Loading...
HomeMy WebLinkAboutSD-11-11 - Decision - 0378 0380 Lime Kiln Road#SD-11-11 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING CHAMPLAIN HOUSING TRUST FINAL PLAT APPLICATION #SD-11-11 FINDINGS OF FACT AND DECISION Final plat application of Champlain Housing Trust to amend a previously approved planned unit development consisting of two (2) 24 unit multi -family dwellings. The amendment consists of the installation of solar panels on the roof of each building requiring the need of height waivers, 378- 380 Lime Kiln Road. The Development Review Board held a public hearing on April 5, 2011. Gordon Rowe represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT I. Final plat application of Champlain Housing Trust to amend a previously approved planned unit development consisting of two (2) 24 unit multi -family dwellings. The amendment consists of the installation of solar panels on the roof of each building requiring the need of height waivers, 378-380 Lime Kiln Road. 2. The owner of record of the subject property is HV 2001 Inc c/o Housing Vermont. 3. The application was received on March 3, 2011. 4. The subject property is located in the R4 Zoning District. 5. The plans submitted consist of a two (2) page set of plans; page one (1) entitled "Lime Kiln Housing Burlington, Vermont Building #1 Exterior Elevations", prepared by Vermont Architects Collaborative dated 2/15/01. Waivers for Structures in the ....R4 District... states that: For structures proposed to exceed the maximum height for structures specified in Table C-2 as part of a planned unit development or master plan, the Development Review Board may waive the requirements of this section as long as the general objectives of the applicable zoning district are met. A request for approval of a taller structure shall include the submittal of a plan(s) showing the elevations and architectural design of the structure, pre - construction grade, post -construction grade, and height of the structure. The DRB shall CADocuments and Settings\Mark C. Behr\Desktop\SD_11_11_378LimeKi1nRd_CHT_ffd.doc #SD-11-11 approve the structure if it finds that the building will not detract unduly from public scenic views from adjacent properties or public streets and walkways. The applicant has submitted a site plan as well as a drawing depicting the elevations with the proposed solar panels. The applicant has stated that the installation will not connect to the grid. The Board finds that the requirements of this section are met and recommends approval of the application. DECISION Motion by John Dinklage, seconded by Gayle Quimby, to approve Final Plat Application #SD- 11-11 of Champlain Housing Trust subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect except as amended herein. 2. This project shall be completed as shown on the plat submitted by the applicant and on file in the South Burlington Department of Planning and Zoning. 3. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. 4. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to the use of the solar panels. 5. The final plat plan shall be recorded prior to issuance of a zoning permit. 6. Any changes to the final plat plan shall require approval of the South Burlington Development Review Board. 7. The final plat plan (Sheet 7 of 7) shall be recorded in the land records within 180 days or this approval is null and void. The plan shall be signed by the Board Chair or Clerk prior to recording. Mark Behr — yta/nay/abstain/not present Matthew Birmingham — yea/nay/abstain/not present John Dinklage — yea/nay/abstain/not present Roger Farley — yea/nay/abstain/not present Michael Sirotkin — yta/nay/abstain/not present Gayle Quimby — y2a/nay/abstain/not present Bill Stuono — yta/nay/abstain/not present Motion carried by a vote of 6 -0 -1 CADocuments and Settings\Mark C. Behr\Desktop\SD_11_11_378LimeKilnRd_CHT_ffd.doc #SD-11-11 Signed this 6th day of April 2011, by Digitally signed by Mark C. Behr r DN —Mark C Behr, RichardHenryBehr Mark C. Beh Architect P.C., ou, email=mark@rhbhbpcccom, c=US Date: 2011.04.06 14:47:40-04'00' Mark Behr, Chairman Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this decision, a notice of appeal and the required fee by certified mail to the Superior Court, Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed to the City of South Burlington Planning and Zoning Department at 575 Dorset Street, South Burlington, VT 05403. See V.R.E.C.P. 5(b)(4)(A). Please contact the Environmental Division at 802-828-1660 or http://vermontbudiciarV.org/GTC/environmental/default.aspx for more information on filing requirements, deadlines, fees and mailing address. The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call 802.879.5676 to speak with the regional Permit Specialist. CADocuments and Settings\Mark C. Behr\Desktop\SD_11_11_378LimeKilnRd_CHT_ffd.doc