Loading...
HomeMy WebLinkAboutSP-87-0001 - Decision - 0040 IDX DriveFINDINGS OF FACT STATE OF VERMONT, t COUNTY OF CHITTENDEN ! CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of BDP Realty for IDX for construction of a 120,000 square foot office building in 2 phases at 1400 Shelburne Road. On the 15th of December 1987, the South Burlington Planning Commission approved the request of BDP Realty for site plan approval under Section 19.10 of the South Burlington Zoning Regulations based on the following findings: 1. TRAFFIC ACCESS: Access shall be provided from a new relocated curb cut on Shelburne Road. The existing driveway shared with Nordic shall be closed and grassed and the curbing replaced. Two curb cuts on Holmes Road Extension are approved. The applicant shall bond for the construction of Holmes Road Extension to the first driveway for Phase I and for the cost of construction to the second driveway prior to permit for Phase II. The amount shall be determined by the City Engineer. Easements shall be obtained from the adjacent owner prior to permit. Prior to permit an offer of dedication and deed shall be submitted to the City Attorney. 2. CIRCULATION AND PARKING: Circulation is adequate. A tem- porary paved access is approved between the front and back parking lots during Phase I. 407 parking spaces are approved; 73 are available if required by the applicant or the Planning Commission. 210 shall be constructed in Phase I. 3. LANDSCAPING & SCREENING: A $30,000 landscaping bond for Phase I and $9000 for Phase II shall be posted prior to permit. 4. OTHER: A $6983 intersection improvement fee shall be paid prior to permit. A sidewalk shall be constructed along Route 7 frontage. It shall be concrete and continuous across the driveway. A bond shall be posted for this prior to permit in an amount determined by the City Engineer. 5. OTHERR: A complete erosion control study by Heindel & Noyse shall be submitted to the City Engineer for approval prior to permit. The recommendations for storm water detention shall be followed. The fire hydrant location and relocation shall be reviewed and approved by the South Burlington Fire Chief. A sewer allocation of 7650 gpd (3825 per phase) is granted. The applicant shall pay $2.50 per gallon prior to permit. The proposed sewer manholes shall be within paved areas. Storm sewer pipe shall be concrete or pvc, not metal or aluminum. The 45 foot height is approved for the atrium only. The building permit shall be obtained;raithin 6 months �jr this approval is null and void. /' Chairman or Clerk, South Burlington Planning Commission 11