Loading...
HomeMy WebLinkAboutSD-97-0000 - Decision - 0285 Kirby RoadFINDINGS OF FACT & DECISION STATE OF VERMONT �'� _ �'j 7_ Oaf,v COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Norman and Jean Parrow to subdivide a 42,904 square foot parcel into two (2) parcels of 21,452 square feet each, 285 Kirby Road. On the 9th day of September, 1997, the South Burlington Planning Commission approved the request of Norman and Jean Parrow for preliminary plat review under Section 203 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists subdividing a 42,904 square foot lot into two (2) lots of 21,452 square feet each. Lot #1 is currently developed with a single family dwelling. Lot #2 will not have any frontage on a public street so this subdivision is a major subdivision. The sketch plan was reviewed on 8/12/97. 2. This property located at 285 Kirby Road lies within the R4 District. It is bounded on the east by the airport, on the south by undeveloped land, on the west by a single family dwelling, and on the north by Kirby Road. 3. Access/circulation: Access to lot #1 is provided by an existing curb cut on Kirby Road. Lot #2 is proposed to be served by a curb cut on Kirby Road east of the existing curb with a 20 foot r.o.w.across lot #1. 4. Lot size/frontage: Both lots meet the minimum lot size requirement of 9500 square feet. 5. Lot #1 meets the minimum frontage requirement of 80 feet. Lot #2 has no frontage on a public street and will be served by a 20 foot r.o.w. 6. Sewer: The sewer allocation requested is 480 gpd (includes 20% reduction allowed by State). The applicant will be required to pay the per gallon fee prior to permit issuance. 7. Impact fees: The applicant was made aware that the new dwelling will be subject to road, school and recreation impact fees. 8. Final plat: The final plat plan should include the following: --- the plat should clearly indicate that the easterly property line is the boundary between the Airport District to the east and R4 District to the west (the R4 and Airport District notes need to be moved closer to the line). 1 --- the size of existing and proposed water and sewer lines. --- the property line symbol should be different than the symbol for the setback lines. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the preliminary plat application of Norman and Jean Parrow to subdivide a 42,904 square foot parcel into two (2) parcels of 21,452 square feet each, 285 Kirby Road, as depicted on a plan entitled "Property Plan Norman & Jean Parrow Kirby Road South Burlington Vermont," prepared by William A. Robenstein, dated 9/2/97, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plat shall be revised prior to final plat submittal as follows: a) The plat shall be revised to clearly indicate that the easterly property line is the boundary between the Airport District to the east and R4 District to the west. b) The plat shall be revised to indicate the size of existing and proposed water and sewer lines. c) The plat shall be revised to use different line symbols for the property lines and setback lines. 3. The Planning Commission approves a sewer allocation of 480 gpd (includes 20% reduction allowed by State). The applicant will be required to pay the per gallon fee prior to permit issuance. 4. The final plat application shall be submitted within 12 months. Chairman or Clerk South Burlington Planning Commission �'12 ✓ % ate 2