Loading...
HomeMy WebLinkAboutSP-99-0000 - Decision - 0040 IDX DriveFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of BDP Realty Associates for a planned unit development consisting of a 384,400 square foot general office use facility and a 679 space parking structure, 1400 Shelburne Road. On the 26' day of January, 1999, the South Burlington Planning Commission approved the request of BDP Realty Associates for final plat approval under Section 204 of the South Burlington Subdivision Regulations based on the following findings: 1. This project consists of : l) razing a 21,200 square foot general office building, 2) constructing a 239,708 square foot addition and a 20,476 square foot connector to an existing 124,208 square foot general office building, 3) constructing a 679 space 3-level parking structure, and 4) merging three (3) lots into one (1) lot. The 124,208 square feet building was approved on 12/15/87. Several minor site modifications have been made since 1987. This application will be treated as a planned unit development. The preliminary plat was approved on 12/8/98. 2. This property located at 1400 Shelburne Road lies within the C2 District, and the Bartlett Brook Watershed Protection Overlay District. It is bounded on the north by IDX Drive, on the west by Shelburne Road, on the east by Green Mountain Drive, and on the south by an auto dealership. 3. Access/circulation: Access is currently provided by a 32 foot and 45 foot curb cut on IDX Drive and a 24 foot curb cut on Shelburne Road. The applicant proposes to: 1) eliminate the Shelburne Road curb cut, 2) extend IDX Drive to connect with Green Mountain Drive, and 3) construct two (2) new 24 foot curb cuts on Green Mountain Drive. Circulation on the site is adequate. 4. Coverage/setbacks: Building coverage is 23.9% (maximum allowed is 30% and includes parking garage). Overall coverage is 66.2% (maximum allowed is 70%). Front yard coverage along Shelburne Road is 0%, along IDX Drive is 31.8%, and along Green Mountain Drive is 21.5% (maximum allowed is 30%). Front yard coverage along IDX Drive is proposed to be exceeded. The Planning Commission allowed this coverage to be exceeded under Section 12.406(b) of the zoning regulations as part of the preliminary plat approval. 5. The existing building and proposed addition will meet the setback requirements. The proposed parking structure does not meet the 40 foot front yard setback requirement from Green Mountain Drive. The proposed setback is 32 feet. The applicant sought a waiver from the front setback requirement as provided under Section l 2.406(b) of the zoning regulations. A 12 foot setback was approved as part of the preliminary plat approval. 1 6. Parkinla: A total of 1538 spaces are required and 1425 spaces are provided including 26 handicapped spaces. This represents a 113 space or 7.3% shortfall. The Commission, as part of preliminary plat approval, agreed to base parking calculation on a total floor area of 363,916 square feet and exclude the 20,476 square foot building connector/cafeteria space. The total parking required would be 1456 spaces which would result in a 31 space or 2.1% space shortfall. 7. Parking structure: The proposed parking structure is in substantial compliance with the "Design Guidelines for Parking Structures." The parking layout within the structure has been revised since preliminary plat approval such that the maximum distance between parking spaces and nearest exit stairwell is less than 200 feet. The applicant has not provided sufficient lighting information within the parking structure to determine compliance with the guidelines in the "Design Guidelines for Parking Structures" booklet. The guidelines require that two (2) elevators be provided. The applicant indicated that the State will not require elevators because this is a private parking structure. The Planning Commission agreed to not require elevators. 8. Landscaping: The minimum landscaping requirement, based on building costs, is $257,950 which is being met. Proposed plantings include: Red Maple, Green Ash, Crabapple, Honeylocust, Sugar Maple, Birch, Pin Oak, Shadblow, Spruce, Pine, Viburnum, Juniper, and Wintercreeper. Landscaping plan should be revised to provide street trees on the east side of the extended portion of Green Mountain Drive. Additional evergreen landscaping should be provided around the existing cooling tower adjacent to IDX Drive. 9. Preliminary plat condition #13b required that parking be shifted back to create a green strip between the circulation aisle and parking and the proposed r.o.w. (at the northwest corner ofthe site) and that this green strip be adequately landscaped. This condition has been met. 10. Building✓ height: Section 25.1 l3(a) of the zoning regulations limits the height of a flat roof structure to 35 feet. The proposed addition will have a height of 68 feet from the average pre - construction grade. This is 33 feet greater than permitted. Section 25.113(c) of the zoning regulations allows the Planning Commission to approve a non-residential structure with a height in excess of the limitations provided the Commission determines that a taller structure: (i)) will not affect adversely the essential character of the neighborhood or district in which the property is located. (ii) will not detract from important scenic views from adjacent public roadways and other public rights -of -way. Preliminary plat stipulation #9 granted the height waiver. 11. Section 25.113(d) of the zoning regulations requires additional front, side and rear setbacks for taller structures. The proposed addition will meet the additional setback requirements. 2 12. Height of the parking structure measured to top of the light fixtures on the upper level is 32 feet. 13. Bartlett Brook Watershed Protection Overlay District BBW): This property is located in the BBW District. Under Section 23.20 of the zoning regulations, the applicant shall submit applicable information regarding the development and storm water management design to Heindel and Noyes for inclusion into the City's stormwater hydrology computer model. The final plat plans incorporate the recommendations from Heindel and Noyes. 14. Sewer: The additional sewer allocation requested is 25,800 gpd (this includes 20% reduction allowed by State). The applicant will be required to pay the per gallon fee prior to permit issuance. There is currently no reserve capacity currently available at the Bartlett Bay Wastewater Treatment Facility. Approved allocation will be placed on a waiting list until such time as allocation is available. Preliminary plat stipulation # 10 requires that no Certificate of Occupancy/Compliance be issued until such time as sewer capacity is available. 15. Traffic: Two (2) traffic impact studies were submitted dated November 19, 1998 and January 21, 1999. The studies indicate the following: 1) Overall levels of service during the A.M. and P.M. peak hour north of IDX are acceptable with the IDX expansion in year 2005. 2) IDX Drive/US 7 operates poorly during the 2005 A.M. build scenario. 3) South of IDX Drive, certain intersections operate at poor levels of service by year 2005. The study further concludes that all intersections will operate at acceptable levels of service after the Route 7 widening project. In a letter dated January 26, 1999, the VAOT indicates that the widening of Route 7 will correct any problems associated with the IDX expansion, including the coordination of traffic signals in the corridor. The applicant should be aware that the road impact fee is approximately $110,000. 16. Dumpsters: The dumpsters will be located inside the building. 17. Lighting: Proposed exterior lighting consists of the following: — twelve (12) 100 watt metal halide lamps mounted on 43" bollards. — nine (9) 27 watt flourescent lamps mounted on the building with downcasting shielded fixtures. — thirteen (13) 100 watt halogen stake -mounted uplights. — three (3) 100 watt halogen surface -mounted uplights. — forty-four (44) 175 watt metal halide lamps mounted on 20 foot poles with downcasting 3 shielded fixtures. eleven (I 1) fountain lights. 18. Existing exterior lights consist of the following: nine (9) 250 - 400 watt metal halide lamps with downcasting shielded fixtures. A point by point lighting plan was submitted which indicates that the average illumination on the site is 1.4 to 1.6 foot candles. This meets the City's lighting standards. 19. Sidewalk: The applicant should construct a sidewalk along their frontage on Green Mountain Drive. The sidewalk should be constructed as part of the street construction. 20. Phasing: This project will be constructed in three (3) main phases. Phase I would begin in the summer of 1999 and consist of constructing the east wing of the main building including the connecting link and the extension of both IDX Drive and Green Mountain Drive. Phase II would begin in 2000 and involve constructing the parking structure. Phase III would begin in 2002 and would involve constructing the west wing of the main building. Staff recommended that this approval be conditioned on obtaining the zoning permits for all phases by December 31, 2002. 21. Other: the "residential zone" on sheet SPI should be noted as "R4 District." plans do not comply with preliminary plat condition #13 that requires the plan to include street lights along IDX Drive and the extended portion of Green Mountain Drive. — applicant has submitted evidence that these plans have been submitted to the City Water Department. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the final plat application of BDP Realty Associates for a planned unit development consisting of: 1) razing a 21,200 square foot general office building, 2) constructing a 239,708 square foot addition and a 20,476 square foot connector to an existing 124,208 square foot general office building, 3) constructing a 679 space 3-level parking structure, and 4) merging three (3) lots into one (1) lot, as depicted on a 19 page set of plans, page three (3) entitled, "IDX South Burlington Vermont Master Site Plan," prepared by Trudell Consulting Engineers, Inc, et al, dated 11 /12/98, last revised 1/18/99, with the following stipulations: 1) All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 4 2) Prior to issuance of zoning permit for the first phase or start of utility or road construction, all appropriate legal documents including easements (e.g., irrevocable offer of dedication and warranty deed for the proposed public road extension and utility, sewer, drainage and water, etc.) shall be submitted to the City Attorney for approval and recorded in the South Burlington land records. 3) Prior to start of construction of the improvements described in condition #2 above, the applicant shall post a bond which covers the cost of said improvements. 4) In accordance with Section 301.5 of the subdivision regulations, within 14 days of completion of required improvements (e.g., roads, water mains, sanitary sewers, storm drains, etc.) the developer shall submit to the City Engineer, "as -built" construction drawings certified by a registered engineer. 5) Pursuant to Section 12.406(b) of the zoning regulations, the Planning Commission modifies the front yard coverage limitation to be exceeded along IDX Drive. 6) Pursuant to Section 26.406(b) of the zoning regulations, the Planning Commission modifies the front yard setback requirement along Green Mountain Drive to allow the proposed parking structure to be within 32 feet of the front property line. 7) Pursuant to Section 26.256(b) ofthe zoning regulations, the Planning Commission approves a total of 1425 spaces which represents a 31 space or 2.1 % waiver. This waiver is based on a total floor area of 363,916 square feet and excludes the 20,476 square foot building connector/cafeteria space. 8) Prior to issuance of a zoning permit, the applicant shall post a $257,950 landscape bond The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good chance of surviving. 9) Pursuant to Section 25.113(c) of the zoning regulations, the Planning Commission approves a building height of 68 feet above the average pre -construction grade. 10) The Planning Commission approves an additional sewer allocation of25,800 gpd (includes 20% reduction allowed by State). The applicant shall be required to pay the per gallon fee prior to permit issuance. There is currently no sewer allocation available at the Bartlett Bay Wastewater Treatment Facility. The allocation granted shall be placed on a waiting list until such time as the allocation is available. No Certificate of Occupancy/Compliance will be issued until such time as sewer capacity is available. 11) For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the expansion will generate 565 additonal vehicle trip ends during the P.M. peak hour. 12. The plat plans shall be revised to show the changes listed below and shall require approval of the Director of Planning & Zoning. Four (4) copies of the approved revised plat plans shall be submitted 5 to the Director of Planning & Zoning prior to recording a) The landscape plan shall be revised to provide street trees along the east side of the extended portion of Green Mountain Drive. b) The landscape plan shall be revised to add evergreen landscaping around the existing cooling tower adjacent to IDX Drive. c) The site plan (sheet SP1) shall be revised to change the note reading "residential zone" to read "R4 District." d) The plans shall be revised to show a sidewalk along the applicant's frontage on Green Mountain Drive. e) The plans shall be revised to show all ground mounted generators/cooling equipment/HVAC equipment. 13. Prior to permit issuance, the applicant shall provide lighting information within the parking structure. Proposed lighting shall meet the guidelines in the "Design Guidelines for Parking Structures" booklet. 14. All exterior lighting shall consists of downcasting shielded fixtures. Any change to approved lights shall require approval of the Director of Planning & Zoning prior to installation. 15. The applicant shall be responsible for installing street lights along IDX Drive and the extended portion of Green Mountain Drive. Prior to the start of construction of the streets, the applicant shall submit a plan showing the locations of proposed street lights. This plan shall require approval of the City Engineer. 16. In order to make a determination that the project will not cause an adverse traffic impact, the applicant shall be responsible for the following: a) At the Route 7/IDX Drive intersection, a southbound left -turn lane shall be constructed and appropriate signal phasing shall be installed and implemented, prior to the occupancy of more than 300 additional employees (approximately 78,000 square feet of office space). Said improvements shall be constructed in accordance with the Shelburne Road widening plans developed by the VAOT. b) The applicant shall be responsible for developing and implementing a transportation demand management (TDM) plan as discussed in the traffic impact study entitled, "IDX Expansion," prepared by Resource Systems Group and dated 1/21/99. For a period of five (5) years starting 10/1/99, the applicant shall submit to the City, biannual (i.e., twice a year) progress reports explaining the status and results of said TDM plan. 6 17. The applicant shall obtain zoning permits for all phases by December 31, 2002. Any phase which has not received a zoning permit by this date shall require re -approval by the Planning Commission. 18. Any change to the final plat plans shall require approval by the South Burlington Planning Commission. 19. The final plat plans (boundary plat, and sheets SP 1, SP2, SP3 and W) shall be recorded in the land records within 90 days or this approval is null and void. The plans shall be signed by the Planning Commission Chair or Clerk prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy of the boundary plat in digital format. The format of the digital information shall require approval of the Director of Planning & Zoning. Chairman or Clerk South Burlington Planning Commission ZnI F Date 7