HomeMy WebLinkAboutBATCH - Supplemental - 0275 Kennedy DriveCITY OF SOUTH BI.JRLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 October 21, 2004 Kris Francis Merchants Bank 275 Kennedy Drive South Burlington, VT 05403 Re: Minutes — 275 Kennedy Drive Dear Mr. Francis: Enclosed, please find a copy of the minutes from the October 5, 2004 Development Review Board meeting. If you have any questions, feel free to contact me. Sincerely, Betsy McDonough Administrative Assistant Encl. 1 DEVELOPMENT REVIEW BOARD 5 OCTOBER 2004 Arrowwood was then hired to do an ecological study to get a grip on natural resources in the SEQ. They identified key natural "communities" which Ms. Hinds showed on the map. The Planning Commission is taking all the different overlays and is focusing on appropriate mapping techniques and appropriate densities. They are also looking at design standards with a major focus on PRD and landscape standards. Ms. Hinds said she didn't think there will be a change in base density in the SEQ, but she thought there would be a change in density in major receiving areas. She invited the DRB to attend a Planning Commission meeting on Tuesday which will focus on the SEQ. Mr. Kupferman said one thing that is always at the DRB's tension level is the issue of east -west roadways vs. neighborhood connections. He said it would be beneficial to know how that thinking may change. Ms. Hinds said neighborhood connections are now required. She said it is essential for a city so it doesn't turn into a bunch of isolated pods. Mr. Kupferman said the Board would like stronger language about that concept to work with. Ms. Hinds agreed and said that will be a major thrust of the upcoming Comprehensive Plan update. Mr. Kupferman also raised the issue of public notice. Ms. Hinds said they are struggling with that issue. One question is lead time. The longer the notice period, the more likely people will forget. Methods of notice are also at issue. 4 5. Public Hearing: Application #CU-04-09 of Merchant's Bank for conditional use approval under Section 14.10 Conditional Use Review of the South Burlington Land Development Regulations. Request is for permission to exceed the 35-foot height limitation by 9.5 feet by installing two energy recovery ventilators on the roof, 275 Kennedy Drive: Mr. Francis explained that they need more air pressure in the building. The best solution is to put 2 units on the roof. They will be in the middle of the building so they won't be visible from the street. The building next door has similar units and are about the same height. Mr. Belair said there is a minimal landscaping requirement. They don't propose any. Staff suggests giving them a credit. They will have to bond to be sure they landscaping they are being given credit for survives. Ms. Quimby moved to approve Application #CU-04-09 of Merchant's Bank subject to the stipulations in the draft motion. Mr. Farley seconded. Motion passed unanimously. 6. Continued Public Hearing: Final Plat Application #SD-04-50 of University Mall Realty Trust to amend approval #SD-03-70 to expand the shopping center by 1884 sq. ft. GLA at 155 Dorset St. The amendment consists of -2- CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 October 6, 2004 Kris Francis Merchants Bank 275 Kennedy Drive South Burlington, VT 05403 Re: Conditional Use Application #CU-04-09 Dear Mr. Francis: Enclosed, please find a copy of the Findings of Fact and Decision of the above referenced project approved by the South Burlington Development Review Board on 10/5/04 (effective 10/5/04). Please note the conditions of approval, including that the applicant shall obtain a zoning permit within six (6) months of this approval or this approval is null and void. In addition, the applicant shall obtain a Certificate of Occupancy prior to use of the energy recovery ventilators. If you have any questions, please contact me. Sincerely, Betsy M ough Administrative Assistant Encl. Certified Mail- Return Receipt Requested - #7003 3110 0001 3598 4582 CITY OF SOUTH BURLINGTON DEPARTMENT OF PIL ANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 October 1, 2004 Kris Francis Merchants Bank 275 Kennedy Drive South Burlington, VT 05403 Re: 275 Kennedy Drive Dear Mr. Francis: Enclosed is the agenda for next Tuesday's Development Review Board meeting and staff comments to the Board. Please be sure that someone is at the meeting on Tuesday, October 5, 2004 at 7.00 p.m. at the City Hall Conference Room, 575 Dorset Street. If you have any questions, please give us a call. Sincerely, L Betsy McDonough Administrative Assistant Encl. 11 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING DEVELOPMENT REVIEW BOARD Report preparation date: September 30, 2004 \drbVnisc\merchants_bank\conditional_use.doc Application received: August 27, 2004 CONDITIONAL USE APPLICATION #CU-04-09 275 KENNEDY DRIVE Agenda #5 Meeting Date: October 5, 2004 Owners/Applicants Property Information Merchants bank Tax Parcel 0970-00275-C 275 Kennedy Drive Commercial 1 — Limited Retail (C1-LR) Zoning South Burlinqton, VT 05403 District Mechants Bank, hereafter referred to as the applicant, is seeking conditional use approval under Section 14.10 Conditional Use Review of the South Burlington Land Development Regulations. Request is for permission to exceed the 35 foot height limitation by 9.5 feet by installing two (2) energy recovery ventilators on the roof, 275 Kennedy Drive. Associate Planner Brian Robertson and Administrative Officer Ray Belair, referred to herein as Staff, have reviewed the plans submitted on August 27, 2004 and have the following comments. CONDITIONAL USE CRITERIA Pursuant to Section 14.10(E) of the Land Development Regulations the proposed conditional use shall meet the following standards: 1. The proposed use, in its location and operation, shall be consistent with the planned character of the area as defined by the City of South Burlington Comprehensive Plan. The proposed modifications are not in conflict with the planned character of the area, as defined by the Comprehensive Plan. 2. The proposed use shall conform to the stated purpose of the district in which the proposed use is located. According to Section 5.04(A) of the Land Development Regulations, the Commercial 1 with Limited Retail C 1-LR District is formed in order to encourage the location of general retail at specific intersections in the city, to serve nearby residential areas. These commercial areas are intended to serve the convenience shopping needs of local residents and employees. Their location and design are intended to make them accessible both by motorized vehicle and by foot, thereby somewhat reducing traffic volume in the immediate vicinity. In these areas, businesses offering goods and services will be limited in allowed floor area and use. Such regulations generally follow existing Commercial 1 District regulations. The addition of the two (2) proposed energy recovery ventilators is not in conflict with the stated purpose of the C1-LR Zoning District. 3. The Development Review Board must find that the proposed uses will not adversely affect the following: (a) The capacity of existing or planned municipal or educational facilities. The proposed modification will not adversely affect municipal services. K, I I (b) The essential character of the neighborhood or district in which the property is located, nor ability to develop adjacent property for appropriate uses. Staff does not feel that the proposed modification will have an adverse affect on the character of the neighborhood or zoning district that this property falls within. The area is comprised predominantly of commercial uses and the addition of the proposed rooftop apparatuses will not impact its character. (c) Traffic on roads and highways in the vicinity. The proposed modifications will not affect traffic in the vicinity. (d) Bylaws in effect The proposed modifications are in keeping with applicable regulations. (e) Utilization of renewable energy resources. The proposed modifications will not affect renewable energy resources. (t) General public health and welfare. The proposed modifications will not have an adverse affect on general public welfare. Pursuant to Section 3.13(F) of the Land Development Regulations, the proposed conditional use shall meet the following standards: The Development Review Board, in granting conditional use approval, may impose conditions of the following: 1. Size and construction of structures, quantities of materials, storage locations, handling of materials, and hours of operations. Staff does not feel it is necessary to impose any of these conditions to the proposed project. Z Warning systems, fire controls, and other safeguards. Staff does not feel it is necessary to impose any of these conditions to the proposed project. 3. Provision for continuous monitoring and reporting. Staff does not feel it is necessary to impose any of these conditions to the proposed project. 4. Other restrictions as may be necessary to protect public health and safety. Staff does not feel it is necessary to impose any of these conditions to the proposed 3 project. SITE PLAN REVIEW STANDARDS Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations the proposed conditional use shall meet the following standards: (a) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement; and adequate parking areas. The proposed project has been planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement. (b) Parking shall be located to the rear or sides of buildings to the greatest extent practicable. The proposed modifications only involve rooftop apparatuses, so this criterion is not applicable. (c) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. The allowable height for a flat -roofed building is 35' and the top of the proposed rooftop apparatuses will be 44.5'. Thus, the proposed project will exceed the height limitations for the subject building by 9.5'. Pursuant to Section 3.07(G) of the Land Development Regulations, rooftop apparatuses may exceed the standard height limitations if approved as a conditional use subject to Article 14 of the Land Development Regulations. The conditional use criteria are discussed above in this document. Staff feels that the proposed height waiver is acceptable. (dJ Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. 1. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground. (e) The DRS shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles Staff does not feel that any additional architectural characteristics, landscaping, buffers, screens, or visual interruptions are necessary for the proposed project. 4 (t) Proposed structures shall be related harmoniously to themselves, the terrain, and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. Staff feels that the proposed addition will relate harmoniously to existing buildings in the area. (g) The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial of collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. Staff does not feel it is necessary to require any additional access easements as part of the proposed project. (h) Electric, telephone and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground. (7) All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). A dumpster is not part of the proposed project. Q) Landscaping and Screening Requirements Pursuant to Table 13-9 of the Land Development Regulations, the proposed project will require a minimum of $1,950 of landscaping. The applicant is not proposing any additional landscaping as part of this project. RECOMMENDATION Staff recommends that the Development Review Board approve Conditional Use application #CU-04-09. Respec submitted, Brian Robertson, sociate Planner Copy to: Kris Francis, applicant 5 1 0 110-IE /_e9 KENNEDY DRIVE GRAPHIC SCALE IN rerr l 1 I-h - M IL I 00 GRAVEL ISLAND AD( t ` t YYITH MONEY iOCUST TREES t t t � tt ttl t t ErEV . 95.D7� i t tttt Ll A V LEGEND — - - PROPERTY LINE 80 EXISTING GROUND CONTOUR —..—" STREAM IRON PIPE FOUND EDGE OF PAVEMENT ' - - - STEEL GUARD RAIL QEXISTING TREE Q EXISTING LIGHT NOTES 1. THE PROPERTY LINES SHOWN ON THIS PLAN ARE BASED ON A PLAN ENTITLED FINAL PLAN. BUSINESS PARK NORTH, SOUTH BURLINGTON. VERMONV DATED AUGUST. 1978. BY BY CIVIL ENGINEERING ASSOCIATES. i. ELEVATIONS SHOMM ON 714S PLAN ARE BASED ON THE INVERTS OF THE 5' DIA. CMP TO THE NORTH Or THE PROPERTY AS SHOWN ON A PLAN ENTITLED 'OVRIEN BROTHERS AGENCY, 1855 WILLISTON ROAD. SOUTH BURLINGTON VERMONT, LANDSCAPE PLAN.- DATED MARCH. 1991. BY FI TZPATRICK-LLEWELLYN. INC. M-Thl Tf?-l- I 4- P—.& 7 A V- -T W E L -E: V A -r I-jn--W F6. :5 0 L) -T 14 E L E: V A 0 KI 0 e-A L E -MeTAL TK.IAA T m I C-Y- U TT ,r 4 B "A 5 T E:'L E- V A- T 1 0 W CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING DEVELOPMENT REVIEW BOARD Report preparation date: September 30, 2004 \drb\misc\merchants_bank\conditional_use.doc Application received: August 27, 2004 CONDITIONAL USE APPLICATION #CU-04-09 275 KENNEDY DRIVE Agenda #5 Meeting Date: October 5, 2004 Owners✓Aaplicants Property Information Merchants bank Tax Parcel 0970-00275-C 275 Kennedy Drive Commercial 1 — Limited Retail (C1-LR) Zoning South Burlington, VT 05403 District ',•' w.'' 6r „r I P �' ! ' pry ,•cy„ VE��iA. 1 � rlY i Mechants Bank, hereafter referred to as the applicant, is seeking conditional use approval under Section 14.10 Conditional Use Review of the South Burlington Land Development Regulations. Request is for permission to exceed the 35 foot height limitation by 9.5 feet by installing two (2) energy recovery ventilators on the roof, 275 Kennedy Drive. Associate Planner Brian Robertson and Administrative Officer Ray Belair, referred to herein as Staff, have reviewed the plans submitted on August 27, 2004 and have the following comments. CONDITIONAL USE CRITERIA Pursuant to Section 14.10(E) of the Land Development Regulations, the proposed conditional use shall meet the following standards: 1. The proposed use, in its location and operation, shall be consistent with the planned character of the area as defined by the City of South Burlington Comprehensive Plan. The proposed modifications are not in conflict with the planned character of the area, as defined by the Comprehensive Plan. 2. The proposed use shall conform to the stated purpose of the district in which the proposed use is located. According to Section 5.04(A) of the Land Development Regulations, the Commercial 1 with Limited Retail C 1-LR District is formed in order to encourage the location of general retail at specific intersections in the city, to serve nearby residential areas. These commercial areas are intended to serve the convenience shopping needs of local residents and employees. Their location and design are intended to make them accessible both by motorized vehicle and by foot, thereby somewhat reducing traffic volume in the immediate vicinity. In these areas, businesses offering goods and services will be limited in allowed floor area and use. Such regulations generally follow existing Commercial 1 District regulations. The addition of the two (2) proposed energy recovery ventilators is not in conflict with the stated purpose of the C1-LR Zoning District. 3. The Development Review Board must find that the proposed uses will not adversely affect the following: (a) The capacity of existing or planned municipal or educational facilities. The proposed modification will not adversely affect municipal services. 2 ri (b) The essential character of the neighborhood or district in which the property is located, nor ability to develop adjacent property for appropriate uses. Staff does not feel that the proposed modification will have an adverse affect on the character of the neighborhood or zoning district that this property falls within. The area is comprised predominantly of commercial uses and the addition of the proposed rooftop apparatuses will not impact its character. (c) Traffic on roads and highways in the vicinity. The proposed modifications will not affect traffic in the vicinity. (d) Bylaws in effect The proposed modifications are in keeping with applicable regulations. (e) Utilization of renewable energy resources The proposed modifications will not affect renewable energy resources. (t) General public health and welfare. The proposed modifications will not have an adverse affect on general public welfare. Pursuant to Section 3.13(F) of the Land Development Regulations, the proposed conditional use shall meet the following standards: The Development Review Board, in granting conditional use approval, may impose conditions of the following: 1. Size and construction of structures, quantities of materials, storage locations, handling of materials, and hours of operations. Staff does not feel it is necessary to impose any of these conditions to the proposed project. Z Warning systems, fire controls, and other safeguards. Staff does not feel it is necessary to impose any of these conditions to the proposed project. 3. Provision for continuous monitoring and reporting. Staff does not feel it is necessary to impose any of these conditions to the proposed project. 4. Other restrictions as may be necessary to protect public health and safety. Staff does not feel it is necessary to impose any of these conditions to the proposed 3 ( project. SITE PLAN REVIEW STANDARDS Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations, the proposed conditional use shall meet the following standards: (a) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movemen; and adequate parking areas The proposed project has been planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement. (b) Parking shall be located to the rear or sides of buildings to the greatest extent practicable. The proposed modifications only involve rooftop apparatuses, so this criterion is not applicable. (c) Without restricting the permissible limits of the applicable zoning dkstrkc� the height and scale of each building shall be compatible with its site and existing or adjoining buildings. The allowable height for a flat -roofed building is 35' and the top of the proposed rooftop apparatuses will be 44.5'. Thus, the proposed project will exceed the height limitations for the subject building by 9.5'. Pursuant to Section 3.07(G) of the Land Development Regulations, rooftop apparatuses may exceed the standard height limitations if approved as a conditional use subject to Article 14 of the Land Development Regulations. The conditional use criteria are discussed above in this document. Staff feels that the proposed height waiver is acceptable. (d) Newly installed utility services and service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. 1. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground. (e) The DRS shall encourage the use of a combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles Staff does not feel that any additional architectural characteristics, landscaping, buffers, screens, or visual interruptions are necessary for the proposed project Ell (f) Proposed structures shall be related harmoniously to themselves, the terrain, and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. Staff feels that the proposed addition will relate harmoniously to existing buildings in the area. () The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial of collector street; to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. Staff does not feel it is necessary to require any addifional access easements as part of the proposed project. (h) Electric, telephone and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground. (1) All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). A dumpster is not part of the proposed project. Q) Landscaping and Screening Requirements Pursuant to Table 13-9 of the Land Development Regulations, the proposed project will require a minimum of $1,950 of landscaping. The applicant is not proposing any additional landscaping as part of this project. RECOMMENDATION Staff recommends that the Development Review Board approve Conditional Use application #CU-04-09. RespeF"I submitted, � Brian Robertson; sociate Planner Copy to: Kris Francis, applicant 5 Permit Number C k -�- APPLICATION FOR THE DEVELOPMENT REVIEW BOARD All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development Review Board. I understand the presentation procedures required by State Law (Section 4468 of the Planning & Development Act). Also that hearings are held twice a month . That a legal advertisement must appear a minimum of fifteen (15) days prior to the hearing. I agree to pay a hearing fee which is to off -set the cost of hearing. Type of application check one: ( ) Appeal from decision of Administrator Officer (includes appeals from Notice of Violation) ( x) Request for a conditional use ( ) Request for a variance ( ) Other PROVISION OF ZONING ORDINANCE IN QUESTION (IF ANY) Merchants Bank 275 Kennedy Drive, 865-1995 fx 865-1912 WHAT ACTION OF THE ADMINISTRATIVE OFFICER ARE YOU APPEALING? 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) Merchants Bank 275 Kennedy Drive 865-1995 fx 865-1912 2) LOCATION OF LAST RECORDED DEED (Book and page #) Book 146 Page 308-11 3) APPLICANT (Name, mailing address, phone and fax #) samP 4) CONTACT PERSON (Name, mailing address, phone and fax #) Kris Francis 5) PROJECT STREET ADDRESS: 275 Kennedy Drive 6) TAX PARCEL ID # (can be obtained at Assessor's Office) 0970-00275 7) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use) Bank Operations Center & Bank Branch b) Proposed Uses On property (include description and size of each hew use and existing uses to remain) Same / Addition of 2 Energy Recovery Ventilators (Roof ton units) *Height Waiver* c) Total building square footage on property (proposed buildings and existing buildings to remain) 40.000 d) Height of building & number of floors (proposed buildings and existing buildings to remain, specify if basement and mezzanine) Avg height 39.5 feet 4 floors 1st floor has 3 sides below grade e) Number of residential units (if applicable, new units and existing units to remain) None f) Number of employees & company vehicles (existing and proposed, note office versus non -office employees) 137 employees 1 company vehicle g) Other (list any other information pertinent to this application not specifically requested above, please note if Overlay Districts are applicable): 8) LOT COVERAGE a) Building: Existing s % Proposed % b) Overall (building, parking, outside storage, etc) Existing 59 % Proposed % c) Front yard (along each street) Existing n/a % Proposed % (does not apply to residential uses) 77'�/ 9) COST ESTIMATES a) Building (including interior renovations): $ 65,000 b) Landscaping: $ -o- c) Other site improvements (please list with cost): -o- 10) ESTIMATED TRAFFIC a) Average daily traffic for entire property (in and out): b) A.M. Peak hour for entire property (in and out): c) P.M. Peak hour for entire property (In and out): 11) PEAK HOURS OF OPERATION: 12) PEAK DAYS OF OPERATION: 13) ESTIMATED PROJECT COMPLETION DATE: 12/30 14) LIST ABUTTERS ( List names and addresses of all abutting property owners on a separate sheet of paper). 3 l C I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. IGN=FPLICANT SIGNATURE OF PROPERTY OWNER Do not write below this line DATE OF SUBMISSION: �;�1-d REVIEW AUTHORITY: L'7 Development Review Board ❑ Director, Planning & Zoning I have reviewed this site plan application and find it to be: L2 Complete ElIncomplete W, J�A.� 9---- kt Planning & Zoning or Designee 4 List of Abutters: Daniel I & Leo I O'Brien P.O. Box 2184 S. Burlington, VT 05407 Munson Earth Moving Corp 85 Shunpike Rd Williston, VT 05495 Alan Palmer 5576 Dorset St Shelburne, VT 05482 00 �'o E ltuo.�t o n i 1124 loft O L 7L "., Ej ..: HE3X900RT (fyp.2) New Roof HI, J ORA& KENNEDY DRIVE ROOF Lidssicar DacKgrouno otters les- sons in guitar, theory and ear training. Individualized, step-by- step approach. I enjoy teaching all ages/styles/levels. Call Rick Belford at 864-7195. GUITAR INSTRUCTION: Relaxed yet disciplined arena. 20+ years experience. No -pretense environ- ment fosters technique and cre- ativity. Beginners welcome. Refs. avail. 802-877-3624. PRIVATE GUITAR INSTRUC- TION in Essex Jct. Beginner to advanced. Many styles; seven - string, electric, acoustic, bass. 872-8861. franky.andreas@ verizon.net. TABLA DRUMMING: Study the hand drumming of North India. Pvt. Lessons and classes. All ages. Tabla rental and repair. Burlington and Montpelier. Gabe Halberg, 802-229-9926, www.tabta-vermont.com. VIOLIN LESSONS with Tom Charpentier. For all ages and abilities. Experience the joy of the four strings of the violin vibrating in harmony under your chin, right from the first lesson. Impossible you say, call today. Let me know that you saw this ad and receive your first lesson free. For more information, call Tom 434-4449. ► legals CITY OF BURLINGTON ORDINANCE 8.0 Sponsor: (Councilors Carleton, Ellis: Ordinance Com.) First reading: 05/10/04 Referred to: Ordinance Committee Second reading: 09/07/04 Action: adopted Date: 09/07/04 Published: 09/15/04 Effective: 10/06/04 In the Year Two Thousand Four An Ordinance in Relation to Animals and Fowl Use of Non -domesticated Animals for Public Display Prohibited It is hereby Ordained by the :ity Council of the City of 3urlington, as follows: That :hapter 5, Animals and Fowl, of he Code of Ordinances of the Ity of Burlington be and hereby s amended by adding a new Sec. -6 thereto to read as follows: ec. 5-6 Use of Non -domesticated nimals for Public DisDlav rohibited. (a) Purpose. This ordi- ance is intended to assist in the revention of the mistreatment of :)n-domesticated animals used in ly public display, to reduce risk harm to the public from acd- mts and incidents involving ich animals. and to reduce the iblic health risk associated with seases and pathogens carried by ch animals. Definitions. "Jon -domesticated animals" defined as Felida(all wild is and hybrids thereof). @idae (all bears), Proboscideae L elephants). and Non -human mates and Prosimians. __ y yvuni,y play of Live non-d-m a e �jl�� n r a�nnt, received animals i or ` pY c V X`5than l'mi s of i ohibited. September 28, 2004. *Material underlined added. PUBLIC HEARING SOUTH BURLINGTON DEVEL- OPMENT REVIEW BOARD The South Burlington Development Review Board will hold a public hearing at the South Burlington City Hall Conference Room, 575 Dorset Street, South Burlington, Vermont on Tuesday, October 5, 2004, at 7:30 P.M. to consider the following: 1. Application #CU-04-08 of Harry Bliss & Kelly Miller for conditional use approval under Section 14.10, Conditional Use Review of the South Burlington Land Development Regulations. Request is for permission to allow a 6'x8' room and a 4'x6' porch with stairs to encroach 10 feet beyond the limitation allowed under Section 3.06(J)2) of the Land Development Regulations, 5 Mayfair Street. 2. Final plat application #SD-04- 65 of Daniel & Elspeth Tolan and Veronique Dobson for a boundary line adjustment (minor subdivi- sion) between 9 Tabor Place & 165 Holbrook Road. 3. Application #CU-04-09 of Merchants Bank for conditional use approval under Section 14.10 Conditional Use Review of the South Burlington Land Development Regulations. Request is for permission to exceed the 35 foot height [imita- tion by 9.5 feet by installing two (2) energy recovery ventilators on the roof, 275 Kennedy Drive. 4. Preliminary plat application #SD-04-67 and final plat applica- tion #SD-04-68 of Mike Anderson to subdivide a 14.12 acre parcel into three (3) lots of 11.4 acres (lot #1), 1.36 acres (tot 42), and 1.36 acres (lot #3), 1600 Hinesburg Road. Copies of the applications are available for public inspection at the South Burlington City Hall. John Dinktage, Chairman South Burlington Development Review Board September 15, 2004 PUBLIC NOTICE Vermont Agency of Natural Resources Department of Environmental Conservation Solid Waste Management Program (SWMP) All Cycle Waste, Inc. Transfer Station The public is hereby notified that the SWMP has reviewed the appli- cation for minor amendment of Copies of the Application and the Draft Certification are avail- able for public inspection at the offices of the Town of Williston and at the SWMP by calling (802) 241-3484 during normal business hours. To request a public informational meeting and extension of the public comment period or to submit comments for this project, please contact Jeff Bourdeau, Solid Waste Management Program, 103 South Main Street, Waterbury, Vermont 05671-0407, Telephone 241- 3484. STATE OF VERMONT CHITTENDEN SUPERIOR COURT CHITTENDEN COUNTY, SS. DOCKET NO. S747-04 CnC Argent Mortgage Company, LLC, Plaintiff V. John E. Gregory and Christine A. Gregory, Rice Memorial High School and Occupants residing at 31 Rivendell Drive, Essex Junction, Vermont, Defendants SUMMONS & ORDER FOR PUBLICATION TO THE ABOVE NAMED DEFEN- DANT: John E. Gregory You are hereby summoned and required to serve upon Joshua B. Lobe, Esq., plaintiffs attorney, whose address is P.O. Box 4493, 35 King Street, Burlington, Vermont 05406, an Answer to plaintiffs Complaint in the above errtitled action within forty-one (41) days after the date of the first publica- tion of this Summons, which is November 1, 2004. If you fait to do so, judgment by default wilt be taken against you for the relief demanded in the Complaint. Your Answer must also be filed with the Court. Unless otherwise provided in Rule 13(a). Your Answer must state as a Counterclaim any related claim which you may have against the plaintiff, or you will thereafter be barred from making such claim in any other action. YOUR ANSWER MUST STATE SUCH A COUNTERCLAIM WHETHER NOR NOT THE RELIEF DEMANDED IN THE COMPLAINT IS FOR DAM- AGE COVERED BY A LIABILITY INSURANCE POLICY UNDER WHICH THE INSURER HAS THE RIGHT OR OBLIGATION TO CON- DUCT THE DEFENSE. If you believe that the plaintiff is not entitled to all or part of the claim set forth in the Complaint, or if you believe that you have a Counterclaim against the plaintiff, you may wish to consult an attor- ney. If you feet that you cannot afford to pay an attorneys fee, you may ask the clerk of the Court for information about places where you may seek legal assistance. Plaintiffs action is a Complaint in Foreclosure which alleges that .Intl havp h,p.rho.+ «- + — It appearing from Affidavit duly filed in the above entitled action that service cannot be made with due diligence by any of the methods prescribed in V.R.C.P. 4(d) through (f) inclusive, it is hereby ORDERED that service of the above process shall be made upon defendant, John E. Gregory, by publication pursuant to V.R.C.P. 4(g). This Order shall be published once a week for three consecutive weeks on September 20, 2004; September 27, 2004; and October 4, 2004 in the Seven Days. A copy of this Order shall be mailed to defendant at his address if his address is known. DATED at Burlington, Vermont this 9th day of September, 2004. /s/ Richard W. Norton Hon. Richard W. Norton, Presiding Judge Chittenden Superior Court JB1155-90 ► support groups DON'T SEE A SUPPORT group here that meets your needs? Call United Way GET -INFO (a confi- dential help line) 652-4636, Monday -Friday, 8:30 a.m. - 4:30 p.m. SURVIVORS OF SUICIDE: Support group for those who have Lost a loved one to suicide. Meets the 2nd Wednesday of every month at the Holiday Inn in South Burlington (1068 Williston Rd.), from 6-7:30 p.m. For more information, please contact Cory Gould, 223-4111 or cgould1136@earthlink.net. Sponsored by the American Foundation for Suicide Prevention -VT. FREE WORKSHOP FOR SUR- VIVORS OF SEXUAL VIOLENCE: The Women's Rape Crisis Center is offering a free workshop series called "Considering the Uses of Adversity: SeLf-Healing for Survivors of Sexual Violence." This series, designed and facili- tated by Gwen Evans, will run Tuesday evenings, October 5 through November 16. Info, 865-0555. SEX AND LOVE ADDICTS ANONYMOUS: 12-step recovery group. Do you have a problem with sex or relationships? We can help. Sunday meetings, 7- WEDNESDAYS CIRCLE: A Transpersonal support group, every Wed., 6 p.m., Innerharmoi Community Wellness Center, Rt. 100N, Rochester, VT. 767-6092. sharing circle focusing on persor at growth, transformation, spiri- tuality and healing, led by Jim Dodds. DISORDERED EATING SUPPOR' GROUP: Do you struggle with anorexia, bulimia, or binge eat- ing? I am looking to start a sup- port group to help others and myself in moving forward on the road to recovery. If you are inter ested in joining a new discus- sion/support group and are over 20 yrs, please email Jessica at jesslyn6@yahoo.com. Together we can make small steps forward to a more fulfilling lifestyle. DECLUTTERS SUPPORT GROUP: Are you ready to make improve- ments but find it overwhelming? Maybe 2 or 3 of us can get together to help each simplify. 453-3612. PARENTS TOGETHER: Support group will be meeting in Rutland on Monday evenings. Snacks and childcare provided. All groups are free and confidential. Please call Amy at 247-5460 for more information. WOMEN CHANGING: A continu- ous educational support group for women who are interested in changing patterns in their lives. Wednesdays -ongoing. 12:30-2 p.m. Call Angie at AWARE in Hardwick, 472-6463. SUPPORT GROUP FOR WOMEN who have experienced intimate partner abuse, facilitated by Battered Women's Services and Shelter of Washington County. Please call 1-877-543-9498 for more info. REIKI SUPPORT GROUP: July 18, 1-3 p.m. Fletcher Free Library, Burlington. All levels of students and practitioners are welcome. For more info., contact Joan at 860-4673 or Lynn at 893-3064. WANTED: Fellow painters to get together bi-weekly for coffee and to discuss our work. Support each other's creativity! Show your work. Meet at local down- town coffee shops. Call 658- 2976, if interested. AHOY BREAST CANCER SUR- VIVORS: Join our support group where the focus is on living not on the disease. We are a team of CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 February 7, 2003 Chris Francis Merchants Bank 175 Kennedy Drive South Burlington, Vermont 05405 Re: Landscape Bond Release Dear Mr. Francis: Please be advised that the landscaping required for your generator project was recently inspected and found to be acceptable. The City therefore releases you from the obligation of maintaining a bond for this landscaping. If you have any questions, please feel free to contact me. Sincerely; Raym'�d J. Belair Administrative Officer Fidelity and Deposit e�otnpany HOME OFFICE OF MARYLAND BALTIMORE, MD. 21203 License and/or Permit Bond KNOW ALL MEN BY THESE PRESENTS: That we,.__Merchants— Bank, ___PO Box 1009, Burlington, VT 05402 as Principal, and FIDELITY AND DEPOSIT COMPANY OF MARYLAND, incorporated under the laws of the State of Maryland, with principal office P.O. Box 1227, Baltimore, Maryland 21203, as Surety, are held and firmly bound unto __City-__of__South Burlington, 575 Dorset Street, So_. Burlington, VT 05403 � as Obligee, in penal sum of___ One thousand, two hundred forty. —five dollars and 00/100 Dollars, ------------------------------------------------- lawful money of the United States, for which payment, well and truly to be made, we bind ourselves, our heirs, ex- ecutors, administrators, successors and assigns, jointly and severally, firmly, by these presents. WHEREAS, the above bounden Principal has obtained or is about to obtain from the said Obligee a license or permit for____Landscaping —at 275 Kennedy_ Drive, So: __Burlington, VT _ ---------------------------- ----------------------------------------------------------------------------------------------- and the term of said license or permit is as indicated opposite the block checked below: 22nd day of December. 1999_, and [ Beginningthe_______________ _ ending the -------------------- 22nd---------------------- day of------ December--------JJZQ(12. ❑ Continuous, beginning the -------------------------------------- day of.----- ------------------------------ 19------- Cit of South Burlin ton VT WHEREAS ,the Principal is required by law to file with ____.—__�'_________________________g�:______________ a bond for the above indicated term and conditioned as hereinafter set forth. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, That if the above bounden Prin- cipal as such licensee or permittee shall indemnify said Obligee against all loss, costs, expenses or damage to it caused by said Principal's non-compliance with or breach of any laws, statutes, ordinances, rules or regulations pertaining to such license or permit issued to the Principal, which said breach or non-compliance shall occur during the term of this bond, then this obligation shall be void, otherwise to remain in full force and effect. PROVIDED, that if this bond is for a fixed term, it may be continued by Certificate executed by the Surety hereon; and PROVIDED FURTHER, that regardless of the number of years this bond shall continue or be continued in force and of the number of premiums that shall be payable or paid the Surety shall not be liable hereunder for a larger amount, in the aggregate, than the amount of this bond, and PROVIDED FURTHER, that if this is a continuous bond and the Surety shall so elect, this bond may be cancelled by the Surety as to subsequent liability by giving thirty (30) days notice in writing to said Obligee. 22nd---------------------------da of Signed, sealed and dated the________________________ _ y ___ 1999 Merchants Bank Principal FIDELITY AND DEPOSIT CO PAN;Y OF M�ARRYYLAND Scott F. Boardman Attorney -in -Fact J519.-5M. 6-92 236160 No. -- License and/or Permit Bond Effective — —19__ On Fidelity and Deposit Company OF MARYLAND Power of Attorney FIDELITY AND DEPOSIT COMPANY OF MARYLAND HOME OFFICE: P.O. BOX 1227, BALTIMORE, MD 21203-1227 Know ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the State of Maryland, by W. B. WALBRECHER, Vice -President, and T. E. SMITH, Assistant Secretary, in pursuance of authority granted by Article Vl, Section 2, of tpk By -Laws o 'd Company, which are set forth on the reverse side hereof and are hereby certified to be in full fo d effect a date hereof, does hereby nominate, constitute and appoint Scott F. BOARDMAN, Paul PLU , D. M' OARDMAN, I. Munn BOARDMAN, III and Richard S. SMITH, all of Burlington, Vermont H its o awful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as sur as its deed: any and all bonds and undertakings and the execution of such bonds or undertakings in p ce of th sents, shall be as binding upon said Company, as fully and amply, to all intents and purposes, as if d been ecuted and acknowledged by the regularly elected officers of the Company at its office in Baltimo , in thei proper persons. This power of attorney revokes those issued on behalf of Scott F. Boardman, et al, eptemb 994, on behalf of 1. Munn Boardman, III dated January 16, 1997 and on behalf of Richard S. Smith une 7, •1Q1 The said Assistant Secretary does he y rtify th extract set forth on the reverse side hereof is a true copy of Article VI, Section 2, of the By -Laws Compaa� is now in force. IN WITNESS WHEREOF, the sai ice-Pres' and Assistant Secretary have hereunto subscribed their names and affixed the Corporate Seal of the said FIDE AND DEPOSIT COMPANY OF MARYLAND, this 17th day of November, A.D. 1999. ATTEST: FIDELITY A POSIT COMPANY OF MARYLAND 4ys�L -1. GZC�e�� T. E. SmI th Assistant Secretary W. B. Walbrecher Vice -President State of Maryland SS: County of Baltimore On this 17th day of November, A.D. 1999, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, came W. B. Walbrecher, Vice -President and T. E. Smith, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company aforesaid, and that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corporate Seal and their signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporation. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. v Carol J. Fa r Notary Public My Commissi Expires: August 1, 2000 L 1428-063-8076A EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND "Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice -President, or any of the Senior Vice -Presidents or Vice -Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have power, by and with the concurrence of the Secretary or any one of the Assistant Secretaries, to appoint Resident Vice -Presidents, Assistant Vice -Presidents and Attorneys -in -Fact as the business of the Company may require, or to authorize any person or persons to execute on behalf of the Company any bonds, undertaking, recognizances, stipulations, policies, contracts, agreements, deeds, and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages,... and to affix the seal of the Company thereto." CERTIFICATE I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the original Power of Attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the Vice -President who executed the said Power of Attorney was one of the additional Vice -Presidents specially authorized by the Board of Directors to appoint any Attorney -in -Fact as provided in Article VI, Section 2, of the By -Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND. This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 1 Oth day of May, 1990. RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect as though manually affixed." IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said Company, this 22nd day of December 1999 Assistant Secretary -rta�eS r -ALL 0IMeVAS1OMTy TO 1;t VttIP1w0 AT THE S1Tt:' 1:`I T14C VaWTtACTOR, AN j L'RtDIL ;prt Po1NTS 114 WESTIoft MusT RL 2ef0tillRo rY The PteulTur OgDomev f'rY A \i6CISION 66Pdot9 Pee, CeE0it-Ad WITW TNC WaQ III 1t15[E LLnLICOJt 'TQL'CS�'7�¢v^b! //�,' -�- _ G -PAVEn PAIL IC,Ni • -r f �� P A V C b PAR 1L I N 4 f i r r i n T7 r I M — 7 r W 'V ALK We '•- WAI.f. '• NF-W of E RAT1o1I CENTC[ SUILQING IST.rtbor EL 32S.e' dl r� 0 4 d —J0 12 -finsT / rLEet Oft 41 �I�Y�yY�-- t. A .W N —(1 CiNiNL awl �! CA 1 V E• ' K ----' -- - L A n 0 1 C A V 1 IV 9; YLA ,. t e 0 y L A T1 N N A M a - �� SCA4l: 1 w �'• luel[f 1.+4 GRA♦. MA�vS aeCou,f. A� - �� r1eBWA4 ,AAou• AC,Ln o�Anwo gee cenA¢S G Lees- — •..rnl�til► SIIAn�w MASTfn� _0 Nr'q •P �• .. L.1.�cr •.a f A L!c%V.A P L A N.__- L.AN%>SCAPIN4 i IS RI•vleep 2EV IS Gn le-G99 ¢emsEu 0-90-» ►tvlcen % - If-) . lec"A. � 11 -A - -41 gom1.IT 1- I-S1 e„wrfe 9CPT,�3� t IntN toPtlT ... 91tO M f„ffA CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 February 9, 2000 Mike Gilbert Southworth-Milton, Inc. 554 Maple Street Hopkinton, NH 03229 Re: Merchants Bank, Site Plan Application Dear Mr. Gilbert: Enclosed is a copy of the December 21, 1999 Development Review Board Minutes on the above referenced project. Please note the conditions of approval which include the requirement that a zoning permit be acquired within the next six months. If you have any questions, please feel free to give me a call. Sincerely, Sarah MacCallum Planning & Zoning Assistant Encls DEVELOPMENT REVIEW BOARD 21 DECEMBER 1999 Mr. Belair said he will need a new plan showing the location of the new lights. The applicant agreed to meet with Mr. Belair or Mr. Weith to look at the site. Mr. O'Rourke moved to continue the application until the third Tuesday in February. Ms. Quimby seconded. Motion passed unanimously. 14. Site plan application of Merchants Bank to amend a previously approved plan for a 40,000 sq. ft. general office building including a 1600 sq. ft. bank with drive -through service. The amendment consists of 1) installation of an emergency generator, and 2) a 23 space parking waiver, 275 Kennedy Drive: Mr. Dean said they need the generator for the building. They also discovered that they have fewer parking spaced than they originally had. The building said he was handicapped by the brook, which was not taken into consideration when the project was planned. The spaces aren't needed and they are asking for a waiver for them. They also propose some screening for the generator. Mr. O'Rourke moved the Development Review Board approve the site plan application of Merchants Bank to amend a previously approved plan for a 40,000 sq. ft. general office building including a 1600 sq. ft. bank with drive -through service. The amendment consists of: 1) installation of an emergency generator, and 2) a 23 space parking waiver, 275 Kennedy Drive, as depicted on a two -page set of plans, page one entitled "Merchants Bank — Operations Center Kennedy Drive, South Burlington, Vermont," prepared by Gordon G. Woods Associates Architects, dated September, 1999, last revised on 10/14/99, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. Any new exterior lighting shall consist of downcasting shielded fixtures. Any change to approved lights shall require approval by the Director of Planning & Zoning prior to installation. 3. Pursuant to Section 26.256(b) of the zoning regulations, the Development Review Board approves a total of 128 spaces, which is a 23 space or 15% waiver. It is the Board's opinion based on the parking study prepared by the applicant that adequate parking is being provided. 4. Prior to issuance of a zoning permit, the applicant shall post a $1245 landscape bond. The bond shall remain in effect for three years to assure that the landscaping takes root and has a good chance of surviving. 15 DEVELOPMENT REVIEW BOARD 21 DECEMBER 1999 5. The applicant shall obtain a zoning permit within six months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 6. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use of the generator. 7. Any change to the site plan shall require approval by the South Burlington Development Review Board. Ms. Quimby seconded. Motion passed unanimously. 15. Public Hearing: Final Plat Application of Highlands Development Co, LLC, and JAM Golf, LLC, to amend a planned residential development consisting of 297 residential units and an 18 hold golf course, Dorset Street. The amendment consists of relocating a recreation path easement located along the ridge east of Dorset Street: Mr. Marshall said there are minor changed, all agreed upon with Joe Weith in the field during construction. They are all more toward what the public wanted. He showed the location of the 2 pocket parks. There will landscaping work adjacent to the 15t' hole. Mr. Dinklage said people have asked if there will be any structures in the pocket parks. Mr. Marshall said only what is there. Mr. McLane, a resident of the area, said that landscaping is blocking his view of the golf course. Mr. Magnus said he will look into it. Mr. Belair said if they make a change within 90 days that can be the plan of record. Mr. O'Rourke moved the Development Review Board approve the final plat application of Highlands Development Company, LLC and JAM Golf, LLC to amend a planned residential development consisting of 297 residential units and an 18-hole golf course, Dorset Street. The amendment consists of relocating a recreation path easement located along the ridge east of Dorset Street, as depicted on a five page set of plans, page one entitled "Vermont National Country Club Proposed Recreation Path South Burlington Vermont," prepared by Civil Engineering Associates, Inc., dated September, 1998, last revised on 12/16/99, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 16 J CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 February 4, 2000 Chris Francis Merchants Bank 175 Kennedy Drive South Burlington, VT 05403 Re: Generator Dear Mr. Francis: Enclosed is a copy of the Findings of Fact and Decision for the above referenced project approved by the Development Review Board on December 21, 1999 (effective 2/1/00). Please note the conditions of approval including the requirement that a zoning permit be obtained within six (6) months or this approval is null and void. If you have any questions, please give me a call. Sincerel.,y, f R4 ond 3. Belair, Administrative Officer RIB/mcp 1 Encl C 14) MERCHANTS BANK - GENERATOR & PARKING WAIVER- SITE PLAN This project consists of amending a previous site plan approval for construction of a 40,000 square foot general office building including a 1600 sq. ft. bank with drive -through service granted on August 12, 1986 (minutes enclosed). The amendment consists of requesting a 23 space parking waiver and installing a generator. This property located at 275 Kennedy Drive lies within the C2 District. It is bounded on the west by Kennedy Drive, on the south by Kimball Avenue, on the north by Potash Brook, and on the east by an office building. The only issues presented by this application are parking and screening. Parking: The required number of parking spaces is 151. August 12, 1986, the Planning Commission approved 137 spaces which represented a 14 space waiver. The existing number of parking spaces is 128. The applicant is not proposing any new parking. The applicant is requesting a 23 space waiver which represents a 15% shortfall. The applicant has submitted a parking study which found that an average of 27-32 spaces are available at any time (see enclosed). Staff recommends granting the parking waiver because the existing parking has proven adequate for the building over the past 13 years. Landscaping: The applicant is proposing to plant $1,245 worth of landscaping along the exit to Kennedy Drive to screen the generator. The applicant will be required to post a landscape bond in the amount of $1,245 prior to the issuance of a zoning permit. The bond will remain in effect for three years to assure that the landscaping takes root and has a good chance of surviving. 13 Memorandum - City Engineer December 21, 1999 agenda items December 16, 1999 Page 2 MERCHANT BANKS - KIMBALL AVENUE & KENNEDY DRIVE - EMERGENCY GENERATOR CONCRETE PAD Site plan showing location of concrete pad for an emergency generator prepared by Gordon Woods Architect dated September 1999 is acceptable. ROMAN CATHOLIC DIOCESE - HINESBURG ROAD Site plan prepared by TK Landscape Architects dated 1999 is acceptable. F -Staf's opinion is that the applicant has a period of two years to obtain a permit for this project since it is being constructed in phases. WASTE SYSTEMS INTERNATIONAL, INC. (WSI) - CHANGE OF USE - 73 ETHAN ALLEN DRIVE This project consists of changing the use from a construction business to an auto service and repair business. This property located at 73 Ethan Allen Drive is located within the IC district. It is bounded on the north by Ethan Allen Drive, on the South by Commerce Avenue, on the east by an industrial building complex, and on the west by a vacant lot. Landscaping: The applicant is not proposing any new landscaping. Existing landscaping on the site is sufficient. Access/Circulation: Access is provided via a 31' curb cut on Commerce Avenue and via a 33' curb cut on Ethan Allen Drive. Circulation on the site is adequate. Parking: The parking requirement is 4 spaces. The applicant is providing 4 spaces, plus a handicapped space and a bike rack. Traffic: The applicant is not required to pay a road impact fee. Coverage/setbacks: The existing front yard coverage on Commerce Avenue is 63%. The maximum allowed is 30%. The applicant is proposing to convert part of the gravel area to greenspace in order to comply with the 30% requirement. The front yard on Ethan Allen Drive meets the requirement. Setback requirements have been met. Other: Staff visited the site and observed vehicles parked along the east side of the access drive from Ethan Allen Drive to the building. The applicant should be aware that vehicle storage in this area is prohibited. Staff recommends that these vehicles be removed. 4r� Id/N q MerC�r*S BOr,k MEMORANDUM To: South Burlington Development Review Board From: South Burlington Fire Department Re: December 21, 1999 agenda items Date: December 16, 1999 1) 2) 3) 4) Roman Catholic Diocese Dated 11/16/99 200 Hinesburg Road Acceptable National Gardening Association Dated 11/18/99 1100 Dorset Street Acceptable Merchants Bank Dated 11/29/99 275 Kennedy Drive Acceptable A&M Construction Dated 11/3/99 1035 & 1045 Hinesburg Road The new office building should be sprinklered and include a fire alarm. got f Vv" toots F4*, N dt Ilk i 'WW- 'I - 4f No Text w 10, 06. pop% 12/21/99 MOTION OF APPROVAL MERCHANTS BANK I move the South Burlington Development Review Board approve the site plan application of Merchants Bank to amend a previously approved plan for a 40,000 square foot general office building including a 1600 square foot bank with drive -through service. The amendment consists of: 1) installation of an emergency generator, and 2) a 23 space parking waiver, 275 Kennedy Drive, as depicted on a two (2) page set of plans, page one (1) entitled, "Merchants Bank - Operations Center Kennedy Drive, South Burlington, Vermont," prepared by Gordon G. Woods Associates Architects, dated September, 1999, last revised on 10/14/99, with the following stipulations. 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. Any new exterior lighting shall consist of downcasting shielded fixtures. Any change to approved lights shall require approval by the Director of Planning and Zoning prior to installation. 3. Pursuant to Section 26.256(b) of the zoning regulations, the Development Review Board approves a total of 128 spaces which is a 23 space or 15% waiver. It is the Board's opinion based on the parking study prepared by the applicant that adequate parking is being provided. 4. Prior to issuance of a zoning permit, the applicant shall post a $1245 landscape bond. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good chance of surviving. 5. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 6. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to the use of the generator. 7. Any change to the site plan shall require approval by the South Burlington Development Review Board. CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 December 16,1999 Mike Gilbert Southworth-Milton, Inc. 554 Maple Street Hopkinton, NH 03229 Re: Generator, 275 Kennedy Drive Dear Mr. Gilbert: Enclosed is the agenda for next Tuesday's Development Review Board meeting and comments from City Engineer Bill Szymanski, the Fire Department and myself. Please be sure someone is present on Tuesday, December 21, 1999 at 7:30 P.M. to represent your request. If you have any questions, please give me a call. Sincerely, Raymond J. Belair, Administrative Officer ]W/mcp Encls cc: Chris Francis REQUEST FOR WAIVER WAIVER REQUEST ■ AUTHORIZE MERCHANTS BANK TO HAVE 128 PARKING SPACES FOR THE 275 KENNEDY DRIVE SITE HISTORY ■ REQUEST FOR Y2K GENERATOR PERMIT REQUIRED UPDATED SITE PLAN ■ UPDATED SITE PLAN IDENTIFIED 128 PARKING SPACES VERSUS THE APPROVED 151 ■ INVESTIGATION OF SHORTAGE REVEALED PARKING LOT IS APPROXIMATELY 40 FEET SHORTER THAN ORIGINAL SITE PLAN ■ PARKING LOT WAS PHYSICALLY LIMITED BY POTASH BROOK - ORIGINAL SITE PLAN DID NOT TAKE BROOK INTO CONSIDERATION. - RESTRICTIONS AND SLOPES OF LAND PREVENTED BUILDING ANY CLOSER ■ 128 PARKING SPACES HAVE BEEN IN EXISTENCE FOR THE BANK FOR THE PAST 13 YEARS REQUEST FOR WAIVER TODAY ■ PARKING LOT HAS AN AVERAGE OF 27 - 32 SPACES OPEN AT ANY TIME (REF: PARKING LOT AUDIT) ■ BUILDING HAS BEEN IN OPERATION FOR 13 YEARS ■ SITE PLAN HAS BEEN UPDATED TO CURRENT CONDITIONS ■ WAIVER IS REQUIRED FOR THE Y2K GENERATOR PERMIT REQUEST ■ APPROVE WAIVER TO PERMIT 128 PARKING SPACES AT MERCHANTS BANK LOCATION AT 275 KENNEDY DRIVE. AVAILABLE PARKING SPACES AT 275 KENNEDY DRIVE (MERCHANTS BANK) Gary W. Dean Morning sample - 10:30 Facilities Manager Afternoon sample - 2:30 December 8, 1999 . . . . . I . . . . .. . ...... .. IL I I, , a . V 5 1 T rz L A x T.J, All :,a rMMTI IN aw TV AfeWl It,... —T. ............ I Z, Flo AUG-24-1999 12:43 SOUTHWORTH-MILTON, WARNER 1 6037464630 P.02iO4 'd- S f'- 5� - ��r CRY OF SOUTH BURUNGTON APPLICATION FOR SITE PLAN REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay to the review before the Developrneht Ravlew Board. i 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone and fax #) McAchantA Sant, 275 Kennedy Drive. South Phone NumbeA 658-34,00; Fax Numbers 165; 1912 _ 2) APPLICANT (Name, rnalling address, phone and fax #) -PI), -,".0 1009 'Ak.1Tk,ncc fn►, -%j I LyL;4ua �3() 3) CONTACT PERSON (Name, mailing address, phone and fax #) l'L S ock r ,11v� I 5 LA ct S "�✓1 V N 3 . � '3 - 7-4G, 1467I bc3 '7`I to 3o Jrt bek,,I� tJ\e rck0-^- S San K- 4) PROJECT STREET ADDRESS: 275 Kennedy D,'.i.ve, South Su�rUndton, VT 05403 f 5) TAX MAP NUMISER (can be obtained at Assessor's Office) 29-2-7 Q) PROJECT DESCRIPTION a) Existing Uses on Property (including description and size of each e�parate use) O� Aice apace with bank bnaneh b) Proposed Usea (Include description and size of each now use and aAsting uses to remain) OAAice .mace w th bank branch c) Total building square footage (proposed buildings and exfating builgingR to remain) 40_000 5quate A,eet d) Height of building & number of floors (proposed buildings and existing bulldinga to remain, specify if basement and ma=anlne) North 45 /ee.t; South 30 4ee-t Focus Atoo" itti th watk out 14t �aon a) Number of residential units (if applicable, new units and exlsting unKs to remain) n Number of employoes (existing and proposed): 140 tii� d E65� oN �UyB SlvhH�d3'r'1 HdH:E 6661 ,96'onV PUG-24-1999 12:43 � SOUTHWORTH-M I LTON, WARNER / 6037464630 P.03iO4 e) Other (list any other information pertinent to thls application not above): s ej - _4 T) LOT.COVERAOE a) Building: Existing 7.8 % Proposed 7.8 b) Overall (building, parking, outside storage. etc) Existing 65 % Proposed c) Front yard (along each street) Usting 23.2 % Totaf .6,to), Cage along 8) COST ESTIMATES a) Bulldiny: $ acifically requested 65.1 % i Proposed 23.8 % Kennedy Dni,ve and Shunpike Road b) Landscaping_ $ i c) Other else Improvements (please Iist with coat): i 7 -r.^ C--1�i< , ' ,I 4ndl'/% ell Si ci/in,) ha .^,OAA)/1,n!M � � 13 71, JDC 8) ESTIMATED TRAFFIC e) Aversg• daily traffic (in and out): 900 to 11000 b) A..M, Peak hour (in and out): 1 1: 00am. to 12 °OOpm c) P.M. Peak hour (In and out): 12:OOQm to 1: 30pm i 10) PEAK HOURS OF OPERATION: _ _ 9: 00a.m to 5: OOpm 11) PEAK DAYS OF OPERATION: Monday and Fn%day 12) ESTIMATED PROJECT COMPLETION DATE: _ A/0 V. / % i 13) SITE PLAN AND FEE A site plan shall be submitted which shows the Information listed on Exhiujt A attached. Five (5) regular size copies and one reduced copy (11" x 17") of the site plan must be submitted. A zits plan application fee shall be paid to the City of the time of submitting the site plan application (see Exhibit A). b%8 d . 869V ' ON ?NV9 SAVH)d3'J, d98: 8 666 1 , 9Z *,,nV SEP-14-1999 12:00 SOUTHWORTH-MILTON, DARNER I-- y •,-- -r - 6037464630 P.04iO4 I horaby certify that all the information requested as part of this application hea been 5ubmltted and Ia accurate to the best of my knowled e. l SIGhI RE OF APPLICANT SIGNATURE OF'CO-APPLICANT I Do not write below this fine DATE OF SUBMISSION: REVIEW AUTHORITY; (_] Development Review Board I have reviewed mis site plan application and find It to be: (Apfrmsp) 11 Complete i i 0 Director] Planning & Zoning 13 Incomplete Director of Planning & Zoning or Designee Date f V/V 'd 661ti'ON �NVO SiNVK 013 Ad06:1 6661 'V1'daS.04 FILE No.027 08/24 '99 11:00 � ID:BATES/MURRA'Y INC FAX:18024763748 PAGE 5 • I EXHIBIT A SITE PLAN The following Information must be Shown on the site plan. Please submit five (5) copies and one reduced copy (11" x 17") of the site plan. Failure to provide the following Information will result In your application being rejected and a delay in the review before the Development Review Board. • Lot drawn to scale (20 feet scale if possible) • Survey data (distance and acreage) • Contours (existing and finished) Proposed landscaping schedule (number, variety and alze) as required In Section 28,105 of the zoning regulations • Location of streets, abutting properties, fire hydrants, existing buildings, existing landscaping • Existing and proposed curb cuts, pavement, walkways • Zoning boundsades • Number and location of parking spaces (as required under Section 26,25 of the zoning regulations) • Number and location of handicapped spaces (as required under Seotlon 26.233(a) of the zoning regulations) Location of septic tanks (if applicabl®) Location of any easements • Lot coverage information. Building footprint, total lot, and front yard • North arrow Name of person or firm preparing site plan and date • Exterior lighting details (must be down casting and shielded) • Dumpater locations (dumpsters must be screened) Bicycle rack as required under Section 26.253(b) of the zoning reguillations • If Restaurnnt Is proposers, provide number seats and square footage of floor area provided for patron use but not containing fixed somts APPLICATION FEE [� New Application $ 60.00, l Amendment $ 35.ob" i Includes $10.00 recording fee (Apfrmsp) PLANNING COMMISSION 12 AUGUST 1986 PAGE 3 approval prior to permit. 6. The plan shall be amended to move the access to the west over the O'Brien property at the existing depressed curb which may be used as a curb cut for this purpose only. 7. The building permit shall be obtained within 6 months. Mr. Burgess seconded, and the motion passed 5-1 with Mrs. Maher voting against. 2. Continue site plan application of Nordic Ford for conversion of existing building to Nordic Pre -owned Autos and Rental Vehicles at 1519 Shelburne Road Mrs. Lafleur advised that Peter Allison asked to defer action until a later time. The item can be postponed until 16 September without running into the 60-day problem. Mr. Dooley moved that the Commission deny the site plan ap- plication of Nordic Ford for conversion of existing building to Nordic Pre -owned Autos and Rental Vehicles at 1519 Shelburne Rd., unless within a week the City Planner receives an agreement from Nordic Ford to waive the deadline 2 weeks beyond the 60-day deadline. Mrs. Maher seconded, and the motion passed unanimously. 3. Continue 40,000 sq. branch bank and Kennedy site plan of Merchants Bank for ft. operations center including on lot 47, Business Park North, Drive construction of a a 1600 sq.. ft. Kimball Avenue Mrs. Lafleur advised that the sidewalk will be along Kimball Avenue and on Kennedy Drive to the end of the building. There is still discussion going on about the remaining frontage and the CO Zone and O'Brien land. Mr. Jacob said he spoke with the City Manager and they feel the situation is almost as bad as Palmer's, since there would have to be filling in the CO Zone. Mr. Schuele said it is very precarious if the CO Zone is filled. He is also concerned about the need for a pedestrian footpath, however. He suggested that if it can't be built now, money be put in escrow so it could be built later. He added that the Com- mission should consider this kind of issue at subdivision time, before it becomes a major problem. There is no question that if there is filling, the stream will be affected. He felt that a footpath could be constructed to the inside of the guardrail. Mrs. Maher recommended asking for a sizable fee to be put in escrow. She noted that the O'Brien land is zoned R-7, and there could be many people PLANNING COMMISSION 12 AUGUST 1986 PAGE 4 living in the area one day. Concensus of the Commission was that the sidewalk end at the building. It was suggested that the applicant be required to put in an equivalent amount of sidewalk at some other location, and Mrs. Lafleur agreed to discuss this option with the City Attorney. Mrs. Lafleur then discussed the proposed traffic impact policy for the Williston Rd. area. Suggested improvements include traffic signals at Victoria Drive & Williston Rd, extra lanes at the interesection of Airport Drive, Williston Rd., and Kennedy Drive; a signal at Kimball Ave & Kennedy Drive, crosswalks and pedestrian signals at Kennedy Dr. & Williston Rd, traffic signals at Shunpike Rd. & Williston Rd, the widening of Williston Rd. from Clinton St. to the city line. The Merchants Bank would contribute 4% of the total amount based on traffic generated by their development. The Bank had no objection to this. A letter wma received from David Spitz indicated the signal timing changes needed at Kennedy Dr. & Williston Rd. The green arrow for left turning from Williston Rd. would be the applicant's responsibility. Mr. Woods indicated that green space has been increased by taking out parking from the Kimball Avenue side. The building has been pushed in a bit. This resulted in the loss of 14 parking spaces. Some evergreens have been placed in front and trees have been taken off the pedestrian easement. There will be rhododendrons around the base of the building. Mrs. Lafleur will discuss an alternate sidewalk site with Sonny Audette. Mr. Dooley then moved that the Planning Commission approve the site plan application of the Merchants Bank, Gordon Woods, agent, for construction of a 40,000 sq. ft. bank op- erations center including a 1600 sq. ft. branch bank on lot #7 of Business Park North as depicted on a plan entitled "New Operations Center for Merchants Bank, Kennedy Drive, South Burlington" prepared 12y Gordon G. Woods, dated May 1986, last revised 8/5/86 with the following stipulations: 1. A $20,000 landscaping bond shall be posted prior to permit. 2. A sidewalk shall be constructed along Kimball Avenue and along Kennedy Drive from Kimball Avenue to the access drive. A bond for both sidewalks shall be posted prior to permit in an amount determined by the City Engineer. PLANNING COMMISSION 12 AUGUST 1986 PAGE 5 3. The guard rail that is removed to build the sidewalk shall be removed and transported undamaged to the City Highway garage site. 4. Parking spaces for 151 vehicles are approved. Fourteen spaces are waived which represents 8% of the total. The 41 compact car spaces that represent 25% of the total are approved by the Planning Commission. 5. A 1500 gpd sewer allocation is made as a portion of the original 3020 gpd allocation for the 10-lot subdivision; 640 gpd remain for the undeveloped parcels. 6. The deceleration and acceleration lanes shall be con- structed Kennedy driveway curbed. with the granite curbing that is removed from Drive as well as any additional curbing to curb to the parking area. The island shall also be the 7. The signal modifications including a left turn arrow as proposed by David Spitz in a letter dated 8/8/86 shall be reviewed bv Craig Leiner at the Regional Planning Commission for appropriateness. If appropriate, these changes shall be made at the expense of the Merchants Bank. If a new or upgraded signal controller is required it shall be the responsibility of the applicant. 8. The Planning Commission finds that the proposed 45 foot height will 1)utilize topography and will relate to other ex- isting and proposed structures; 2)will not detract from scenic views of adjacent properties or public streets and walkways; and 3)will allow retention of additional green space that will enhance the appearance of the developed property. 9) A stormwater runoff control plan shall be approved by the City Engineer prior to permit. 10. An easement shall be given to the City to reconstruct or add to the drainage pipe under Kennedy Drive. The City agrees to restore the distrubed area to its original condition. A written agreement or easement shall be submitted to the City Attorney for approval prior to permit. 11. The applicant shall contribute an amount determined by the City Planner in accordance with a formula based on the total number of trips in the Williston Rd. corridor and the amount projected �2y this development to p� for that share of intersection improvements over the next 10 years in the Williston Rd. corridor. That share shall not exceed 4% of PLANNING COMMISSION 12 AUGUST 1986 PAGE 6 the total cost. 12. The applicant shall provide a sidewalk of 240 ft. length approved by the City Engineer on the east side of Kennedy Drive between Kimball Avenue and Hinesburg Rd. 13. The building permit shall be obtained within 6 months. Mr. Burgess seconded, and the motion passed unanimously. 4. Consider sketch plan application of Semicon, Inc., for subdivision of 111.2 acre property into two lots of 31.2 acres with existing building and an 80 acre lot at 1000 Hinesburg Rd. Mrs. Lafleur noted that previous approvals outlined a roadway for the extension of Swift St. The area is encumbered by the CO District, airport approach area, and sewer easements. There are sewer lines in the developed parcel. Semicon wishes to subdivide into 2 lots so that the 80-acre area will encircle the developed area. They will have a 30-foot access road. There is no current proposal for the 80 acres. Mrs. Hurd commented that when Mitel wanted to build, they were required to leave land for agricultural uses. Mr. Perry noted there was a 5-year agricultural lease which expired this year. Mr. Dooley asked what the coverage would be on the 31.2 acres after the 80 acres are taken out. Mrs. Lafleur didn't know, but Mr. Perry said they are well below requirements. Mrs. Maher asked where it is most logical a building would be put in the new lot. Mrs. Lafleur said both saides are developable. Access would have to be secured by legal right-of-way. Mr. Schuele said he remembered the Planning Commission and City Council also set aside an area for agriculture, and Mrs. Lafleur will check on this. Mr. Krassner recollected Mitel indicating they might expand their building; they did not say they would sell off the land. Mrs. Lafleur said they did at one time get a 6,000 sq. ft. extention. City Council and Planning Commission minutes will be checked on the agricultural land/open'space issue, and discussion will continue on September 16. 5. PUBLIC HEARING: Preliminary Plat of Mery Brown for a 119 lot subdivision, a lot for future development, 14 acres of open space, and a 28 acre industrial lot on the Vermont Structural Steel property, 1175 Hinesburg Rd. Mr. Jacob stepped down during this discussion which was then chaired by Mr. Burgess. 7) MERCHANTS BANK, LOT #7, KIMBALL AND KENNEDY The Merchants Bank, (Gordon Woods, agent) proposes to construct a 40,000 square foot bank operations facility including a 1600 square foot branch bank (10,000 square feet per floor including a basement) on lot #7 of Business Park North on the corner of Kennedy Drive and Kimball Avenue. The 2.94 acre property is zoned Commercial-2; the northern portion of the property is within a conservation zone that will not be disturbed. Access: The original 10 lot subdivision set specific locations for curb cuts. A common shared curb cut serves lot #11, lot #6 (the existing Palmer -Digital Building), #5 (proposed Milot- O'Brien Office Building) and this lot. The stipulations in the original subdivision also include a curb cut on Kennedy Drive. The Commission required the Kennedy Drive access to have a right turn entrance and a right turn exit only as the plans show. (see enclosed memo of 3/24/86 and minutes of 4/4/78 and 10/23/79). The length and design of the decel lane/ramp should be designed to meet state standards. See Bill Szymanski's memo regarding this. Height: Section 18.112 states that the maximum height shall be 35 feet or 2 1/2 stories unless modified with setback increases and Planning Commission approval. This has been interpreted to mean the height at the front door, so the height from a basement level may actually be greater. This building will be 36 feet at the Kimball Avenue side and part of the Kennedy drive side. The setback has been increased one foot as required. The height from the Williston Road rear side will be 48 feet. Circulation: Circulation is adequate on the lot with sufficient aisle width and stacking space for a drive up bank window. Evi- dently, the Commission has retained the right to use a connection through the CO Zone to lot #8 (Dan O'Brien's office/Vermont National Bank building). This does not appear feasible given the grade and narrow width of the O'Brien Drive. Parking: The plans show 165 parking spaces; 162 are required for the 1600 square foot branch bank and the 38,400 square foot operations center. There are 42 compact car spaces representing 25% of the total. This ratio needs Planning Commission approval. A landscaped buffer is shown along the edge of the parking lot so there is space for snow in winter. However, this is also the location of a 15 foot pedestrian trail that is shown on the final subdivision plat. In order to keep the trail from being part of the paved parking lot, the lot will have to be moved closed to Kennedy drive. When moved, the front ,yard lot coverage requirement, should be cheek so that, it does not exceed 30%. 4 Landscaping: This building requires $20,000 in new landscaping. The landscaping plan meets this requirement with large crab and norway maple, locus and spreading yews. The parking lot will be bordered with large trees. Traffic: A traffic study prepared by David Spitz and Craig Leiner's critique are enclosed. Given Craig's reservation and the need for more information, this issue should probably be tabled for 2 weeks. As you will notice in the original 1978 subdivision minutes the Commission discussed limiting construction by the level of ser- vice produced. This was not stipulated at final plat as the preliminary plat approval suggested. However, the Commission reserved the right to require each developer to contribute toward signalization improvements at Kennedy Drive and Kimball. (see stipulation #7 and #1 in minutes of 4/4/78, and O'Brien memo, item #11). Sidewalks: A sidewalk should be constructed along Kimball as well as the Kennedy Drive frontage. The Kimball Avenue sidewalk should connect to the sidewalk required of the O'Brien property and the existing building. This should be shown on the plans. Lot coverage: Total lot coverage is 65%. The maximum is 70%. The building coverage is 8%; the maximum is 30% Sewer: The original subdivision received 3020 gpd. for the 10 lot development. The Palmer office uses 220 the O'Brien Bank used 210 gpd; the Milot-O'Brien office required 450. This build- ing requires 1500 gpd. from the balance of the original alloca- tion. Other: See Bill Szymanski's and Jim Goddette's comments. 9 �Dlltlj I tirlillgtou Sire 1Departlllent. 575 1Duroct Street *nut4 iBurlington, lRermnut 05401 OFFICE OF JAMES W. GODDETTE, SR. CHIEF 863-6455 MEMORANDUM ---------------- TO: SO. BURLINGTON PLANNING COMMISSION FROM: CHIEF JAMES W. GODDETTE SR. RE: JULY 22,1986 AGENDA ITEMS DATE: JULY 16,1986 #1. NORDIC AUTOMOTIVE FACILITY( FORMERLY MILBROOK STORE ) PLANS REVIEWED ON THIS PROJECT AND AT THIS TIME I DO NOT SEE A PROBLEM FOR EMERGENCY SERVICES. #2. CEDRIC DEMERITT BERARD DRIVE PROJECT. PLANS REVIEWED AS WELL AS AN ON SITE INSPECTION AND DO NOT SEE A PROBLEM FOR EMERGENCY SERVICE AT THIS TIME. #3. MERCHANT BANK OFFICE COMPLEX KIMBALL DRIVE REVIEWED PLANS AND HAVE HAD MEETINGS WITH MR. WOODS TO INSURE THE NEEDS FOR EMERGENCIES SERVICES AND AT THIS TIME HAVE NO PROBLEMS WITH THIS PROJECT. #4 ARNOLD & DONALD MARCK LOT SUBDIVISION I DO NOT SEE A PROBLEM WITH THE SUBDIVISION, BUT NEXT IS WHAT IS TO GO ON THE LOT AND THE LAY OUT OF ANY BUILDINGS AND ACCESS FOR EMERGENCY EQUIPMENT. #5. BARNES LOT SUBDIVISION: MEADOW DRIVE. PLANS REVIEWED AND THE ONLY PROBLEM I SEE AT THIS TIME IS THE ENTRANCE TO THE DUPLEX IS NOT ADEQUATE FOR EQUIPMENT TO GET IN . THE CRITERIA COME FROM ARTICLE 5; BBC-81 AND 83 BASIC BUILDING CODE AND F-311.0 BOCO FIRE PREVENTION CODE. M.1 N `IMAM Q.0 L- INN C of- k% FEEI Vs ALSO k&-t2U\QZ--5 t?IAWN No Text 32 i rt OSC4\0"� 0�� =- A14 4' 1�� �� llff/I vim. (n `� `1 i,t� ► !1�� =-Xo2 = or 1nGl fll Is C C I I VIFL-i 1), -1 o ;92) L c)c-t.to,� ITb , 5-r3 (oC�6c.O,q y �@ , � 11� lip -nip �c/CZ -ail ' 3630 f. Xcmpar Roar ''ALMA sn, OH 4$341-2146 February 25, 1998 Gary Dean Merchwit bank fax (802)865-1975 RE: Diluted Thiorrogard Dear Mr. Dean, 513-554-4200 313.554-4369 Per oarpl":X?nc t3 a"� e$"S `its �, ;1"�1 l ett. x iA r :fergr.. : dt ci. g cf 3.$t3d� Chemicals, product Th--rop'rd. Aire diSCUSUd, the quannty of the di'mid'I`v�aornprd which =spilled into zhe parking lw; and area 1S to 20 91110ns J1i: sa:.s mpresem , vi! 1r':s�.1cated Lhat *w 6m eor:CPz-mtriatl is at , ('_7 1 ppw. molybdate azd Sod± Xt r= e, wl:i h is equivaltv.t to a I :100 4ilur-,on, in the chil* er TLe'Duorscein dy:, which cils!.� :h..-g;ven col.0.2 is v. tace antcu ?m `,tJater is at treav thiaea 90'Xa in Ote formula. There should oe :10 s p-,Lc rlt hs:a W'. ha.?ald,. or virop-w„z;al limpid to 1-� mil or aeafay waW4�!r w4ys &ac o t:he spill of this very diNic solo ion of Thorogard. ink cart ';Ac of funlwy assisrance, p414:ask C.^.macz rae at (513)554.41296. Sincerely, w 1 L' b �a=j Nicole Ballard Regulatory Specialist cc Jeff Gendron M3464 Steve Carter Jack Ho=berger -t 2KA;Lt, A. 41 4t i;e�n'P6L-0 �.=h'Sg3e�iu 39 PH♦fihtV¢i r:,a wn%ars�. liPr.i. a3 A.w'7 ryM :r�.•x:3: �^�' a �..a'vi:�a :. � �TuuL rr'i;,tr. k+1^ id:0A1r:,.t hl<.Y1W r'� Qt t3 r.;' w, ag+;1ar: .yr.:+;� l;�cae rr�.�nx .:c::c: rni,,':; 'Ye Faax:a: .t.Lnfiewn..a :Asow1a�O�e�r pma yw ,rt tr 'ZMA �rw.Q" rXA.i k..w9, s:..:car. A t N'W �w Aieaezj ru.W66mv :io n kArxm .A .y pma..t, suP7ry�� _r vs.�r�ta City of South Burlington 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 FAX 658-4748 PLANNER 658-7955 October 13, 1993 Mr. Thomas R. Havers Executive Vice President The Merchants Bank 123 Church Street P.O. Box 1009 Burlington, Vermont 05402-1009 Re: Storage Trailer, Kimball Avenue Dear Mr. Havers: ZONING ADMINISTRATOR 658-7958 The South Burlington Planning Commission recently reviewed your letter to Raymond Belair, dated 10/8/93, regarding the storage trailer at the Merchants Bank property on Kimball Avenue. Please note that any change to an approved site plan, including the use of a temporary storage trailer, requires Planning Commission approval. We are disappointed that the trailer was brought on site and has been in use without Planning Commission approval. Our schedule is quite full at this time, and therefore, we would not be able to review an application for the temporary use until early December. Since you stated in your letter that you will be removing the trailer by the end of December, we will not require you to submit an application at this time. If the trailer is not removed by the end of December, however, the City will be forced to pursue enforcement of a violation. Please remember that any change to a site plan, including temporary uses, requires approval by the Planning Commission. Such approval must be obtained prior to implementing any change. Sincerely, ai ham Burg ss, hai man South Burlington Planning Commission WB /mcp cc: Richard Ward Raymond J. Belair City of South Burlington 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 FAX 658-4748 PLANNER 658-7955 October 13, 1993 Mr. Thomas R . Havers Executive Vice President The Merchants Bank 123 Church Street P . 0. Box 1009 Burlington, Vermont 05402-1009 Re: Storage Trailer, Kimball Avenue Dear Mr. Havers: ZONING ADMINISTRATOR 658-7958 The South Burlington Planning Commission recently reviewed your letter to Raymond Belair, dated 10/8/93, regarding the storage trailer at the Merchants Bank property on Kimball Avenue. Please note that any change to an approved site plan, including the use of a temporary storage trailer, requires Planning Commission approval. We are disappointed that the trailer was brought on site and has been in use without Planning Commission approval. Our schedule is quite full at this time, and therefore, we would not be able to review an application for the temporary use until early December. Since you stated in your letter that you will be removing the trailer by the end of December, we will not require you to submit an application at this time. If the trailer is not removed by the end of December, however, the City will be forced to pursue enforcement of a violation. Please remember that any change to a site plan, including temporary uses, requires approval by the Planning Commission. Such approval must be obtained prior to implementing any change. Sincerely, ffil am Burg ss, h a i man South Burlington Planning Commission WB /mcp cc: Richard Ward Raymond J. Belair City of South Burlington 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 FAX 658-4748 PLANNER 658.7955 October 6, 1993 Tom Havers Merchants Bank P.O. Box 1009 Burlington, Vermont 05402 Re: Storage Trailer at 275 Kennedy Drive Dear Mr. Havers: ZONING ADMINISTRATOR 658-7958 This is to confirm our phone conversation of 10/5/93 in regards to the storage trailer at 275 Kennedy Drive. It is my understanding that this trailer is being used for temporary storage purposes. It is expected to be removed by the end of November or at the latest the end of December. Please let me know if my understanding of the situation is correct. Since ly, Ra oird J. Belair, Zoning and Planning Assistant RJB/mcp The Merchants Bank MAIN OFFICE: 123 CHURCH STREET, P.O. BOX 1009, BURLINGTON, VERMONT 05402 - 1009 802/658-3400 October 8, 1993 Mr. Raymond J. Belair City of South Burlington 575 Dorset Street So Burlington, Vt 05403 Dear Raymond, As we discussed by phone and in follow up to your letter dated October 6, 1993. Our plans are to utilize the storage trailer for temporary storage of furniture that is being moved from several newly acquired bank offices (The First National Bank of Vermont) and then distributed to other Chittenden County banking offices. We hope to have completed these furniture movements by the end of November, though may need to extend this process through December due to some delays in a Northfield banking office construction project. Carolyn Antone (Facilities Manager) or I will advise you when we have removed the trailer. Please call either of us if you have further questions or need more information. Thank You. Sincerely, Thomas R. Havers Executive Vice President cc Carolyn Antone 1 NORM COUNTRY - P.O. Box &„ PLANNING Winooski. Vermont55-366 asaoa August 8, 1986 Jane Lafleur, City Planner 575 Dorset Street South Burlington, Vermont 05401 Dear Jane, Existing signal timing at the Williston Road/Kennedy Drive inter- section is as follows: Approach # of Seconds 34 4 2 24 4 2 Williston Rd, E& W G Y R R R R Airport & Kennedy Dr R R R G Y R Proposed signal revisions, essentially allowing extra green time for the Williston Road, East approach, are as follows: Approach # of Seconds 7 3 24 4 2 24 4 2 Williston Rd, East Y or - Left Turn Arrow G Off Off Off Off Off Off Off Wllstn Rd, East - Thru G G G Y R R R R Williston Rd, West R R G Y R R R R Airport & Kennedy Dr R R R R R G Y R To accomplish these revisions, required signal improvements are (1) an additional green arrow for the Williston East approach, (2)(optional) a yellow arrow for the Williston East approach and (3) a "delayed green" sign for the williston West approach. The City Manager should be able to determine whether the existing timing mechanism can accomodate the proposed changes. Please let me know if any further information is required. Sincerely, cc: Gordon Woods David H. Spitz Rodney Campbell MERCHANT'S BANK, INC, TO CITY OF SOUTH BURLINGTON - - - a right-of-way fifteen feet wide to lay and maintain a gravity sewer line and necessary appurtenances over a portion of all and the same land and premises conveyed to the GRANTOR by deed of Gwendolyn S. LaPlant on June 30, 1981 and recorded at Book 175, Page 163, of the City of South Burlington Land Records, and being more particularly described as follows; beginning at the intersection of the centerline of said pipe alignment, and the boundary of lands of the GRANTOR, and land now or formerly of Lee Zachery, at appropriate station 5 + 10, thence northeasterly along the centerline of said pipe alignment to the boundary between land of the GRANTOR, and land now or formerly of Harold Bensen, at approximate station 5 + 90, as an aid in further description of said right-of-way, reference is made to the project plans entitled, "White Street Spur Sewer Extension - M-I1 to M-I2, English Village Apartments - Hal Bensen, Patchen Road, South Burlington, Vermont", prepared by Wiemann-Lamphere Architects, Inc. December 1985. CITY OF SOUTH BURLINGTON ,�/GvSr11 SITE PLAN APPLICATION %1SS/MiC. t'v 2- /Q 1) NAME, ADDRESS, AND PHONENUMBEROF: a) owner of Record / a3 01A Atlf«/ zti j2/27 4 JAM4 XVAl 4 4, ,,kaq /a/ b) Applicant c)Contact S �ac t Person C7�%rf7d� l� (©d �4 S �.ew / ine �,y>gyts Pa9�rG T. ��1��3/=LL,, /�2"Ni4i41S�1� /GU 2) PROJECT STREET ADDRESS: �/='�C���✓JGJ �i�l(%L%�'�%iS/�T�N 3) PROPOSED USE (s) 4) SIZE OF PROJECT: (i.e. Building Square Footage, #units, maximum height and #floors /d Od4y�o�X41O% S) NUMBER OF EMPLOYEES (full and part time): 6) LOT COVERAGE: Building � %; Building, Parking, Outside Storage: C> % 8) COST ESTIMATES: Buildings: $ ��a d1tJ Landscaping $ Other Site Improvements: (Please list with cost) $ '5 1ZL �o fitly 9) ESTIMATED PROJECT COMPLETION DATE: 10) ESTIMATED AVERAGE DAILY TRAFFIC (in and out) 11) PEAK HOUR(s) OF OPERATION: 12) PEAK DAY(s) OF OPERATION: SIGNATURE OF APPLICANT R. SPrv10�2 �/�ce ��2Psi'G��P� y •UU��T IT ICU IVY M.,�VV '�/3° ..•mi l 10 South BurMptan Tom Maps 19.20.29 11 Easaesnl Ptoo Ib. 2,3A 4/77 � ' 1 A44 \ \ 00, 1 1 �/V/g^; �\ Access to lots 3 and 4 `3?M \\ `\ o Wjq LDT 2 ,� t Area 4.42 acres �� LOT 3 �'0 `•N3o3s \\ 20'ISevwr EaMfrMnt � - � Area = 2 34 acres � ��� 60 Construction Eaw►»F+1 11 d ^I f \. <r, x —. Conservation Zone :O -tea 2 45 �\ LOT Area = U39 as c'\ ' 1 _ L INC I 'S 36053':50"E C z � N 0. N R L IN N I— U J _J C,Of1SerV0l K)n (' e Cl) LOT 9 Area = 749 acres ce LU 3 W > U") _ Q -0 J N in o. r i K3 w ;i 2 M 20' Se ver Eosement % 60' Construction ECs�\ I `S 5f 0730" W 210.62' 1 / S 37°5557"E I S 37°52' 30E 1 1 d - -145-22'- LCT �L 02 Area = 2 87 acres i 324.37' 1; S TIJ LINES �qt 11 = S K d-M 5 = S 3 LOT F =1 885 6' Fedestra —1 330.00L S47' 30" I BROWNS R1VEF I w \'i0 FWd of 1 to lot 9 I 1 1~ MAYO 1 ClJ 2d E Z / 11 'S~I ev� N/3?..� '�I Access to Lots 3 and 4 \ 2 acres LOT 3 Itr Easement -J� a Area = 2 34 acres struction EaiemeM 11��' ^o 06`` 1 — Conservat,on Zane �53 INN LOT 5g2 area=245 /V)f� 3) gam, \Area=L89 `Conservation LOT 9 �62 ' I Area = 749 acres _ S 36053': 50"E 550.0 - Fd 20' Sewer Easement \y 60' Construction Eaaemerl \ JCHAR L w F- Z z_ a w 5"v o) �E( I * a 2 _ b t°D- '�. - -- N 'E � `� - S 5LP07'30' W 1 210.62' S 3705657"E 1 (;L INTO (�� S, S3 52'3oE ( l N 3752 3b W o 1 S 37"52' roLot 9 °t kby LET jQ s IY L VUI ,OII U Q wp) WiOi 15 L. 0Bran to { Peterson 16. Leo and DanloWkren to K Bbeonefte 9 17 Leo and Darid O' Brun to 0 Mothon CLRVE DATA 0 Lso and Dail O'Brien to P Casey ius = M Leo and DaW d&-Wn to State of vermom ME 87' to prop" ine \ 20 L O'Brien to 'Pawn of South Burlington A = 24-04' 3G' Tpngent = 204.06' along ITL of rood i TIE LINES I I = S 19°4O'25"E 212.70' 5= S 31e42' 43" E 209;62' \ -Access 10 L -a" 5,6,7, and 11 ` 2lO.00 N 37°41' 13" W - N 37 41 13° W Offer of INewoobb Dedtc 288.70' 179.87' Area • 0.10 Acres qht 1 ' TIE SINE ONLY Cres ; L a 6. Loto7 artd Ldl I1 W N 2'f56'46' E S 5727' 15" W - ,ti� 4O ti �.90' P 12Q04' CARVE 0 LOT LDT/6 _CD �USc�s� 1 18 5 acres , N Al rea's 1.88 acres � 1 N . ( 1 I100' To, gew ' Z I t ziC1 - - ' of Access to Lot 7 Z_ 28a78' -_ - - - .Isi 15' Pedestnon Easement , i /r 260' fnxn corner of Industrial Park Rood ROW, S T47'30"E S :3e47'W'E Area = 2.94ocres 181 I BROWNS RIVER CO. MUNSON E ARTH MOVING - C II T' TIE LINE ONLY � 1 I N 44° 54' 04" E 1 398. I I Comerve zone 1 t Slope r i" for w ideor 1 .. ` 1 icennedy Drive = 30' 291.27' _ ,t TIE LINE ONLY S 38047'30"E— N 320 58' 11aE 94.30. LT 1 \ SJ 3 ` tr - y M Area = 2.08 ��r ti acm Area = 2 87 ocres 1 m MA) 5 Sewer Easement �0 cn i (V 1� 2' Easemed to Z sewer Ea men, 324.37'�' 1 ---- _S3_57'E —', *— ------ ---------- ---- -=S 732E - -- _ — — — US_ ROUTE_-2 WI LL_ISTON ROAD_ 66' _—Aces to Lot e 12' Offer of Irrevocable Dedlcc,tlon Access to Lori 9and 10 I 12' Offer of Irrevocohip Dedication 8/11/86 MOTION OF APPROVAL JBL That the South Burlington Planning Commission approve the site plan application of the Merchants Bank, Gordon Woods, agent for construction of a 40,000 square foot bank operations center including a 1600 square foot branch bank on lot #7 of Business Park North as depicted on a plan entitled "New Operations Center for Merchants Bank, Kennedy Drive, South Burlington" prepared by Gordon G. Woods, dated May, 1986, last revised 8/5/86 with the following stipulations: 1) A $20,000 landscaping bond shall be posted prior to permit. 2) A sidewalk shall be constructed along Kimball Avenue and along Kennedy Drive from Kimball Avenue to the access drive. A bond for both sidewalks shall be posted prior to ermit in a ount determiKipd by the City Engineer. oQ �vl �,► �L )K ow,, Ya 5fi c�� S�&� eN K - _Q) 3) The guard rail that is removed to build the sidewalk shall be removed and transported undamaged to the City Highway garage site. 4) Parking spaces for 151 vehicles are approved. Fourteen spaces are waived which represents 8% of the total, The 41 compact cars P�C�that represent 25% of the total are approved by the Planning Commission. 5) A 1500 gpd sewer allocation is made as a portion of the original 3020 gpd allocation for the 10 lot subdivision; 640 gpd remain for the undeveloped parcels. 6) The deceleration and acceleration lanes shall be constructed with the granite curbing that is removed from Kennedy Drive as well as any additional curbing to curb the driveway to the parking area. The island shall also be curbed. 7) The signal modifications including a left turn arrow as proposed by David Spitz in a letter dated 8/8/86 shall be reviewed by Craig Leiner at the Regional Planning Commission for appropriateness. If appropriate, these changes shall be made at the expense of the Merchants Bank. If a new or upgraded signal controller is required it shall be the responsibility of the applicant. 8) The Planning Commission finds that the proposed 45 foot height will 1) utilize topography and will relate to other existing and proposed structures; 2) will not detract from scenic views of adjacent properties or public streets and walk- ways; and 3) will allow retention of additional green space that will enhance the appearance of the developed property. 9) A storm water runoff control plan shall be approved by the City Engineer prior to permit. 10) An easement shall be given to the City to reconstruct or add to the drainage pipe under Kennedy Drive. The City agrees to. restore the disturbed area to its original condition. A written agreement or easement shall be submitted to the City Attorney for approval prior to permit. 11) The applicant shall contribute an amount determined by the City Planner in accordance with a formula based on the total number of trips in the Williston Road corridor and the amount projected by this development to pay for that share of intersec- tion improvements over the nextJ6 year in the Williston Road. corridor. That share shall not exceed q % of the total cost. 12 The building permit shall be obtained within 6 months. �a) s�A�al,� a`1p K„r,i�fA d FI YL.A Page 6 Findings of Fact #4C0310-6 of directional signs to further reinforce the right turn only design of the Kennedy Drive access (testimony of the applicants). The sight distance is greater than a 1000 feet in both direction at either access point and the posted speed limit for Kennedy Drive is 40 miles per hour (Exhibit #5). 14. The applicants estimated that the project will generate approximately 1321 weekday vehicle trips on the average each day, including 103 AM peak hour trips and 185 PM peak hour trips (Exhibit #22). 15. The Kennedy Drive -Williston Road intersection is the closest signalized intersection that will be impacted by this project (Exhibit #21). The Applicant estimates that the current Level of Service (LOS) for the intersection is a LOS C and that this project will generate additional traffic which will create a LOS between C and D, or increase traffic delays from 19.39 to 22.00 seconds (Exhibits #21 and #22 and testimony of the applicant). The applicants' traffic consultant indicates that the LOS could remain at C with certain improvements to the phasing of the current signal timing. The revised signal phasing has been proposed to the City of South Burlington by the applicants. The City has identified those projects providing additional traffic impacts to the intersection and will require the applicants to contribute its fair share towards any additional intersection improvements requires (Exhibit #22 and testimony of applicants). SECTION 6086(a) (8) AESTHETICS, SCENIC BEAUTY, HISTORIC SITES & NATURAL AREAS: The Commission finds that this project will not have an undue adverse effect on the scenic or natural beauty of the area, aesthetics, historic sites, or rare and irreplaceable natural areas. This finding depends on and is supported by the following: 16. Historic sites, necessary wildlife habitat and rare and irreplaceable natural areas will not be affected by this project (Exhibit #5). 17. The present site is open with a few trees (Exhibit #5). The project will be landscaped as outlined on Exhibit #6B. The existing trees in the conservation zone will not be cut. The applicants will be responsible for the continual maintenance of the landscaping (Exhibit #5). Page 7 Findings of Fact #4C0310-6 18. Exterior lighting will consist of pole mounted downshielded fixtures as depicted on Exhibit V . All fixtures will have concealed light sources. 19. The building will be constructed as depicted on Exhibit #12 with a brick facade. 20. The trash recepticle will be screened and all utilities will be located underground (Exhibits #5 and #6B). A sign has not yet been designed and the Commission will require that the applicants submit sign plans for review and approval prior to the installation of any sign. SECTION 6086(a) (9) (F) ENERGY CONSERVATION: The Commission finds that the planning and design of this office building reflects the principals of energy conservation and incorporates the best available technology for the efficient use or recovery of energy. This finding depends on and is supported by the following: 21. The buildings will be constructed with an insulation "R" factor of at least R-19 in the walls, at least R-19 in the roof or cap, and at least R-10 in the foundation walls. Additional measures to conserve energy include double - glazed windows (Exhibits #18 and #19). SECTION 6086(a) (9) (J) PUBLIC UTILITY SERVICES: The Commission finds that utility service is available to this project, that an excessive or uneconomic demand will not be placed on such facilities or services, and that the provision of such services has been planned on the basis of a projection of reasonable population increase and economic growth as evidenced by the letters from Vermont Gas and Green Mountain Power Corporation (Exhibits #20 and #26). CONSTRUCTION COMPLETION AND EXPIRATION DATES: The Commission finds that the expiration date of #4C0310-5, September 30, 2014, should be sufficient to cover the expected useful life of this building. Page 8 Findings of Fact #4C0310-6 CONCLUSION OF LAW .Sled upon f o inn F in t 1- Ba L, the Dreg y � dings of Fact � � is the conclusion of this District Environmental Commission that the project described in the application referred to above, if completed and maintained in conformance with all of the terms and conditions of that application, and of Land Use Permit Amendment #4C0310-6, will not cause or result in a detriment to public health, safety or general welfare under the criteria described in 10 V.S.A., SEC.6086 (a). IV. ORDER Based upon the foregoing Findings of Fact and Conclusions of Law, Land Use Permit Amendment #4C0310-6 is hereby issued. Dated at Essex Junction, Vermont, this J&day of October, 1986. By: n T. Ewing, C ayman District #4 Comm sion Commissioners participating in this decision: Helen B. Lawrence Richard H. Wadhams John T. Ewing RAym d S. Stewart Envi nmental Board Assistant Coordinator RSS/JTE/aml State of Vermont CASE NO. APPLICANT ADDRESS AGENCY OF ENVIRONMENTAL CONSERVATION CERTIFICATION OF COMPLIANCE 4C0310-6 LAWS/REGULATIONS INVOLVED Merchants Bank Environmental Protection Rules 123 Church Street Chapter 4 - Public Buildings Burlington, VT 05401 Chapter 7 - Sewage Disposal Chapter 8 - Water Supply Chapter 9 - Plumbing This project consisting of construction of a new 4 story office building (maximum 100 employees) with new municipal water and sewer services located on Lot 7 on Kennedy Drive in the City of South Burlington, Vermont is hereby approved under the requirements of the regulations named above, subject to the following conditions: GENERAL (1) The project must be completed as shown on the plans Sheet SP 2 "Site Plan - Erosion & Drainage" dated Sept. 2, 1986; and Sheet SP 3 "Water Sewer Plan - Profile Detail" dated Sept. 15, 1986 prepared by Richard Wheeler, P.E.; and Sheets HVAC1 through HVAC4, "Heat Pump Layout, Exhaust and Ventilation Air Systems" dated 7-22-86 and Sheets P1 through P11 dated 7/21/86 prepared by New England Air Systems and which have been stamped APPROVED by the Division of Protection. No alteration of these plans shall be allowed except where written application has been made to the Agency of Environmental Conservation and approval obtained. (2) A copy of the approved plans and the Certificate of Compliance shall remain on the project during all phases of construction and, upon request, shall be made available for inspection by State or Local personnel. (3) The Vermont Department of Health is to be contacted in regard to any regulations and/or licenses required by their department. (They may be reached at 60 Main Street, Burlington, Vermont, or by phoning 802-863-7220.) WATER SUPPLY (4) The project is approved for connection to a municipal type water system approved by the Department of Health provided that all construction is in accordance with the approved plans and the Environmental Protection Rules, Effective September 10, 1982. (5) The installation of the water line extension shall be inspected by a professional engineer registered in the State of Vermont who shall report in writing, prior to occupancy, that the work has been completed in accordance with the approved plans. The engineer's report shall include but not be limited to the numerical results of all leakage tests performed on the water line and review of the pipe in trench before covering, and the disinfection of all water pipes. SEWAGE DISPOSAL (6) The project is approved for connection to a municipal sewage collection system. The work shall be done in accordance with the Environmental Protection Rules, Effective September 10, 1982. M Certification of Compliance 4C0310-6 Page 2 (7) A professional engineer, registered in the State of Vermont, is to generally supervise the construction of the sanitary sewer line extensions, and, upon completion of construction, the supervising engineer is to submit to the Protection Division a written certification stating all construction has been completed in accordance with the stamped approved plans. The engineer's certification is to be submitted to the Division prior to the occupancy of any unit and the certification shall include, but not limited to, the numerical results of all leakage testing performed on each section of the sanitary sewer extension and all manholes, as described in Appendix A, of the Environmental Protection Rules. PLUMBING (8) The Division of Protection is to be notified prior to the closing or covering of any waste plumbing so that we may inspect the workmanship. (9) The applicant is reminded that all plumbing material and workmanship must meet the standards of the Environmental Protection Rules, Chapter 9, Plumbing; the National Plumbing Code; and the requirements of the Vermont Fire Prevention Section of the Department of Labor and Industry. Dated in the Village of Essex Junction, Vermont this 23rd day of September, 1986. cc: Donald Robisky Katherine Vose Dept. of Health Dept. of Labor & Industry City of South Burlington Gordon Woods Richard Wheeler New England Air Systems FOR THE DIVISION OF PROTECTION Mary Clark Assistant Regional Engineer EXHIBIT LIST FOR APPLICATION # 4CO31 E D R E A= APPLICANT X A E N T= TOWN H T C T TPC = TOWN PLANNING COMMISSION I E E E RPC = Regional Planning Commission B I R AEC = Agency of Environmental Conservation I V E T E D D N B 0. Y NATURE OF EXHIBIT Date Entered 1 7/23/86 A Application form; by T. Havers (7-23-86) 9-24-86 lA 8/22/86 A Application form, by T. Havers & Dan & L. O'Brien 9-24-86 2 8/4/86 A Notice - Commencement of Construction; by T. Havers (7/23/86) 9-24-86 3 8/4/86 A Notice - Service; by T. Havers (7/23/86) 9-24-86 4 9/4/86 A Map - Location 9-24-86 5 7/23/86 A Document - Schedule B; by G. Woods (7/23/86) 9-24-86 6 7/23/86 A Plan - "Site Plan" (SP1) by G. Woods (5-86, rev. 7-16-86) 9-24-86 6A 9/17/86 A Plan - "Site Plan"; (SPl) by G. Woods (5-86, rev. 8-5-86) 9-24-86 7 7-23-86 A Plan - "Site Plan, Utilities, Etc. (SP-u) by G. Woods 9-24-86 8 7-23-86 A Plan - "First Floor Plan" (A-1); by G. Woods (5-86, rev. 7-23-86) 9-24-86 9 7-23-86 A Plan - "Second Floor Plan" (A2); by G. Woods (5-86) (rev. 7-23-86) 9-24-86 10 7-23-86 A Plan - "Third Floor Plan" (A3); by G. Woods (5-86) 9-24-86 11 7-23-86 A Plan - "Fourth Floor Plan" (A4); by G. Woods (5-86) 9-24-86 12 7-23-86 A Plan - "Elevations" (A5); by G. Woods (5-86) 9-24-86 13 9-25-86 A Plan - "Site Plan - Erosion & Drainage" (SP-2), by G. Woods (5-86, rev. 9-24-86) 9-25-86 13A 9-25-86 A Plan - "Site Plan - Erosion & Drainage (SP2), By G. Woods -k5-86, Rev. 9-24-86) 9-25-86 EXHIBIT LIST FOR APPLICATION # 4CO310-6 E D R E A= APPLICANT X A E N T= TOWN H T C T TPC = TOWN PLANNING COMMISSION I E E E RPC = Regional Planning Commission B I R AEC = Agency of Environmental Conservation I V E T E D D N B 0• 1 IY 1 NATURE OF EXHIBIT Date Entered 14 8-19-86 15 8-19-86 16 8-19-86 17 8-19-86 18 8-11- 86 19 8-11-86 20 8-11-86 21 8-11-86 22 8-11-86 24 9-12-86 T T T T A A A A A 2 9-17-86 SCS 2 9-24-86 A 2 9-24-86 AEC Letter - Re: Conformance; by J. Lafleur (8-18-86) 9-24-86 Letter - Re: 1500 gpd sewage allocation; by W. J. Szymanski, City MAnager (8-18-86)9-24-86 Letter - Re: fire services; by J. W. Goddette, Sr., Chief (8-18-86) 9-24-86 Letter - Re: Police Services, by R. C. McGee, Captain (8-18-86) 9-24-86 Letter - Re: Interior lighting fixtures, by R. A. Wolbac: (8-7-86) 9-24-86 Document - Energy addendum to Schedule B; by (8-7-86) 9-24-86 Letter - Re: Electric service, by E. L. Shlatz, GMP (7-30-86) 9-24-86 Document - Traffic Study; by D. Spitz (7-12-86) 9-24-86 Document - Traffic Study addendum, by D. Sptiz (8-5-86) 9-24-86 Letter - Re: review, by M. K. Clark, Division of Protection (9-4-86) 9-24-86 Letter - Re: Contact Airport Planner, by F. E. Aldrich (9-10-86) 9-24-86 Letter - Re: erosion review/recommendations, by M. Forest (9-16-86) 9-24-86 Letter - Re: gas service, by M. J. Poirier, (9-11-86) 9-24-86 Entry of Appearance - pre -hearing comments, by G. Gebauer, (9-18-86) 9-24-86 August 14, 1986 Gordon Woods 104 Church Street Burlington, Vermont 05401 Re: Merchants Bank, Kimball Avenue Dear Gordon: Enclosed are the minutes of the August 12, 1986 Planning Commission meeting. The bank is responsible for meeting all of the conditions regarding this approval prior to permit. All forms and sample escrow or letter of credit agreements are available from Dick Ward, Zoning Administrator. Please call me or Dick if you have any questions. Sincerely, Jane B. Lafleur, City Planner JBL/mcp Encl cc: David Spit Rodney Campbell August 14, 1986 Gordon Woods 104 Church Street Burlington, Vermont 05401 Re: Merchants, 75 Kennedy Drive Dear Gordon: Enclosed are the August 5, 1986 minutes. Please call me if you have any questions. Sincerely, Jane B. Lafleur, City Planner JBL/mcp Enc1. cc: David Spitz Rodney Campbell Craig Leiner August 18, 1986 Katherine Vose AEC 111 West Street Essex Junction, Vermont 05452 Re: Merchants Bank, Kimball Avenue and Kennedy Drive Dear Katherine: This letter serves to confirm that the South Burlington Planning Commission granted site plan approval to the 40,000 square foot Merchants Bank building on Kimball Avenue and Kennedy Drive. This plan conforms with the Comprehensive Plan of South Burlingotn. The Commission granted a sewer allocation of 1500 gpd that is part of the 3020 gallons per day for the entire 10 lot subdivision. Sincerely, Jane B. Lafleur, City Planner JBL/mcp cc: Gordon Woods PLANNING COMMISSION 5 AUGUST 1986 PAGE 2 Vermont, Proposed Addition" prepared �?y Casey Construction, dated March 1986, last revised June 16, 1986 because of the following reasons: 1. Construction of a building within the water easement on the north side of the building is not permitted. 2. New landscaping shall not be permitted within the right- of-way. 3. The southern curb cut on Shelburne Rd. is not deleted on the plans as instructed 12y the Planning Commission. Ms. Peacock seconded, and the motion passed unanimously. 5. Continue site plan application 2� Merchants Bank for construction of a 40,000 sq. ft. operations center including a 1600 sq. ft branch bank on lot #7 of Bu siness Park North, Kimball Avenue & Kennedy Drive. Traffic Consultant Craig Leiner said he met with Dave Spitz and that they agree on trip generation, access points, and source data. Question of development of design hourly volumes and the lack of an AM analysis have also been resolved. They differ on level of service estimates at Williston Rd. and Kennedy Drive. Their differences are as follows: Development Condition Spitz Leiner 1986 w/o bank C 19.39 sec delay D 27.1 sec delay 1986 w/bank C 22 sec delay D 30.7 sec delay 1991 w/o bank E 52.15 sec delay oversaturated 1991 w/bank E 59.67 sec delay oversaturated Mr. Leiner agrees that with modified signal timing the intersection can be brought to a better level of service, but there is just so far you can go with modified timing. The worst problem will be westbound traffic,.and he felt there should be a plan for capacity improvement. Mrs. Lafleur said this is important because it must be level of service C. Mr. Belter asked if the Commission can make this developer pay for an existing problem that someone else caused. Mr. Leiner said he would recommend getting some money from all developers till there is enough for improvements such as a turning lane westbound. Mr. Spitz said he felt 2 factors cause the discrepancy between himself and Mr. Leiner: consideration of right turn on red vehicles, and his assumption that cars will use part PLANNING COMMISSION 5 AUGUST 1986 PAGE 3 of the yellow signal for turning. He said they are prepared to pay for signal modification and to contribute to future improvements. He felt that signal modification money should be credited to future improvements. Mrs. Lafleur will prepare figures for improvement funds. She added that the be consisted with what was done at Lakewood, this developer would pay for the signal and also would contribute to future improvements. On other issues, the pedestrian trail has been removed from the parking lot and some trees have been moved. The question of the sidewalk was considered. Mr. Szymanski wants a side- walk on Kennedy Drive to the end of the length of the bank building. Mrs. Maher said she felt the developer should put in a full sidewalk. Mrs. Lafleur will check with Mr. Szyman- ski as to why he made his recommendation and a1So on the question of filling to be done in the CO zone. Mr. Woods said they have agreed to fill and put in a culvert and mow to the curb on Kennedy Drive. With regard to drainage, Water Resources won't accept holding ponds, so they want to drain through the grassed area. On the subject of building height, the Kimball Avenue side of the building is 36 ft. They are requesting 45 ft. in the back (basement + 3 floors). Mr. Woods noted the Palmer Building is 41 ft. on one side including the air conditioning unit. Mrs. Lafleur noted that setbacks have been increased proportionally. Mr. Woods noted that lot coverage is 65% but could be as much as 70%. A poll of members showed that the majority did not object to the 45 ft. height. Mrs. Maher felt their arguments were very poor as far as criteria, and Mr. Dooley and Mrs. Hurd felt they would like to see more green space. Mr. Dooley felt that the 4 stories resulted in less green space because of the additional parking required. Mrs. Lafleur will look at parking to see if it can be reduced in favor of more green space. Mrs. Maher felt there should be some evergreen trees which minimize visual impace. Regarding the future access question, Mrs. Lafleur didn't like it as it will bring more traffic out onto Williston Rd. and also goes through the middle of a very dense CO Zone which she felt should not be disturbed. Mr. Dooley then moved to continue the hearing for one week. Mr. Belter seconded, and the motion passed unanimously. 6. Continue PUBLIC HEARING for a 2-lot subdivision of a .537 acre parcel into .26 and .27 acres at 27 Meadow Rd. No Text - ----- '1}:itt'HAN'I'S [�IA till , h I MBAIJ, AVENU}, AND KI%NN!:I)Y Bi] 1 SzyIII arnslti has reviewed the proposal t.o prov.idc• �j "iti(,waI1< from the exit drive towards Wi.il.iston Road. TI)e fiII wiII h( subst.antia.I with over 30 feet in depth required. The piI)r wi I l have to be extended under it for drainage and the City tat I i 11aAve t.o upgrade the pipe under Kennedy Drive when this is done The City plans to reel -ace the hi.pe whether or• not. the sid,r).nIIt is bu i .l t . The f'i l l would also be requ i red on Dan O' Br i en' s l and i f the sidewalk is built. :'11t. this point it seems costly, pot rn- t:.i.aI I detrimc�,,taI and unnecessary. See Bi 1 l Szymanslc i 's comments on this. The Natural. Resources comm.i.ttee has been :tslcc i to review this as well. I will. try to have a formu.lrt for the intersection i mpr o� c mrn t and a list of improvements available at the meeting. The plans now show some evergreens around the parkirt.g !ot and an increase in the green area by removing 1;01110 p:t rk i n-,, spaces and moving the building back from Kennedy Dr \ waiver for parking is required. 5) SEMICON, 1000 111NESBURG ROAD Semicon, Inc, proposes to divide the property into r,nc-a ►,,t �: i t i� 80 acres for future development and one lot: of 31.2 rtrr� �:ith the existing building. Access is proposed through a ;act foot right. -of -way to the Semicon property rather than the two lots to meet the frontage requirements. The owner of the Semicon building (present or t'utur•c realize that this arrangement prohi.bi.ts the existing sign rtr,xt t ) Hinesburg Road. After, the subdivision i. s ipproved , t h.t t s i ,,, will be off -premise and will have to be removed. A st,,ttr sign sim:il.ar to what 1)ii;ita-1 uses will be permitte(i. See I-3ill. Szymanski's regarding the I of cont'i,gurati;)n ;,,,J ,'hi t' Goddettc-'s comments. 2 Williston Road Traffic Impact Policy For the purposes of this policy,, the Williston Road corridor is divided into 3 segments. Segment 1 includes the Gaynes/Sheraton and Holiday Inn/HoJo's area shown on tax maps #6, #7, #15, #16. Segment 2 includes the heavily developed commercial area and the lesser developed area to the east shown on tax maps 9, 12, 17, and 18. Segment 3 includes the Kennedy Drive/Airport Drive intersection east to the City limits shown on tax maps 14, 19, 20, 21, 29, and 32. The impact fee is based on: 1) the undeveloped land in each segment; 2) an estimate of the development potential of the undeveloped acreage; 3) an estimate of the peak hour trip ends for the unde- veloped acreage; and 4) the required traffic improvements and costs. Each development proposal in the impact area will contribute to the total trips projected for the corridor. Those trips are a share of the total trips estimated over the next 10 years. That share shall be paid toward the total cost of Williston Road improvements. The following improvements shall be made with the impact, fees: Segment #1 (No improvements planned yet) Segment #2 'a in K IaDC,� o10J,OL'3 1 ) Widen Williston Road to 5 lanes ( Dorset to Hinesburg) . 3o,L)0C) 2) Set of traffic signals at intersection of Patchen Road and White Street. 3) Crosswalks and pedestrian actuated signals. Segment #3 1) Set of traffic signals at intersection of Victoria Drive - Williston Road to allow cars to exit out of Mayfair Park where movement is mainly to the west. 3oa�aon x\C�6- 3oa30 2 ) Extra lanes at intersection of Airport Drive, Kennedy Drive and Williston Road. 3a/DJ 3) A set of traffic signals at Kimball Avenue and Kenned�- Drive especially as Kimball Avenue, Shunpike Road and Williston develop. �oDp fi 4) Crosswalks and pedestrian actuated signals at Kennedy/Williston intersection. 5) Widen Williston Road from Clinton Street. to City line to 4 lanes (State). M 6) 'Traffic signals at Shunpike - Williston Road intersection (State). The following are estimates of undeveloped acreage, building growth and trip generation: Impact Area 1 Commercial 1: Impact area 2 Commercial 1: Residential 4: Impact Area 3 Commercial 1: Commercial 2: 70.38 acres x 43560 = 3,065,753 x 30% coverage = 919,726 x 2.84 trip ends/1000 gfa = 2,612 11.48 acres x 43560 = 500,06,8 x 30% coverage = 150,021 x 2.84/1000 = 426 11.13 acres - 15% = 9.36 x 4 units/acre x 1 trip end/unit = 38 TOTAL TRIP ENDS = 464 82.46 acres x 43560 = 3,591,957.6 x 30% coverage = 1,077,587.2 square feet 24.05 acres x 43560 = 1,047,618 x 30% coverage = 314,285.4 square feet Industrial -Commercial: 164.3 acres x 43560 = 7,156,908 x 30% coverage = 2,147,072.4 square feet Total Commercial: 3,538,945 square feet..x 2.84 trips/1000 square feet = 10,051 trip ends Residential 4: 18.39 x 4 units/acre 73.56 w►15% = 63 x 1 trip end/unit = 63 trips TOTAL = 10,114 trip ends. If we assume that all of this land will be developed in 20 years, and we want to pay for the improvements in 10 years, we must assume that half of the total trip ends will be generated in 10 years. 2 y Impact Area 1: 1306 trip ends Impact Area 2: 232 trip ends Impact Area 3: 5,057 trip ends The Planning Commission recognizes that these estimates may be changed as properties are developed and modifications to the list of improvements may be required. The Commission reserves the right to adjust this policy as required. (The Merchants Bank will contribute 4% (185 / 5,057) of the future growth in Segment 3. Therefore 4% of the cost, of these improvements shall be paid prior to permit.) 3 '�1 i `ice � - � �1' •!+"' ;°.� " '•"J'�r.�i1 • �' �'� a; �:J► I '' t 'ate• ! ! � Mj4 . �3� a!• 7;�'.�' � I�.ys•w / � .7"�'..2' '• � .,��.: ,ilk �� �/%/ 1. d •� Y-•:�^:•• '�'� -it E 'r M E M O R A N D U M To: South Burlington Planning Commission From: William J. Szymanski, City Manager Re: August 12, 1986 agenda items Date: August 8, 1986 3) NORDIC CAR RENTAL, SHELBURNE ROAD 1. The 30 foot ditch along Bartletts Bay should be eliminated and existing pipe extended beyond the entrance drive. 2. Plans are difficult to read. There are lines that are not identified such as the one behind the G.E. Supply Building and one in rear parking island. 4) MERCHANTS BANK, KENNEDY DRIVE. 1. Construction of a sidewalk along Kennedy Drive from the bank access drive to the northerly property line would require a considerable amount of filling. To do this would also require permission from the adjacent owner. The cost estimate for doing this work amounts to approximately $45,500 assuming all required fill material is trucked in from the outside. If surplus fill from the site, such as from the building site is available then that cost can be reduced. The City has plans for jacking another pipe across Kennedy Drive and from the information available it appears this filling will extend into that area adding some extra expense to the project. Continuing the sidewalk northerly to Williston Road will be the responsibility of the City. No estimate of that cost has been made but it will be considerable (+$50,000) 2. Comments from previous memo's still apply. 5) SEMICON INC., HINESBURG ROAD 1. The property should be subdivided so that existing utilities mainly water and sewer could be used for future development. The access road can also be upgraded and become a public street to serve adjacent development. 1 August 8, 1936 Gordon Woods 104 Church Street Burlington, Vermont 05401 Re: Merchants Bank, Kimball and Kennedy Drive Dear Gordon: Enclosed are the agenda and my memo to the Planning Commission. I hope to have the intersection improvement formula available Tuesday night so the Commission may act on this item. I do not expect it to be tabled again. Please be sure someone is present to represent this proposal. Sincerely, Jane B. Lafleur, City Planner JBL/mcp Encls cc.; David Spitz Rodney Campbell � aV �Fi/ p f G'O Z ov -t- 0 X 3 a Z ZGD�X rK il/uY 7'5� 8� w r3 , b 30 ' ^��"3 /tea 8;, 5" �> 3, a a p ifs 3 /Gl'''�c'v c � rC'S���uG✓G'�' !Ga/ / 2nal�41lz C7) .................... �, C ii it .� �........�. �.�..�..r.nr...... i ------------ D �a •X/ ` fir , l� x l,�-1e ,ASK � AA-.- _-- _ L� �r a.i na __ems_ � _�1 �; �..� v f f No Text Chittenden County Regional Planning Commission 66 PEARL STREET P.O. Box 1108 ESSEX JuwoION.VERMoNT 05452 mm&WX0404 AUGUST 5, 1986 TO: SOUTH BURLINGTON PLANNING COMMISSION FROM: CRAI8 T. LEINER, CCRPC RE: MERCHANTS BANK TRAFFIC ANALYSIS MY ORIGINAL REVIEW LETTER (JULY 17, 1986) RAISED SIX ISSUES CONCERNING THE TRAFFIC IMPACT ANALYSIS FOR THIS PROPOSED DEVELOPMENT. THE CONSULTANT WAS RESPONSIVE TO THE REVIEW COMMENTS, AND I THINK TRIP GENERATION, ACCESS POINTS, SOURCE DATA, DEVELOPMENT OF DESIGN HOURLY VOLUMES, AND THE LACK OF AN AM ANALYSIS HAVE, IN MY OPINION ALL BEEN RESOLVED. THE OUTSTANDING ISSUE CONCERNS LEVELS OF SERVICE AT THE KENNEDY/WILLISTON INTERSECTION. THE RESUL[S OF THE CONSULTANT'S ANALYSIS AND MY ESTIMATES ARE SHOWM BELOW. LEVEL OF SERVICE KENNEDY DRIVE/WILLISTON RUAD DEVELOPMENT NCP �� ' ' CCRPC (-d*|( CONDITION 1. 1986 W/O BANK 19.39sec C J 27.1sec D 2. 1986 W/ BANK 22.00sec C 30.7sec D 3, 1991 W/O BANK 52.15sec E OVERSATURATED 4. 1991 W/ BANK 59.67sec E OVERSATURATED MY ESTIMATES USED THE INPUTS DEVELOPED BY THE CONSULTANT: PEAK HOUR FACTORS, HEAVY VEHICLE PERCENTAGE, VOLUMES AND SO ON. IT WOULD TAKE ADDITIONAL ANALYSIS AND PERHAPS ANOTHER WORK SESSION WITH MR. SPITZ TO DETERMINE EXACTLY WHY OUR RESULTS DIFFER. WHAT IS IMPORTAANT, IS THAT BOTH HE AND I ESTIMATE THAT THE BANK WILL ACCOUNT FOR ABOUT THREE SECONDS OF ADDITIONAL DELAY AT THE INTERSECTION. MOREOVER, I THINK THERE IS AGREEMENT ON THE NEED TO BEGIN TO PLAN FOR IMPROVEMENTS AT THIS LOCATION. IN PARTICULAR, AN ADDITIONAL LANE FOR LEFT TURNING VEHICLES ON THE WESTBOUND APPROACH OF WILLISTON ROAD WILL BE NECESSARY. — �.�s°��e*=m."mp"ov�"/.. 000" o�o"em" chna*tte Coichester E.`°"J"nction Essex Town */"esb",» Huntington Jericho w/»"" n/"hmv"u MOTION OF APPROVAL 8/4/86-JBL That the South Burlington Planning Commission approve the site plan application of the Merchants Bank, Gordon Woods, agent for construction of a 40,000 square foot bank operations center including a 1600 square foot branch bank on lot #7 of Business Park North as depicted on a plan entitled "New Operations Center for Merchants Bank, Kennedy Drive, South Burlington" prepared by Gordon G. Woods, dated May, 1986, printed 6/30/86 with the following stipulations: 1) A $20,000 landscaping bond shall be posted prior to permit. 2) A sidewalk shall be constructed along Kimball Avenue and along Kennedy Drive from Kimball Avenue to the access drive. A bond shall be posted for this prior to permit in an amount determined by the City Engineer. 3) The guard rail that is removed to build the sidewalk shall be removed and transported undamaged to the City Highway garage site. 4) The 42 compact cars that represent 25% of the total are approved by the Planning Commission. 5) A 1500 gpd sewer allocation is made as a portion of the original 3020 gpd allocation for the 10 lot subdivision; 640 gpd remain for the undeveloped parcels. 6) The deceleration and acceleration lanes shall be constructed with the granite curbing that is removed from Kennedy Drive as well as any additional curbing to curb the driveway to the parking area. The island shall also be curbed. 7) The Planning Commission finds that the proposed 45 foot height will 1) utilize topography and will relate to other existing and proposed structures; 2) will not detract from scenic views of adjacent properties or public streets and walk- ways; and 3) will allow retention of additional green space that will enhance the appearance of the developed property. 8) A storm water runoff control plan shall be approved by the City Engineer prior to permit. 9) An easement shall be given to the City to reconstruct or add to the drainage pipe under Kennedy Drive. The City agrees to restore the disturbed area to its original condition. 10) The applicant shall contribute an amount determined by the City Planner in accordance with a formula based on the total number of trips in the Williston Road corridor and the amount projected by this development to pay for that share of intersec- tion improvements over the next 5 years in the Williston Road corridor. 11) The building permit shall be obtained within 6 months. 1 8/14/86 Sonny - I will be on vacation for 2 weeks but I wanted to let you know about the new Merchants Bank before I go. 1) They will be installing a sidewalk on Kimball from where it ends to Kennedy Drive. Also, they will continue it to their new driveway on Kennedy Drive. Instead of going further north beyond their new drive towards Williston Road, since it would require a lot of fill and may damage the CO Zone, they are required to put 240 feet further west on Kennedy Drive to attach to the existing sidewalk near the condos. 2) They are required to install a left turn arrow for west bound turns from Williston Road to Kennedy Drive. Signal timing will also be changed. 3) They are required to contribute to future intersection improvements on Williston Road. Thanks. The minutes will be available soon. We can discuss these when I get back if you want. NORTH COUNTRY PLANNING i Jane Lafleur, City Planner 575 Dorset Street South Burlington, Vermont 05401 P.O. Box 333 Winooski. Vermont 05404 (e02) 655.3661 August 8, 1986 Dear Jane, Existing signal timing at the Williston Road/Kennedy Drive inter- section is as follows: Approach # of Seconds 34 4 2 24 4 2 Williston Rd, E& W G Y R R R R Airport & Kennedy Dr R R R G Y R Proposed signal revisions, essentially allowing extra green time for the Williston Road, East approach, are as follows: Approach # of Seconds 7 3 24 4 2 24 4 2 Williston Rd, East Y or - Left Turn Arrow G Off Off Off Off Off Off Off Wllstn Rd, East - Thru G G G Y R R R R Williston Rd, West R R G Y R R R R Airport & Kennedy Dr R R R R R G Y R To accomplish these revisions, required signal improvements are (1) an additional green arrow for the Williston East approach, (2)(optional) a yellow arrow for the Williston East approach and (3) a "delayed green" sign for the williston West approach. The City Manager should be able to determine whether the existing timing mechanism can accomodate the proposed changes. Please let me know if any further information is required. Sincerely, cc: Gordon Woods David H. Spitz Rodney Campbell Chittenden County Regional Planning Commission 66 PEARL STREET P.O. BOX 108 ESSEX JUNCTION, VERMONT 05452 802 658-3004 July 17, 1986 Jane Lafleur, Planner City of South Burlington 575 Dorset Street South Burlington, Vermont 05LI01 Dear Jane: I have reviewed the traffic impact study prepared for the proposed Merchants Bank facility which, according to the study is to encompass 38,400 square feet of data processing and public banking uses. In general, it was difficult for me to develop recommendations because much of the source data needed to substantiate the analysis is not provided in the report. My specific comments are as follows: 1. The consultant states that "both access points can operate safely." This may be true; however, the proposed access plan creates a short weaving section on Kennedy Drive, between the Kimball/Kennedy intersection and the right turn into the site. Did the consultant perform a weaving analysis to determine the extent of vehicle conflicts? 2. The consultant states that Williston/Kennedy can operate at LOS C with signal modifications. However, no operational analysis of this location under current timing is presented. I agree that volumes from the east are higher in the evening; however, a count performed by CCRPC in June 1986 shows substantial volumes from the west. An analysis using the June 1986 CCRPC volumes indicated this intersection is currently operating at close to level of service E. I re -analyzed the intersection using the phasing suggested by the consultant, and indeed intersection 20 Years of Service to the Municipalities of ... Bolton Burlington Charlotte Colchester Essex Junction Essex Town Hinesburg Huntington Jericho Milton Richmond St. George Shelburne So. Burlington Underhill Westford Williston Winooski Jane Lafleur -2- July 17, 1986 operations improved to LOS D. Thus, the consultant's suggestion certainly has merit, but there is a limit to how far this approach can be taken. For example, if future growth results in increased volumes on other approaches, signal timing and phasing options will be limited. Consequently, if the consultant's suggestion is to be pursued, I suggest the intersection signal timing be optimized using software such as SOAP84. 3. On page three of the report, six traffic counts are referenced. Without having this data included in an appendix to the report, it it difficult to verify the reasonableness of the Design Hourly Volumes. 4. The consultant uses employee trip rates to generate traffic from the proposed use. This is unacceptable. Numbers of employees are subject to change over time. Trip generation should be based on square feet of the proposed use. In this instance, using square feet rather than employees results in a change in estimated p.m. peak hour trips from 65 to 81. Further, the consultant uses a local estimate for generating trips from the bank facility; this may be acceptable, but again supporting documentation is not provided on how this local data was collected and applied. 5. On page 7, the consultant notes an analysis was done for the PM hour only, stating that "AM volumes are considerably lower and should not affect capacity determinations." As I have emphasized in previous reviews of traffic studies, the AM hour should not be ignored at a consultant's discretion. The South Burlington Planning Commission or its staff should make the determination as to whether an AM analysis is necessary. 6. The consultant used a planning analysis to develop Table 3, but attaches an operational analysis for 1986 with development and modified signal phasing. No cycle length is given, and the computed intersection delay of 24.48 seconds is within 0.62 seconds of going from LOS C to LOS D. Further, this re -allocation of -green time to the east approach may result in increased delay on some other approach. The Planning Commission should know that the additional green time must be taken from another approach, unless the total cycle length is increased. In addition, an operational analysis should be performed for all design years on Table 3. Jane Lafleur -3- July 17, 1986 In summary, I think this intersection is currently operating near LOS E and might be improved with signal modifications. I performed an operational analysis for 1991 with and without the development, and I have come to some preliminary conclusions, but I am deferring my recommendations since the study in its present form is, in my opinion, incomplete. If you have any questions, please call. Sincerely, CRAIG T LEINER TRANSP TATION ENGINEER CTL:bf N01al MUMMY - po I'11.wiING r� aye Mr. Rodney Campbell The Merchants Bank 123 Church Street Burlington, Vermont 05401 Dear Mr. Campbell, . .Box 333 Winooski, Vermont 05404 (802) 655-3661 August 5, 1986 The enclosed traffic addendum, prepared by North Country Planning ("consultant"), responds to comments provided by Craig Leiner ("reviewer") in his July 17, 1986 letter to the South Burlington Planning Commission. Responses are numbered to correspond with the reviewer's comments. 1) A formal weaving analysis was determined at a joint meeting to be unnecessary at this site. The consultant will accept the reviewer's determination that both acceleration and deceleration lanes should be provided at the Kennedy Drive entrance. 2) This addendum contains an operational analysis of the Williston/ Kennedy intersection with current signal timing. Overall intersection delay for 1986 P.M. DHV (design hour volume) is calculated at level of service C, with or without the development. Inclusion of development traffic increases delay from 19.39 to 22.00 seconds. 3) All back-up traffic counts are concluded in the appendix. 4) Trip rates for the "non-public" portion of the bank are now based on square feet rather than employees. Also, the total square footage for this portion of the bank has been corrected from 36,800 square feet to 38,400 square feet. Drive-in bank traffic is based on a composite of ITE and local traffic counts. Two ITE methods produce estimates of 40 or 70 p.m, peak hour trips. Actual counts at two nearby banks produced 4 to 5 p.m, totals from 37 trips at the Vermont National Bank on Williston Road to 134 trips at the Bank of Vermont on Kennedy Drive. Based on location and type of facility, the Merchants Bank is estimated at 100 trips for the p.m, peak hour. 5) A.M. calculations are now included for 1991 DHV with develop- ment at the Williston/Kennedy intersection. Since calculations for that time period are at level of service C, no further calculations were deemed to be necessary. Merchants Bank, Kimball Avenue Traffic Impact Report - Addendum 8/5/86 page 2 6) Operational analyses for all p.m. conditions are contained in this addendum. Whenever green time has been reallocated (as in the 1991 calculations), delays for all approaches are closely specified on the work sheets. Overall intersection delays are listed below. Time Period 1986 P.M. DHV Without Developmt 1986 P.M. DHV With Development 1991 P.M. DHV Without Developmt 1991 P.M. DHV With Development 1991 P.M. DHV With Development, Revised Phasing * 1991 A.M. DHV With Development Total Intersection Level Of Delay (Seconds) Service 19.39 C 22.00 C j 52.15 E ! 59.67 E J 20.31 to 29.35 C to D 15.32 C * This time period was calculated twice - once with liberal and once with conservative assumptions. Other time periods might produce similar ranges for total intersection delay under varying assumptions. The above results indicate that the Williston/Kennedy intersection can operate at a satisfactory level of service for the 1986 design hour. If revised signal timing is implemented, the intersection will operate either just above or just below the C to D threshhold by the 1991 design hour. This consultant continues to recommend implementation of revised signal timing for the short term. Eventually, additional intersection improvements will become necessary - most likely a new left turn lane for the Williston Road East approach. The Merchants Bank can be expected to contribute its fair share towards those eventual improvements. Please contact me if any additional information is required. Sincerely, 9)az S/� -- David H. Spitz Merchants Bank, Kimball Avenue 8/5/86 Traffic Impact Report - Addendum page 3 Development Traffic Volumes The "non-public" portion of the bank facility is now calculated at 38,400 square feet. Calculations for the public banking area are unchanged (see comments in the summary of this addendum). TABLE 1: TRIP GENERATION ESTIMATES - MERCHANTS BANK Drive -In Bank Bank Offices Total A.M. Enter 8 75 83 Exit 6 14 20 Total 14 89 103 P.M. Enter 43 14 57 Exit 57 71 128 Total 100 85 185 Average Weekday 849 472 1321 Assignment Of Development Traffic Volumes No changes. Proposed Development Entrances No changes are proposed for access locations. Revised a.m. and p.m. turning movements are given in Figures 1 and 2. Kennedy Drive/Kimball Avenue Intersection Minor changes from the original report for traffic volumes at this intersection will not affect the previously calculated levels of service. Merchants Bank, Kimball Avenue Traffic Impact Report - Addendum FIGURE 1: DEVELOPMENT TURNING MOVEMENTS - A.M. PEAK HOUR 5 Williston Road 631 T 4 6 25 41 —� Kimball Avenue Kennedy l Drive FIGURE 2: DEVELOPMENT TURNING MOVEMENTS - P.M. PEAK HOUR 9 3 -- -- Williston Road 17 /� ('�' 36 20 8 T=- 64 11 2 �9 �- 26 38 17 Kimball Avenue 11 29 Kennedy Drive 8/5/86 page 4 Merchants Bank, Kimball Avenue 8/5/86 Traffic Impact Report - Addendum page 5 Williston Road/Kennedy Drive Intersection Revised traffic volumes for the 1986 P.M. DHV at this intersection reflect two changes: (1) higher development traffic volumes from Table 1 and (2) a slightly higher DHV/average peak hour ratio (1.175). Base data are from a Vermont Agency of Transportation June 1984 turning movement count. In calculating volumes for the 1986 A.M. DHV it was determined that Vermont Agency of transportation 1984 counts do not accurately reflect current conditions. A more recent May 1986 count provided by the Chittenden County Metropolitan Planning Organization is used with adjust- ments for DHV/average peak hour (1.15) and for the month of May (.90). A 2% annual growth rate is used to calculate 1991 volumes for both A.M. and P.M. DHV. For all counts, additional development traffic is underlined. 1986 and 1991 A.M. and P.M. counts are given in Figures 3 through 6. Operational analyses for 1991 A.M. with development and for 1986 and 1991 P.M. with and without development are included in the appendix. Total intersection delays and levels of service are contained in the summary. Merchants Bank, Kimball Avenue 8/5/86 Traffic Impact Report - Addendum page 6 FIGURE 3: 1986 A.M. DHV - WILLISTON ROAD/KENNEDY DRIVE 312 + 13 27 + 3 13 Airport 17 Drive 130 615 + - ---—506--- -_ ----- 881 + 5 Williston Road 141 + + 13:�� 132 + 3 - 623 + 2 J g9 — - -- 929 + 1 11 45 + 5 + 23 — 282 + 1 ,^ Kennedy Drive 503 41 51 + 10 FIGURE 4: 1986 P.M. DHV - WILLISTON ROAD/KENNEDY DRIVE 280 + 9 405 + 20 4 Airport 4 Drive 193 838 + 3� _ 661 -_-- _---____.. _ 1116 + 3 135 + 36 Williston Road 101 170 + 20 -- 7 597 + 17 --- __ _- - 490 _ - -- -- --- -- 838 + 8 65 262 + 3 11 + 8 + 17 Kennedy Drive 428 + 29 516 + 64 Merchants Bank, Kimball Avenue 8/5/86 Traffic Impact Report - Addendum page 7 FIGURE 5: 1991 A.M. DHV - WILLISTON ROAD/KENNEDY DRIVE 344 + 13 308 + 3 Airport 1 Drive 19 679 + 6 - _ 559 - --- --- �-,- 973 + 5 - 155 + 146 + 3 Williston Road 13 5 688 + 23 -- -� - -- -- 1026 + 1 129 271 +23 +5 11 + 1 Kennedy Drive 555 + 41 563 + 10 FIGURE 6: 1991 P.M. DHV - WILLISTON ROAD/KENNEDY DRIVE 309 + 9 447 + 20 Airport 4 Drive 46 925 + 36 - - _730 -- -- - - -- 1232 + 3 112 + Williston Road 188 + 20 151 659 + 17 `�f ----- -5�+1 . - _ _ --- ------ 925 + 8 72 289 + 17 + 3 233 + 8 Kennedy Drive 473 + 29 570 + 64 A P P E N D I C E S I. Level Of Service Worksheets o 1986 P.M. DHV With and Without Development ° 1991 P.M. DHV With and Without Development ° 1991 P.M. DHV With Development, Revised Phasing ° 1991 A.M. DHV With Development, Revised Phasing II. Traffic Counts ° VAOT, Kennedy Drive/Kimball Avenue, A.M., 6/11/82 ° VAOT, Kennedy Drive/Kimball Avenue, P.M., 7/26/82 ° VAOT, Williston Road/Kennedy Drive, A.M., 6/29/84 ° VAOT, Williston Road/Kennedy Drive, P.M., 6/28/84 ° VAOT, Kimball Avenue, ATR Count, 9/85 ° VAOT, Kimball Avenue, ATR Count, 8/85 ° NCP, Kennedy Drive/Kimball Avenue, A.M., 6/27/86 ° NCP, Kennedy Drive/Kimball Avenue, P.M., 6/26/86 SIGNALIZED INTERSEC-IIONSI i 9-75 ___j INPUT WORKSHEET �Ptl�t �A; A A11OL".0 v/ /1/ Intersection: Date: < i l� 1��� 0"I OhtV I) < Analyst: Time Period Analyzed: ; ____ Area Type: O CBD ,Other Project No.: City/State: VOLUME AND GEOMETRICS 'I'(l P' N/S STREET 9J ^ t' SB TOTAL .; I) I I i �, p�o� ctide,f)W B TOTAL NORTH -J IDENTIFY IN DIAGRAM: 1. volumes E/W STREET 2. lanes, lone widths (j \1 J 211 3. Movements by lone 1' t 4. Parking (PKG) locations 14g0 S. Bay storage lengths Sq 7 z- —` 'l (/ K� 6. Islands (physical or pointed) 7. Bus stops EB TOTAL ��J ( NB TOTAL r TRAFFIC AND ROADWAY CONDITIONS Approach Grade O % HV Ad'. Pk . Lane Buses (Ne) PNF Conf. Peds. (eds. hr /) Pedestrian Button Arr. Y or N N m Y or N Min. Timing EB —v /�) _Type W B � rA � Al i I A/ � J NB LU 12 SB , t,% I Al Grade: + up, — down NB: buses stopping/hr Min. Timing: min. green for HV: veh. with more than 4 wheels P1IF: peak -hour factor pedestrian crossing Nm: pkg. maneuvers/hr Conf. Peds: Conflicting peds./hr Arr. Type: Type 1-5 PHASING D A E IS �/� �I R A M Timing G= �. G= 1�`� G= G= G= G= G= G= Y+R= Y+R=(, Y+R= Y+R= Y+R= Y+R= Y+R= Y+R= Pretimed or Actuated _� Protected turns _--," Permitted turns -------Pedestrian Cycle Length Sec 9-80 URBAN STREETS LEVEIrOF-SERVICE WORKSHEET Lane roup First Term Del Second Term Delay Total Delay & LOS O Appr. ® Lane Group Move- ments O v/c Ratio X O Green Ratio g/C © Cycle Length C (sec) © Delay d, (sec/veh) O Lane Group Capacity c (vph) O Delay d, (sec/veh) O Progression Factor PF Table 9-13 Lane Group Delay (sec/veh) ((fl ®) X & Lane Group LOS Table 9-1 Approach Delay (sec/veh) Appr. LDS Table 9-1 EB ,— ,� , (a7 11c11 % (� 1,o WB J E� J NB 40 all 1. I r 41 �1 Intersection Delay �- __ _, sec/veh Intersection LOS (Table 9-1) 1 SKiNALILLD INTLkSLCIIONS C' 4 9-7.1 I VI INPUT WORKSHEET Intersection: Qyl���r�ll �iit r L1i/n� l 011ve � �6 ,; Date: � • -� ,. !� Analyst: �� f!� ..� Time Period Analyzed: IV/ 0/ _ nn Yf(k Area Type: ❑ CBD G�l Other <� l'� III C' 0 1'�6 Project Na: City/State: VOLUME AND GEOMETRICS / I b t'id 1. ( spa+ DPc Q(D P,jI 1- al Pa i�P � e, N/S STREET t ! —. Ala, 1;1JO' I SB TOTAL � � l i` -- (f!PG1 l�� lJI p WBTOTAL . , NORTH IDENTIFY IN DIAGRAM: 1. volumes 2. lanes. lane widths E/W STREET 3. Movements by Ian• � I l� .• �� J A. Parking (PKG) locations S. say storage lengths 6. Islands (physical or (n [) rl � � � pointed) 7. sus stops EB TOTAL NB TOTAL TRAFFIC AND ROADWAY CONDITIONS Approach PPro Grade (%) % HV Ad'. Pkg. lane Buses (Ns) PHF Conf. Peds. (eds./hr) Pedestrian Button Arr. Type Y or N Nm Y or N Min. Timing EB - ` � `�o �� o - (, o WB NB �� Al 1�/f Grade: + up, — down NB: buses stopping/hr Min. Timing: min. green for HV veh. with more than 4 wheels PHF: peak -hour factor pedestrian crossing Nm: pkg. maneuvers/hr Conf. Peds: Conflicting peds./hr Arr. Type: Type 1-5 PHASING l I G R 1/ M Timing G= 2`i G G= G= G= G= G= G= IY+R=(, Y+R=( Y+R= Y+R= Y+R= Y+R= Y+R= Y+R= Pretimed or Actuated _J Protected turns Permitted turns -------Pedestrian Cycle Length Sec 9-80 URBAN STREETS LEVEGOF-SERVICE WORKSHEET Lane roup First Term Delay Second Term Delay 1bta1 Delay & LOS O Appr. ® Lane Group Move- ments O v/c Ratio X O Green Ratio g/C © Cycle Length C (sec) O Delay d, (sec/veh) O Lane Group Capacity c (vph) O Delay d2 (sec/veh) O Progression Factor PF Table 9-13 Lane Group Delay (sec/veh) (") X ® Lane Group LOS Table 9-1 Approach Delay (sec/veh) Appr. LOS Table 9-1 EB �l < <, q 1/0,l (, 13 I. 3 ? SB (19 Intersection Delay I�sec/veh Intersection LDS (Table 9-1) S16NA1.IZCU IN I1.IISLCIIONS 9-75 INPUT WORKSHEET Intersection: � �IP�l� �, ;/f Date: J �h Analyst: // Time Period Analyzed: Area Type: CA CBD ,k'Other (� Project No.- City/State: elf. VOLUME AND GEOMETRICS N/S STREET l� SB TOTAL f I i I t) I'/ I �l (rc� W B TOTAL IL` I• �J NORTH IDENTIFY IN DIAGRAM: 1. Volumes I E/W STREET 2. lanes, lone widths 9. Movements by Ion* �� I O 4. Parking (PKG) locations S. Gay storage lengths i 6. Islands (Physical or painted) [ C) (� 1 I I (� I (� 7. Bus stops EB TOTAL I NB TOTAL TRAFFIC AND ROADWAY CONDITIONS Approach Grade Imo) % HV Ad'. Pkg. Lane Buses (N) e PtiF Conf. Peds. (eds. hr P /) Pedestrian Button Arr. Type Y or N Nm Y or N Min. Timin EB W B Al lof, lV NB SB o Grade: + up, — down N.: buses stopping/hr Min. Timing: min. green for HV: veh. with more than 4 wheels PHF: peak -hour factor pedestrian crossing Nm: pkg. maneuvers/hr Conf. Peds: Conflicting peds./hr Arr. Type: Type 1-5 PHASING X e �% I D ( Ilk, G\v J R A M Timing G= �� IY+R=r G= i() I G= 0 G= G= G= G= G= Y+R= Y+R= Y+R= Y+R= Y+R= Y+R= Y+R= Pretlmed or Actuated —1 Protected turns __� Permitted turns -------Pedestrian Cycle Length Sec 9.76 URBAN STREETS VOLUME ADJUSTMENT WORKSHEET O ppr. ©' Mvt. O Mvt. O Peak © Flow © Lane O Flow rate O Number O Lane Adj. Prop. Volume (vph) Hour Factor Rate vpp Group in Lane Group of Lanes N Utilization Factor Flow v of LT or RT PHF Q%) Q _ (D vs (vph) U Table 9-4 (vph) OT XO Pu or PAT LT EB TH v 1 J LT 0 (p (� J O l WB TH _ 1'I C I RT LT NB TH /r/.�l �. 0 Z- 119 RT 0-0 LT SB TH �.9 1-16 �';J(Aii SIGNALIZED INTERSECTIONS 9-77 SATURATION FLOW ADJUSTMENT WORKSHEET LANE GROUPS OO Ideal Sat. Flow (pcphgpl) OO No, of Lanes N ADTUSTMENT FACTORS Ad'. Sat. I ow Rate s (vPhB) OO Appr. ® Lane, Group Movements © Lane Width f 'le OO Heavy Veh f v OO Grade f (A) Pkg. f O Bus Blockage f O Area Ty f- © Right Turn f (9 Left Turn f Tab 9-5 Ta a 9-6 a e 9-7 a e 9-8 Ta a 9-9 Ta a 9-10 a e 9-11 ab e 9-12 - I goy �, �) .� �,�� !' 16 EB NB ' I z o SB I /r� r�� ��I / I,l)' - c� I� r r1 I'6' 9-78 URBAN si Reds SUPPLEMENTAL WORKSHEET FOR LEFT -TURN ADJUSTMENT FACTOR, fLT INPUT VARIABLES EB WB NB SB Cycle length, C (sec) Effective Green, g (sec) Number of Lanes, N J Total Approach Flow Rate, v, (vph) 7J d`i Ct 0 % �) I Mainline Flow Rate, v,,, (vph) (�O � � (� /01I 01�) J 1/ Left -Turn Flow Rate, VLT (vph) Proportion of LT, PST Opposing Lanes, No CJ < Opposing Flow Rate, vo (vph) I C, 0, 1 11lF,� Prop. of LT in Opp. Vol., PLTo �I COMPUTATIONS EB NB SB 1800 N.. ,.P l + P 400 + vM L70 11400-v, I /I b ! l� J 00 ��J � �. V g.(g—CY,.)/(I—Y,.) �� �j, ��� �h • J1vl � ��- f.J C/ f, _ (875 — 0.625 v„) / 1000 , `10 `� ' tr'-v , ,s PLT 14 f,g„+4.5 J,o gv g — g.. �)?, l o l) 5 %. �� , J I' ►F,. PT=1—PL gj — 2 PT [1 — PT 0.5 J P, EL-1800/(1400—v,,) , i, 8l( f =go+g. g g 1 +2 (1+.P) g .J��J ,�+��� ,��.J 1+P,(E,-1) fLT=(fm+N-1)/N 3! i �11 -1 Oki J—- SIGNALIZED INTERSECTIONS 9.79 CAPACITY ANALYSIS WORKSHEET LANE GROUP ® A•d;. Flow (4) Ad'. Sat. Flow ® Flow Ratio (l) G reen Ratio m e G ruu P Capacity Z v i, Ratio S r �ri�icai (D Appr. Lane Group Rate Rate v/s 0 — g/C c X - Lane Group Movements (vph) (vpl1g) (i kz Jan fl t i �,? - (1.0.07 _ (566 WB 'IGI,•(I / I NB (� '' try-r� 7J� (J.�7()) (.�i2c) I, Ohl SB � , c� J I i1l 0, IV .I`� , 17% ' .`'- .'3 r1P`I Cycle Length, C ! r sec IC Lost Time Per Cycle, L sec (V/s). . _ • S� % � (V/5)., X C . 70 X = _ C —L 9-80 URBAN STREETS LEVEGOI-SERVICE WORKSHEET Lane roup First Term Delay Second Term Delay Tbta1 Delay & LOS O Appr. ® Lane Group Move- ments O v/c Ratio X © Green Ratio g/C O Cycle Length C (sec) © Delay d, (sec/veh) O Lane Group Capacity c (vph) © Delay d, (sec/veh) O Progression Factor PF Table 9-13 Lane Group Delay (sec/veh) X ® Lane Group LOS Table 9-1 Approach Delay (sec/veh) Appr. LDS Table 9-1 EB A 75 ru ` � � J (q3 ,Z! / J �� . b �J ICI A 2 , 40 WB NB l5 ITU 18q I�,.I' 1 SB,tag JCCS�✓ ,Jh// IS ��?-JJ�✓! % ((�V Intersection Delay �'� n'/ sec/veh Intersection LASS / J (Table 9-1) SIGNALIZLD IN 11:PSI:C11ONS 114 9-75 INPUT WORKSHEET �1 P�Ir7o r(� 1 / l(p !j '1O� �/ /L Intersection- D te: 1 ' Analyst: ����� Time Period Analyzed: 1411, �c r/o. :0; !Area Type: ❑ CBD Other �ll/ \ r/ Project No.: City/State. VOLUME AND GEOMETRICS (qoi I U� N/S STREET —� SBTOTAL 'I(� �I/ 5 q (7�� W B TOTAL NORTH- Iq - IDENTIFY W DIAGRAM: 1. volumes 2. Lanes, lone widths f 19 I 19 E/W STREET n .} t n 9. Movements by lane 4. Parking locations (PKG) S. say storage lengths 6. Islands (physical or pointed) 7. Bus stops EB TOTAL 15 I NB TOTAL TRAFFIC AND ROADWAY CONDITIONS Approach Grade � %) % HV Ad'. Pkg. Lane Buses (Ns) PFiF Conf. Peds. (eds./hr ) Pedestrian Button Arr. Type Y or N Nm Y or N Min. Timing EB 4 WB NB f� ` 1r A (0 SB-- Grade: + up, — down NB: buses stopping/hr Min. Timing: min. green for HV: veh. with more than 4 wheels PlfF: peak -hour factor pedestrian crossing Nm: pkg. maneuvers/hr Conf. Peds: Conflicting peds./hr Arr. Type: Type 1-5 PHASING K0V15/Oh A 1 G J ( A Y y M Tithing G= I IY+R=4 G=_ (, Y+R=6 G= Y+R= G= Y+R= G= Y+R= G= Y+R= G= Y+R= G= Y+R= Pretimsd or Actuslsd _f Protected turns 7__% Permitted turns -------Pedestrian Cycle Length Sec 9-80 URBAN STREETS LEVEIrOI-SERVICE WORKSHEET Lane roup First Term DelaY Second Term Delay TWA Delay k LOS O Appr. ® Lane Group Move- ments O v/c Ratio X O Green Ratio g/C © Cycle Length C (sec) © Delay d, (sec/veh) O Lane Group Capacity c (vph) O Delay d, (sec/veh) O Progression Factor PF Table 9-13 Lane Group Delay (sec/veh) (") X ® Lane Group LOS Table 9-1 Approach Delay (sec/veh) Appr. LOS Table 9-1 EB II.�J ��) �b�0 , J�� 7✓ ��,c�.�ill �u� � / , i �1; 1 , �) � f .��� � l < <I �J J �i`l , ti�� 10, IO NB I `���� % r � , 0 .3$ / l 5 j q, I0() 1 o7 , d d �4 (. (► l 1 (lam i`/� r Intersection Delay r�' �� sec/veh Intersection LOS (Table 9-1) VERMONT AGENCY OF TRANSPORTATION PROJECT PLANNING DIVISION TRAFFIC RESEARCH SECTION 4 1 o q D1 14-1 t,4 B TOWN:��%c,�,c. 1 2 3 4 5 6 7 8 v 41 0 o c o 4-1ROUTE: _ COUNTER UMBER: STATION B (�• ay Hour 6. 2-1 16. ?7, h. C ,- -- 1-2 9. 2 1.0. 2-3 _ 2 - 3-4 9. ?0. 7. J. 4-5 '3 21.. 4. ��� 49. 14, 1�4 5-6 215. 37. - ? 178 . FI 6-7 0 ? r 77. 2 305. i.) ` 7-8 ?5 105. V-1 ?b5, ) 8-9 43• 10-11 325. 7,73. f 27P)A ? ,F n12-1 229. 1.12 - W 2)74• 297• 114. 87. 747. 229. 5-6 164 • 134 • '= • 4 �, o __--_- 136. -1. 1.') - 7-8 66 b?• f`;. 37• b3• 8-9 .-� 3? ?9. 24• 44• 39. 11.• J7. '? 1Oill- 5. 103. A. 11. 60• _1 375. 3 771. 1 3^ 1 169. o a DATA SUMMARY I3-1O Day of Week Daily Volumes Week # Total ve. Day 1 2 3 4 5 Sunday I rc<11 i Ili -Monday 3 4 Tuesday Wednesda Thursday Z.' .` F Friday' Saturda " --7otal of Average Days Without Weekend - With Weekend Adjusted Average Day Without Weekend With Wee en 2-1-1 C115 Route ClaFacto ssificat wi: r W Wkendn -,�- Factor, i� 19AADT ;ACC Remarks: f� I �450 Revised November 1981 VERMONT AGENCY OF IRANSPORIAIION PROJECT PLANNING DIVISION TRAFFIC RESEARCH SECTION 4 1 8; c'IL ') I H1510 B TOWN: 1 2 314 5 6 7 8 n, cl U cu o X. o N o {; is ROUTE A v NUMBER: UMBER. 46 STATION 1g : ,ay,0 Day "a - 7, i 7 �/ 6 oL 17- 24. 26. ?? .+ .+ 12-1 -/ - 1" 5• 9. ?• 4. 3-+ 0.+ 2-3 g. J. 0. 1-+ 4.+ -3-4- 11. 8. 7• 6.i 1-+ 11•+ 4-5 177, 179. 169. 182- 24. 7-+ 1 6-+ 6-7 _27M 277- 266-. 1)57- 63. 19-+ ? .+ 7-8 �. 1.78• 195• 217• 72.4 21.f 209-+ 8-9 116- ? 100•+ ?1•+ 104- 97• 5- 92.4 37. ? .gin 10-11 _ p• 264- 17� 276. _ -12.3_ 278. _?II ?_ _20_4L ? __U•i .i 50_+ 60-4 _lqi� 1.5 11-1 166• 165- int. 191, .4 1,90 �- Co 3-4 286- 312• 335- 72.4 62.4 6'.E'. ? )4-5 196- 214- 199• 89- 194- 51.4 35.4 1172 5-6 ? 44- 82; 96; 144. 36• 7-8 46. 51• ? -)9.48-9_ ?p. 26. ? ?_ 27. 17. 10-11 66- 59- 48- ?0. 16- -12 1779-El�t 666• ? o a DATA SUMMARY Day of Week Dally Volumes Week # Total a Ave. Day 1 2 3 4 5 Sunday << o , ,Monday -1 „� .. Tuesday ' Wednesday Thursd 10 Frida ' ' Saturdat 1, 41 114- Total of Average Days Without Weekend With Weekend i Adjusted Average Day Without Weekend With Weekend Route Classification: W Wkendn „-; Factor l 19='�� AADT t 4 LZ I -,1 4 Remarks : --4 Revised November 1981 TURNING MOVEMENT DATA SHEET VERMONT HIGHWAY PLANNING DIVISION TRAFFIC RESEARCH SECT. DIR PC -� T r TOT DIR 1 S 7� - ? 23 �81 j zip 2/2. 3a 2 `2- NORTH i /,/6 I /z a/ CODE NO.s_lli� PLACE: S. ,xl PC T TOT HR ° W Q � 0 1,3 Z 2a S- 1/ / - z f 337 DIR PC T TOT HR 2-7 Z� ° �s 5 27 28 /ie 2 2 2- �sR I 27 TOT I /3Z i / 2- 1 / yl' TURNING MOVEMENT DATA SHEET VERMONT AGENCY OF TRANSPORTATION CODE NO.: 41*7 PROJECT PLANNING DIV.-TRAFFIC RESEARCH SECT- TOWN: DIR PC T I TOT DIR PC T TOT DIR PC T TOT FIR a( 1 ";Ll Ds q ;1bI a94 I 11 D35 65+— 4s 1'/13 ay a--L5 3,P 1 a o 13/ 3 4 q 44 3 (,o - uc > ' IOT / TOT T PC T TOT DIR DIR PC T TOT 1HRI 117 Ca d 41s n Tr_) NORTH qq I I I -- 3 -- 3 //0 TOT TOT (� PC T TOT DIR 45G DIR PC T TOT HR A y `9, 'lit 1 .� `�.: , ,"h u � J. £ �}'r t �.tt t�l ,� F• �� �7� r Gf XQU a 11 1 — 1'1 310 J r PC: All passenger cars and 2-axle,4-tin trucks (* 1 TOT T s Medium and heavy trucks and busses. TOT 3 a 3 y DIR PC T TOT DIR PC T TOT DIR I PC T YOT IHR N 8 q! a 5 -.2-73 3/ A 33 P 13 \I 1 - a o aCt o - 3b 3$ 1 s a9 / a3 {{ /4 3 a 30 - 3D 1 /0 as a/ a Y11j, o o a o U W Y TOT — 74 TOT a fj TOT /40 ' /G�l V[RMQNI AMtNLT UP TRANIPIURTAT10N coo& N(X: ' --' PROJECT MANNING DIV.-TRAFFIC RESEARCH SECT. TOWNS SD•{�[lliL/NG72�N DIR PC T TOT DIR PC T TOT DIR PC T TOT HR 0 1 12- 3. - 3B 5cj 3 62 35 - 35 98 H Ioz ll`1 3 117 I (c 1 17 79 3 6 2 7 1/ 2 76 zo - zo (05 Cl 5 7`1 o 23 2 25 56 41 7Y Z 76 50 1 51 00 8 l08 90 3 93 TOT 155 5 1 1(0 o I TOT , q3&j 2 3 y5 9 TOT yBo I 18 I qqg PC T TOT DIR WEATHER P� M Y cCrau Dy ATM q. r - h Z_ d Ul. CL I s• z7(o7 \ 8z153 sz9 3(-L7 DIR PC T TOT Hn 0 %- i " Hp j ��� � 1 � 2-1 - 2 I 61 2 63 - 26 103 1 lo`1 13 ! / `I 75 3 78 22 I z3 66 & 741_ Flo — 410 0 5 )10 35 - 35 ctq oo 1:i7 Z 159 TOT TOT 50`1 Z5 5Z9 PC T TOT DIR UIR PC T TOT 23o 114 2`1H 1 /8 ►&y 3io9 Zo _ 3813 378 37 1115 30 331 3y2 76r-89 Us2 •� ��y �, w/1,15�v Ro, w��s 3,q 385 260 ZZ 302 334, 36 377- 25�0 23 Z79 _ 3 2� 2 3 3`1 �l 30 30 33 q 2 Woo zy97 ales y„�;, Kati o •begz ? »1�$ +• Y .s . r iRi-�.k w' ; 1753 yx - �QT TOT Z1 3 .et S'.: ,�:. .+ � # 9?9 - 89 179 ►'l 193 (0 I 69 IbZ 2(0 188 3 71 15q 21 175 GPI 3 (oy 138 Zj 16Z o - d,o 1711 17 191 PCs All oa"*ngw cars and 2-axla,4-tire Iroc T = N►adium and hoav frocks and buss". ,/3(0 7 Y' 3 TOT TOT 87y /it 11 965 DIR PC T TOT DIR PC T TOT DIR PC 1 TOT HR o7 c W r 1 2`1 3 Z7 4!0 - `I(0 7(o Z 78 3 1 6 y 87 1 88 155 RCI 5 Cl 11 6,9 Z 71 115 2-3 13 B (cw 70 (n (v 75 1o6 1 B JZ6 o, 81 6. 87 70 7 85 119 15 / 3 y Ito Z 112 loo 5 105 133 I Lq )5) ITT, TOT y 3 3 21 -/5 4 TOT y'I `] 21 y 70 TOT 70� g� 7 9 Z I V I� 1• I I♦ v I ♦1 V♦[ lT l 1� 1 L/ � I r J .. L L 1 VERMONT AGENCY OF TRANSPORTATION Place SSQ• &IRuA)6Ton) PROJECT PLANNING DIV.-TRAFFIC RESEARCH SECT. Date 6-29'61l Recorder �<(3 TAB DIR PC T TOT IDIR I PC T I TOT HR DIR PC T TOT DIP PC T TOT 7 I - 19 0700 30 - 30 2 2c Z z z c"715 3 - I I H Z - y 2- 0 73O 2 5 2. Z 7 I i I o7,{5 2 4l I 2 5 5.7 7 ll`I 3 99 ti 102 35 0 35 3`i I 35 10700 1-7 17 o7I5 1 % - 17 0730 I9 - 19 U7`f5 1111 `i 1 `ie 7q 8 82 10700 t1 Z Z 'Ill 8 Lf 13Z a715 5 `( (a (n 0 -.at-- I I ly 17 13 071 c, 39 Z 141 112 E5 IZO o7" �ms�m 378 1371 yl5 I s--. 19 1 ZO qf3 z 50 155 I to I(o5 mm� ®s® mm® =am mom . ... �mmm �mmm mom .r =© fflm �smm �mmm �mm �. : • ® gem �m PC: ALL PASSENGER CARS AND 2-AXLE, 4-TIRE TRUCKS Transcribed by T: MEDIUM AND HEAVY TRUCKS AND BUSES �— Checked by V�RMNNI AVtNIi ut I4AN.2,rUR1A/1uN COU& NLX1 PROJECT PLANNING DIV.-TRAFFIC RESEARCH SECT. TOWNS SO:�j(((�L/n16Ton EWA ora TOT 1 2oB 1 TOT 57`j Z3 I (,02 TOT fo5I Z,/, 677 PC T TOT DIR DIR PC T TOT HR WEATHER W41a y I oG !o I Z z 50 - 50 O LI 1 �{ 1 NOlTN 1 1 Z- 2-1 5 5ro 13 �c 3337. 178 BIZ - /z1(9 Z 41 1(. � � v a Z q y o zq q TOT TOT 79 33 032 PC T TOT DIR 7 03' UIR PC T TOT HR �p9 23 1/3 Z 6� 396, `/ 3 1/3 9 'Z J 39Z 38 . y30 3G�1 �z�6s B az `175Z' 33Z 31 363 ' 39� 37 3 3 ToZ-V9W"D 3&7 Z 5 39 C(S2c/srcw .ea _ �lln 17 78 !;z, �/5 Z / yloG 61 I lo7-8(05 1 Toww3r" 57 8 y653y9 Z. Z G ;�„ 33. ;=92o TO �oZ,7 3 76 Z 2 ~ J Z N' 1q7 18 1(.5 I' lie 1 119 135 25 l�o 62 3 65 y7z7. ZI 15 2z �2 - Z_ 23y 250 ►� 86 89 172 to / Z PCs All passengor cars and 2-axle,4-tires Irucks 50 Z 1 131 515 TOT T :Medium and beav trucks and busses. TOl to 5 3 1 o 2 1 1 5 S DIR PC T TOT DIR PC 1 TOT DIR PC 1 TOT JHRI 1& I 9 7 132 (0 138 1117 2`1 17:0 '23 z 68 8 y 3 131 ZH 15 i-1 n 41 03 137 5 1HZ III 2Z 1411 lyis 12`1 i IZ, 9B 5 l03 jqe 33 18/ 15 G 12 - • 12`j 156, 5 I 163 18 ZoI ill 1 11Z 13`i Z 13 16 18 187 �� W x o y TOT Z5 1 Z 637 TO 27 773 TOT 89 7 INS I0�15 I UKr4I Nv M\J v aMtry l Lj+ �ncc 1 VERMONT AGENCY OF TRANSPORTATION Place �kp.g,,eLINGToN, PROJECT PLANNING DIV.-TRAFFIC RESEARCH SECT. Date Recorder _1c g T/tA a DIR PC T TOT DIR PC T TOT HR DIR PC T TOT DI PC T TOT 5 - ; 32 1 33 i 3 1 11 i 2-3 1 z l I ', Z6 Z 30 1 �, - v - 8 ZI I z6 .Sp Z 7 - 1 25 - 3 25 1(n S 5 . 7. 3_7 - 3-7 (113 13 `i y (3 2 3 1 Z `1 z/ 3 - 1/ 3 Z 5 1 Z 1 31 I�cb 3Z- 3z! lI /I IBIS 116 - ye IZ`► 1 0 1 IZ9 1 1 1561 1 5 1 161 1 5-T 32. q qj 55 3 58 H 50 F33 18 Zol �An=iE miJii• ®0® ®arm ®mom �mm® �■.�=i mom gym® � Mmw �mm mmmm©®� PC: ALL PASSENGER CARS AND 2-AXLE, 4-TIRE TRUCKS T: MEDIUM AND HEAVY TRUCKS AND BUSES Transcribed by J74V 1- 5 Checked by / -Z/ 85- �1)qll 4- Do v e A I TA/a � % J e Y7 AV, i I��P V p -0 5,01, rl, :�GJ j�, � jt� 3� �� �� , �� 3� i,; W L 0 I - I �G I J`' l� '� r No Text NORTI-I MUMMY - - - w-P.O.3 33 W."4�3605404PLANNING (8O2 61 July 12, 1986 Mr. Rodney Campbell The Merchants Bank 123 Church Street Burlington, Vermont 05401 Dear Mr. Campbell, The enclosed traffic study evaluates impacts from the proposed Merchants Bank facility in the Business Park North development on Kimball Avenue and Kennedy Drive in South Burlington. The study addresses both immediate access points to the building as well as two nearby intersections - Kennedy Drive/Kimball Avenue and Williston Road/Kennedy Drive. Business Park North was originally set up as a planned development with controlled access points. The current proposal conforms to the original plans with a shared access on Kimball Avenue and a right turn in/ right turn out access on Kennedy Drive. Both access points can operate safely and without congestion as long as intersection geometrics clearly prohibit left turns at the Kennedy Drive access. Trip generation estimates for the 36,800 square foot building include both data processing and internal bank functions as well as a public drive-in/walk-in banking facili The total peak hour volume of 165 trips is considerably below the 330 trips that were originally approved for this lot in the Business ark North application. The closest signalized intersection at Williston Road and Kennedy Drive can operate at level of service C in 1986 if certain signal phasing modifications are made. Since p.m. peak hour traffic volumes are con- siderably higher from the east than from the west, this report recommends that up to 10 seconds of advanced green time be allocated to the Williston East approach (similar recommendations have been made in previous reports). No changes should be necessary for a.m. peak or off-peak hours. Regardless of any signal adjustments, the Williston Road/Kennedy Drive intersection can be expected to drop into level of service D shortly - with or without this development. In other words, even if no development takes place in South Burlington, traffic from Williston and beyond will continue to place pressure on this intersection. Merchants Bank, Kimball Avenue Traffic Impact Report 7/12/86 page 2 The unsignalized Kennedy Drive/Kimball Avenue intersection can operate within acceptable limits both in 1986 and 1991. Most turning movements will be at level of service A. However, as frequently occurs, left turns from the minor street (Kimball Avenue) onto the major street (Kennedy Drive) will operate at level of service E. By 1991, sufficient gaps in Kennedy Drive traffic will still be available for Kimball Avenue left turns but will be fairly limited. In conclusion, the proposed Merchants Bank facility is appropriately located with access points that are part of a planned circulation pattern. The development can meet all planned commercial development standards for 1986, and the bank's traffic volumes are reasonable for this location. This report recommends certain short term signal phasing adjustments, and the City may wish to start evaluating longer term improvements at the two nearby intersections. Those evaluations would be appropriate regardless of any traffic from the Merchants Bank (5.2% increase to the Kennedy Drive/ Kimball Avenue intersection and 3.5% increase to the Williston Road/Kennedy Drive intersection). Please let me know if any additional information or comments are required. Sincerely, David H. Spitz cc: South Burlington Planning Commission Gordon Woods Merchants Bank, Kimball Avenue 7/12/86 Traffic Impact Report page 3 Study Area and Data Sources The study area includes the two access points to the Merchants Bank and two nearby intersections. Capacity analyses are done for the Kimball Avenue/Kennedy Drive intersection (unsignalized) and the Williston Road/Kennedy Drive/Airport Drive intersection (signalized). Traffic counts are provided by the Vermont Agency of Transportation (VAOT) and by North Country Planning (NCP) and include the following. VAOT, TM #414-7, 6/11 & 7/26/82, Kennedy Drive/Kimball Avenue VAOT, TM #414-3, 6/28 & 6/29/84, US 2/Kennedy Drive/Airport Drive VAOT, ATR #D 4507 8/19 - 8/26/85, Kimball Avenue east of Old Farm Rd VAOT, ATR BCD 464, 9/19 - 9/25/85, Kimball Avenue west of Old Farm Rd NCP, 7-8 a.m., 6/27/86, Kennedy Drive/Kimball Avenue NCP, 4-5 p.m., 6/26/86, Kennedy Drive/Kimball Avenue Design hour volumes are derived from the above counts for 1986 and 1991. An annual growth rate of 2% is estimated for the study area in addi- tion to projected development traffic. Development Traffic Volumes Traffic volume estimates are based on information provided by the Merchants Bank plus data from the Institute of Transportation Engineers (ITE). The bank facility will contain a total of 36,800 square feet. The majority of the building will contain data processing and other internal bank functions. In addition, there will be a 1600 square foot drive-in and walk-in public banking area. Total anticipated employees at the site will be 98 during the 1st shift, 15 during the 2nd shift and 7 during the 3rd shift. Since the operating characteristics of the bank are essentially those of an office building, ITE trip rates per employee for general office buildings are used. Local estimates are used for the public banking faci- lity (previous studies by North Country Planning indicate that the ITE rates are too low for most drive-in banks). Total trip generation esti- mates are given in Table 1. Merchants Bank, Kimball Avenue Traffic Impact Report TABLE 1: A.M. Enter Exit Total P.M. Enter Exit Total Average Weekday TRIP GENERATION ESTIMATES - MERCHANTS BANK Drive -In Bank Bank Offices Total 8 53 61 6 9 15 14 62 76 43 16 59 57 49 106 100 65 165 849 406 1255 * A.M. totals are based on 1st plus 3rd shift employees (105) ** P.M. totals are based on 1st plus 2nd shift employees (113) Assignment Of Development Traffic Volumes 7/12/86 page 4 A variety of information is available to help predict travel patterns to and from the development. Sources include turning movement counts at Treetop condominiums and nearby intersections as well as an origin/desti- nation study of Digital employees. Based on these sources, this report estimates main travel routes as follows: East (via Kimball Avenue and Williston Road) - 30%; Southwest (via Kennedy Drive) - 20%; North and West (via Williston road and Airport Drive) - 50%. This report further assigns trips to each of the two proposed development access points. A basic assumption is that the Kennedy Drive access will be right turn in, right turn out only. Complete turning movements for the a.m. and p.m. peak hours are given in Figures 1 and 2. Proposed Development Entrances As part of the approval for the Business Park North development in 1978, specific access locations were identified. The current application complies with the original plan with a shared access on Kimball Avenue and a right turn in/ right turn out access on Kennedy Drive. Both access points have good visibility and can operate with minimal congestion. How- ever, if turning movement conflicts on Kennedy Drive are to be avoided, the entrance design must clearly discourage left turn in and left turn out movements. It should be noted that the projected turning movements in Figures 1 and 2 are considerably below the volumes projected for this lot in the original approval. Merchants Bank, Kimball Avenue Traffic Impact Report FIGURE 1: DEVELOPMENT TURNING MOVEMENTS - A.M. PEAK HOUR 10 �4 -----_--- Williston Road 17 t-� T 2 4 1 T _7 31 12 3 5 Kimball 2 31 Avenue KennedylDrive FIGURE 2: DEVELOPMENT TURNING MOVEMENTS - P.M. PEAK HOUR 17 30 17 6 �- 53 19 12 21 12 Kennedy Drive Williston Road 21, �2 29 -� �18 Kimball Avenue 7/12/86 page 5 Merchants Bank, Kimball Avenue 7/12/86 Traffic Impact Report page 6 Kennedy Drive/Kimball Avenue Intersection 1991 A.M. and P.M. design hour volumes for the Kennedy Drive/ Kimball Avenue intersection are given in Figures 3 and 4. Development traffic volumes are underlined. 20 0101 FIGURE 3: 1991 A.M. DHV - KENNEDY DRIVE/KIMBALL AVENUE lien '-1 j1'Q1 . 10 FIGURE 4: 1991 P.M. DHV - KENNEDY DRIVE/KIMBALL AVENUE 538 + 2 .596 + 12 5 0 9) 75_� �,__---- - Treetops 42 40 17 538 + '2 101 + 3 187 + 31 264 + 21 17 +12 Kimball Avenue `---...__.. 63-+` - 9 109 + 29 /42 7 + 21 ,,Kennedy Drive K + 12 Merchants Bank, Kimball Avenue Traffic Impact Report 7/12/86 page 7 Unsignalized level of service analyses are calculated on work- sheets 1 and 2 and summarized in Table 2. Approach Kennedy Dr, North Kimball Ave Kimball Ave Kennedy Dr, North Kimball Ave Kimball Ave TABLE 2: 1991 LEVEL -OF -SERVICE Kennedy Drive/Kimball Avenue Intersection Turning Movement Time Period Level Of Service Left A.M. DHV A Left " E Right " A Left P.M. DHV A Left " E Right " A The above levels of service are common for minor streets attempting to turn onto major thoroughfares in South Burlington. To this point, con- ditions do not justify installation of a traffic signal; however, signal warrants should be carefully watched as development continues on Kimball Avenue. To some extent, left turning conditions from Kimball avenue will be affected by the Williston Road/Kennedy Drive intersection (see below). Williston Road/Kennedy Drive Intersection This intersection is analyzed only for the P.M. design hour. A.M. volumes are considerably lower and should not affect capacity determinations. 1986 and 1991 p.m. design hour volumes are given in Figures 5 and 6. Development traffic volumes are underlined. An informal analysis, using "Planning Application" methods from the 1985 Highway Capacity Manual, yields the results as shown in Table 3. Merchants Bank, Kimball Avenue 7/12/86 Traffic Impact Report page 8 FIGURE 5: 1986 P.M. DHV - WILLISTON ROAD/KENNEDY DRIVE 27 + 9 401 + 17 Airport ' 42 Drive 42 1 829 + 3 1011 + 3 1311 + _ Williston Road 100 168 + 17 485829 + 6 64 + 1 260 + 3 209 + 6 Kennedy 424 + 29 Drive 511 + 53 FIGURE 6: 1991 P.M. DHV - WILLISTON ROAD/KENNEDY DRIVE 306 + 9 44 + 17 Airport Drive 46 211 4 915 + 30 - -- 721— - - -- -- _ — --- .-- —=� 1220 + 3 Williston Road 110 185 + 17 ' 150 652 + 17 - — --- 535 _ -_ f._ 916 + 6 71+17 88+3 231+6 Kennedy 469 + 29 Drive 564 + 53 Merchants Bank, Kimball Avenue Traffic Impact Report TABLE 3: CAPACITY LEVELS Williston Road/Kennedy Drive Intersection Design Year 1986 Without Development 1986 With Development 1991 Without Development 1991 With Development * 0 to 17200 - UNDER 1,201 to 1,400 = NEAR More than 1,400 - OVER Sum Of Critical Volumes 1121 1152 1387 1415 (requires further analysis) 7/12/86 page 9 Capacity Level Under Under Near Over It is clear that normal growth, with or without this development, will bring the intersection to a point of concern around 1991 if not sooner. For the short term, the intersection can operate satisfactorily. A capacity analysis for 1986 with development (worksheet 3) shows that level of service C can be retained with certain signal adjustments. The most critical move- ment is Williston Road left turns onto Kennedy Drive. Improvement here could also help relieve left turn pressure from Kimball Avenue onto Kennedy Drive. 10-34 URBAN STREETS (�✓ l�/ ✓ ��{.1 / �I WORKSHEET FOR FOUR -LEG INTERSECTIONS Page 1 Location: P nn P ' ��--�AfT � P Name: HOURLY VOLUMES Grade 0 % D ' STOP � 2 6N N = � YIELD❑ V12 V„ V,o N 1 V6 3�2 N=® V, N= Grade % 6 V � V, Grade % �_ � major road 3�IFST01"D N =0 V, V, YIELD ❑ iV�, / -u Date of counts: q /it • 0 �/ minor road Time Period: 1AIvP 7n+p,; Average Running Speed: PHF: I1,0PI1pr Grade L % VOLUME ADJUSTMENTS Movement No. 1 27r 3 4 5 6 7 8 91/0` 1/1 12 Volume (vph) 16 I�/ c � IJ I' I, '7dv be 1i D rp 1 6 of �� Vol. (pcph), see Table 10-1 USQ �� LY' c %� J_�j 1L m VOLUMES IN PCPH NA v12 vll v10 V6 NA v5 NA v' Vq Ow v2 NA v3 V, V8 V9 r.vern_w,wi 771:n I1'JTF12C17C-rT 1NS vt � V --, 1 �'� / 1� WORKSHEET FOR FOUR -LEG INTERSECTIONS Page 2 STEP 1: RT From Minor Street I V9 J V12 Conflicting Flows, Vc 1/2 V3 + V2 = Vc9 d q-5 3 0 1/2 V, + V5 = V,12 a 6 + L1,00 = vph � + = , vph Critical Gap, T, (Tab. 10-2) 0 (sec) e ) (sec) Potential Capacity, cp (Fig. 10-3) CP9 = 0 pcph / cp12 = pcph Percent of cP Utilized (V,/CP9) X 100 = % (v12/CP,2) X 100 = % Impedance Factor, P (Fig. 10-5) P9 = I Q P 12 = • q J On Actual Capacity, C,,, cm, = CP9 = //o pcph Cm,2 = cP12 = pcph STEP 2: LT From Major Street V4 V' Conflicting Flows, Vc V3 + V2 = VC4 306 V6 + V5 = VC, 5L +//())= 1/1 � vph I_+,95 = vph Critical Gap, T, (Tab. 10-2) 5,45 (sec) 25 (sec) Potential Capacity, cP (Fig. 10-3) 81-0 - cP, — pcph = ��)�� c P1 pcph � `' y Percent of cP Utilized n. ' (v4/cP4) X 100 = % (� /� ) x 100 = % , P, Impedance Factor, P (Fig. 10-5) P4 P, _ 13 Actual Capacity, cm Cm4 = cP4 = L/) - pcph C. = cP, = 1nn pcph STEP 3: TH From Minor Street I V8 1 V11 Conflicting Flows, V, 1 1 IV3+V +V,+V6+VS+V4=Vc8 �J5 % 1/2V,+VS+V4+V3+V2+V1=V111 .t I + '190 + 7 + + + + 5d + q In + �_ _ Z6 vph / / + a Q5+21 = vph Critical Gap, Tc (Tab. 10-2) ( 2-5 (sec) d 36 6 ;'S (sec) 2 t15 Potential Capacity, cP (Fig. 10-3) Percent of cP Utilized CPA = pcph (vA/Cp,) X 100 = % cp1 = pcph (v, 1/cP„) X 100 = ' Impedance Factor, P (Fig. 10-5) PA = �=�— P„ /10 — Actual Capacity, cm cm = CPA X P, X P4 �9 = a30 x Cm11 = cP11 X P, X P4 a03 = J t6 x . 8 x /, (pcph) 8.3 x /- D (pcph) STEP 4: LT From Minor Street V, LVIO Conflicting Flows, V� V� (step 3) + V 11 + V 12 = V , + cfn = T /2 vph V,„ (step 3) + VA + V9 = VC,o qO5+ 2 +29 = 9,30vph Critical Gap, T. (Tab. 10-2) 7 z5 (sec) ! 8c. / -5 (sec) = Potential Capacity, cP (Fig. 10-3) cP, _ pcph cp10 pcph Actual Capacity, cm cm cP, X P, X P, X P11 X P12 qq 1hx x cm10 = cP,o X P, X P1 X P, X P9 !t = /?9 x = X " X . 9 7 (pcph) � �+ �' X 15_ X 39 (pcph) 10-36 URBAN STREETS/() K WORKSHEET FOR FOUR -LEG INTERSECTIONS Page 3 SHARED -LANE CAPACITY CSH = where 2 movements share a lane ��q T �� f (vi/Cmi) + (vj/Cmj) !1 ri C� i u�. G' : 21 CSH = + (vk�Cmk) + (vjwhere 3 movements share a lane (Vi �Cmi) �Cmj) , - j,'l f ;(?�(� 7 °:7 C iJ MINOR STREET APPROACH MOVEMENTS 7, 8, 9 Movement v(pcph) cm(pcph) CSH(pcph) CR = CSH - V LOS 7 L� s- 9 �� 9 7/0 MINOR STREET APPROACH MOVEMENTS 10,11,12 Movement v(pcph) cm(pcph) CSH(pcph) CR = CSH — V LDS 10 -- MAJOR STREET LEFT TURNS 1, 4 Movement v (pcph) cm (pcph) CR = Cm - V LOS 1 O COMMENTS: 10-34 URBAN STREETS �/� k --- 1 / , / M WORKSHEET FOR FOUR -LEG INTERSECTIONS Page 1 �� Location: KenneA/ P /Vllit;' all IlVe- Name: HOURLY VOLUMES ��Wjhq ✓(. Grade () S l 14O7 YN= ) STOP�f YIELD❑ V12 V,I V10 N V6 1 N=© . V5 �ag N=© �!o �— V, �1— Grade ° R a � Grade �90 V, major road V2 --► —5-L V3 STOP N =0 V, VB V9 YIELDD O Date of counts: y P. M • Elf/l minor road Time Period: A Pt'e!P r,,re��� Average Running Speed: +n ;> PHF: Grade r 0/0 VOLUME ADJUSTMENTS Movement No. 1 2 3 4 5p 61 7 8 9 10p 11 12 Volume (vph) 9 �a� J lea 1 l�cJ� r� 1-/ 1 ? �O 7 rise LDy 0kris a �P Vol. (pcph), see Table 10-1 . . -' � e e•�� ;, j l� / � �i� �7 �c� 3 7 VOLUMES IN PCPH NA V12 VIl V10 V6 NA VS V4 NA vl V2 NA V 3 V7 V8 Vy UNSIGNALIZED INTERSECTIONS I WORKSHEET FOR FOUR: LEG INTERSECTIONS Page 2 1 STEP 1: RT From Minor Street Conflicting Flows, V. Critical Gap, T, (Tab. 10-2) Potential Capacity, cp (Fig. 10-3) Percent of cp Utilized Impedance Factor, P (Fig. 10-5) Actual Capacity, c,„ STEP 2: LT From Major Street Conflicting Flows, V, Critical Gap, Tc (Tab. 10-2) Potential Capacity, cp (Fig. 10-3) Percent of cp Utilized Impedance Factor, P (Fig. 10-5) Actual Capacity, cm STEP 3: TH From Minor Street Conflicting Flows, V, Critical Gap, T, (Tab. 10-2) Potential Capacity, cp (Fig. 10-3) Percent of cp Utilized Impedance Factor, P (Fig. 10-5) Actual Capacity, c., STEP 4: LT From Minor Street Conflicting Flows, V, Critical Gap, T, (Tab. 10-2) Potential Capacity, cp (Fig. 10-3) Actual Capacity, cm N FV9 1/2 V3 + V2 = Vc9 0 � + � � _ qb 0 vph 60 (sec) I= t �j cp9 =yi pcph (v9/cp9)x loo = P9 = - Cm9 = cp9 = J `In pcph V4 V3 + V2 = VC4 ✓ + 11d tl = GF /� vph P _� (sec) cp4 = %?? pcph (V4/cp4) X 100 = J ' �� % p = , `1 'S 4 Cm4 = Cp4 = ) 90 - pcph 1 V8 V12 1/2 V6 + V5 = VC12 ✓ aJ + d = E6 (� vph 6,0 (sec) cp12 = -J70 pcph (V 12/Cp12) X100 = P12 = . 79 Cm12 = Cp12 Z) pcph — J V, V6 + V5 = V,, + tl,) = vph II `l J (sec) cp, _ 0 pcph (V,/cp,) X 100 = 3, g P, = ° 7J cm, = cp, _ 0 pcph 1 V11 1/2V3+V2+Vl+V6+VS+V4=V,8 1/2V6+V5+V4+V3+V2+V1=Vc11 J,6 + qQ1! +� L+ �+ Ll 2 + r/ + + 11,9+ 1L = 1(3q vph `/ +t13+ 26 = 0vph 62� (sec) (')- ,(sec cpe = a00 pcph cpt 1 = n) pcph (ve/cp,) X 100 = , 0 % (V 1 I/cp11) X 100 = .3• % PK = . 99 Pn = c,h8 = cp„ X P, X P4 179 = �900 x X ' <� (pcph) V, V,K(step3)+V„ +V12=V , 1o.3y+ 7 +16= 120 vph 7.25 (sec) cp, = la 0 pcph Cm=Cp,XP, XP4XP„XP12 a = 00 x .91 x 128 X AIX /T (pcph) cm = cp„ X P, X P4 IDS = aoC) x x (pcph) LV 10 V,„ (step 3) + VK + V9 = Vc,o n' +Ll+1Z=1o5 vph 7, 2.` (sec) cp10 = —60 pcph cm=cp,,,XP XP,XPBXPy 8 = 166 x�Lx r i x d? x • `IL(pcph) 10-36 URBAN STREETS Wo�' WORKSHEET FOR FOUR -LEG INTERSECTIONS Page 3 SHARED -LANE CAPACITY v; + vj ��� i78 •a3? t 422 CSH = where 2 movements share a lane (Vi/Cmi) + (vi/Cm) a3 130 -13(7 Vi+Vj+Vk t'Z 778 �8�1t•o3p,9. 6 CSH = where 3 movements share a lane (Vi /Cmi) + (Vj/Cmj) + (Vk/Cmk) MINOR STREET APPROACH MOVEMENTS 7, 8, 9 Movement v(pcph) cm(pcph) CSH(pcph) CR = CSH - V LOS 7 r�' - 8 `f — 91 69 F MINOR STREET APPROACH MOVEMENTS 10, U,12 Movement v(pcph) cm(pcph) cSH(pcph) CR = CSH - V LOS to 3 — 11 7 — 11q0 F 12 146 1_0 MAJOR STREET LEFT TURNS 1, 4 Movement v (pcph) cm (pcph) CR = C, - V LOS 90 5 9 4 COMMENTS: 4level F L.e�i`f iurn � kehnej/ l o Gr►�,ba��> W►ay reac �� P ar l� l`��0� —Of s00/10" r ��s/Pr dPve�opw�Ph`I ©ccu�S, SIGNALIZED INTERSECTIONS 9-75 INPUT WORKSHEET Intersection: l�l9�.c ✓'IL (? ,c .ri'; [ Date: Igo f Analyst: / Time Period Analyzed: ' � � I /Area Type: ElCBD (Other �DU�� Project No.: City/State: VOLUME AND GEOMETRICS / I 6 N/S STREET SBTOTAL 1161 rWB TOTAL -�- - d NORTH --- lL Ic IDENTIFY IN DIAGRAM: u� �{�SSumeA� 1. Volum*s 2. Lanos, Ian* widths �E/W STREET 11 LLL 't(j 21,5 3. Movemonts by Ion* I I. Parking (PKG) locations 5. Boy storogo I*ngths �� C c �D 6. Islands (physical or painted) 7. Bus EB TOTAL �/ stops NB TOTAL TRAFFIC AND ROADWAY CONDITIONS pPiO Approach Grade M % HV Ad'. Pkg. Lane Buses (NB) PHF Conf. Peds. (peds./hr) Pedestrian Button An, Type_ Y or N Nm Y or N Min. Timing IV p 1 � WB NB SB - �" ►! Grade: + up, — down NB: buses stopping/hr Min. Timing: min. green for HV. veh. with more than 4 wheels PHF: peak -hour factor pedestrian crossing Nm: pkg. maneuvers/hr Conf. Peds: Conflicting peds./hr Arr. Type: Type 1-5 PHASING D A\ G R A / M Timing G= 25 IY+R=.5, G=10 G=a5 G= G= G= G= G= Y+R= Y+R= Y+R= Y+R= Y+R= Y+R= Y+R= Pretlmed or Actuated _..i Protected turns __l' Permitted turns -------Pedestrian Cycle Length Sec 9-76 URBAN STREETS VOLUME ADJUSTMENT WORKSHEET O ppr. ® Mvt. ® Mvt. O Peak ® Flow © Lane T Flow rate O Number O Lane ® Adj. 4 Prop. Volume (vph) Hour Factor Rate vpp Group in Lane Group of Lanes N Utilization Factor Flow v of LT or RT PHF (vp-h) v8 (vph) U Table 9-4 (vph) OO OO XEB PST or P, TH 917 LT �6� WB TH 637 1 /45 � I D� a �, ►�3�ao�� RT 11� �i; r11,1 LT I6q (13 NB TH (g ' t S % h ' os 6 / 31,L , RT I7 a .95 0 o-� LT `�`j. •OS 1� f SB TH 101 - ' G 336 ' V z' �J� 1�f•Ci RT Ll -� 4sSul+ e AO 'lo SIGNALIZED INTERSECTIONS 9-77 ` SATURATION FLOW ADJUSTMENT WORKSHEET LANE GROUPS O Ideal Sat. Flow (pcphgpl) O No of Lanes N AD STMENT FACTORS Ad'. Sat. ow Rate 8 (vphg) O Appr. O Lane, Group Movements O1 Lane Width f, © Heavy Veh f V 0 Grade f p Pkg. f O Bus Blockage f @ Area Type O Right Turn f (9) Left Turn f —Table 9-5 Table 9-6 Table 9-7 Table 9-8 Table 9-9 Ta a 9-10 Tab a 9-11 Ta a 9-12 ---� 1900 I 10 . °7� r��� - - - . ►►�5 aw EB IVJ �, o , `�f 2 — lc 0 NB I300 q qj ^b, 916, sB I0�0 9-78 URBAN STREETS /�//� V SUPPLEMENTAL WORKSHEET FOR LEFT -TURN ADJUSTMENT FACTOR, fLT INPUT VARIABLES EB WB NB SB Cycle Length, C (sec) /0 Effective Green, g (sec) Number of Lanes, N j J Total Approach Flow Rate, v, (vph) 76 Mainline Flow Rate, vti, (vph) Left -Turn Flow Rate, vLT (vph) it �. 7 / l 59 Proportion of LT, PIT 1.0 .039 Opposing Lanes, No a Opposing Flow Rate, vo (vph) 5 336 6(-j Prop. of LT in Opp. Vol., P,,T0 . n 3A I1 J ' 215 COMPUTATIONS EB W B NB SB 1800 N„SOP LTO _ f�1,,��U2 g„ = (g — CY„) / (l — Y„) f, _ (875 — 0.625 v„) / 1000 (N-1)g f + 4.5 n I gy = g — g. PT=1—Pc O O gr = 2 PT [l — PT 0.5 g,4l J Pi - O EL =1800/(1400—v„) fm = 9,+ g„ g g 1 + (l +-PL) g f`QQ i 7 n ? cl� 1 + P, (El — 1) f,.T=(f,,,+N-1)/N q� ,�)r�_1� •mq -Y -�` Cl ;,_f(►,ltnq ��°/o L-pp� / C'�U� �i0r1 c7�t a[��an(f[X vem SIGNALIZED INTERSECTIONS '9-79 r CAPACITY ANALYSIS WORKSHEET LANE GROUP ® Adj. Flow Rate (vph) ® Ad)". Sat. Flow Rate (vphg) ® Flow Ratio v/s _ ® ® Green Ratio g/C L®e Group Capacity c (i X � Rahn X 0 _ Critical Lane Group Appr. ® Lane Group Movements W EBICA mc WBa553 l J ,log SB J Cycle Length, C sec E (v/s),; Lost Time Per Cycle, L sec E (v/s),i X C X = — C—L 9-80 URBAN STREETS "�/ ,k ` / - LEVEIrOF-SERVICE WORKSHEET Lane roup First Term Delay Second Term Delay Total Delay & LOS O Appr. ® lane Group Move- ments ® v/c Ratio X O Green Ratio g/C © Cycle Length C (sec) © Delay d, (sec/veh) O Lane Group Capacity c (vph) O Delay d2 (sec/veh) O Progression Factor PF Table 9-13 ® Lane Group Delay (sec/veh) (&+4V) X & 6 Lane Group LOS Table 9-1 Approach Delay (sec/veh) Appr. LOS Table 9-1 EB 7 I. r ) P.m B 6 70 15.U1 ��6�� 16,�U /, U WB P)V (, -- .�a5 , 70 II.3� Bbl 0 1M11 C, NB 5y 70/ O-LIa I c.► avj,q(, SB 1la 3f6 o I5.1a I-OtEf o / Intersection Delay �� �� sec/veh Intersection LOS ��w (Table 9-1) I M E' M U R .A N 1 i t! M Sout.h Burlington Planning Commission From: Jane B. Lafleur, (:.ity Planner Re: August 5, 1986 agenda items _J�v Date: August. 1, 1986 2) PALMFR, 1,01' #1 , RDR. SUBDI VISION, KIMBALL AVENUP] :Enclosed is a letter from Jeff Nelson of Wagner, Heindel and Noyes regarding the effects of the proposed development.. Mr. O'Brien has been contacted by the Natural Resources Committee to see if he is willing to grant an easement or, sell some proper- ty for better access to this lot.. Mr. Palmer and the O'Brien's have not reached any agreements ;vet. Since 1 have not, received revised plans with new access and scaled down coverage, this item should be tabled until. August 12, 1986. 3) NORDIC PRE -OWNED VEHICLES, 1519 SHELBURNE ROAD This item should be tabled until August 12, 1986. 1 have not received revised plans showing the corrections to the front yard, the lot dimensions, and the parking lot.. An eval►.�ation from Wagner, Heindel and Noyes is also needed. It would bo helpful to have lease information that confirms why improvements to the Gl property can not be done now. The Zoning Board wi 1 1 not. be able to review th i s for cond i t i ()na l use approval until Aug►.ast. 25 since the applicant. did not meetthe filing deadlines. 4) LASH, 'TOWN AND COUNTRY FLfRNITUR.E, 1515 SHE1Jfl1PN1-: ROAD I have not, yet, received new plans reflecting the changes required by the P 1 anni n,g Commission. A motion to deny this plan w i 1) be available at the meeting since the 60 day art i o I i period is quickly approaching. 5) MFR.C'HAN'rS BANK, 75 KENNEDY DRIVE AND KIMBAI,L AVENUE Craig Leiner and David Spitz will both be available on Tuesday night to discuss the traffic impact of this operations fa(- iIity, branch bank and leased office space. The Commission should be> prepared to discuss the improvements required by this ap1)11(,ent such as signalizati.on improvements at the Kennedy and Williston 1 ^1t'.^1O-I) ftl. x/ l /86 Road intersect i.on and t.hcr himhal 1 and kenriedN !)rive intorccee tion. We may want to requi r•e the improvemf�nts needed as a resu t c f this development now, and a contr i hut, i on to a t ra f f' i s i m1)ac t f*11nd for fut1.rre improvements as we clo on 5he.lbr.rrne road. Fle ht. The definition section ()t' the Lonin.g Orciinance c Iarifies Section 18.1.12 definition of height. The ma-\imum height at the tallest point. is 35 feet. The Merchants Bank roquests; approval. of 45 feet. and will argue that the 3 criteria of Section 18.112b are met. They wi.l.1. also bring elevations to show the rel.ationship of the building to existing buildings. The issues of the pedestrian trail and landscaping have been resolved. See Bill's memo regarding the sidewalk. fie would 1 i ke it built at. .least to the new Kennedy- Drive dr i vow[Ay f r o m Kimball Avenue. I will. bring the O'Brien bank plan to the meeting to review the proposed connection of the two properties. The 24 foot. wide road connection is located 20 feet from the northeast. corner of the Merchant's Bank property. The grade to the O'Brien bank is quite steep; a connection between the two properties is likely to add a number of left, turning vehicles onto Wi_11iston Road. This should be avoided. 6) BARNES, 27 MEADOW ROAD Enclosed is a memo from me regarding Spoke's opinion on the four issues raised by the Commission. 7) LARKIN, LOT 39, HARBOR VIEW ROAD Several months ago Mr.. Larkin requested an extension to the site plan approval for construction of a 20,000 square foot office building on lot #9 of the Bartlett property. The Commission postponed action until. an erosion and runoff evaluation from Wagner, Heinde.l. and Noyes was obtained. That; evaluation is enclosed. They recommend no detention due to the location of the site within the watershed. The only other new condition of approval will be the intersection improvement fund contribution. The original memos and minutes are enclosed to describe the project to the new Planning Commis- sion members. 2 August 4, 1986 Gordon Woods 104 Church Street Burlington, Vermont 05401 Res Merchants Bank, Kimball & Kennedy Drive Dear Gordon: Enclosed are the July 22, 1986 Planning Commission minutes. Please call me if you have any questions. Sincerely, Jane B. Lafleur, City Planner JBL/mcp Encl cc: David Spitz Rodney Campbell Craig Leiner M l M O H A N D 1_� �1 To: South Burlington Planning Commission From: Wi-11.iam Szymanski, City Manager Re: August 5, 1986 agenda items Date: August, 1, 1986 5) MERCHANTS BANK, CORNER OF KENNEDY DRIVE, KIMBALI, AVENt-1? 1. The Kennedy Drive sidewalk should be constructed to the access drive. Construction beyond that would require a large quantity of fill. material which in order to make the walkway usable would have to continue northerly; and also the large culvert under Kennedy Drive would have to be extended. 2. The guard rail along Kennedy Drive where filling for si(iei:allc will take place shall be removed and delivered to City 1-1i.ghway Garage site. Care shall be taken not to damage i t (iuri 11.9 removal. 8) GIGURE, Alan, 128 AIRPORT PARKWAY 1. Unless both properties remain under one ownership a common driveway is not a good arrangement. Both deeds must. rIearJ.y define responsibility for maintenance including snow removal. 2. Drainageway along south side of property should be shown on the plan. 3. Extra turnaround space should be provided to accommodate delivery and emergency vehicles. 9) O'BRIENS TRAINING CENTER, SHELBURNE ROAD 1. A 5 foot, landscaped strip should be included aalOng the southerly line to prevent encroachment upon adjacent: property and protect, existing trees. 2. Angle parking should be considered which improves ingress and garage drive a good turnaround area. 10) J-CARE SUPPLIES, INC., LIME ROCK DRIVE 1. Driveway of street should include five foot flare at. curb. 1 7/22/86 JBL MOTION OF APPROVAL That the South Burlington Planning Commission approve the site plan application of the Merchants Bank, Gordon Woods, agent for construction of a 40,000 square foot bank operations center including a 1600 square foot branch bank on lot #7 of Business Park North as depicted on a plan entitled "New Operations Center for Merchants Bank, Kennedy Drive, South Burlington" prepared by Gordon G. Woods, dated May, 1986, printed 6/30/86 with the following stipulations: 1. A $20,000 landscaping bond shall be posted prior to permit. The trees shown in the triangular area at the corner of Kennedy Drive and Kimball Avenue shall be re- located to a location approved by the City Planner. 2. A sidewalk shall be constructed along Kennedy Drive and Kimball Avenue frontages. A bond shall be posted for this prior to permit in an amount determined by the City Engineer. 3. The 42 compact cars that represent 25% of the total are approved by the Planning Commission. 4. The parking lot shall be shifted towards Kennedy Drive so that it is not within the 15 foot pedestrian trail. The Kennedy Drive 50 foot front yard coverage shall not exceed 30 percent. 5. A 1500 gpd sewer allocation is made as a portion of the original 3020 gpd allocation for the 10'lot sub- division; 640 gpd remain for the undeveloped parcels. 6. The deceleration and acceleration lanes shall be constructed with the granite curbing that is removed from Kennedy Drive as well as any additional curbing to curb the driveway to the parking area. The island shall also be curbed. 7. The traffic island shall be redesigned to meet State Agency of Transportation standards. It shall be constructed so right turn in and right turn out are the only possible movements, similar to the entrance at the Factory Outlet and Sears on Shelburne Road. 8. A storm water runoff control plan shall be approved by the City Engineer prior to permit. 9. An easement shall be given to the City to reconstruct or add to the drainage pipe under Kennedy Drive. The City agrees to restore the disturbed area to its original condition. 10. Revised plans reflecting these changes shall be sub- mitted to the City Planner prior to permit. 11. The building permit shall be obtained within 6 months. 4. Plan should show who owns what and limits of site being reviewed. Site development seems to include part of the G.E. Supply site. 7) MERCHANTS BANK, KIMBALL AVENUE 1. In construction of the deceleration lane and acceleration lane the removed road granite curb shall be used with additional as required to curb this drive to the parking area instead of shoulders as shown. The island shall also be lined with curb. 2. Vermont State Highway has standards for traffic islands. This standard shall be followed. 3. Site should have sidewalks on both streets. 4. The corner of Kimball Avenue and Kennedy Drive has a triangle reserved to maintain day lighting. Large trees should not be planted in this area. 5. Site should include storm water runoff control. 6. City requests rights of access across this property to maintain reconstruction or add to the drainage pipe under Kennedy Drive under the condition the City restore any disturbed area to its original condition. 7. The parking at the north-east corner infringes on the 15, pedestrian easement. 2 PLANNING COMMISSION 22 JULY 1986 Page 6 7-Site Plan Application of the Merchants Bank for construction of a 40,000 sq. ft. banko era ions center including a E-ranch ban7 on lot #V of Business Park Northat the corner of Kimball ve- nue and Kennedy Drive Gordon Woods explained the project. The building will be 3 stories except on the side where the land is lower which will be 4 stories. It will house a small branch bank (40' x 401) with a drive -up window, and the operations section of the bank. Mr. Woods considered that the front of the building faced the east; however, they have been given a Kennedy Drive address, so the Commissionw�`kennedy Drive to be the front. Mr. Jacob noted the inclusion of the helicopter space. Mr. Woods said this was within the allowable parking spaces. Members discussed the building height restrictions. Both Mr. Burgess and Mr. Poger recalled that it was the intent of the Ordinance that 35 ft. be the maximum with the Commission having the right to waive up to 45'. Mr. Jacob said the Commission then cannot consider the planned 48 feet on the 4-story side of the building. Mrs. Lafleur confirmed they have met the waiver set- back requirement for the extra building height in front and on the sides. They will shift the parking lot to keep the pedestrian trail at 15 feet in width. The Commission could also require the internal connection which was part of the original subdivision; Mr. Spitz felt this was not a good idea as it would bring traffic out through lot #8 onto Williston Rd. at a bad point. Mrs. Lafleur will check on this. Regarding traffic, Mr. Spitz said they have estimated trips from both the public and non-public uses of the bank. For the PM peak hour, they estimate 59 trips in and 106 trips out, for a total of 165. This, he said, was well within what was considered conceptually. The 2 affected intersections are Kennedy Dr. and Kimball P,ve. and Kennedy Dr. and Williston Rd. At Kimball, their study shows the left turn at level "E", but does not indicate the need for a signal. At Williston Rd., differences with Craig Leiner's report must be reconciled. Mr. Spitz said that now there is effectively a left turn lane coming from Williston. It would not take a lot more traffic to make that a problem, and something should be done to that intersection, such as re - timing of signals. It was agreed that Craig Leiner would come to the next meeting to explain his analysis. The question of the helicopter was again raised. The bank does not now own one and would plan to use it in off -hours. Mr. Dooley felt the proximity to the airport could be a problem and others felt the proximity made the strip unnecessary. Mrs. Hurd noted that it blocked 22 parking spaces. Mr. Krassner objected strongly to the noise, especially since it would be in none business hours. 1. PLANNING COMMISSION 22 JULY 1986 Page 7 Members discussed the need for a sidewalk on Kennedy Drive, and Mrs. Lafleur agreed to discuss this further with the City Manager. Mr. Krassner questioned what services would be offered by the bank. The response indicated it would be a full -service bank. They anticipate half the traffic of White Street and are not sure about safe deposit boxes at the location. The primary use would be for data processing and bank operations. They will transfer 100 employees from downtown to this location. There is the possibility that the top floor will be leased which may bring the number of people in the building up to as many as 200. Mrs. Lafleur said this reinforces Craig Leiner's statement that traffic should be calculated on the number of square feet, not the number of bank employees. Mr. Dooley then moved to table discussion until the next meeting. Mrs. Maher seconded, and the motion passed unanimous Craig einer will attend is meeting. Other Business Mrs. Lafleur reported that the City Council wants the Commission to review the official city map and also to change the Master Plan accordingly. The next meeting will be on August 5th. As there was no further business to come before the Commission, the meeting adjourned at 11:00 pm. Clerk August 1, 1986 Gordon Woods 104 Church Street Burlington, Vermont 05401 Re: Merchants Bank, Kennedy Drive and Kimball Avenue Dear Gordon: Enclosed are the agenda and my memo to the Planning Commission. Please be prepared to defend your request for a height waiver to 45 feet. David Spitz and Craig Leiner should both be available to discuss traffic issues. If they are not ready, this should be tabled until August 12, 1986. Sincerely, Jane B. Lafleur, City Planner JBL/mcp Encls cc: David Spitz Rodney Campbell Craig Leiner Rzq weic"k 06'�NUAk-o c-� 191, r� v -tuA,-r, M4t a-,rl S v`-+ -�> :.A,A--� MEM- LIMM TO: SOUTH BURLINGTON PLANNING COMMISSION FROM: O'BRIEN BROTHERS AND BRUCE HOUGHTON, ENGINEER RE: BUSINESS PARK NORTH SUBDIVISION APPLICATION, NORTHERLY SIDE INDUSTRIAL PARK ROAD, EASTERLY SIDE KENNEDY DRIVE, SOUTHERLY SIDE WILLISTON ROAD DATE: MARCH 24, 1978 AGREE_D__SMTnNT_ OF -FACTS 1. O'BRIEN BROTHERS AGREE BY APPROPRIATE DOCUMENTS TO CONVEY TO THE CITY AN EASEMENT FOR THE WIDENING OF WILLISTON ROAD WITH RESPECT TO LANDS FRONTING WILLISTON ROAD AS SHOWN ON THE BUSINESS PARK NORTH DOCUMENTS SUBMITTED, TO A DEPTH OF 12 FEET. 2, O'BRIEN BROTHERS AGREE TO CONVEY TO THE CITY BY APPROPRIATE DOCUMENTS SLOPE RIGHTS ALONG LOT 7 AND LOT c ON THE EASTERLY SIDE OF KENNEDY DRIVE. THIS STATEMENT IS MADE SUBJECT TO AN UNDERSTANDING BETWEEN O'BRIEN BROTHERS AND THE CITY OF SOUTH BURLINGTON AS TO WHAT SLOPE RIGHTS IN FACT ARE REQUIRED. 3, O'BRIEN BROTHERS AGREE TO DEDICATE OR TO CONVEY TO THE CITY OF SOUTH BURLINGTON A TRIANGULAR PORTION OF LAND TAKEN FROM THE SOUTHWESTERLY CORNER OF LOT 7 BY APPROPRIATE DOCUMENTS FOR SUBSEQUENT USE BY THE CITY OF SOUTH BURLINGTON IN IMPROVING THE INTERSECTION OF INDUSTRIAL PARK ROAD AND KENNEDY DRIVE. 4. O'BRIEN BROTHERS AGREE THAT THE CURB CUTS SHOWN ON INDUSTRIAL PARK ROAD ON THE SUBDIVISION PLANS SUBMITTED ARE PLACED IN A LOCATION WHERE THEY WILL COINCIDE WITH CURB CUTS ON THE SOUTHERLY SIDE OF INDUSTRIAL PARK ROAD AT SUCH TIME AS THAT AREA IS DEVELOPED. THIS IS SUBJECT TO THE UNDERSTANDING THAT AT SITE PLAN REVIEW FOR EACH OF THE BUSINESS PARK NORTH LOTS, FROM THE POINT -OF -VIEW OF THE LOT OWNER AS WELL AS THE CITY, IT MAY BE DESIRABLE TO ADJUST THE CURB CUTS WITHIN THE BUSINESS PARK NORTH PROPERTY TO DEAL INTELLIGENTLY WITH ANY ISSUES THEN RAISED. 5. O'BRIEN BROTHERS AGREE THAT LOTS Q AND TO ARE RE- STRICTED TO ACCESS THROUGH THE PRIVATE RIGHT OF WAY LYING TO THE WEST OF LOT 10. 6. O'BRIEN BROTHERS AGREE IN CONCEPT TO ACCESS CONNECTORS BETWEEN BUSINESS PARK NORTH ABUTTING PROPERTIES WHERE SUCH CONNECTORS ARE DESIRABLE, PRACTICABLE, AND FEASIBLE. HOWEVER, WHETHER OR NOT SUCH A CONNECTOR IS APPLICABLE TO EACH PARTICULAR LOT WILL DEPEND UPON THE INTENDED USE FOR THAT LOT AND THE NEEDS OF THAT LOT OWNER AND THIS ISSUE SHOULD BE HANDLED AT SITE PLAN REVIEW WHEN THE SPECIFICS OF EACH OWNER'S USE OF THE PROPERTY ARE THEN KNOWN. 7. O'BRIEN BROTHERS AGREE TO CONVEY TO THE CITY OF SOUTH BURLINGTON A PEDESTRIAN EASEMENT ALONG POTASH BROOK, 8. O'BRIEN BROTHERS AGREE TO RESTRICT INGRESS AND j EGRESS TO LOT % AT THE CORNER OF INDUSTRIAL PARK ROAD AND KENNEDY DRIVE TO THAT WHICH IS SHOWN ON'A PLAN ATTACHED HERETO AS DEVELOPED BY MR. BRUCE HOUGHTON, TRAFFIC ENGINEER, PAULSEN ASSOCIATES. 9. O'BRIEN BROTHERS AGREE THAT SUBDIVISION APPROVAL, IF GRANTED, MAY BE MADE SUBJECT TO THE AVAILABILITY OF THE MUNICIPAL WATER LINE WITHIN THE INDUSTRIAL PARK ROAD RIGHT OF WAY. -2- 10. O'BRIEN BROTHERS STAND BY THEIR REQUEST FOR A WAIVER FROM ANY REQUIREMENT FOR THEIR CONSTRUCTING A SIDE- WALK ON INDUSTRIAL PARK ROAD, 11. O'BRIEN BROTHERS UNDERSTAND THAT THE CITY OF SOUTH ' BURLINGTON WISHES TO SIGNALIZE THE INTERSECTION OF INDUSTRIAL y� PARK ROAD AND KENNEDY DRIVE, O'BRIEN BROTHERS AGREE TO CON- TRIBUTE THEIR PROPORTIONATE SHARE OF THE COST OF THAT SIGNAL, SUBJECT TO THE UNDERSTANDING THAT THEIR SHARE WILL BE DETERMINED BY TRAFFIC FLOW REASONABLY ATTRIBUTED TO THE BUSINESS PARK NORTH SUBDIVISION ONLY, 12. O'BRIEN BROTHERS AGREE TO CONVEY TO THE CITY OF SOUTH BURLINGTON AN EASEMENT FOR THE PLACEMENT OF FUTURE SEWER LINES EITHER WITHIN THE POTASH BROOK CONSERVATION DISTRICT OR AT SUCH OTHER LOCATIONS AS THE CITY ENGINEER AND O'BRIEN BROTHERS MAY AGREE UPON. 13. WITH REFERENCE TO MEMORANDUM FROM WILLIAM J. SZYMANSKI, CITY MANAGER, TO THE SOUTH BURLINGTON PLANNING COMMISSION DATED MARCH 10, 1970' RELATIVE TO THE AIRPORT PARKWAY SEWAGE FLOW, O'BRIEN BROTHERS REQUEST THAT ANY RE- FERENCE ON THE BUSINESS PARK NORTH PLAN SUBMITTED TO THE SOUTH BURLINGTON PLANNING COMMISSION AS TO ON -SITE SEWAGE DISPOSAL BE IGNORED INASMUCH AS IT IS NOW UNDERSTOOD THAT SEWAGE CAPACITY IS AVAILABLE TO SERVE THE BUSINESS PARK NORTH DEVELOPMENT AND FINAL PLANS OF BUSINESS PARK NORTH WILL BE SHOWN AS PROVIDING MUNICIPAL SEWAGE TO EACH OF THE LOTS, 14, O'BRIEN BROTHERS REQUEST THAT THEY BE PERMITTED TO MOVE THE EASTERLY LOT LINES OF LOT 3 AND LOT 4 50 FEET EACH FURTHER TO THE EAST, AND WHERE NECESSARY THAT THEY BE PERMITTED TO MAKE AN APPROPRIATE ADJUSTMENT TO THE SOUTHERLY LINE OF -3- LOT 9 TO COORDINATE THE MOVEMENT OF THE LOT 4 EASTERLY LINE. THE ADJUSTMENT IN LOT LINES MENTIONED ABOVE IS IN CONJUNCTION WITH COMMENTS MADE ABOUT THE USEFULNESS OF LOT 4 AS SHOWN ON THE INITIAL PLANS. 15. O'BRIEN BROTHERS AGREE TO INSTALL POWER AND TELEPHONE LINES UNDERGROUND. 16. O'BRIEN BROTHERS FURTHER AGREE TO THE PLACEMENT OF A BUFFER AREA AROUND THE RESIDENTIAL PROPERTIES LYING TO THE NORTHEAST OF LOT 9. 17. O'BRIEN BROTHERS AGREE TO MODIFY LOT 9 TO THE EXTENT THAT THEY WILL CLOSE ITS BOUNDARIES AT THE SOUTHERLY END OF THE NARROW STRIP OF LAND HAVING FRONTAGE ON WILLISTON ROAD WHICH NARROW STRIP OF LAND WILL BECOME A PRIVATE RIGHT OF WAY SERVING LOT 9 AND LOT 10. 18. O'BRIEN BROTHERS WOULD LIKE TO DEFER ANY QUESTION ABOUT THE NEED FOR FILL TO SUCH TIME AS THOSE LOTS IN NEED OF FILL COME BEFORE THE SOUTH BURLINGTON PLANNING COMMISSION FOR SITE PLAN REVIEW AT WHICH POINT IN TIME THE NEED FOR FILL CAN BE COORDINATED MORE REALISTICALLY WITH ACTUAL DEVELOPMENTAL PROPOSALS. 19. O'BRIEN BROTHERS AGREE IN CONCEPT TO PROTECTIVE COVENANTS RELATIVE TO BUSINESS PARK NORTH, BUT TO DATE, HOWEVER, THERE ARE NO ISSUES APPARENT TO O'BRIEN BROTHERS WHICH NEED TO BE INCORPORATED IN PROTECTIVE COVENANTS. IF ANY ARE RAISED SUBSEQUENTLY, PROTECTIVE COVENANTS FOR THEM WILL BE CREATED. 20. MR. BRUCE HOUGHTON, TRAFFIC ENGINEER, PAULSEN ASSOCIATES, MAKES THE FOLLOWING STATEMENTS: (A) BASED ON PERMITTED USES FOR BUSINESS PLANNED -4- DEVELOPMENT AND INDUSTRIAL ZONES DESCRIBED IN THE SOUTH BURLINGTON BONING REGULATIONS AND POTENTIAL USABLE LAND PER LOT RELATIVE TO EXISTING TOPOGRAPHY OF THE AREA, I ESTIMATED THE P.M. PEAK ROADWAY HOUR ENTERING AND EXITING TRIPS FOR THE DEVELOPMENT, THESE ESTIMATES ARE REPRESENTED IN TABLE I. IN ADDITION, I TOTALED THE ENTERING AND EXITING TRIPS BY ACCESS POINT PLANNED FOR THE DEVELOPMENT. THESE NUMBERS ARE REPRESENTED IN TABLE II. (B) I HAVE ANALYZED EACH ACCESS POINT AS IT RELATES TO OTHER PLANNED ACCESS POINTS FOR THE DEVELOPMENT AND EVALUATED THE PLANNED ACCESS POINTS AS THEY RELATE TO THE OLD FARM ROAD -INDUSTRIAL PARK ROAD INTERSECTION, THE INDUSTRIAL PARK ROAD-KENNEDY DRIVE INTERSECTION, AND THE KENNEDY DRIVE- I';ILLISTON ROAD -AIRPORT DRIVE INTERSECTION. TABLE III REPRESENTS APPROXIMATE DISTANCES BETWEEN VARIOUS POINTS OF REFERENCE. THE PLANNED ACCESS POINTS TO THE DEVELOPMENT ON INDUSTRIAL PARK ROAD ARE REASONABLY SPACED (EQUIVALENT TO ONE CITY BLOCK) TO ACCOMMODATE VEHICLE MOVEMENTS INTO THE PARK, THE DISTANCE BETWEEN ACESS POINT 'C' AND OLD FARM ROAD IS SUFFICIENT TO ALLOW REASONABLE MOVEMENT OF VEHICLES WITHOUT RESTRICTIONS. IN ADDITION, THE DISTANCE BETWEEN ACCESS POINT 'C' AND KENNEDY DRIVE IS SUFFICIENT TO ALLOW FOR REASONABLE MOVEMENT OF VEHICLES. ALTHOUGH THE DISTANCE BETWEEN ACESS-POINT 'D' AND INDUSTRIAL PARK ROAD IS SUFFICIENT (250') TO ALLOW BOTH LEFT AND RIGHT TURN VEHICLE MOVEMENTS EXITING LOT No. %, IT IS RECOMMENDED THAT RIGHT TURN ENTRANCE AND RIGHT TURN EXIT BE THE ONLY ALLOWABLE VEHICLE MOVEMENTS AT ACCESS POINT 'D,' -5- ACCESS POINT 'E' IS LOCATED 450' FROM THE KENNEDY DRIVE-WILLISTON ROAD -AIRPORT DRIVE INTERSECTION, AND ITS LOCATION IS ACCEPTABLE. WITH THE PROJECTED LOW ENTERING AND EXITING VOLUMES FOR LOT N0. 8 DURING THE P.M. PEAK ROADWAY HOUR, MINIMAL VEHICLE RESTRICTIONS WOULD BE EXPECTED AT THIS ACCESS POINT. ACCESS POINT 'F' IS REASONABLY LOCATED WITH RESPECT TO LOT N0, 9 AND LOT NO. 10. ANY OTHER LOCATION OF THIS ACCESS WOULD SEVERELY LIMIT THE USEFULNESS OF LOT NO. 10. (C) THE INDUSTRIAL PARK ROAD-KENNEDY DRIVE INTERSECTION SHOULD BE SIGNALIZED WITH A SEMI -ACTUATED TRAFFIC SIGNAL DEVICE WITH SIGNAL ACTUATION ON THE INDUSTRIAL PARK ROAD APPROACH. SIGNALIZATION WILL ALLOW THIS INTERSECTION TO OPERATE AT LEVEL OF SERVICE A. (LEVEL OF CAPACITY APPROXIMATELY 6510") . (D) EXISTING FIXED TIME TRAFFIC SIGNALIZATION AT THE WILLISTON ROAD-KENNEDY DRIVE -AIRPORT DRIVE INTERSECTION SHOULD BE REPLACED WITH FULL ACTUATION TRAFFIC SIGNALS. VEHICLE SENSING DEVICES SHOULD BE PLACED ON EACH INTERSECTION APPROACH TO PROVIDE TOTAL VEHICLE RESPONSIVENESS IN ALLOCATING AVAILABLE GREEN TIME PER APPROACH. WITH FULL ACTUATION TRAFFIC CONTROL, THIS INTERSECTION SHOULD OPERATE AT LEVEL OF SERVICE C. (LEVEL OF CAPACITY APPROXIMATELY 78%). O'BRIEN BROTHERS DULY AUTHORIZED AGENT BRUCE HOUGHTON, ENGINEER Ls���til a l o i o (P.M. PEAK ROADWAY HOUR) LOT NUMBER ENTERING TRIPS EXITING TRIPS LOT #1 15 30 LOT # 2 15 30 LOT # 3 10 25 LOT #4 10 25 LOT # 5 15 45 LOT # 6 10 20 LOT # 7 165 165 LOT # 8 10 15 LOT # 9 30 30 LOT # 10 10 10 TOTAL TRIPS 290 395 TABLE II ESTIMATED TRIP GENERATION BY ACCESS POINT (P.M. PEAK ROADWAY HOUR) ACCESS LOT ENTERING EXITING POINT NUMBER TRIPS TRIPS A LOT # 1 30 60 LOT #2 B LOT # 3 20 50 LOT #4 C LOT # 5 110 150 LOT #6 LOT #7 D LOT # 7 80 80 E LOT #8 10 15 F LOT # 9 40 40 LOT # 10 TOTAL TRIPS _290. 3�5 TABLE III LOCATION OF ACCESS POINTS (INDUSTRIAL PARK RD-KENNEDY DR4,ILLISTON RD) DESCRIPTIOIN ACCESS 'A' TO ACCESS 'B' ACCESS 'B' TO ACCESS 'C' ACCESS 'C' TO OLD FARM ROAD ACCESS 'C' To KENNEDY DRIVE ACCESS 'D' TO INDUSTRIAL PARK ROAD ACCESS 'D' To W.ILLISTON ROAD ACCESS 'E' TO KENNEDY DRIVE ACCESS 'E' To ACCESS 'F' APPROXIMATE DISTANCE BETWEEN POINTS 600' 850' 325' 575' 250' 700' 425' 900' PLANNING C010,ISSION OCTOBER 23, 1979 The South Burlington Planning Commission held a meeting on Tuesday, October 23, 1979 at 7:30 pm in the Conference Room, City Hall, 1175 Williston Road Members Present Sidney Poger, Chairman; Ernest Levesque, James Ewing, Kirk Woolery, Peter Jacob, George Nona (late, James Draper Others Present Stephen Page, former Planner; Sandy hleppinger, Taylor 111cDermott, Harry Wallace, William Schuele, Leo O'Brien, Lowell ?:rassner, Richard Wiemann, Peter Gebauer Minutes of October 16, 1979 Mr. Ewing moved to approve the October 16, 1979 minutes. Mr. Levesque seconded the motion and all voted aye. Continue public hearing on final plat application for resubdivision of Business Park :worth Mr. Page said the plan shown tonight was exactly the same one shown at preliminary plat. What used to be the west end of lot 4 and the east end of lot 5 is now an additional new lot, so there are 11 rather than 10. The number of access points on Kimball Avenue does not change with this plan and there will be a service road parallel that road. One access point will serve lots 11,5,6, and 7. Mx. `r;oolery moved that the South Burlington Planning Commission approve the final plat application of Daniel and Leo O'Brien for a resubdivision of the _ Business Park North plat to add 1 lot, as depicted on a plan entitled, "rival Plan, Business Park North..." revised 9 79 by SJM, subject to the following stipulations: 1. Water supply and sewage disposal shall be off -site, via the municipal systems. 2. All applicable stipulations of the previous approval for Business Park North remain in full effect, such as the deferral o grading an ra�nage plans to site plan review. 3. The final plat shall show the mutually agreed upon location of the pedestrian easement along Potash Brook and shall be recorded within 90 days. MIr. Ewing seconded the motion. Mr. Nona arrived just before reading of the motion. fir. Leo O'Brien felt that stipulation #3 would give the developers and the City enough' time to work out the location of that easement. The motion carried, with Mr. ?bona abstaining because he did not participate in the discussion. Continue site plan review of Farrell Real Estate proposal for former Lake Chuz:nlain Motors property at corner of Allen Road and Shelburne road i-.r. :age stated that this apYi_Jcation h.ad been withdrawn. 3. PLANNING Ci,KMISSIOh Ir Discussion of Planning Commission public hearing procedures APR IL 4. 1976 Mr. Page gave the Commission a procedure that had been worked up in 1976. The Commission decided that the Chairman and/or the Planner would make introductory remarks and they said that witnesses and applicant would be sworn in en masse if this was requested. ''.r. Poger remarked that he did not like having witnesses sworn in because that implies that they can lie to the Commission any other time and he felt that whenever anyone spoke to the Commission they should tell the truth and that their remarks should be as binding as if they were sworn in. This only happens in the most formal hearings, though, he said. :�Ir. Ewing moved that the Planning Commission improve the memo as corrected dated June 18, 1976 from William Wessel and also that they direct N,r. :age to post the corrected memo in the Conference room at City Hall or at any other meeting place. i?r. Poger seconded the motion, and it passed unanimously. Mr. Page also said that he would have ready for the Commission, anyone in the audience, and the applicant, a checklist of' issues to be discussed for each of the Commission's activities. Not every item would have to be discussed, he said, but the members would have them all before them. Xr. Page told the Commission that there was an overlap in the review of PUD's and Subdivisions and he would like comments on that at the neat _soft meeting. PIr. Poger asked how Mr. Page's limited working hours were working out and was told that it was going well. N.r. Mona said that he appreciated all Irr. Page's hard work on this and other things and Mr. Poger seconded that. DeliDeration on preliminary plat, Business Park North Mr. Page said that he felt the number and location of curb cuts on the industrial road was reasonable given the proposed uses and the roadway length. The pavement width is 32', which would allow for a stacking lane in the middle of the road if needed. he said that he would like to see how the National Guard drive lined up with access to lots 9 and 10 but that could be done at final plat. He said that an approval would mean conceptual approval of the curb cuts, which could be moved a little later on in the review process. Mr. Ewing asked if they wanted a service road and I-.r. Poger said that he was not sure this was the right time to discuss it but lie felt they could not design a road for its maximum capacity. He said that lot 7 would probably have a bank on it and he noted that there was another proposal for a bank on the ot:ie side of the street. he was hesitent to allow two high traffic generators so close to this corner, he said. He said that he would vote against having 2 banks on the corner and said that he was uncomfortable with that use in that place. Mr. Mona asked how many people Digital could employ before the inter- section would have to be signallized and ?.r. Ewing replied that the Commission needed an engineer to tell them that. Kr. Poger said it would not be long before they needed a signal but he said it might take a long time to get one. Xr. Kona said he did not know if access across the street from the three accesses on the side under discussion would be good or bad and fir. Poger assumed that they were good. 'Kr. Levesque pointed out that there was a lot of right of way here which could be used to i.ake adjustments in the roadway. !Ir. Page said the Council wanted to limit the use of Shunpike Road by Digital employees but he was not sure how they would do that. 1'.r. Poger said it could be olocked at iiiilliston Road or at the other end but it seemed to him that 4. PUINNING COMMISSION APRIL 4, 1978 j ` the Commission should not count on the road as a means of relieving traffic from Digital since putting that kind of traffic through a residential neighborhood was contrary to the A3aster Plan. As. Page suggested an approval predicated on a certain level of service at the Kennedy Drive intersection. I~;r. I -Iona said that he would like to look at traffic in the surrounding area sometime in the fall and 1•:r. Page said the Commission was waiting to hear on funding for such a study. Mr. Levesque said these lots had much less traffic than Digital and it was at a different time. Air. Mona said he liked the idea of phasing development of the land to a service level of the traffic. Mr. Morency asked if traffic on Kennedy Drive would have room to accomodate people turning right into lot 7 and Air. Poger suggested that a dViceleration lane might be needed. The Commission discussed this point. Mr. Page said a car could swing past another one turning right at that point. Kr. ~king said that the curb cuts were being approved conceptually now and could be moved at site plan review. I.T. Poger did not want to take any action on this plat tonight, feeling that Mr. Wessel had wanted to deliberate two weeks from the last meeting, but that he had wanted to deliberate at this meeting and take action at the next hard meeting night, when there would also be more people attending. The other Commissioners wanted to vote tonight, however. The Commission discussed curb cuts and possible land uses on the lots. Zr. Morency said he did not want to be pinned down to the accesses as shown. Nr. Poger said he would vote for no high traffic generators on the lots because he did not feel the accesses shown were adequate for that intensive use. He felt the developer had limited his options by putting in only as many curb cuts as he had. Mr. Page said that he had spent time with a professional traffic engineer who had put his seal on the location of the curb cuts to minimize impact on the roadway. Mr. Poger added "within the perameter of the anticipated traffic from the lot." Air. Mona moved that the South Burlington Planning Commission approve the preliminary plat application of Daniel O'Brien,_ as depicted -on a plan set of 5 pages sheets 2-6 entitled "Business Park North", drawn by RCK, dated January 1978, subject to the following stipulations_ 1) The conditions numbered 1-18, contained in a_memo of -8 24/7from O'Brien to the South Burlington Planning Commission shall apply,_`and _be shown as appropriate on the final plat, with the following exceptions or clarifications: #1 'easement' to be 'offer of irrevocable dedication' alignment of the National Guard drive shall be shown on the -- ----- --- -- -- — ----- - -- final plat, to decide the proper location of the access to lots 9-& 10 '10 a sidewalk shall be installed #11 cost sharing should also include geometric _or_ot_he_r_-measures_ - t_ o improve the capacity of this intersection._ 2) Final utility review (sewer, water, phone shall be Performed by the City Engineer. 3) The suitability of lot 10 soils for development ramE ins to be shown. 4) Storm drainage, cutting, and fillies review shall be deferred to site plan review on a lot by lot basis. 5) The IIBPD district line shall be shown on the final plat. 5. PLANNING COYYIISSION APRIL 4, 1978 IF 6) The following required improvements are waived: street signs, out- door li,,hting, and landscaping. 7) Because of the uncertainty surrounding future conditions at the Kennedy Drive intersections with the "industrial road" and Williston Road, phased development of this project, predicated on adequate levels of service at this intersection or some alternative suitable to the Planning Commission, is required. _The _desired levels of service, and the degree of development phasing ­shall be decided at the final plat stage. The motion was seconded by Yr. Ewing and passed with Ns. Morency voting no. He stated that he felt that by putting access D as planned on lot 7, the �} Commission was approving a high traffic generator and paving the way for the Zoning Board to give conditional use permits to high traffic generators. Mr. Foger felt that the wording of stipulation 3 was too weak and that if the soils were not suitable for development, there should not be any development. Mr. Levesque said that the City Council had asked the Commission what plans the Commission had for improving traffic during the period of interim zoning. Xr. :•Iona said that since they did not have a traffic engineer, they did not have any plans and he felt it was an unreasonable request. The interim zoning hearing is April 10. Ns. Ewing said the Council was proposing it so they should have the answer. He felt they should consider breaking the BR zone into more zones on Williston and Shelburne Roads. The Commission added that they should consider the zoning amendment laid out in principle in Mr. Morency's High Traffic Generators report and that they should hire an engineer or a consultant to help the Commission. The meeting was declared adjourned at 11:00 pm. Clerk - -- _ - -- - ����- r C \� r / Al � P / A ,�, ` 1 �� � `�__�� � Y t y'Ca July 18, 1986 Gordon Woods 104 Church Street Burlington, Vermont 05401 Re: Merchants Bank, Kimball Avenue Dear Gordon% Enclosed are the agenda and my memo to the Planning Commission. Also enclosed are Chief Goddette's and Bill Szymanski's comments. Please be sure someone is present on Tuesday, July 22, 1986 to represent your application. Sincerely, Jane B. Lafleur, City Planner JBL/mcp Encls CC: Rodney Campbell David Spitz Craig Leiner i R� rya 37/ All ►i *.! 1„ I � a 45t 440 tea