Loading...
HomeMy WebLinkAboutSD-97-0001 - Decision - 0285 Kirby RoadFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Norman and Jean Parrow to subdivide a 42,904 square foot parcel into two (2) parcels of 21,452 square feet each, 285 Kirby Road. On the 21st day of October, 1997, the South Burlington Planning Commission approved the request of Norman and Jean Parrow for final plat approval under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists subdividing a 42,904 square foot lot into two (2) lots of 21,452 square feet each. Lot #1 is currently developed with a single family dwelling. Lot #2 will not have any frontage on a public street, and therefore is a major subdivision. The preliminary plat was approved on 9/9/97. 2. This property located at 285 Kirby Road lies within the R4 District. It is bounded on the east by the airport, on the south by undeveloped land, on the west by a single family dwelling, and on the north by Kirby Road. 3. Access/circulation: Access existing curb cut on Kirby Road. by a curb cut on Kirby Road east foot r.o.w. across lot #1. to lot #1 is provided by an Lot #2 is proposed to be served of the existing curb with a 20 4. Lot size/frontage: Both lots meet the minimum lot size requirement of 9500 square feet. 5. Lot #1 meets the minimum frontage requirement of 80 feet. Lot #2 has no frontage on a public street and will be served by a 20 foot r.o.w. 6. Sewer: The sewer allocation requested is 480 gpd (includes 20% reduction allowed by State). The applicant will be required to pay the per gallon fee prior to permit issuance. 7. Impact fees: The applicant was made aware that the new dwelling will be subject to road, school and recreation impact fees. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the final plat application of Norman and Jean 1 Parrow to subdivide a 42,904 square foot parcel into two (2) parcels of 21,452 square feet each, 285 Kirby Road, as depicted on a plan entitled, "Property Plan Norman & Jean Parrow Kirby Road South Burlington Vermont," prepared by William A. Robenstein, dated 9/15/97, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The Planning Commission approves a sewer allocation of 480 gpd (includes 20% reduction allowed by State). The applicant shall be required to pay the per gallon fee prior to permit issuance. 3. The plat plan shall be revised to show the change listed below and shall require approval of the City Planner. Three (3) copies of the approved revised plat plan shall be submitted to the City Planner prior to recording: a) The final plat plan shall be revised to show a water easement where the proposed line crosses the northeast corner of lot #1. 4. The sewer connection to the 18 inch main, which is concrete pipe, shall be made with a manufactured fitting. 5) Any changes to the final plat plan shall require approval of the South Burlington Planning Commission. 6) The final plat plan shall be recorded in the land records within 90 days or this approval is null and void. The plan shall be signed by the Planning Commission Chair or Clerk prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy of the survey plat in digital format. The format of the digital information shall require approval of the City Planner. / n South Burlington 'Planni g Commission Chairman or Clerk 7 Date