Loading...
HomeMy WebLinkAboutSD-97-0000 - Decision - 1550 Hinesburg RoadFINDINGS OF FACT & DECISION STATE OF VERMONT S Y - / -7- v b 0b COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Nile and Julie Duppstadt and John and Debrorah Alden for a planned residential development consisting of 62 single-family lots on 62.4 acres of land, 1550 Hinesburg Road and Van Sicklen Road. On the 25th day of March, 1997, the South Burlington Planning Commission approved the request of Nile and Julie Duppstadt and John and Debrorah Alden for preliminary plat approval under Section 203 of the South Burlington Subdivison regulations based on the following findings: 1. This proposal consists of the resubdivison of six (6) lots into 62 lots involving 62.4 acres. This property is currently developed with a single family dwelling and related accessory buildings. 2. This property located at 1550 Hinesburg Road lies within the SEQ Zoning District, C.O. District, Floodplain Overlay District and Hinesburg Road - South View Protection Zone. It is bounded on the north by Van Sicklen Road, on the east by a single family dwelling, on the west by Hinesburg Road, and on the south by farm land. 3. Access: Access to this development is proposed by: 1) a 950 foot long cul-de-sac street with access to Van Sicklen Road known as road "A", 2) a 1500 foot long cul-de-sac street with access to Van Sicklen Road known as road "B", 3) a 300 foot long loop street with access to road "B" known as road "C", 4) a private road serving three (3) lots (#54-56) with access to road "B", 5) a private road serving three (3) lots (#18-20) with access to road "A" 6) a private road serving four (4) lots #2-5 with access to Hinesburg Road, 7), three curb cuts (two (2) new and one (1) existing) on Van Sicklen Road serving lots #1, 6, 7 and 8, 8) a private road serving lots #38 and 39, and 9) a private road serving lots #45 and 46. 4. Roads "A" and "B", which have lengths of 950 and 1500 feet respectively, exceed the maximum length of cul-de-sac streets provided in Section 401.1(g) of the subdivision regulations. The maximum length allowed is 850 feet. The Commission may waive or vary this requirement pursuant to Section 513.1 of the subdivision regulations. 5. A 20 foot wide emergency road and path is proposed which would connect road "A" with road "B" . This emergency road would be built 1 to withstand the weight of any emergency vehicle, and the road would be maintained and plowed by the Homeowner's Association. The same 20 foot wide specifications would apply to the private roads. 6. All roads (except private ones) would be built to City standard with the exception of reduced radius and tangent at the beginning of road "A". 7. Section 401.1(j)(1)(a) of the subdivision regulations requires a public road if the proposed roadway serves four (4) or more separate residential lots or single family detached units. The applicant is proposing one (1) roadway serving four (4) single family detached units (lots #2-5). 8. A r.o.w. is being reserved at the end of roads "B" and "C" which would allow for road connections if and when the Auclair property to the south is developed. This is consistent with Section 401.1(a) of the subdivision regulations. 9. Lot size/frontage: It appears that all lots will meet minimum lot size and frontage requirements. This information will be verified with the final plat when the metes and bounds information is provided for the interior lot lines. 10. Density: This 62.4 acre parcel generates a maximum of 74 units (1.2 x 62.4) for development. The acreage of development area as shown on the SEQ zoning map is 24.7 acres which allows a maximum of 98.8 units (4 x 24.7) to potentially be developed on this property. Since the parcel generates a maximum of 74 units and 62 lots are proposed, density limits will not be exceeded. 11. Non -buildable area: All or portions of 42 lots are located in a non -buildable area as shown on the SEQ zoning map. The boundaries of the non -buildable area should be shown on the plan and the acreage indicated. Since development activity is proposed in a restricted area, the applicant must address the criteria in Section 6.606 of the zoning regulations. 12. Wetlands: Wetlands on the property have been delineated. Their boundaries, with associated buffer/C.O. District boundaries, are shown on the plan. The proposed crossing of the C.O. District (wetlands) by roadways is permitted under Section 3.20 of the zoning regulations. 13. C.O. District: There are a number of C.O. Districts on the property. The plans show C.O. Districts along the wetlands, streams and drainageways. The final plat should show all existing streams/drainageways with the corresponding C.O. Districts including the C.O. District along Muddy Brook. The C.O. District along the existing wetlands should also be noted as such, perhaps "wetland buffer/C.O. District." The Natural Resources Committee has reviewed this plan and submitted comments. 6 14. Large portions of lots #34-39 and 57-62 consist of wetland and wetland buffer area. Consideration should be given as to how to discourage human activity in the wetland and corresponding buffer. Perhaps rear lot lines should be drawn along edge of buffer, trees planted along buffer boundary, deed restrictions, etc. Lot #39 appears to be very constricted. 15. PRD criteria: The applicant should submit a report which addresses the PRD criteria contained in Sections 6.606 and 26.151 of the zoning regulations for this plan. 16. Traffic: The applicant submitted a revised traffic impact analysis for the 64 lot proposal which would be applicable to this proposal. A response to questions about the grades on Van Sicklen Road and available headlight related sight distance from the proposed access points on Van Sicklen Road was submitted. Road B was relocated 40 feet to the west to insure that headlights of vehicles approaching from the west will be visible at all times. 17. Sewer: The sewer allocation requested for this proposal is 32,088 gpd. It is the Commission's policy to grant sewer allocation for a 10 year period. Any portion of the project not developed within this time period would require reapproval for sewer allocation. 18. Scenic View Protection Zone: A portion of the development is located within the Hinesburg Road - South View Protection Zone (lots #44-48). The VZP boundary should be shown on the plan. The applicant should provide information regarding the maximum height of buildings allowed on lots located within the VPZ. 19. Lighting: Street lights are shown and they are the type maintained by GMP. 20. Landscaping: The final plat should include a landscaping plan meeting the requirement of Section 412.4 of the subdivision regulations. The quantity, type and size of proposed street trees should also be included on the plan. 21. Recreation path/pedestrian trail: This new proposal includes a five (5) foot wide gravel path with an eight (8) foot easement centered on the path along Van Sicklen Road. This is similar to the path proposed on the 64 lot proposal. The City's Comprehensive Plan and Official Map show a future recreation path along Muddy Brook. The plan should show a reserved r.o.w. along Muddy Brook. The r.o.w. should be located outside of the floodplain and wetlands. 22. Mailbox cluster: The proposed sheep shed along street "A" (which includes a mailbox cluster) does not meet the front yard 3 setback requirement. The Commission may modify this requirement under Section 6.607 of the zoning regulations. The Homeowner's Association documents should indicate that snow removal and maintenance of the mailbox clusters will be their responsibility. A mailbox cluster is provided along road "B" outside of the proposed street r.o.w. 23. School impact: The school impact letter for the 64 lot proposal is acceptable for this proposal. 24. Floodplain Overlay District: The plan should show the floodplain limits along Muddy Brook. 25. Wildlife: The applicants have submitted a report from their wildlife expert. 26. Other: --- each unit and house will be assessed road, school and recreation impact fees in accordance with the South Burlington Impact Fee Ordinance. --- provide base flood elevation data. --- provide finished contour lines. --- show access to lot #6 --- provide street names for final plat. --- the open space lots and the pump station lot should be numbered. --- the survey plat should be revised to reflect the 62 lot proposal. --- enclosed is a letter from Victoria Fraser regrading zoning in Williston. DECISON & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the preliminary plat application of Nile and Julie Duppstadt and John and Deborah Alden for a planned residential development consisting of 62 single-family lots on 62.4 acres of land, 1550 Hinesburg Road and Van Sicklen Road, as depicted on a 15 page set of plans, page one (1) entitled, " The Old Stone House Farm Hinesburg & Van Sicklen Roads South Burlington, Vermont Overall Site Plan ", prepared by Lamoureux, Stone & O'Leary Consulting Engineers Inc., dated 11/25/96, last revised 2/26/97 with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. Prior to issuance of a zoning permit for the first lot or start of utility or road construction, all appropriate legal documents including easements (e.g., irrevocable offer of dedication and 4 warranty deed for the proposed public roads, and utility, sewer, drainage, water and pedestrian path, etc.) shall be submitted to the City Attorney for approval and recorded in the South Burlington land records. 3. Prior to start of construction of the improvements described in condition #2 above, the applicant shall post a bond which covers the cost of said improvements. 4. In accordance with Section 301.5 of the subdivision regulations, within 14 days of completion of required improvements (e.g., roads, water mains, sanitary sewers, storm drains, etc.) the developer shall submit to the City Engineer, "as -built" construction drawings certified by a registered engineer. 5. The proposed 5 foot wide gravel path along Van Sicklen Road shall be constructed prior to occupancy of the first residential lot. 6. The plans shall be revised prior to final plat submittal as follows: a) The plans shall be revised to designate the wetland buffer boundary as "wetland buffer/C.O. District". b) The plans shall be revised to show a 20 foot wide recreation path easement r.o.w. along Muddy Brook in a location outside of the flood plain and wetlands. c) The plans shall include finished contour lines of the entire development area. d) The plans shall include street names approved by staff. e) The plans shall be revised to show all elevations based on mean sea level. f) The plans shall include base flood elevation data. g) The plans shall show all building envelopes including those for lots #6, 7 and 8. The building envelopes shall be located outside of C.O. Districts. h) The plans shall include a sheet which shows the non - buildable area as shown on the SEQ zoning map. The acreage of the non -buildable area shall also be indicated on the plan. i) The plans shall show the C.O. District along Muddy Brook. j) The plans shall show the boundary of the Hinesburg Road - South View Protection Zone. 5 k) The plans shall include a landscaping plan meeting the requirements of Section 412.4 of the subdivision regulations. This plan shall also include the quantity, type and size of proposed street trees. 1) The plans shall show the floodplain limits along Muddy Brook. m) The plans shall be revised to show the access to lot #6. n) The plans shall be revised to number the open space lots and the pump station lot. o) Sheets 3 and 6 shall be revised to show a concrete sidewalk for roads A and C, if determined necessary by staff. p) The plans shall show the sheep shed meeting setback requirements. 7. The planning Commission approves a sewer allocation of 32,088 g.p.d. The sewer allocation shall remain in effect for ten (10) years from the date of final plat approval. Any lots which have not been developed within ten (10) years shall lose their allocation unless reapproved by the Planning Commission. The applicant shall be required to pay the per gallon fee prior to permit issuance. 8. Pursuant to Section 513.1 of Planning Commission waives the provided in Section 401.1(g) of proposed roads "A" and "B". the subdivision regulations, the length of cul-de-sac limitation the subdivision regulations for 9. Pursuant to Section 513.1 of the subdivision regulations, the Planning Commission waives the requirement of Section 401.1(j)(1)(a) which requires a proposed roadway serving four (4) separate residential lots to be publicly owned. This waiver specifically applies to the private road serving lots #2-5. 10. Pursuant to Section 513.1 of the subdivision regulations, the Planning Commission varies the street standards provided in Section 401.1(i) of the subdivision regulations to allow reduced radius and tangent at the beginning of road "A". 11. Pursuant to Sections 6.602 and 6.606 of the zoning regulations, the Planning Commission allows the following residential lots or portions of residential lots to be located in restricted areas: lots #1-12, 20, 27 and 32-62. It is the Planning Commission's opinion that allowing residential development activities on the above lots is consistent with the intent and purpose of the Southeast Quadrant District for the following reasons: a) Scenic corridor along Hinesburg Road is being maintained by locating building envelopes back behind tree line and 1.1 stone wall, b) wetlands and streams are being protected, and c) both Muddy Brook and important wildlife habitat along Muddy Brook is being protected. 12. The removal of vegetation outside of the building envelopes for lots #2-5 shall be prohibited. 13. The applicant shall post a landscape bond in an amount to be determined at final plat. This bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. 14. Snow removal and maintenance of the mailbox clusters shall be the responsibility of the Homeowners Association. This requirement shall also be reflected in the Homeowners Association documents. 15. Applicant shall submit plans to the Water Department for review prior to final plat. Comment's from the water department shall be submitted with final plat application. 16. The applicant shall provide information regarding the maximum height of buildings allowed on lots located within the view protection zone. 17. At locations where concrete thrust blocks are called for, the pipe being blocked shall be wrapped with plastic to prevent the concrete from bonding to it. 18. The applicant shall use tees instead of Y branches where sewer services connect to the street main sewer. 19. The applicant shall be responsible for upgrading the Lane Press sewage pumping station to accommodate the sewage from this development. 20. Back flow preventers shall be installed in homes where a large storm will result in a back up of the foundation drains. 21. The sewage pumping station site shall be large enough to accommodate additional emergency storage tanks. 22. The final plat application shall be submitted within 12 months. Chairman or Clerk South Burlington Planning Commission i S (/`/ 7 Date 7