Loading...
HomeMy WebLinkAboutLandscaping Budget Estimate REVISED 10-14-19 T.J. Boyle Associates | 301 College Street • Burlington VT 05401 | www.tjboyle.com DORSET MEADOWS - LANDSCAPE BUDGET Total Building Construction or Building Improvement Costs Landscape Percent of Total Construction / Improvement Cost Cost of Proposed Project $0 - $250,000 3% $7,500 Next $250,000 2% $5,000 Additional over $500,000 1% $138,387 Total Minimum Landscaping* $150,887 *Project cost used to calculate the landscape budget is $14,058,750, which includes construction of 24 duplexes ($220,00 per unit), 35 townhomes ($150,000 per unit), and 6,925 L.F. of roadway ($550/L.F). OPINION OF POTENTIAL LANDSCAPING COST Total Buildings Cost per Building Total Potential Cost Typical Duplex Foundation Planting 12 $1,010 $12,120 Typical 5 Unit Townhouse Foundation Planting 4 $1,900 $7,600 Typical 4 Unit Townhouse Foundation Planting 3 $1,600 $4,800 Typical 3 Unit Townhouse Foundation Planting 1 $1,300 $1,300 Townhome Surrounding Area Plantings - - $82,000 Duplex Surrounding Area Plantings - - $12,970 Phase 1 Greenspace Areas and Stormwater Pond Buffer Areas - - $50,000 Phase 2 Greenspace Areas and Stormwater Pond Buffer Areas - - $18,000 Phase 3 Greenspace Areas and Stormwater Pond Buffer Areas - - $29,000 Phase 4 Greenspace Areas and Stormwater Pond Buffer Areas - - $25,000 Phase xx Greenspace Areas and Stormwater Pond Buffer Areas - - $14,000 Wetland Buffer Planting Areas (Total Site) - - $37,200 Total: $293,990 ADDITIONAL POTENTIAL LANDSCAPING COSTS Street Trees (Total Site) $233,500 Small Typical Single Family Lot (per unit) $2,100 Large Typical Single Family Lot (per unit) $2,700