HomeMy WebLinkAboutSD-05-41 - Decision - 0040 IDX DriveCITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNNG AND ZONING
IDX SYSTEMS, CORP. - 40 IDX DRIVE
FINAL PLAT APPLICATION #SD®05-41
FINDINGS OF FACT AND DECISION
IDX Systems Corp., hereinafter referred to as the applicant, is seeking to amend a
previously approved planned unit development consisting of a 233,133 sq. ft. general
office building. The amendment consists of Phase it to include: 1) adding three (3) floors
to the west wing building containing 87,234 sq. ft. of general office use, and constructing
179 net new surface parking spaces at 40 IDX Drive, and 2) demolishing an existing
14,389 sq. ft. building, off -site parking approval and constructing a new 126 space
parking lot at 35 Green Mountain Drive. Phase III to include: 1) constructing four (4)
story west wing addition containing 64,025 sq. ft. of general office use at 40 iDX Drive,
and 2) constructing a 565 space parking structure at 40 IDX Drive to replace off -site
parking at 35 Green Mountain Drive. The applicant received final plat approval for the
proposed project from the Planning Commission on February 9, 1999. However, the
entire project was not constructed and therefore the approval lapsed for the unfinished
portion of the project. This application is essentially for re -approval of the same project.
The Development Review Board granted the applicant preliminary plat approval for the
proposed project on April 5, 2005. The Development Review Board held public hearings
on June 7, 2005 and July 19, 2005, Peter Smichenko represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following;
FINDINGS OF_FACT
1) The applicant is seeking to amend a previously approved planned unit
development consisting of a 233,133 sq. ft. general office building. The
amendment consists of Phase 11 to include: 1) adding three (3) floors to the west
wing building containing 87,234 sq. ft. of general office use, and constructing 179
net new surface parking spaces at 40 IDX Drive, and 2) demolishing an existing
14,389 sq. ft. building, off -site parking approval and constructing a new 126
space parking lot at 35 Green Mountain Drive. Phase III to include: 1)
constructing four (4) story west wing addition containing 64,025 sq. ft. of general
office use at 40 IDX Drive, and 2) constructing a 565 space parking structure at
40 IDX Drive to replace off -site parking at 35 Green Mountain Drive. The
applicant received final plat approval for the proposed project from the Planning
Commission on February 9, 1999. However, the entire project was not
constructed and therefore the approval lapsed for the unfinished portion of the
project. This application is essentially for re -approval of the same project.
2) The Development Review Board granted the applicant preliminary plat approval
for the proposed project on April 5, 2005.
- 1 -
3) The owner of record of the subject property is IDX Systems Corporation.
4) The subject property is located in the Commercial 2 (C2) Zoning District.
5) The plans submitted consist of an 18 page set of plans, page one (1) entitled,
"IDX Systems Corp. Shelburne Road, So. Burlington, VT Boundary Plat",
prepared by Trudell Consulting Engineers, dated 12/15/98, last revised on
11 /22/04.
ZONING DISTRICT & DIMENSIONAL REQUIREMENTS
Table 1. 40 IDX Drive
C2 Zoning District
Required—]�
Proposed_]
Min. Lot Size
SF
713,985 SF_
_
Max. Building Coverage
Max. Overall Coverage
_40,000
40%
70%
_ 23%
1
65%
Min. Front Setback
ft.
>30 ft.
Min. Side Setback
_30
10 ft.
__ _
>10 ft.
Min_Rear Setback
30 ft.
> 30
Max. Building Height _
40 ft.
L 71.5 ft._ �!
NI zoning compliance
4 waiver required pursuant to Section 3.07 of the Land Development
Regulations
Table 2. 35 Green Mountain Drive
C2 Zoning District
Re aired �[
Min. Lot Size
�l Max. Building Coverage
40,000 SFF_
40%
_Proposed__
71,098 SF
0%
ti Max. Overall Coverage
�l Min. Front Setback
Min. Side Setback
_
70%%_
30 ft.
10 ft.
n/a
n/a
Min. Rear Setback
30 ft.
n/a
4 zoning compliance
n/a not applicable because parking lots are not subject to setback
requirements
PLANNED UNIT DEVELOPMENT STANDARDS
Section 15.13(F) of the Land Development Regulations requires that the PUD meet the
standards of the Vermont Stormwater Management Manual.
Both of the subject properties fall within the Bartlett Brook Watershed Overlay District.
Thus, the proposed project shall be in compliance with Section 12.03 of the Land
Development Regulations.
-2-
Pursuant to Section 12.03 of the Land Development Regulations, the applicant submitted
the applicable information regarding the development and stormwater system to Heindel
and Noyes for inclusion into the City's stormwater hydrology computer model.
Pursuant to Section 15.18 of the proposed Land Development Regulations, PUDs shall
comply with the following standards and conditions:
(a) Sufficient water supply and wastewater disposal capacity is available to meet
the needs of the project.
Pursuant to Section 15.13(B)(1), municipal water service must be extended to serve the
proposed development. Prior to final plat approval, the applicant must obtain final water
allocation approval from the South Burlington Water Department.
The City of South Burlington Water Department Superintendent, Jay Nadeau, reviewed the
plans and provided comments in a letter dated April 4, 2005.
The City Engineer reviewed the plans and provided comments in a memorandum dated
March 24, 2005.
(b) Sufficient grading and erosion controls will be utilized during and after
construction to prevent soil erosion and runoff from creating unhealthy or
dangerous conditions on the subject property and adjacent properties.
The proposed project shall adhere to standards for erosion control as set forth in Section
16.03 of the South Burlington Land Development Regulations. in addition, the grading plan
shall meet the standards set forth in Section 16.04 of the South Burlington Land
Development Regulations.
(c) The project incorporates access, circulation and traffic management
strategies sufficient to prevent unreasonable congestion of adjacent roads.
Access to the property at 40 IDX Drive is currently provided via a 24' wide curb -cut and a
34' wide curb -cut off of IDX Drive, and a 28' wide curb -cut off of Green Mountain Drive.
Access to the property at 35 Green Mountain Drive is currently provided via an 18' wide
curb -cut off of Green Mountain Drive. No changes to access are proposed for either
property. These are sufficient means of access for the project.
Circulation on the properties appears to be adequate.
(d) The project's design respects and will provide suitable protection to
wetlands, streams, wildlife habitat as identified in the Open Space Strategy,
and any unique natural features on the site.
There do not appear to be any wetlands on either of the subject properties, but they do fall
within the Bartlett Brook Overlay District. The applicant submitted the applicable
information regarding the development and stormwater system to Heindel and Noyes for
inclusion into the City's stormwater hydrology computer model.
WE
(e) The project is designed to be visually compatible with the planned
development patterns in the area, as specified in the Comprehensive Plan
and the purpose of the zoning district(s) in which it is located.
The proposed project is in keeping with the stated purpose of the C2 Zoning District.
(t) Open space areas on the site have been located in such a way as to maximize
opportunities for creating contiguous open spaces between adjoining parcels
andlor stream buffer areas.
Open space on the property is sufficient.
(g) The layout of a subdivision or PUD has been reviewed by the Fire Chief or
(designee) to ensure that adequate fire protection can be provided.
The South Burlington Fire Department has reviewed the plans and Chief Douglas Brent
submitted his comments and recommendations in letters to the Director of Planning and
Zoning dated 6/2/05 and 7/19/05.
(h) Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility
lines and lighting have been designed in a manner that is compatible with the
extension of such services and infrastructure to adjacent landowners.
The City Engineer reviewed the plans and did not raise any concerns regarding the above -
mentioned criteria.
Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner
that is consistent with City utility and roadway plans and maintenance standards.
The City Engineer reviewed the plans and did not raise any concerns regarding the above -
mentioned criteria.
(i) The project is consistent with the goals and objectives of the Comprehensive
Plan for the affected district(s).
The proposed project is in compliance with the South Burlington Comprehensive Plan.
SITE PLAN REVIEW STANDARDS
Pursuant to Section 14.03(A)(6) of the Land Development Requlations, anv PUD shall
require site plan approval. Section 14.06 establishes the following general reviewstandards
for all site plan applications:
(a) The site shall be planned to accomplish a desirable transition from structure
to site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas.
The project accomplishes a desirable transition from structure to site and from structure to
structure. The site does provide for adequate planting and safe pedestrian movement.
AcnordingtoGeotion13.O1(E)oftheL8ndDeva|opnoentReou|odiona.thepropoSed
expansion requires a minimum 530 parking spaces. All of the buildings on the subject
pn}pertv, including the proposed and existing bui|dingS, require minimum Of1.34Oparking
spaces.
AcCondingto8eCtion13U1(B)oftheLandOave|opm8OtRe0u|adonS.Ph2se1ofthe
proposed expansion (identified as "new second phase" in the application) will require 305
parking spaces, for @ total of1.O5Oparking spaces. Atotal of3O5parking spaces are
proposed for Phase 1.for atotal nf1.O37parking spaces. Phase 2nfthe proposed
expansion (identified as "new third phase" in the application) requires a minimum of 225
parking spaces. Aparking structure containing 5O5parking spaces iaproposed for this
phase. However, phase construction will eliminate 164 existing parking spaces, so the
net increase will be 375 parking spaces. In tOt3|, the applicant is proposing 1.273 parking
opomas, which will require o 73epaoe. 5.4%, parking waiver. The Development Review
Boardh8Sthe8uth0ritytOgr8nt\hiSvvaiverpureu@nttoOootiOn13O1/NX2>oftheL@nd
Development Regulations.
The parking calculations for the proposed project include the 126-space parking area that
will beconstructed onthe property at35Green Mountain Drive, The off -site parking area is
within 800 linear feet of the property at 40 IDX Drive, so the Development Review Board
has the authority to approve this parking |ayout, pursuant to Section 13 O1(D) of the Land
Development Regulations.
Nd Parking shall be located tmthe rear mrsides of buildings rothe greatest extent
practicable.
Most ofthe parking onthe property at40|DKDrive isinexistence. The proposed parking
on this property is located to rear of the existing and proposed building, in relation to
Shelburne Road.
(c) Without restricting the permissible limits mf the applicable zoning district, the
height and scale mfeach building shall be compatible with its site and
existing or adjoining buildings.
The scale of the proposed buildings is compatible with the site and existing buildings inthe
area. The nn8xinnunn height ofproposed structure is 71 5' above average pre -construction
grade. Thus the applicant is seeking a height waiver of 36.5', which the Development
Review Board may grant pursuant to Section 3.07 (F)(1) of the Land Development
Regulations.
(d) Newly installed utility services and service modifications necessitated by
exterior alterations or building expansions shall, to the extent feasible, be
underground
Pursuant to Section 15 13/E\ of the Land Development Regu|atiOns, any new utility lines,
services, and service modifications shall beunderground.
(e) TMeDRB shall encourage the use of a combination ofcommon materials and
architectural characteristics, landscaping, buffers, screens and Visual
interruptions tmcreate attractive transitions between buildings ofdifferent
architectural styles.
-�-
Proposed building elevation plans have been submitted.
Proposed structures shall be related harmoniously to themselves, the terrain
and to existing buildings and roads in the vicinity that have a visual
relationship to the proposed structures.
Proposed building elevation plans have been submitted.
In addition to the above general review standards, site plan _gppLlications shall meet the
following specific standards as set forth in Section 14.07 of the Land Development
Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial of collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation
in the area.
It is not necessary to require the reservation of land to provide access to abutting
properties.
(b) Electric, telephone and other wire -served utility lines and service connections
shall be underground. Any utility installations remaining above ground shall
be located so as to have a harmonious relation to neighboring properties and
to the site.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure and
properly screened with opaque fencing to ensure that trash and debris do not
escape the enclosure(s).
The dumpsters on the subject property are existing and are adequately enclosed.
(d) Lighting
The applicant submitted lighting point -by -point plans for the properties at 40 lDX Drive and
35 Green Mountain Drive. The proposed lighting -levels are in compliance with Appendix A
of the Land Development Regulations. The proposed lighting fixtures are in compliance
with Appendix D of the Land Development Regulations.
(e) Landscaping
Pursuant to Section 13.06 of the Land Development Regulations, landscaping and
screening shall be required for all uses subject to site plan and PUD review.
Wev
The applicant submitted an adequate landscape plan and landscape budget, in compliance
with Section 13.06 of the Land Development Regulations. The landscape budget
separates the proposed plantings into three (3) phases. The minimum landscaping
requirement, based on building costs for the remaining buildings to be built, is $213,605.
The applicant has indicated that they have spent $326,536 on landscaping as part of Phase
I and will be spending $49,155 in additional plantings for Phase II and Phase III for a total of
$375,691.
The City Arborists reviewed the plans and provided comments in a memorandum dated
March 24, 2005.
Pursuant to Section 13.06(B)(4) of the Land Development Regulations, the plans depict
adequate snow storage areas for both properties.
(0 Traffic
According to the ITE, 7th Edition (Land Use Code 710), the proposed expansion is
estimated to generate and additional 225.38 P.M. peak -hour vtes. The existing buildings
are estimated to generate 347.37 P.M. peak -hour vtes. Thus the property in its entirety is
estimated to generate 572.75 P.M. peak -hour vtes. The property is located within the
Traffic Overlay District -- Zone 3, so it may generate a total of 803.23 peak -hour vtes.
The applicant submitted a traffic study with the original application for the IDX expansion
project. During the sketch plan review of the current application, the Development Review
Board requested that the applicant's traffic engineer review the traffic study to ensure that
its recommendations are still applicable to the project. The applicant's traffic engineer
reviewed this study and provided comments in a memorandum dated October 18, 2004.
DECISION
Motion by seconded by
to approve Final Plat Application # D-05-41 of IDX System Corp. subject to the
following conditions:
1) All previous approvals and stipulations shall remain in full effect, except as amended
herein.
2) This project shall be completed as shown on the plans submitted by the applicant,
and on file in the South Burlington Department of Planning and Zoning.
3) 'The applicant shall comply with the requests of the City Engineer, as outlined in his
memorandum dated March 24, 2005.
4) The applicant shall comply with the requests of the Water Department Superintendent.
as outlined in his letter dated April 4, 2005.
5) The applicant shall comply with the requests of the City Arborist, as outlined in his
memorandum dated March 24, 2005.
6) The applicant shall comply with the requests of the South Burlington Fire Department,
-7-
as outlined in Chief Doug Brent's letter dated June 2, 2005 with the exception of item
#'s6&7.
7) Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility
lines, services, and service modifications shall be underground.
8) Stormwater drainage plans shall comply with the Vermont Stormwater Management
Manual, pursuant to Section 15.13(F) of the Land Development Regulations.
9) The proposed project shall adhere to standards for erosion control as set forth in
Section 16.03 of the South Burlington Land Development Regulations. In addition, the
grading plan shall meet the standards set forth in Section 16.04 of the South Burlington
Land Development Regulations.
10) Pursuant to Section 13.01(D) of the Land Development Regulations, the applicant small
record appropriate legal documents to ensure that the off -site parking spaces shall be
available for the intended user, prior to recording of the final plat plans.
11) Pursuant to Section 3.07(F)(1) of the Land Development Regulations, the Board
approves a 36.5 foot height waiver and allows the office addition to not exceed 71.5
feet above average pre -construction grade.
12) Pursuant to Section 13.01(N)(2) of the Land Development Regulations, the Board
approves a 73 space or 5.4% parking waiver for a total of 1,273 parking spaces.
13) The plans shall be revised to shoe✓ the changes below and shall require approval of the
Administrative Officer. Three (3) copies of the approved revised plans shall be
submitted to the Administrative Officer prior to permit issuance:
a) The plans shall be revised to show a revised curb location per the Fire Chief's
request outlined in his letter dated 7/19/05 and shown on the Trudell Consulting
Engineers sketch dated 6/23/05 presented at the meeting.
14) For the put pose of calculating road impact fees under the South Burlington Impact
Fee Ordinance, the Development Review Board estimates that the proposed project
will generate 318.5 additional vehicle trip ends during the P.M. peak -hour that have
not been paid for.
15) All new exterior lighting shall consist of downcasting fixtures. Any change to approved
lights shall require approval of the Director prior to installation.
16) Any changes to the final plat plan shall require approval of the South Burlington
Development Review Board.
17) The final plat plan (SP1 for both 40 IDX Drive and 35 Green Mountain Drive) shall be
recorded within 90 days or this approval is null and void. The plan shall be signed by
the Board Chair or Clerk prior to recording.
Mark Behr -6e
Chuck Bolton y'
John Dinklage -
Roger Farley - YE
Larry Kupferma
Gayle Quimby - i
ibstain/not present
iy/abstain/not present
ay/abstain/not present
y/abstain/not present
0/nay/abstain/not present
ay/abstain/not present
Motion carried by a vote of (� - C) - o
Signed this ;� D day of July 2005, by
John Dinklage, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy, -
finality).