HomeMy WebLinkAboutSD-00-53 - Decision - 0030 Community Drive#SD-00-53
FINDINGS OF FACT AND DECISION
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, final plat application of Technology Park Partners to amend a
previously approved 16 lot subdivision. The amendment consists of re -subdividing seven
(7) lots to make minor boundary adjustments, Kimball Avenue and Community Drive.
On the 17th of October, 2000, the South Burlington Development Review Board
approved the final plat application of Technology Park Partners under Section 204 of the
South Burlington Subdivision Regulations based on the following findings:
1. This project consists of amending a previously approved 16 lot subdivision. The
amendment consists of re -subdividing seven (7) lots to make minor boundary
adjustments, Kimball Avenue and Community Drive.
2. The owners of record are Technology Park Associates, Inc.; PMF Energy, Inc.; and
Axinn-Vermont, Inc.
3. Technology Park is located within the Mixed Commercial and Industrial District. It
is bounded on the north by Kimball Avenue, on the east by Muddy Brook, on the
south by Interstate 89, and on the east by undeveloped lands.
4. Boundary Line Adjustments: The boundary adjustments will result in several
increases and decreases to those lots within the Community Drive circle. All
proposed lots meet the minimum lot size. All of the lots, except for lot eight A, are
currently undeveloped.
5. Coverages: The only lot which currently has been developed is Lot 8A. The building
coverage will increase from 20.2% to 21.2% (30% max). The total lot coverage will
also increase from 51.1% to 53.5% (70% max). The front yard coverage will increase
from 13% to 13.4% (30% max).
6. Setbacks: The existing building has been delineated on the plans and satisfies setback
requirements.
7. Other: Wetlands have been delineated on an overall site plan. New legal documents
including easements will be required as a result of this proposed project.
DECISION AND CONDITIONS
Based on the above Findings of Fact, the South Burlington Development Review Board
approves final plat application 4SD-00-53 of Technology Park Partners to amend a
previously approved 16 lot subdivision. The amendment consists of resubdividing seven (7)
lots to make minor boundary adjustments, Kimball Avenue and Community Drive, as
depicted on a two (2) page set of plans, page one (1) entitled "Subdivision Plat Technology
Park 115 Kimball Avenue, Vermont," prepared by Trudell Consulting Engineers, Inc., dated
2/l/96, last revised on 9/22/00, with the following stipulations:
1. All previous approvals and stipulations which are not superseded by this approval shall
remain in effect.
2. Prior to recording the final plat plan, the applicant shall record new legal documents
approved by the City Attorney which are changing as a result of the boundary adjustments.
The subdivision plat shall be revised to show the boundary adjustment between 8B and 7.
3. Any change to the final plat plans shall require approval by the South Burlington
Development Review Board.
4. The final plat plan (sheet 1) shall be recorded in the land records within 90 days or this
approval is null and void. The plan shall be signed by the Board Chair or Clerk prior to
recording. Prior to recording the final plat plan, the applicant shall submit a copy of the
survey plat in digital format. The format of the digital information shall require approval of
the Director of Planning & Zoning.
Chair or Clerk bate
South Burlington Development Review Board