Loading...
HomeMy WebLinkAboutSP-15-12 - Decision - 0035 Joy Drive#SP-15-12 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING UNIVERSITY OF VERMONT MEDICAL CENTER — 35 JOY DRIVE SITE PLAN APPLICATION #SP-15-12 FINDINGS OF FACT AND DECISION University of Vermont Medical Center, hereafter applicant, is requesting site plan review to amend a previously approved plan for an 8,664 sq. ft. medical office building with approval to expand the facility by 5,534 sq. ft. in two (2) phases of 5,065 sq. ft. in phase 1 and 469 sq. ft. in phase 2. The amendment consists of revising condition #11 of site plan approval #SP-15-03 to reduce the estimated traffic generation, 35 Joy Drive. The Development Review Board held a public hearing on Tuesday, April 7, 2015. Paul Simon represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT University of Vermont Medical Center, hereafter applicant, is requesting site plan review to amend a previously approved plan for an 8,664 sq. ft. medical office building with approval to expand the facility by 5,534 sq. ft. in two (2) phases of 5,065 sq. ft. in phase 1 and 469 sq. ft. in phase 2. The amendment consists of revising condition #11 of site plan approval #SP-15-03 to reduce the estimated traffic generation, 35 Joy Drive. 2. The owner of record of the subject property is University of Vermont Medical Center. 3. The application was submitted on 3/25/15. 4. The subject property is located in the Commercial 1- Residential 15 Zoning District. 5. The plan submitted is entitled, "University of Vermont Medical Center Dialysis South Burlington", prepared by Joseph Architects, dated 3/1/13, and last revised on 1/15/15. In the Findings of Fact and Decision for #SP-15-03 the Board stated the following with regards to traffic generation: Other — Vehicle Trip Ends Based upon the ITE Trip Generation Manual (9th) edition using Land Use Code"630"for Clinic, the average Trip Generation Rate for the Weekday AM. Peak Hour is 5.18 VTEs per 1,000 SF of gross floor area. The VTE of the existing clinic space is 5.18 x 8,410 SF/ 1000 or 43.56 VTEs. Phase 1 would increase the size of the clinic space to 13,475 SF while Phase 1 and Phase II would increase the size to 13,944 SF. Total VTE's respectively for Phase I only and for Phase 1 and 11 combined are 69.80 and 72.23, respectively. SP 15 12 35JoyDrive—UVM Medical Center facility_ expansion_ffd.doc - 1 — #SP-15-12 Therefore, the Board finds that construction of Phase I only will result in an increase of 26.24 VTEs while construction of both Phase I and Phase 11 will result in an increase of 28.97 VTEs. For condition #11 of the decision, the Board stated as follows: For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Development Review Board estimates that the addition will generate twenty-six point two-four (26.24) and twenty-eight point nine -seven (28.97) additional vehicle trip ends during the P.M. peak hour for Phase I only and Phase I and 11 combined, respectively. The applicant has submitted this present application, #SP-15-12, to recalculate the Trip Ends for the property. The applicant notes that only 1 study is included in the ITE manual for Land Use Code 630 (medical clinic), and that the City's Land Development Regulations allow for the use of traffic counts to substitute for the ITE manual where certain conditions exist, including having four or fewer studies for a given land use category. The applicant further notes that the approved use, for a dialysis center, falls more squarely under the ITE land use for a "medical clinic" than a "medical -dental office building," which prior to SP-15-03, had been the land use code used for calculation of traffic on the property. The Board affirmed this in its decision for SP- 15-03. The applicant prepared its own traffic counts for this present application, measured as recommended within the ITE manual. The counts indicated that the average pm peak hour of the existing facility to be 19.17 VTEs which translates to 2.28 VTEs per 1,000 sq. ft. of building area. The applicant then used this trip generation rate to calculate a projected future need for the 5,534 square foot addition approved as part of SP-15-03. The result would be a total pm peak hour generation of 31.79 VTEs [(5,534 / 1000) x 2.28 +19.17]. In an email to staff dated April 3, 2015, the Department of Public Works commented as follows with regards to the traffic calculation: Ray, I have reviewed the trip generation information provided by Paul Simon (dated March 25, 2015) provided on behalf of the UVM Medical Center and agree with his methodology and findings. Further, the ITE Land Use Code 630 (Clinic) is an appropriate starting point for this land use. Please let me know if you have any questions. Justin Rabidoux Director of Public Works/City Engineer The Boards concurs with the assessment of the Director of Public Works and the applicant's methodology. The original approval for the building (#SP-99-12) estimated that the building would generate 31.96 VTEs using Land Use Code 720 (medical -dental office building). The latest edition of the ITE manual estimates that the existing building would generate 32.24 VTEs using Land Use Code 720. The figure from this latest SP 15 12 35JoyDrive—UVM Medical Center facility_ expansion_ffd.doc - 2 — r #SP-15-12 version of the ITE manual represents the number of pm peak hour trip ends paid by /allocated to the applicant at the time of this application. The total pm peak hour VTEs of the building and expansion, using Land Use Code 630 and making calculations based on counts from the existing building, is 31.79. This is less than the 32.24 VTEs previously paid for / allocated to. DECISION The South Burlington Development Review Board hereby approves Site Plan Application #SP-15-12 of the University of Vermont Medical Center, subject to the following conditions: 1. All previous approvals and stipulations, which are not superseded by this approval, shall remain in effect. 2. This project shall be completed as shown on the plans submitted by the applicant and on file in the South Burlington Department of Planning and Zoning. 3. Prior to any change in tenant or use of the property such that the new use or tenant no longer fits the definition of "medical clinic" as defined in the latest edition of the ITE Trip Generation Manual, the applicant shall obtain site plan approval from the Development Review Board. 4. For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Development Review Board estimates that the addition will generate zero (0) additional vehicle trip ends during the P.M. peak hour for Phase I and II combined. 5. Any change to the site plan shall require approval of the South Burlington Development Review Board or the Administrative Officer. Tim Barritt Yea Nay Abstain Not Present Mark Behr Yea Nay Abstain Not Present Brian Breslend Yea Nay Abstain Not Present Bill Miller Yea Nay Abstain Not Present David Parsons Yea Nay Abstain Not Present Jennifer Smith Yea Nay Abstain Not Present John Wilking Yea Nay Abstain Not Present Motion carried by a vote of 6— 0 — 0. th Signed this y of ` ` 2015, by im Barri t, Chair Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is issued. The fee is SP 15 12 35JoyDrive—UVM Medical Center facility—expansion_ffd.doc - 3 — #SP-15-12 $225.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality). SP 15 12 35JoyDrive UVM Medical Center facility_ exponsionjfd.doc - 4 —