous approval. ITE estimates that this additional building will increase P.M. peak hour trip ends by 13 vte's for a total of 626 vte's. Applicant was made aware that a road impact fee will be assessed for the additional traffic. 11. Lighting: Details of the exterior building lights should be approved by the City Planner prior to permit issuance. 12. Notice of Condition: The "Notice of Condition" should be revised to include the newly created lots into the requirement that all the lots are to be considered one (1) lot for all zoning, subdivision and sign regulation purposes. This legal document should be approved by the City Attorney and recorded in the land records prior to recording the final plat plans. 13. Other: The applicant has been closing off the "entrance only" access to the parking area located on the north side of the Barnes and Nobel building during peak times. Apparently, vehicles were using this access as an exit and causing problems. Typically the Planning Commission reviews these temporary curb cut closures. Staff did not have a problem with this issue. 2 DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the revised final plat application of Century Partners to amend an approved planned unit development consisting of 93,800 square feet of general office and shopping center use in 3 buildings. The amendment consists of 1) adding a 3000 square foot 2-story office building (building "C") for a total of 96,800 square feet of general office and shopping center use, and 2) subdividing a 5.5 acre parcel into 2 lots of 4.72 acres (lot #1) and 0.83 acres (lot #3), 100 Dorset Street and 2 Corporate Way, as depicted on a two (2) page set of plans, page one (1) entitled "100 Dorset Street Complex 100 Dorset Street South Burlington, VT. Expand Shopping Center Site Plan Phase II", prepared by Trudell Consulting Engineers, Inc, dated 10/31/95, last revised 12/2/96, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plat plans shall be revised to show the changes below and shall require approval of the City Planner. Three (3) copies of the approved revised plans shall be submitted to the City Planner prior to recording. a) A landscaping plan shall be submitted showing all existing and proposed landscaping including building "C". b) Plan shall be revised to show the proposed 136 square foot enclosed stairwell on the rear of Building "C". c) The plan shall be revised to show the connection to Ramada Inn in the location shown on the approved 2/20/96 final plat. 3. Pursuant to Section 26.256(b) of the zoning regulations, the Planning Commission approves 445 parking spaces which represents a 10 space, or 2.2% waiver. 4. For the purpose of calculating required road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the proposed building "C" will generate 13 additional vehicle trip ends during the P.M. peak hour. 5. Any new exterior lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. Details of the exterior building lights for building "C" shall be approved by the City Planner prior to permit issuance. 6. The applicant shall submit for review and approval by the City Attorney a revised "Notice of Condition" to include the newly created lots into the requirement that all the lots are to be 3 considered one (1) lot for all zoning, subdivision and sign regulation purposes. This legal document shall be recorded in the land records prior to recording the final plat plans. 7. The Planning Commission approves the temporary closing off of the "entrance only" access to the parking area located on the north side of the Barnes and Nobel building (building "A") during the peak times. 8. The applicant shall obtain a zoning permit for Building "B" by 2/20/99, and a zoning permit for Building "C" within three (3) years of this approval, or this approval is null and void. 9. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to occupancy of each building. 10. Any change to the site plan shall require approval by the South Burlington Planning Commission. 12. The final plat plans shall be recorded in the land records within 90 days or this approval is null and void. The plans shall be signed by the Planning Commission or Clerk prior to recording. The plans shall be recorded prior to issuance of a zoning permit. Chairman or Clerk South Burlington Planning Commission Date 4