HomeMy WebLinkAboutSP-96-0000 - Decision - 0043 Comcast Way (2)FINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Adelphia Communications Corporation to: 1) construct a 13,400 square foot office addition to a 4,888 square foot office building, 2) construct a 5,000 square foot accessory building, and 3) extend the deadline for the removal of a temporary office trailer to April 1,1997, 106 Kimball Avenue. On the 27th day of August, 1996, the South Burlington Planning Commission approved the request of Adelphia Communications Corporation for site plan approval under Section 26.10 of the zoning regulations based on the following findings: 1. This project consists of: 1) constructing a 13,400 square foot office addition to a 4,888 square foot office building, 2) constructing a 5,000 square foot storage building and 3) extending the deadline for the removal of a temporary office trailer to April 1, 1997. A 5,000 square foot office addition was approved on 7/11/95 but was never constructed. 2. This property located at 106 Kimball Avenue lies within the IC and CO Districts. It is bounded on the west by Potash Brook and the Woodlands commercial/industrial complex, on the east and north by undeveloped property and on the south by Kimball Avenue. 3. Access/circulation: Access is provided by a 27 foot curb cut on a proposed public street known as Adelphia Drive. No change proposed. Circulation is adequate. 4. Coverage/setbacks: Building coverage is 8.1% (maximum allowed is 30%). Total lot coverage is 28.4% (maximum allowed is 70%). Front yard coverage along Kimball Avenue is 4% and along Adelphia Drive is 17% (maximum allowed is 30%). Setback requirements will be met. 5. Parking: A total of 94 parking spaces are required and 116 spaces including four (4) handicapped spaces will be provided. A bike rack will be provided as required under Section 26.253(b) of the zoning regulations. The plan should show the location of the bike rack. 6. Landscaping: The minimum landscaping requirement, based on building costs, is $18,700 which is being met. Plantings will include Norway Maple, Red Maple, Paper Birch, Honeylocust, Scotch Pine, Yew and Arborvitae. Sheet SP5 should be revised to indicate the number dense Japanese Yew to be planted. 7. Traffic: ITE estimates that the existing use generates 20.1 vte's and the proposed addition an additional 33 vte's for a total of 53.1 vte's. The applicant should be aware that the road impact fee will be approximately $6200. 8. Sewer: Additional sewer allocation needed is 1225 gpd. The applicant will be required to pay the per gallon fee prior to permit. 9. Sidewalk: The applicant contributed to the former sidewalk fund for construction of a sidewalk along the property's frontage along Kimball Avenue. The sidewalk shown on the plan along the property's frontage should be removed since there currently does not exist a sidewalk at this location. 10. Lighting: Existing and proposed exterior lighting consists of the following: --- seven (7) 250 watt metal halide lamps with downcasting and shielded fixtures on 16 foot poles. --- one (1) 250 watt metal halide building mounted lamp with a downcasting and shielded fixture (mounted on accessory building). --- one (1) 9 watt florescent lamp mounted on the office addition in a "jelly jar" type of fixture. 11. Dumpster: The dumpster storage area will be screened by a stockade fence. 12. C.O. District: The easterly portion of the site is located in a C.O. District as a result of Potash Brook. The wetlands on this property should be delineated and should be shown on the plans including the 50 foot buffer area. It was staff's understanding that a portion of the development lies within the 50 foot wetland buffer. Plans were presented at the meeting showing this encroachment. Applicant adequately addressed the criteria under Section 3.503(a)-(e) of the zoning regulations. 13. Temporary office trailer: The 7/11/95 approval included a temporary office trailer which is required to be removed by November 1, 1996. Since the temporary office trailer is needed until the new addition can be occupied, the applicant is requesting to extend the deadline for removal of the office trailer until April 1, 1997. 1.4 . other: --- the plan should be revised to indicate the correct size of the office addition (13,400 square feet). 2 DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Adelphia Communications Corporation to: 1) construct a 13,400 square foot office addition to a 4,888 square foot office building, 2) construct a 5,000 square foot accessory building, and 3 ) extend the deadline for the removal of a temporary office trailer to April 1,1997, 106 Kimball Avenue, as depicted on a five (5) page set of plans, page one (1) entitled "Adelphia Cable Communications, Kimball Avenue, South Burlington, VT.", prepared by Trudell Consulting Engineers, Inc., dated 6/26/96, last revised 8/20/96, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The plans shall be revised to show the changes below and shall require approval of the City Planner. Three (3) copies of the approved revised plans shall be submitted to the City Planner prior to permit issuance. a) Sheet SP1 shall be revised to show the location of the bike rack. b) Sheet SP5 shall be revised to indicate the number of Dense Japanese Yew to be planted. c) Sheets SP1 and SP5 shall be revised to not depict the sidewalk along the property's frontage on Kimball Avenue. d) Sheet SP1 shall be revised to show the locations of the building mounted lights. e) Sheets SP1 and SP5 shall be revised to correctly indicate the size of the proposed office addition (i.e., 13,400 square feet). f) Sheet SP1 shall be revised to show the delineated wetland boundaries including the 50 foot buffer area. 3. The Commission grants an additional sewer allocation of 1225 gpd. The applicant shall pay the per gallon fee prior to issuance of a zoning permit. 4. Prior to issuance of a zoning permit, the applicant shall post an $18,700 landscape bond. The bond shall remain in effect for three years to assure that the landscaping takes root and has a good chance of surviving. 5. The Planning Commission approves the encroachment of portions of the parking area, and accessory building within the C.O. 3 District as provided under Section 3.50 of the zoning regulations. It is the Commission's determination that the proposed encroachment into the C.O. District will not significantly affect adversely the attributes contained in Section 3.503(a)-(e) of the South Burlington Zoning regulations. 6. All new exterior lighting shall be downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. 7. For purposes of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the proposed expansion will generate 33 additional vehicle trip ends during the P.M. peak hour. 8. The Planning Commission approves of extending the deadline for the removal of the temporary office trailer to April 1, 1997. 9. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 10. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to occupancy of the new building. 11. Any change to the site plan shall require approval by the South Burlington Planning Commission. Chairman or Clerk South Burlington Planning Commission Date 4