HomeMy WebLinkAboutSP-97-0000 - Decision - 0120 Kimball AvenueFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Rick Poston to construct a 2- story 20,000 square foot building consisting of 15,000 square feet on indoor recreation use and 5,000 square feet of office use, 120 Kimball Avenue. On the 28th day of January, 1997, the South Burlington Planning Commission approved the request of Rick Poston for site plan review under Section 26.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of constructing a 2-story 20,000 square foot building consisting of 15,000 square feet of indoor recreation use and 5,000 square feet of office use. The ZBA on 1/13/97 granted the applicant a conditional use permit for the multiple use. 2. This property located at 120 Kimball Avenue lies within the IC District. It is bounded on the north by a single family residence, on the east by Shunpike Road, on the south by Kimball Avenue, and on the west by an undeveloped lot. 3. Access/circulation: Access is proposed to be provided by a 24 foot curb cut on Shunpike Road and a 24 foot curb cut on Kimball Avenue. Staff recommended that the Kimball Avenue access be moved further to the west away from the intersection. Section 26.103(a) of the zoning regulations states that "unless specifically approved by the Planning Commission there shall be a maximum of one driveway per lot accessing a public street." Staff did not see a problem with two (2) curb cuts since this is a corner lot. Circulation on the site is adequate. 4. Coverage/setbacks: Building coverage is 12% (maximum allowed is 30%). Overall coverage is 69% (maximum allowed is 70%). Front yard coverage along Shunpike Road is 16.9% and along Kimball Avenue is 27.6% (maximum allowed is 30%). Setback requirements are met. 5. Parking: A total of 140 spaces are required and 140 spaces are being provided including five (5) handicapped spaces and a bike rack. The space closest to Shunpike Road at the northeast corner of the building should be relocated to provide a 15 foot green strip interrupted only by the driveway (Section 25.107 of the zoning regulations). 6. Landscaping: The minimum landscaping requirement, based on building costs, is $13,500 which is being met. Plantings include: Burning Bush, Forsythia, Honey Locust, Juniper, Crabapple, Austrian Pine and Red Oak. 7. Traffic: ITE estimates the proposed uses to generate 84.9 vehicle trip ends (vte's) during the P.M. peak hour. The applicant was made aware that the road impact fee is approximately $18,000. 8. Sewer: The sewer allocation requested for this project is 2180 gpd. The applicant will be required to pay the per gallon fee prior to permit issuance. 9. Sidewalks: The applicant is proposing, at staff's recommendation, sidewalks along the property's frontage with Kimball Avenue and Shunpike Road. The plan should be revised to show the two (2) sidewalks connected at the intersection. 10. Lighting: Exterior lighting will consist of the following: --- four (4) 250 watt metal halide lamps with downcasting shielded fixtures mounted on 15 foot poles. 11. Dumpster: A screened dumpster storage area is shown on the plan. The dumpster should be relocated further away from the adjoining residence. The trash should not be picked -up between the hours of 7:00 P.M. and 7:00 A.M. 12. Other: --- sheet SP2 should be revised to note that this project is in South Burlington not Williston. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Rick Poston to construct a 2-story 20,000 square foot building consisting of 15,000 square feet of indoor recreation use and 5,000 square feet of office use, 120 Kimball Avenue, as depicted on a two (2) page set of plans, page one (1) entitled, "All American Fitness Center Kimball Ave. & Shunpike Rd. South Burlington, VT," prepared by Trudell Consulting Engineers, Inc. dated 11/25/96, last revised 1/9/97, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. Pa 2. For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the proposed uses will generate 84.9 vehicle trip ends during the P.M. peak hour. 3. The Planning Commission approves a sewer allocation of 2180 gpd. The applicant shall pay the per gallon fee prior to permit issuance. 4. The applicant shall post a $13,500 landscape bond prior to issuance of a zoning permit. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good chance of surviving. 5. The plan shall be revised to show the changes below and shall require approval of the City Planner. Three (3) copies of the approved revised plans shall be submitted to the City Planner prior to permit issuance. a) The site plan shall be revised to relocate the parking space closest to Shunpike Road at the northeast corner of the building to provide a continuous green strip 15 feet in width, traversed only by the driveway, between the street r.o.w. line and the balance of the lot. b) The site plan shall be revised to show the two (2) proposed sidewalks connected at the intersection. This shall require approval by the Public Works Director. c) The site plan shall be revised to show the Kimball Avenue access moved further to the west away from the intersection. d) The site plan shall be revised to show the dumpster screened on the three (3) sides which are visible from the street and the adjoining properties. e) The site plan sheet SP2 shall be revised to note that this project is in South Burlington not Williston. f) The dumpster shall be relocated to a portion of the site further away from the adjoining residences. 6. All new exterior lighting shall consists of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. 7. Pursuant to Section 26.103(a) of the zoning regulations, the Planning Commission approves two (2) access drives, one (1) on Shunpike Road and one (1) on Kimball Avenue. 3 8. There shall be no trash pick-up between the hours of 7:00 P.M. and 7:00 A.M. 9. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 10. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use of the new addition. 11. Any changes to the site plan shall require approval by the South Burlington Planning Commission. 4/,tChairman or Clerk South Burlington Planning Commission „/ Date 4