HomeMy WebLinkAboutAgenda 06C SD-19-10 Subdivision Plat (Future) 02-20-19SOUTH BURLINGTONSCHOOL DISTRICTN/FVOL. 39, PG. 661DOUGLAS HUDSONN/FVOL. 1017, PG. 181MARY STREETVOL. 78, PAGE 235THIRTY THREE MARYSTREET LLCN/FVOL. 750, PG. 585CENTURY PARTNERS, LPN/FVOL. 360, PG. 410POON TRUST, LLC.N/FVOL. 780, PG. 728DORSET SQUAREASSOCIATESN/FVOL. 194, PG. 77VOL. 194, PG. 80VOL. 194, PG. 82VOL. 194, PG 90VOL. 266, PG. 120SOUTH BURLINGTON CITYCENTER, LLC. N/FVOL. 853, PG. 222MARKET STREETVOL. 687, PAGE 143( FORMERLY KNOWN ASCORPORATE WAY)CITY OF SOUTHBURLINGTONN/FVOL. 697, PG. 402MARKET STREETVOL. 288, PAGE 1VOL. 288, PAGE 4
EXISTING EASEMENT TO CITY OFSOUTH BURLINGTON (SEE NOTE 9)CMF0.3' AG1/2" IPF1.2' AG241.48'S73°25'30"ES73°23'45"EN46°25'12"WEXISTING EDGE OF PAVEMENTOF SCHOOL DRIVEWAY80'TYPICAL 10' WIDE UTILITY EASEMENT TOGREEN MOUNTAIN POWER CORPORATION,AS RECORDED IN VOL. 207, PAGE 51010'60'LOT AL = 85.08'R = 340.00'20.89'N 29°14'34"E72.75'N 13°31'32"EIPSIPSCMSCMS39.37'S73°33'10"E11.77'S73°33'10"E20.76'S73°23'45"ELOT DLOT C64' WIDE RIGHT OF WAY64'N43°36'05"E 433.67'
N43°36'05"E 466.41'CMSCMS23.98'GARDEN STREET64.00LOT B4FUTURE PUBLIC STREET S73°23'45"E67.39'93.00'60.00'4.47'S73°23'45"E60'LOT B2LOT B6LOT B9T-4 TRANSECT ZONET-5 TRANSECT ZONE48'LOT B10LOT B7LOT B8LOT B5LOT B3LOT B11LOT B12LOT B1MARY STREETConsulting Engineers, Inc.LAMOUREUX & DICKINSON14 Morse DriveEssex Junction, VT 05452Tel: 802-878-4450THESE PLANS WITH LATEST REVISIONS SHOULD ONLY BE USED FORTHE PURPOSE SHOWN BELOW:REVISIONSFINAL LOCAL REVIEWPRELIMINARYSKETCH/CONCEPTSOUTH BURLINGTONCITY CENTER, LLCLANDS OFMARKET STREET SOUTH BURLINGTON, VT15143KMRABRABRDLH/DJG02-20-19sht. no.scaledatecheckeddrawndesignsurveyproject no.RECORD DRAWINGCONSTRUCTIONACT 250 REVIEWdescriptiondatebyPL-1AS NOTEDMAG N E TICPROJECTSITE RICK MARCOTTECENTRAL SCHOOLWILLISTON ROADWHITE STREETHINESBURG ROADLOCATION PLANNTS N/F LEGENDTO THE BEST OF MY KNOWLEDGE, THIS PLAT IS BASEDON INFORMATION ABSTRACTED FROM PERTINENTDEEDS AND/OR OTHER OFFICIAL RECORDS, ANDMARKERS EVIDENT ON THE PROPERTY, ANDCONFORMS WITH THE REQUIREMENTS OF 27 VSA§1403. DATED THIS ___ DAY OF _____, 2019__________________________PROJECT BOUNDARYABUTTING PROPERTY LINEIRON PIPE FOUNDIRON PIPE SETCONCRETE MONUMENT FOUNDNOW OR FORMERLYABOVE GRADEBELOW GRADELANDOWNERSOUTH BURLINGTON CITY CENTER, LLCC/O SOUTH BURLINGTON REALTY CO.P.O. BOX 2204SOUTH BURLINGTON, VT 05407DEED REFERENCE:VOL. 853, PAGE 222TAX MAP PARCEL:0450-00002IPFIPSNOTES:1. THIS PLAT WAS COMPILED FROM FIELD SURVEYS AND RECORD RESEARCH INCLUDINGTHE USE OF THE FOLLOWING PLATS:A."CORPORATE CIRCLE, SOUTH BURLINGTON, VERMONT, SOUTH BURLINGTON REALTYCORP., PROPERTY PLAT." BY WEBSTER-MARTIN, INC., DATED SEPT. 1981, LAST REVISED5-27-92, AS RECORDED IN SLIDE 248 OF THE CITY OF SOUTH BURLINGTON LANDRECORDS.B. "ALTA/ACSM LAND TITLE SURVEY, CENTURY PARTNERS, 100 DORSET STREET, SOUTHBURLINGTON, VERMONT." BY TRUDELL CONSULTING ENGINEERS, DATED DECEMBER 9,1997, LAST REVISED 11/26/07, AS RECORDED IN SLIDE 509 OF THE CITY OF SOUTHBURLINGTON LAND RECORDS.C. "SOUTH BURLINGTON SCHOOL DISTRICT, SOUTH BURLINGTON CENTRAL SCHOOL, 10MARKET STREET, SOUTH BURLINGTON, VERMONT. " BY CIVIL ENGINEERINGASSOCIATES, INC., DATED MAY 19, 2004, LAST REVISED 12-17-04 AS RECORDED IN SLIDE447 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.D. "SUBDIVISION ASND BOUNDARY LINE ADJUSTMENT PLAT, LANDS OF SOUTHBURLINGTON CITY CENTER, LLC", SHEET PL-1, BY LAMOUREUX & DICKINSONCONSULTING ENGINEERS, INC. DATED 10-14-16, LAST REVISED 04-04-18 AS RECORDED INSLIDE 625.1 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.E. "SUBDIVISION ASND BOUNDARY LINE ADJUSTMENT PLAT, LANDS OF SOUTHBURLINGTON CITY CENTER, LLC", SHEET PL-2, BY LAMOUREUX & DICKINSONCONSULTING ENGINEERS, INC. DATED 01-25-18, LAST REVISED 06-11-18 AS RECORDED INSLIDE 625.2 OF THE CITY OF SOUTH BURLINGTON LAND RECORDS.2. BEARINGS SHOWN ON THIS SURVEY ARE BASED ON GPS OBSERVATIONS RECORDED INOCTOBER, 2016,3. THIS PROPERTY MAY BE SUBJECT TO OTHER EASEMENTS AND/OR RIGHTS-OF-WAY.4. A CLOSED TRAVERSE SURVEY WAS COMPLETED IN OCTOBER, 2016. THE METHODS ANDTHE RESULTING ERROR OF CLOSURE MEET OR EXCEED THE MINIMUM PRECISIONREQUIREMENTS FOR URBAN SURVEYS.AGBGSUBDIVISION PLAT(FUTURE)CMFAPPROVED BY RESOLUTION OF THE DEVELOPMENT REVIEWBOARD OF THE CITY OF SOUTH BURLINGTON,VERMONT, ON THE____ DAY OF _______________, 2019SUBJECT TO THE REQUIREMENTS AND CONDITIONS OF SAIDRESOLUTION. SIGNED THIS ____ DAY OF ___________ 2019 BY(CLERK OR CHAIRMAN)CITY OF SOUTH BURLINGTON, VT. __________________ , 2019ATTEST: ______________________________ CITY CLERK__ M., AND RECORDED IN SLIDE# ________RECEIVED FOR RECORD AT________ O'CLOCKCITY CLERK'S OFFICECONCRETE MONUMENT TO BE SETCMSCALCULATED POINT NO MARKER SETMARY STREETGRAPHIC SCALE60060120240(IN FEET)1" = 60 ft.5. MONUMENTATION FOUND IS AS NOTED ON PLAN. IRON PIPES SET ARE 1" DIAMETERWITH A PLASTIC CAP.6. THE RIGHT-OF-WAY WIDTH FOR MARKET STREET OF 80 FEET IS BASED ON A DEEDRECORDED IN VOL. 687, PAGE 143.7. THE EXISTING UTILITY EASEMENT TO GREEN MOUNTAIN POWER CORPORATION ALONGTHE NORTHERLY SIDE OF MARKET STREET IS PROPOSED TO BE RELOCATED TO WITHINTHE MARKET STREET RIGHT OF WAY ALONG THE FRONTAGE OF LOT A.8. THERE ARE EXISTING STORMWATER PIPES, ORIGINATING ON THE SOUTH BURLINGTONSCHOOL DISTRICT PROPERTY, CROSSING LOT B1. NO DRAINAGE RIGHTS WERE FOUNDIN THE CITY LAND RECORDS.9. LOT B1 IS SUBJECT TO A 30' WIDE MINIMUM WIDTH EASEMENT (SHOWN IN THEAPPROXIMATE LOCATION) TO THE CITY OF SOUTH BURLINGTON FOR PEDESTRIAN ANDVEHICULAR ACCESS FROM CORPORATE WAY (AKA MARKET STREET) TO THE CENTRALSCHOOL AS SHOWN ON THE PLAN REFERENCED IN NOTE 1A ABOVE AND ASREFERENCED IN PARAGRAPH 5 OF A DEVELOPMENT AGREEMENT BETWEEN SOUTHBURLINGTON REALTY COMPANY AND THE CITY OF SOUTH BURLINGTON, AS RECORDEDIN VOL. 281, PGS. 550-555.10.LOT B1 IS SUBJECT TO ACCESS AND STORMWATER EASEMENTS TO THESNYDER-BRAVERMAN DEVELOPMENT COMPANY, LLC AS RECORDED IN VOL. 1395, PGS.133-135