HomeMy WebLinkAboutBATCH - Supplemental - 0095 0099 Holmes RoadPLANNING COMMISSION JULY 24, 1979
The South Burlington Planning Commission held a meeting on Tuesday,
July 24, 1979 at 7:30 p.m. in the assessors office, City Hall, 1175
Williston Road.
Members Present
Sidney Poger, chairman; Peter Jacob, Kirk Woolery, Ernest Levesque.
James Draper, Jim Ewing, George Mona
Others Present
Stephen Page, Planner; Gerald Milot, Claude Gagne, Bill Schuele,
Lowell Krassner, Maurice Boisvert, Bob Methot, Bob Cross, Robert
Jolley, Gil Barlow, Dale Kleppinger
Minutes of July 10, 1979
Mr. EwinK moved to approve the July 10, 1979 minutes. Mr. Mona
seconded the motion, which passed unanimously.
Public hearing on final plat application of Maurice Boisvert for a
1 lot subdivision off Holmes Road.
Mr. Poger asked about theadequacy
oraoccassionalhbloockagesal
for erosion. Mr. Boisvert replied therewere
in the spring, but nothing that would impinge on the house sites.
Mr. Page replied that there were no steep slopes and little or no
erosion occurring in the vicinity.
Mr. Woolery moved that the South Burlington Planning Commission
approve the final plat of Maurice Boisvert for a 1 lot subdivision
as depicted on a plan entitled "Proposed Subdivision for Maurice
Boisvert" and accompanying plan for sanitary sewer extension drawn
by Trudell Consulting Engineers, dated 4/30 and 6/15/79 subject to
the following stipulations:
1. A private road and waiver a reement shall be executed.
2. The final plat for recording shall depict building envelopes
and be recorded within 90 days..
3. A municipal sewer easement shall be extended across the
full frontage of lot 2.
4. The public sewer shall be extended per the plans submitted
a bond in an appropriate amount shall be posted.
Mr. Jacob seconded the motion. Mr. Poger asked Mr. Page to explore,
with the City Attorney, the usefulness of requiring building envelopes
to be shown on final plats that are to be recorded.
City of South Burlington
1175 WILLISTON ROAD
j SOUTH BURLINGTON, VERMONT 05401
�, ,,.• � TEL. 863-2891
July 3, 1979
The Burlington Free Press
187 College Street
Burlington, Vermont 05401
Gentlemen:
Please insert the attached legal notice in Legals Column #1
in your issue of Saturday, July 7, 1979.
Please send bill and two tear sheets to this office.
Yours truly,
Stephen Page,
Planner
SP/mcg
i
PUBLIC HEARING
SOUTH BURLINGTON PLANNING COMMISSION
The=South -Burlington Planning Commission will hold a public
hearing at the South Burlington City Hall, Conference Room, 1175
Williston Road,' South Burlington, Vermont on Tuesday, July 24 ,
1979. at 7:30 p.m., to consider the following:
Final plat apnlicat;on 0f__Maur_ice__BQis.ve_r_t for a 1 1ot
subdivision of property directly east of 101 Holmes Road, which
involves the extension of a municipal fewer line.
Copies of the application are available
for public inspection at the South Burlington City Hall.
Sidney B. Poger
Chairman
South Burlington
Planning Commission
___,Tuly 7. 1979 _
3.
PLANNING COMMISSION
JULY 10, 1979
;ir. Draper moved to continue the hearing until August 14, 1979 at 7.30 pm
at City Hall. Mr. Jacob seconded the motion and all were in favor.
Public hearing on preliminary plat application of
subdivision on Holmes Road
for a 1
Mr. Boisvert said they had submitted engineering plans for the sewer
connections to the City Engineer.
Mr. Page said he did not believe there were any other vacant lots in that
area and said there were a total of 7-8 homes there. The land surrounding this
area is vacant and owned by Mr. Farrell. When that land is developed, the
private right of way will have to be upgraded. Mr. Page said it should be clear
that people could not erect structures in the narrow portions of these lots being
set off. He hoped variances would not be granted because of the irregular shape
of the lot.
Mr. Boisvert said he intended to retain the land in the area that he owns now.
Mr. Draper asked what reason there was for the narrow parts of the lots and
was told that if someone bought a lot, he would own the land on the lake and could
pull his boat up there if he wished to, which he could not do if he were only
given a right of way to the lake. Mr. Boisvert did not think anyone could build
in that part of the land because it is wet and the soil is clay. Mr. Draper
did not like the lot shapes.
Mr. Woolery moved that the South Burlington Planning Commission approve the
preliminary plat of Maurice Boisvert for a 1 lot subdivision as depicted on a
Plan entitled "Proposed Subdivision for Maurice Boisvert" and accompanying plan
for sanitary sewer extensions drawn Trudell Consulting Engineers, dated 4 30
and 6 15 79 subject to the following stipulations:
1. A Private road and waiver agreement shall be executed.
2. The final plat for recording shall depict building envelopes
3. A municipal sewer easement shall be extended across the full frontage of
lot 2. _ —
4.. The public sewer shall be extended per the plans submitted; a bond in
an appropriate amount shall be posted.
Mr. Jacob seconded the motion and none voted no.
Public hearing on final Plat application of Emery Victory for a 1 lot subdivision
on Victory Drive
Mr. Page said the lot was behind Merriam Graves Co.
Mr. Victory said there were 2 50' rights of way between this lot and that
of Bishop, and 3 curb cuts for the property in total. He said he has no plans
for the rest of the land.
The question of a buffer strip came up, but it was decided that the only time
one was imposed was when the residential use was there first. If the commercial
use is first, then anyone buying a residence knows who he will have for a neighbor.
Mr. Woolery moved that the South Burlington Planning Commission approve the
final plat application of Emery Victory for a 1 lot subdivision_, as depicted on
the plan of record, subject to t e--fo 1owinRs-tipudations:
1. No building permit shall be issued until the_plans for the water main
ADMINISTRATIVE CHECKLIST
PROJECT NAME/FILE REFERENCE
1. LETTER OF NOTIFICATION &
BO'ISVERT RESUBD.IVISION
Mr
2. BONDING OR ESCROW AGREEMENTS
LANDSCAPING
SEWER
WATER
• STORM DRAINAGE
ROADS
CURBS
SIDEWALKS
(NOTE ALL RELEASES OR AGREEMENT REVISIONS)
FINDINGS & ORDER
3. LIST APPROVALS GRANTED WITH DATES AND PERMITS GRANTEn & SITE
INSPECTIONS COMPLETEDETC.:
4. UTILITY EASEMENTS * BILLS OF SALE y`r.�/J 7-
RECORDED Y/�
ACCEPTED19
5. CERTIFICATE OF TITLE x
6. ROADWAYS
DEEDS FOR CITY STREETS ACCEPTED
PRIVATE ROAD & WAIV�2 AGREEMENT mod'
7. FINAL PLAT OR RECORD COPY - STAMPED * SIGNED, & FILED OR RECORD _-� ED
B. PEDESTRIAN EASEMENTS
ACCEPTED & RECORDED
FILED
9. MISCELLANEOUS AGREEMENTS
LAND FOR ROAD WIDENING
OFFER OF IRREVOCABLE DEDICATION
FUTURE ACCESS POINTS
SHARED ACCESS POINTS
OTHER
10. COPY OF SURVEY TO ASSESSOR (IF CHANGE IN PROPERTY LINES)
I
11. FEES - PAID/DATE
HEARING 1
BUILDING PERMIT
ENGINEERING INSP.
SEWER
RECREATION (RECORD CALCULATIONS AND DEPOSIT IN ACCOUNT)
12. IMPACT FOLLOW UP
i.e., "ON LINE" EVALUATION: SCHOOL KIDS CAR COUNTS
August 3, 1979
Mr. Maurice Boisvert
Box 145
Shelburne,Vermont 05482
Re: Your final plat approval
Dear Mr. Boisvert:
This is to formally confirm the action of the South Burlington
Planning Commission in approving your final plat application, at its
meeting of July 24, 1979. The minutes of the meeting are enclosed
which specify the conditions of your approval. When these conditions,
plus the applicable requirements of the subdivision regulations have
been complied with, a building permit will be issued. Please note
that your final plat (mylar) must be recorded prior to October 24,
1979. Please call if you have any questions.
Sincerely,
Stephen Page,
Planner
SP/mcg
1 Encl
e 7/24/79
SSP
SUGGEST MOTION OF APPROVAL - BOISVERT
I move that the South Burlington Planning Commission approve
the final plat of Maurice Boisvert for a 1 lot subdivision as
depicted on a plan entitled "Proposed Subdivision for Maurice
Boisvert" and accompanying plan for sanitary sewer extension,
drawn by Trudell Consulting Engineers, dated 4/30 and 6/15/79,
subject to the following stipulations:
1. a private road and waiver agreement shall be executed
2. the final plat for recording shall depict building envelopes
and be recorded within 90 days.
3. a municipal sewer easement shall be extended across the
full frontage of lot 2
4. the public sewer shall be extended per the plans submitted;
a bond in an appropriate amount shall be posted
5. the subdivision fee of $29 shall be paid prior to re-
cording the final plat.
SUGGEST MOTION OF APPROVAL - BOISVERT
I move that the South Burlington Planning Commission approve
the preliminary plat of Maurice Boisvert for a 1 lot subdivision as
depicted on a plan entitled "Proposed Subdivision for Maurice
Boisvert" and accompanying plan for sanitary sewer extension,
drawn by Trudell Consulting Engineers, dated 4/30 and 6/15/79,
subject to the following stipulations:
1. a private road and waiver agreement shall be executed
2. the final plat for recording shall depict building envelopes
3. a municipal sewer easement shall be extended across the
full frontage of lot 2
4. the public sewer shall be extended per the plans submitted;a
bond in an appropriate amount shall be posted
M E M O R A N D U M
To: South Burlington Planning Commission
From: Stephen Page, Planner
Re: Next Meeting's Agenda Items
Date: 7/5/79
#2 Berard Final Plat
The lot adjacent to the airport approach lights has been
deleted because of inadequate flyover clearance. The other as-
pects of the plan remain as before.
#3 Twin Oaks Revised Final Plat
Layout revisions are proposed for phases II & III; they in-
clude building configuration, a second curb cut on Kennedy Drive,
addition of a trailer storage area, and city streets throughout.
The new layout preserves the entire wooded buffer area along the
east property line, which was a major concern of the adjoining
Forest Park Condominium residents. I am opposed to the additipnal
access on Kennedy Drive because there will be a future connection
to Timber Lane and Kennedy is such an important arterial. Action
on the plat should be deferred until final engineering is com-
pleted, which can be done after the Commission has decided on an
acceptable overall layout plan. A revised phasing plan is also
being submitted.
#4 Boisver Preliminart Plat
It should be made clear (i.e., note on plan to be recorded)
that a substantial portion of the area on the 2 proposed lots is
in the C-0 district and thus is not suitable for construction
purposes.
#5 Victory Final Plat
This is a simple 1 lot subdivision, which will tap into an
existing sewer; there will be a short water main extension. How-
ever, the application is incomplete at this time.
#6 Grandview Condominiums (Brand property) Revised Final Plat
The layout of buildings has been revised by pulling some of
them back in away from the bank; the unit distribution among building:
has also changed, resulting in one additional 4 unit building, althouc
the total number of units is the same. I have no adverse comments on
the proposed plan. However, the parking lot for the first cluster
of units has been (inadvertently?) omitted; also, I suggest that
the walks for the new building (M) lead to the adjoining parking area.
to minimize the amount of on -street parking. Layout changes for
phases III & IV should be reviewed later, when utilities and the
street have been constructed and their location firmly established.
PUBLIC HEARING
SOUTH BURLINGTON PLANNING COMMISSION
The South Burlington Planning Commission will hold a public
hearing at the South Burlington City Hall, Conference Room, 1175
Williston Road, South Burlington, Vermont on Tuesday, July 10 ,
197 9, at 7:30 p.m., to consider the following:
1. Final plat application of Rene Berard for enlargement of an
existing lot on Berard Drive, an ' nal
two acre lot directly east of 1235 Airport Parkway.
2. Final plat application of Gerald Milot for revisions to a
previously approved finaipiapiat Known as Twin OdkS ApciLthitfilts.
The primary revisions include relocation of roadways and parking
areas, resiting of units, condominium ownership, and revised ui ding
r-nnf i niiraH nns _
3. Preliminary plat application of Maurice Boisvert for a 1 lot
subdivision of property directly east or IU-L Holmes Road, w icy
involves the extension of a municipal sewer line.
4. Final plat application of Emery Victory for a 1 lot subdivision
south of #9 Victory Drive.
Copies of the these applications are available
for public inspection at the South Burlington City Hall.
Sidney B. Poger,
Chairman
South Burlington
Planning Commission
June 23, 1979
u, a., fit&'— ,s RMI � �&& a,h.G �
x4j
46
C_A^r4�LW N
Memorandum
5/18/79
Page 4
#5 Boisvert Subdivision
The--division-6"f-a 2/6 acre parcel into 2 lots (1 acre, 1.6
acres) fronting on Holmes Road extension (private) is proposed.
There is adequate buildable area on both lots and the applicable
dimensional requirements are satisfied. On site water is proposed.
Municipal sewage disposal is planned - the existing main must be
extended to serve the proposed lot. A private road and waiver
agreement must be executed.
-7g74VN1� J
S T