Loading...
HomeMy WebLinkAboutAgenda 09 - Site-C2.2 Grading DrainageWETLAND SURFACE=340.2 8' WIDE STONE WEIR. EL. 342.2 RISER #2 12" PERF. HDPE UNDERDRAIN 12" SOLID HDPE UNDERDRAIN CLEANOUT (TYP.) RISER #1 6'x12' HYDRAULIC INLET 12" HDPE 12" PERF. HDPE UNDERDRAIN RISER #3 12" INV.=337.3 338 340 342 345 340. 2 342339337 337 338 341 342. 7 340. 2 344. 9 340. 2 GRAVEL WETLAND BAY 1 GRAVEL WETLAND BAY 2 FOREBAY 342. 7 S S ET C ETC ETC ETC ETC ETC G G G G G G GSSSSSW W W W W W W W ST ST ST ST ST ST EX. CB RIM=344.1'EX. CB#1 RIM=342.7' INV.IN=338.4 (24"S) INV.IN=338.1 (18"W) INV.IN=339.7 (4"W) INV.OUT=337.7 (24"NE) EX. SMH#1 RIM=344.4' INV.IN=335.5 (8"S) INV.IN=335.6 (8"NW) INV.OUT=335.4 (8"E) EX. SMH RIM=341.8' EX. E,T,C, CABINETS 12" HDPE W/FES INV.=339.4 15" HDPE W/FES INV.=339.6 C.O. EXISTING TRANSFORMER S S S FUTURE BUILDING ADDITION FUTURE PARKING SPACES FUTURE EDGE OF PAVEMENTWEIGH SCALE (10'x70')STST4' CHEVRON STRIPPED LOADING AREA ST NEW CB#2 RIM=347.6 INV.IN=341.1 INV.OUT=341.0 FUTURE RECREATION PATHUEUE UEUE D PROPOSED HYDRANT 100' MAX. FROM FIRE DEPARTMENT CONNECTION F.D.C. COORDINATE DOCK LEVELER W/ OWNER AND ARCHITECT EX. BOLLARD (TYP.)24" HDPE4" PV C 24" HDPE 18" H D P E 8" P V C 8" PVC8" P V C 8" PVC STONE EDGE AT BUILDING COORDINATE WITH LANDSCAPE PLAN NEW CB#5 RIM=346.0 INV.IN=341.8 INV.OUT=341.7 NEW CB#3 RIM=347.7 INV.=342.3 STSTST PROPOSED RETAINING WALL T.O.W.=348.012'NEW YD#1 RIM=345.97 INV.=342.7 PROPOSED DUMPSTER PAD PROPOSED BIKE RACK (2)STLOT 1-G 6.2 AC.STNEW CB#4 RIM=345.8 INV.IN=342.5 INV.OUT=342.4 NEW CB#1 RIM=343.6 INV.IN=340.5 INV.OUT=340.4 PROPOSED TRANSFORMER 15" HDPE 15" HDPE10" PVC15" HDPE12" HDP E 15" H D P E15" HDPEPROPOSED BOLLARDS PROPOSED RAIN GARDEN EXISTING 20' RECREATOINAL PATH EASEMENT D 18" HDPE & F.E.S - INV. 339.2 15 " HDPESSNEW DMH#3 RIM=345.0 INV.IN=339.4 INV.OUT=339.3 EX. SMH#2 RIM=343.5' INV.IN=336.2 (8"W) INV.OUT=336.2 (8"N) SUMP=335.7 WWWEMERGENCY OVERFLOW BROAD CRESTED WEIR ELEV.=343.3 200' OPEN SPACE BU F F E R LOT 1 LOT 28"D.I.370370 ~338 339 340 340 341 341 342 342 342 343 344 3 4 1 3 4 0 341 340 339 338 PROPOSED BUILDING 142' x 180' (25,560 S.F.) 13 10 8 4 14 +354.0 4 7 F.F.E=350.0PROPOSED SWALE3:13:1EXISTING BERM "AIRPORT APPROACH ZONE"50' REAR YARD S E T B A C K35' SIDE YARD SETBACK35' SIDE YARD SETBACK50' F R O N T Y A R D S E T B A C K 5 8" CRF 10" 8" PINE 8" PINE 8" PINE 8" 10" 8" 8" 10" SNAG 10" PINE 16" WILLOW +345.4 +344.3 EX. S W AL E 363 362 3 6 1 360 3 6 0 3 5 9 3 5 9 359 3 5 9 3583 58 358358358 357357357357357 356356 356 356356356355355 355 35 5 3553543543543543543 5 4 35335 3 3 5 3 353353353 352352352352351 3513513513 5 0 3503503503 4 9 3493493493483483483483483473473473473463463 4 6346346 34534534534 5 34534434434434 4 344344344344343343 343 343343343343343343 342 342342 342342 3423423423423423423 4 1 341341EX. WOODS EX. WOODS EX. WOODS 5:13 +351.0 +351.0 +345.8 +346.0 +346.7 +351.5 +352.5 +352.0 +351.0 +350.5 +350.0 +349.5 +344.2 +344.2 +348.5 +349.7 +349.7 352 350 348 346 3 4 8 348 348 348 346346348354 370 360 360 362 362 374 370 368 366 364 362 374 372 368 364 358 356 354 352 350 348A P P R O X . L O C A T I O N E X . S W A L E + + + + + + + + + + + 347.0 347.0 347.0 349.0 349.0 349.0 349.0 349.0 349.0 349.0 349.0 +348.4 356 358362 364 366 358356354352350348346346344348348346348 347 346 348 SN O W S T O R A G E SNOW STORAGESNOWSTORAGESNOW STORAG E M E A D O W L A N D D R I V E MICRO POOL STORMWATER POND FILL AREA TO EXTEND PLATEAU AREA EXISTING PLATEAU AREA 374 372 366 364 368 366 36 4 362 35 0 3463 4 8 35 4 364 366 360362 356 368 370 35 2 SNOW STORAGE 30" HDPE344 4:1344+345.8 340 344345348348 344344347346NEW DMH#1 OUTLET STRUCTURE RIM=343.5 INV.IN=339.8 (30" HDPE) S INV. IN=337.3(12" HDPE) SW INV.OUT =339.7 (30" HDPE) N ST ST D NEW DMH#2 RIM=344.2 INV.IN=340.3 (30" HDPE) W INV.OUT =340.2 (30" HDPE) SE(2) 30" HDPE 30" HDPE INV.OUT=340.0 INV.=340.0 EX. CB#2 RIM=342.8' INV.IN=338.9± (24" S) INV.IN=339.1 (4" NW) INV.OUT=338.6± (24" N) (SUMP FROZEN) INV.IN=338.8 (30" HDPE) S REMOVE EX. 24" HDPE EXTENSION (2) 30" HDPE INV.=342.2 F.E.S. S = 0 . 0 5 3 4 8 3 4 6 34 6 34 8 34 4 3 4 4 DRY POND345345344342344346342 340342344 342340342 EMERGENCY OVERFLOW BROAD CRESTED WEIR ELEV.=343.7 340+“ 12" PERF. HDPE 12" PERF. HDPE UNDERDRAIN +346.4 3483503523543563588' PROPOSED 5' WIDE SIDEWALK TEMPORARY BENCHMARK NORTH TOP FLANGE BOLT ELEV.=344.4 PROPOSED 4' HIGH FENCE PER DETAIL THIS SHEET CURBING AT ISLANDS (TYP.) STORMWATER NOTE: ·COORDINATE FINAL INVERT AND GRADING REQUIREMENTS WITH ENGINEER PRIOR TO CONSTRUCTION. ·VERIFY COVER REQUIREMENTS OF ALL PIPES PRIOR TO CONSTRUCTION. (2) 3 0 " H D P E ST ST 6'-0" O.C. POSTS CONCRETE AS NEEDED FINISHED ELEVATION 1x6 RED CEDAR INSTALLED WITH 12" GAP USE 12' LENGTH BOARDS AND STAGGER JOINTS (TYP.) 4x4 P.T. POSTS NOTES: ·'GOOD' SIDE FENCING OPPOSITE BOOSKA ·STAINLESS STEEL ATTACHMENT AS NEEDED ·FINISHED WITH PENETRATING OIL FINISH “LEGEND A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com G ST S T W UE PROPOSED CONTOUR100 PROPOSED CURB PROPOSED PAVEMENT PROPOSED SWALE PROPOSED UNDERGROUND ELECTRIC PROPOSED GAS PROPOSED STORM PROPOSED GRAVITY SEWER PROPOSED TELEPHONE PROPOSED WATER D PROPOSED STORM MANHOLE PROPOSED CATCH BASIN PROPOSED HYDRANT PROPOSED SHUT OFF PROPOSED SETBACK LINE PROPOSED PROPERTY LINE DSM DSM MAB 1" = 40' 18213 C2.2 03/21/2019 LOCATION MAP 1" = 2000' SITE GRADING AND DRAINAGE PLAN PROJECT LOCATION SOUTH BURLINGTON REALTY CORP. WILLISTON, VERMONT 116 89 1.UTILITIES SHOWN DO NOT PURPORT TO CONSTITUTE OR REPRESENT ALL UTILITIES LOCATED UPON OR ADJACENT TO THE SURVEYED PREMISES. EXISTING UTILITY LOCATIONS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL UTILITY CONFLICTS. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. THE CONTRACTOR SHALL CONTACT DIG SAFE (888-344-7233) PRIOR TO ANY CONSTRUCTION. 2.ALL EXISTING UTILITIES NOT INCORPORATED INTO THE FINAL DESIGN SHALL BE REMOVED OR ABANDONED AS INDICATED ON THE PLANS OR DIRECTED BY THE ENGINEER. 3.THE CONTRACTOR SHALL MAINTAIN AS-BUILT PLANS (WITH TIES) FOR ALL UNDERGROUND UTILITIES. THOSE PLANS SHALL BE SUBMITTED TO THE OWNER AT THE COMPLETION OF THE PROJECT. 4.THE CONTRACTOR SHALL REPAIR/RESTORE ALL DISTURBED AREAS (ON OR OFF THE SITE) AS A DIRECT OR INDIRECT RESULT OF THE CONSTRUCTION. 5.ALL GRASSED AREAS SHALL BE MAINTAINED UNTIL FULL VEGETATION IS ESTABLISHED. 6.MAINTAIN ALL TREES OUTSIDE OF CONSTRUCTION LIMITS. 7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARY FOR COMPLETE AND OPERABLE FACILITIES AND UTILITIES. 8.THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL ITEMS AND MATERIALS INCORPORATED INTO THE SITE WORK. WORK SHALL NOT BEGIN ON ANY ITEM UNTIL SHOP DRAWING APPROVAL IS GRANTED. 9.IN ADDITION TO THE REQUIREMENTS SET IN THESE PLANS AND SPECIFICATIONS, THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL PERMIT CONDITIONS AND ANY LOCAL PUBLIC WORKS STANDARDS. 10.THE TOLERANCE FOR FINISH GRADES FOR ALL PAVEMENT, WALKWAYS AND LAWN AREAS SHALL BE 0.1 FEET. 11.ANY DEWATERING NECESSARY FOR THE COMPLETION OF THE SITEWORK SHALL BE CONSIDERED AS PART OF THE CONTRACT AND SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 12.THE CONTRACTOR SHALL COORDINATE ALL WORK WITHIN TOWN ROAD R.O.W. WITH TOWN AUTHORITIES. 13.THE CONTRACTOR SHALL INSTALL THE ELECTRICAL, CABLE AND TELEPHONE SERVICES IN ACCORDANCE WITH THE UTILITY COMPANIES REQUIREMENTS. 14.EXISTING PAVEMENT AND TREE STUMPS TO BE REMOVED SHALL BE DISPOSED OF AT AN APPROVED OFF-SITE LOCATION. ALL PAVEMENT CUTS SHALL BE MADE WITH A PAVEMENT SAW. 15.IF THERE ARE ANY CONFLICTS OR INCONSISTENCIES WITH THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR VERIFICATION BEFORE WORK CONTINUES ON THE ITEM IN QUESTION. 16.PROPERTY LINE INFORMATION IS APPROXIMATE AND BASED ON EXISTING TAX MAP INFORMATION. THIS PLAN IS NOT A BOUNDARY SURVEY AND IS NOT INTENDED TO BE USED AS ONE. 17.IF THE BUILDING IS TO BE SPRINKLERED, BACKFLOW PREVENTION SHALL BE PROVIDED IN ACCORDANCE WITH AWWA M14. THE SITE CONTRACTOR SHALL CONSTRUCT THE WATER LINE TO TWO FEET ABOVE THE FINISHED FLOOR. SEE MECHANICAL PLANS FOR RISER DETAIL. 18.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING TESTING AND INSPECTION SERVICES INDICATED IN THE CONTRACT DOCUMENTS, TYPICAL FOR CONCRETE AND SOIL TESTING. 19.THE CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT AND FIELD ENGINEERING REQUIRED FOR COMPLETION OF THE PROJECT. CIVIL ENGINEERING ASSOCIATES WILL PROVIDE AN AUTOCAD FILE WHERE APPLICABLE. 20.THE OWNER SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ANY AND ALL SAFETY FENCES OR RAILS ABOVE EXISTING AND PROPOSED WALLS. THE OWNER SHALL VERIFY LOCAL, STATE AND INSURANCE REQUIREMENT GUIDELINES FOR THE INSTALLATION AND VERIFY ANY AND ALL PERMITTING REQUIREMENTS. GENERAL NOTES PROPOSED LIGHT POLE BOOSKA COMMERCIAL LLC 410 MEADOWLAND DRIVE SOUTH BURLINGTON VERMONT 05/01/19 DSM LOCAL FINAL SUBMITTAL REVISED 05/07/19 DSM STORMWATER LAYOUT REVISION 05/31/19 DSM ADDED FENCE AT RETAINING WALL N.T.S. FENCE DETAIL 06/03/19 DSM REVISIONS PER CITY COMMENTS 06/13/19 DSM STORM REVISIONS PER CITY COMMENTS P:\AutoCADD Projects\2018\18213\1-CADD Files-\dwg\18213 - Site.dwg, 6/14/2019 1:44:51 PM, mburke