Loading...
HomeMy WebLinkAboutSD-06-09 SD-06-10 - Decision - 0250 Autumn Hill RoadJ CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING CHARLES & JUDITH SCOTT - 3-LOT SUBDIVISION 250 AUTUMN HILL ROAD PRELIMINARY PLAT APPLICATION #SD-06-09 FINAL PLAT APPLICATION #SD-06-10 FINDINGS OF FACT AND DECISION #SD-06-09 #SD-06-10 Charles & Judith Scott, hereinafter referred to as the applicants, are seeking to subdivide a 46.31 acre developed with a single family dwelling into three (3) lots of 3.0 acres (lot #5a), 3.0 acres (lot #5b), and 40.2 acres (lot 5c), 250 Autumn Hill Road. The Development Review Board held public hearings on March 7, 2006 and March 21,2006. Charles Scott was present at the meetings. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicants are seeking to subdivide a 46.31 acre developed with a single family dwelling into three (3) lots of 3.0 acres (lot #5a), 3.0 acres (lot #5b), and 40.2 acres (lot 5c), 250 Autumn Hill Road. 2. In 2004, the City of South Burlington purchased a permanent conservation easement from the applicants. This permanent easement restricts lot 5c (40.2 acres) to open space uses and created a 200 foot wide recreation area at the eastern boundary of the lot. The permanent conservation easement also stipulated that the applicants were entitled to apply for subdivision of the property to create two separate single-family lots of 3.0 acres each, one around the existing home and a new lot in the location identified on the subdivision plat. 3. It was anticipated by City Council that this subdivision would occur pursuant to the conservation easement. To the very best of the Board's knowledge, this application is consistent with the relevant terms of the conservation easement. 4. The applicant appeared before the Development Review Board on December 20, 2005 for sketch plan review. 5. The owners of record of the subject property are Charles L. Scott II & Judith S. Scott, Trustees of the Charles L. Scott, II Revocable Trust and the Judith S. Scott Revocable Trust. 6. The subject property is located in the Southeast Quadrant (SEQ) Zoning District. 7. The plans submitted consist of a two (2) page set of plans, page one (1) entitled, "Proposed Subdivision of Land of Judith Stultz Scott and Charles Lewis Scott, II, -1- ,1 #S D-06-09 #SD-06-10 Trustees Autumn Hill Road, South Burlington, VT", prepared by Harris Surveying & Land Dispute Resolution, dated December 5, 2005. Zoning District & Dimensional Requirements Table 1. Dimensional Requirements SEQ Zoning District Required Proposed Lot 5a Lot 5b Lot 5c Min. Lot Size 12,000 SF 3.0 acres 3.0 acres 40.2 acres 4 zoning compliance ** No buildings are proposed for this property as part of this application. A single family home exists on Lot 5a and will remain; a single-family residence may be constructed in the future pursuant to an approved subdivision on lot 5b; and no buildings of any kind may be built on Lot 5c (40.2 acres) as a result of the conservation easement. SUBDIVISION CRITERIA Per Section 3.05(B) of the South Burlington Land Use Regulations, concerning lots with no public road frontage, this subdivision shall be considered a major subdivision and is subject to the requirements and major subdivision criteria of Article 15 of the South Burlington Land Development Regulations. Pursuant to Section 15.18 of the South Burlington Land Development Regulations, subdivisions shall comply with the following standards and conditions: Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project. There are no new buildings or associated infrastructure proposed for this property as part of this application. Areas for a septic system and replacement field, as well as wells, have been identified in appropriate locations to service a future house on Lot 5b. These will be subject to State and local wastewater and water supply approvals. According to Section 15.13 of the South Burlington Land Development Regulations, the subdivider or developer shall connect to the public sewer system or provide a community wastewater system approved by the City and the State in any subdivision where off -lot wastewater is proposed. On site septic is proposed to continue on Lot 5a and to be installed on Lot 5b in the future when a house is built. -2- l #SD-06-09 #SD-06-10 Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. The applicant should take reasonable erosion control precautions in the construction of a house and associated infrastructure on Lot 5b. At such time that any development occurs, either for the building of residential units or the road, the applicant shall submit grading and erosion control plans that shall be in compliance with the standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. The project incorporates access, circulation, and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. At this time, the applicant is unsure which roadway will be used to access lot 5b. A right-of- way exists for access through the property to the west, owned by Vincent and Allyson Bolduc, which connects to Dorset Street. This is noted as Jennie Blair Lane on the final plat. This right-of-way does provide sufficient access for a single-family residence. However, the road will need to be upgraded to city standards if this route is chosen. At such time in the future as lot 5b is proposed to have a house constructed on it, the applicant should finalize the access to the property understanding that upgrades will be needed. Lot 5c will not have vehicular access per the conservation easement. Lot 5a will continue to use Autumn Hill Road for access. The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. The plans submitted depict a class III wetland on lot 5b. It is unclear if these are existing wetlands or wetlands that will result from the proposed fire pond. The wetlands depicted by the applicant do not appear to match those shown on the state's wetland maps. The applicant should address this issue with a clear and complete wetlands map, including appropriate buffers. Wetland impacts cannot be assesed without a clear delineation of the site's wetlands. Aside from any wetland issues, the applicant depicts a 50 foot buffer from the pond. However, the proposed building envelope encroaches upon the buffer. The applicant should address this issue and has two options. The applicant can: 1) revise the building envelope to stay out of the buffer or 2) appear before the South Burlington Natural Resources to discuss the buffer encroachment. Even if the NRC recommends allowing the encroachment, the DRB will need to issue a final finding on the matter. Furthermore, the right-of-way being proposed as the access for lot 5b crosses a wetland area. This wetland and associated buffer should be shown on the plats. -3- #S D-06-09 #SD-06-10 It is possible that at such time as a house is built on Lot 5b, the applicant may be able to use the existing Autumn Hill Road to access the lot rather than Jennie Blair Lane. This would prevent wetland impacts and a new curb cut on Dorset Street. Prior to the issuance of a zoning permit, the Natural Resources Committee review and sign -off shall be required to evaluate wetland issues if Jennie Blair Lane is to be utilized for access. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. The applicant has noted that the newly created lot will be targeted for residential development. The proposed subdivision is compatible with the planned development patterns of the SEQ Zoning District, as outlined in Section 9.01 of the Land Development Regulations, and with the terms of the conservation easement purchased by the City. Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. The lot layouts and configuration of conserved open space are consistent with the SEQ plan and with the conservation easement on the property. The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided. The Fire Chief has reviewed the plans and provided comments in a letter dated December 20, 2005. Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. The use of on -site wells and wastewater and minimization of new roadways are appropriate in this case. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. There are no new buildings or associated infrastructure proposed for this property as part of this application. It has been noted above regarding the choice of access roads for this property. The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). The proposed subdivision is in conformance with the South Burlington Comprehensive Plan, particularly in light of the conservation easement for the property. C C #S D-06-09 #SD-06-10 Lot Layout Lot layout is acceptable. Lot #5a is developed with an existing single family dwelling with a proposed building envelope. A building envelope is also proposed for lot #5b. RECREATION PATH Explore the possibility of a recreation path along the southern boundary of the property, whether permitted in the conservation agreement. The conservation agreement relating to this property has been examined. It is known as the Grant of Development Rights and Conservation Restrictions, recreation Path Easements, Option, and Right of First Refusal, and found that Section VI (5) specifies that "the City shall not construct or maintain any improvement, including but not limited to any recreation path or facility, on the Protected Property within two hundred feet (200') of the Current or Future Home Sites..." No further review by the Recreation Path Committee will be needed as no recreation path may be legally built. ACCESS TO CONSERVED LOT Explore the methods and modes of access to the conserved lot (referred to in hearing as Lot C). The conservation easement agreement relating to this property has been examined. It specifies that "no motorized traffic.... shall be allowed to use the pathway, except for emergency vehicles for the purpose of maintaining, including snowplowing in the City's discretion or patrolling the pathway." There shall be no vehicular access to this site except as noted here. Access to the property shall be via a pedestrian easement only. OTHER This request includes the elimination of a 60 foot right-of-way along the south boundary previously approved "for a potential future city street". DECISION by� 1 Motion by �� Q� ��� seconded bye+ X kp kxkA N to approve Preliminary Plat Applicati n #SD-06-09 and Final Plah Application #SD-06-10 of Charles & Judith Scott, subject to the following conditions: 1) All previous approvals and stipulations shall remain in full effect, except as amended herein. 2) This project shall be completed as shown on the plat submitted by the applicant, and on file in the South Burlington Department of Planning and Zoning. - 5 - #SD-06-09 #SD-06-10 3) The plat plans shall be revised to show the changes below and shall require approval of the Administrative Officer. Three (3) copies of the approved revised plans shall be submitted to the Administrative Officer prior to recording: a) The plans shall be revised to modify the building envelope to respect the pond/wetland buffer. b) The plans shall be revised to show a complete wetlands delineation for lot 5b. 4) The applicant shall comply with the requests of the South Burlington Fire Chief as outlined in his letter dated December 20, 2005. 5) On -site wastewater systems and wells shall be subject to state and local regulations; all permits shall be demonstrated to be in place prior to issuance of a zoning permit for a house on lot 5b. 6) The applicant shall address erosion control measures when they apply for development of the roads or residential buildings. The applicant shall at that time submit grading and erosion control plans that shall meet the standards set forth in Section 16.03 and 16.04 of the South Burlington Land Development Regulations. 7) Prior to the issuance of a zoning permit for a house to be constructed on lot 5b, the owner shall obtain approval from the Development Review Board as an amendment to this subdivision that access will be provided to the lot over either: i) Jenny Blair Lane: in which event the owner will provide any State and Army Corps permits which may be required to cross the wet area which is being traversed by the proposed road. Such road will meet the then required City standards for roads providing access to fewer than 4 homes. ii) Autumn Hill Road: in which event the owner will improve the road to the then required City standards for roads providing access to 4 or more houses. Ma iii) Other means as approved by the Development Review Board. 8) If Jennie Blair Lane is to be constructed at any time in the future, the Natural Resources Committee (NRC) shall be consulted regarding impacts from the crossing prior to issuance of a zoning permit for the lot. 9) The residence constructed on lot 5b shall include a residential sprinkler system. 10) Access to conserved lot shall be by pedestrian traffic only. 11) Any changes to the final plat plan shall require approval of the South Burlington Development Review Board. IMSE l #SD-06-09 #SD-06-10 12) The final plat plan (survey plat) shall be recorded in the land records within 180 days or this approval is null and void. The plan shall be signed by the Board Chair or Clerk prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy of the survey in digital format. The format of the digital information shall require approval of the Director of Planning and Zoning. Mark Behr —&nay/abstain/not present Matthew Birmingham — yea/nay/abstain/ of resent Chuck Bolton — yea/nay/abstain of presen John Dinklage nay/abstain/no present Roger Farley — 5enay/abstain/not /abstain/not present Larry Kupferman nay/abstain/not present Gayle Quimby — present Motion carried by a vote of 5-- d - C) Signed this 2j day of 2006, by / John Dinkl ge, Chair Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality). -7-