Loading...
HomeMy WebLinkAboutSP-96-0001 - Decision - 0030 Community DriveFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Truex Cullins & Partners Architects to convert 60,000 square feet of a 270,780 square foot light manufacturing facility (former Digital plant) to office (40,000 square feet) and storage (20,000 square feet) on a 155 acre parcel of land, 115 Kimball Avenue. On the 19th day of March, 1996, the South Burlington Planning Commission approved the request of Truex Cullins & Partners Architects for site plan review under Section 26.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of converting 60,000 square feet of a 270,780 square foot light manufacturing facility (former Digital plant) to office and storage use (40,000 square feet office and 20,000 square foot storage) on a 155 acre parcel of land. The remaining 210,780 square feet is currently vacant. 2. This property located at 115 Kimball Avenue lies within the IC District. It is bounded on the east by Muddy Brook, on the south by I-89, on the north by Kimball Avenue and on the west by undeveloped land. 3. Access/circulation: Access is via a "looped" access road with two (2) curb cuts on Kimball Avenue. No changes proposed. Circulation is adequate. 4. Coverage/setbacks: Building coverage is 4.2% (maximum allowed is 30%). Overall coverage is 13.7% (maximum allowed is 70%). Front yard coverage is 0.5% (maximum allowed is 30%). Setback requirements are met. 5. Parking: There are 1,000 parking spaces available on the lot. The 60,000 square feet of office and storage space will require 240 spaces thereby leaving 760 spaces for the rest of the building. A bike rack will be provided as required under Section 26.253(b) of the zoning regulations. 6. Landscaping: The minimum landscaping requirement, based on building costs, is $17,000 which is not being met. Applicant requested a waiver due to the presence of extensive landscaping currently on the site. The site is currently well landscaped. 1 7. Sewer: This building currently has a sewer allocation of 14,000 gpd. The proposed use would need 3150 gpd of the overall allocation. This leaves 10,850 gpd for the future tenants in the remainder of the building. B. Traffic: The issue of exactly how many vehicle trip ends the existing building is approved for has not yet been resolved by the Commission. This is to be resolved at the final plat for the proposed subdivision. While office use generates more traffic per square foot then manufacturing, the additional traffic generated by the proposed use will fit into the total number to be approved for the existing building. Therefore, at this point, traffic should not be a major concern. 9. Dumpster: The dumpster will be located inside the loading dock. 10. Lighting: Existing exterior lighting in the parking areas and along the "loop" road consists of 180 watt low pressure sodium lamps on 30 foot poles. No changes proposed. The applicant may add new building mounted lights in the future. Any new lights must be downcasting and shielded and should be approved by the City Planner prior to installation. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Truex Cullins & Partners Architects to convert 60,000 square feet of a 270,780 square foot light manufacturing facility (former Digital plant) to office (40,000 square feet) and storage (20,000 square feet) on a 155 acre parcel of land, 115 Kimball Avenue, as depicted on a site plan entitled "Ben & Jerry's Homemade, Inc., Central Support Offices, South Burlington, Vermont," prepared by Truex Cullins & Partners Architects, dated March 8, 1996, with the following stipulations: 1) All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2) For the purpose of calculating required road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the proposed change in use will fit within the approved number of trip ends for the property and therefore will generate zero (0) additional trip ends during the P.M. peak hour. 3) Any new exterior lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. Applicant shall obtain approval from the City Planner for the new building mounted lights prior to installation. 2 d 4) Pursuant to Section 26.105(a) of the zoning regulations, the Planning Commission grants a $17,000 credit for existing trees on the site. It is the Commission's opinion that the site is currently well landscaped and no additional landscaping is needed. 5) The applicant shall obtain a zoning permit for the change in use within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 6) The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use of the newly constructed space. 7) Any change to the site plan shall require approval by the South Burlington Planning Commission. l' Chairman or C1 rk South Burlington Planning Commission .i )� G' �' ff� ate 3