Loading...
HomeMy WebLinkAboutSP-95-0000 - Decision - 0043 Comcast WayFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Mountain Cable Company d/b/a Adelphia Communications Corporation for: 1) the temporary placement of a 12'x 60' office trailer with an enclosed link to the main office building, and 2) the construction of a 5,200 square foot addition to an existing 5,000 square foot office building, 106 Kimball Avenue. On the llth day of July, 1995, the South Burlington Planning Commission approved the request of Mountain Cable Company. d/b/a Adelphia Communications Corporation for site plan review under Section 26.10 of the South Burlington Zoning regulations based on the following findings: 1 This project consists of: 1) the temporary placement of a 12'x 60' office trailer with an enclosed link to the main office building, and 2) constructing a 5,200 square foot addition to an existing 5000 square foot office building. The temporary office and enclosed link will be removed upon completion of the office addition. The Planning Commission on 1/14/92 approved a two (2) phase project, of which only phase 1 was constructed. 2. This property located at 106 Kimball Avenue lies within the IC District. It is bounded on the west by Potash Brook and the Woodlands commercial/industrial complex, on the east and north by undeveloped property and on the south by Kimball Avenue. 3. Access/circulation: Access is provided by a 27 foot curb cut on a proposed public street known as Adelphia Drive. No change proposed. Circulation is adequate. 4. Coverage/setbacks: Building coverage is 3.5% (maximum allowed is 30%). Total lot coverage is 10.3% (maximum allowed is 70%). Front yard coverage along Kimball Avenue is 1% and along Adelphia Drive is 17% (maximum allowed is 30%). Setback requirements will be met. 5. Parking: A total of 41 parking spaces are required and 47 spaces including four (4) handicapped spaces will be provided. A bike rack is being provided as required under Section 26.253(b) of the zoning regulations. 6. Landscaping: The minimum landscaping requirement, based on building costs, is $10,500 which is being met. Plantings will include Sugar Maple, Crabapple, Rhododendron and Juniper. 7. Traffic: ITE estimates that the existing use generates 20.4 vte's and 'the proposed addition an additional 21.0 vte's for a total of 41.4 vte's. The applicant was made aware that the road impact fee will be approximately $3900. 8. Sewer: Additional sewer allocation needed is 370 gpd. The applicant will be required to pay the per gallon fee prior to permit. 9. Sidewalk: The applicant has contributed to the sidewalk fund for construction of a sidewalk along the property's frontage along Kimball Avenue. 10. Lighting: Existing and proposed exterior lighting consists of the following: --- six (6) 250 watt metal halide lamps with downcasting and shielded fixtures on 16 foot poles. --- one (1) 100 watt metal halide building mounted lamp with a downcasting and shielded fixture. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Mountain Cable Company d/b/a Adelphia Communications Corporation for: 1) the temporary placement of a 12'x 60' office trailer with an enclosed link to the main office building, and 2) the construction of a 5,200 square foot addition to an existing 5,000 square foot office building, 106 Kimball Ave., as depicted on a plan entitled "Adelphia Cable Communication, Kimball Ave., So. Burlington, VT", prepared by Trudell Consulting Engineers, dated 11/27/91, stamped received June 20, 1995, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. For the purpose of calculating required road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the office addition will generate 21.0 additional vehicle trip ends during the P.M. peak hour. 3. An additional sewer allocation of 370 gpd is approved. The applicant shall pay the per gallon fee prior to issuance of a zoning permit. 4. The applicant shall post a $10,500 landscape bond prior to issuance of a zoning permit. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good chance of surviving. K 5. Any new exterior lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in existing or proposed lighting shall be approved by the City Planner prior to installation. 6. Based on the expressed representation of the applicant, the temporary office trailer and enclosed link shall be removed upon occupancy of the addition or by November 1, 1996, whichever first occurs. 7. The applicant shall obtain separate zoning permits for (1) the addition, (2) the temporary office trailer and enclosed link, within one year or this approval is null and void. 8. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use of the addition. 9. Any change to the site plan shall require approval by the South Burlington Planning Commission. 10. Based on the expressed representation of the applicant, the applicant shall implement certain improvements which help make the temporary trailer and link blend aesthetically with the existing building. Chairman -oi Clerk South Burlington Planning Commission 3