HomeMy WebLinkAboutSP-95-0003 - Decision - 0030 Community DriveFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Technology Park Associates for resubdivision of a 157 acre lot into eleven (11) lots ( nine ( 9 ) developable lots) and resubdivision of one (1) lot (lot #5) of a previously approved six (6) lot subdivision, former Digital plant, 115 Kimball Avenue. On the 14th day of November, 1995, the South Burlington Planning Commission approved the request of Technology Park Associates for preliminary plat approval under Section 203 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of the subdivision of a 155.5 acre parcel (former Digital property) into 10 lots ranging in size from 31.11 acres to 6.59 acres and the resubdivision of a previously approved lot (lot #5). The sketch plan was reviewed on 9/26/95. 2. Access: Access to the proposed subdivision will be via the existing access road. A new cul-de-sac street will be constructed serving lots #9, 10 and 11. Existing lots #2 and 3 will be served by a shared access on Kimball Avenue and existing lots #1 and #4 by the existing access road. A 60 foot r.o.w. connection is being reserved to the Tilley parcel to the west. 3. The applicant requested at the meeting to phase the construction of improvements to the "loop" road prior to occupancy of two (2) of the currently undeveloped internal lots (i.e., lots #6,7,9,10,11,12,13,14), or within five (5) years from the date the existing building, or a portion thereof, on lot #8a (i.e., former Digital building) is first occupied, whichever first occurs. The proposed cul-de-sac street will be constructed to City standard at the time of construction. 4. Lot size/frontage: The minimum lot size of 40,000 square feet is being met by all lots. 5. The minimum frontage requirement of 120 feet on a local street and 200 feet on an arterial or collector is being met. 6. Coverage/setbacks (lot #8a): Building coverage is 20.6% (maximum allowed is 30%). Overall coverage is 53.7% (maximum allowed is 70%). Front yard coverage is 6.7% (maximum allowed is 30%). Setback requirements are being met. 1 7. Recreation paths: The preliminary plat shows the bikepath easements as approved on 3/14/95. The Recreation Path Committee requested that if sidewalks are required along the existing access road that they be eight (8) foot wide paved paths instead of the five (5) foot wide concrete sidewalk. 8. C.O. District: The preliminary plat shows the C.O. District associated with Potash Brook, Muddy Brook, the two (2) drainage ponds and along I-89. 9. A portion of the proposed cul-de-sac street will be located in a C.O. District. The Planning Commission may approve this encroachment if it will not significantly affect adversely the attributes provided in Section 3.503(a) - (e) of the zoning regulations. The applicant has submitted a report addressing these criteria. 10. Sidewalks: The proposed bike path along Kimball Avenue and Shunpike Road will also serve as a sidewalk. A condition in the previous subdivision approval required that the bike path along Kimball Avenue be constructed prior to occupancy of a building on lots 1-4. Staff recommended that this condition be extended to all new lots being created (i.e., lots 1-7 and 9-14). 11. Sewer: The additional sewer allocation requested is 27,672 gpd. Lot 6 (Digital building lot) was previously allocated 14,000 gpd. The developer of each lot will be required to pay the per gallon fee prior to permit issuance. 12. Traffic: At the sketch plan hearing, the Commission had asked that a traffic impact analysis be conducted. The applicant opted to not conduct such a study and is instead requesting that the Commission allow the total number of trip ends which were approved by the State for Digital in 1977 to be allocated amongst the new lots. It appears that the State originally estimated and approved 1,000 P.M. peak hour trip ends for a 520,000 square foot facility (only 270,000 square feet were ultimately constructed). The specific number of approved trip ends will be determined at final plat. Applicant suggested that prior to approval of any development within the project which, in combination with all other previously approved development in the project, will exceed the approved trip end limit, the applicant would conduct a traffic impact analysis of the lots which are yet to be developed. 13. Airport Approach Cone: A portion of this property is located within the Airport Approach Cone. The boundaries of the approach cone are shown on the preliminary plat. 14. Undevelopable lots: Lots #8b and 8c will be undevelopable due to configuration, C.O. District, wetland and floodplain restrictions. Some sort of legal document such as a "Notice of 2 Condition" should be recorded to clearly indicate that these lots are non -developable. 15. Street trees: Applicant is proposing street trees along the new cul-de-sac street. These trees have a value of $5740. Applicant will plant street trees along the "loop" road as part of the phased improvements. 16. Lighting: Existing street lighting along the access road consist of 180 watt low pressure sodium lamps on 30 foot poles. Current zoning standards limit pole heights to 20 feet. 17. Applicant requested a waiver from Section 408 of the subdivision regulations for street lighting along the new cul-de- sac street. Applicant has indicated that GMP will maintain the existing street lights. Written confirmation from GMP should be submitted indicating that they would maintain these lights. 18. Street names: Applicant has submitted "Technology Drive" for the name of the new cul-de-sac street. Applicant should also submit a name for the existing access road. 19. Wetlands: Only wetlands outside of the C.O. zone have been delineated and these are shown on the plat. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the preliminary plat application of Technology Park Associates for resubdivision of a 157 acre lot into eleven (11) lots (nine (9) developable lots), and resubdivision of one (1) lot (lot #5) of a previously approved six (6) lot subdivision, former Digital plant, 115 Kimball Avenue, as depicted on a 13 page set of plans, page one (1) entitled "Digital Equipment Corp., Shunpike Rd., So. Burlington, VT., Subdivision Plat", prepared by Trudell Consulting Engineers, Inc. dated 12/21/94, last revised 5/23/95, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. Prior to issuance of a zoning permit for either of lots 1-7 and 9-14, any occupancy of the existing building on lot 8a, or start of utility or road construction, all appropriate legal documents including easements (e.g., irrevocable offer of dedication and warranty deeds for proposed public roads, and utility, sewer, drainage, water, recreation path, and access easements, etc.) shall be submitted to the City Attorney for approval and recorded in the South Burlington land records. 3 3. The applicant shall be responsible for the following improvements to the "loop" road prior to occupancy of two (2) of the currently undeveloped internal lots (i.e., lots #6, 7, 9, 10, 11, 12, 13, 14), or within five (5) years from the date the existing building, or a portion thereof, on lot #8a (i.e., former Digital building) is first occupied, whichever first occurs: a) widen road to 30 feet with appropriate base b) install curbs along entire length c) install appropriate drainage d) resurface with new layer of pavement 4. The "loop" road shall be brought into full compliance with City standards, including the construction of a sidewalk or recreation path and installation of street trees, prior to occupancy of four (4) of the internal lots described in condition #3 above. 5. Prior to issuance of a zoning permit for the second internal lot described in condition #3 above or start of construction of the road improvements described in condition #3 above, whichever first occurs, the applicant shall submit to the City Engineer for approval, detailed plans for the proposed improvements to the "loop" road described in conditions #3 and #4 above. 6. Prior to start of construction of the improvements described in conditions #3 and 4 above, the applicant shall post a bond which covers the cost of said improvements. 7. Prior to issuance of a zoning permit for either of lots 1-7 and 9-14, or start of utility construction, bonds to cover the costs of utility and recreation path (i.e., bike path) construction shall be posted. The amount of the bond shall be approved by the City Engineer. 8. In accordance with Section 301.5 of the subdivision regulations, within 14 days of completion of required improvements (e.g., roads, water mains, sanitary sewers, storm drains, etc.) the developer shall submit to the City Engineer "as -built" construction drawings certified by a registered engineer. 9. The plans shall be revised prior to final plat submittal as follows: a) Sheet SP1 shall be revised to show a street name approved by the City Planner for the existing "loop" road. b) The plans shall be revised to show a 60 foot r.o.w. reserved along the boundary between lots 9 and 8b extending from the cul-de-sac to the Town line of 4 Williston. c) The plans shall be revised to show the proposed cul-de- sac (i.e., Technology Drive) in compliance with City standards for public roads. 10. The applicant shall construct a 10 foot wide recreation path along the entire frontage on Kimball Avenue and Shunpike Road (approximately 2500 feet) prior to the occupancy of the first building constructed on either lots #1-7 or 9-14. 11. The Planning Commission approves an additional sewer allocation of 27,672 gpd for lots #6-14 for a total sewer allocation for lots #6-14 of 41,672 gpd. The sewer allocation approval shall remain in effect for ten (10) years from the date of final plat approval. Any lots which have not been developed within 10 years shall lose their allocation unless reapproved by the Planning Commission. The developer of each lot shall be required to pay the per gallon fee prior to permit issuance. 12. The Planning Commission approves the encroachment of the proposed cul-de-sac street into the C.O. District as provided under Section 3.50 of the zoning regulations. It is the Planning Commission's opinion that this encroachment will not significantly affect adversely the attributes provided in Section 3.503(a) - (e) of the zoning regulations. 13. Prior to recording the final plat plans, the applicant shall record a "Notice of Condition" approved by the City Attorney which clearly indicates that lots #8b and 8c are undevelopable. 14. The applicant shall post a landscape bond in the amount of $5740 for the proposed street trees along the cul-de-sac prior to start of construction of the new cul-de-sac street. This bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. 15. The entire project (i.e., lots 1-14) is approved for the number of P.M. peak hour trip ends which were theoretically approved for Digital in the late 1970's. The specific number of approved trip ends will be determined at final plat. Prior to approval of any development within the project which, in combination with all other previously approved development in the project, will exceed the approved trip end limit, the applicant shall conduct a traffic impact analysis of the lots which are yet to be developed. Based upon review of the traffic impact analysis, the Planning Commission may impose appropriate conditions on any and all lots which are yet to be developed in order to mitigate potential adverse traffic impacts. 5 16. Prior to final plat submittal, the applicant shall submit written confirmation from GMP that they will maintain the existing street lights along the existing "loop" road. 17. Pursuant to Section 513 of the subdivision regulations, the Planning Commission waives the following requirements: a) Section 408, street lighting along the proposed cul-de-sac street. 18. The final plat application shall be submitted within 12 months or this preliminary plat approval is null and void. / Chairman or Clerk South Burlington Planning Commission / j `'41� Date 0