HomeMy WebLinkAboutSD-02-36 - Decision - 1545 Hinesburg Road#50-02-36
FINDING5 OF FACT & D1<C151ON
5TATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF 5OUTH BURLINGTON
Re: Findings of Fact, preliminary plat application #5D-02-3(5 of John Larkin for a
planned residential development consisting of: 1) the transfer of density from 42.05
acres of adjoining land to two (2) parcels totaling 61.2 acres, and 2) subdividing a 56.2
acre parcel into 52 single family lots and constructing 72 multi -family units in 24
buildings, 1559-1545 Hinesburg Road.
On the 7" day of January 2003, the South Burlington Development Review Board
approved the request of John Larkin for preliminary plat approval under 5ection 203 of
the 5outh Burlington 5ubdivision Regulations, based on the following findings:
1. This project consists of a planned residential development consisting of: 1) the
transfer of density from 42.05 acres of adjoining land to two (2) parcels totaling
61.2 acres, 2) subdividing a 56.2 acre parcel into 51 single family lots, and 3)
constructing 71 multi -family units in 24 buildings, 1539 & 1545 Hinesburg Road.
2. This property lies within the 5EQ District, the Dorset Park 5cenic View
Protection Overlay Zone, and the Conservation and Open 5prece District. It is
bounded on the north by Butler Farms, on the west by the Dorset Heights
development, on the south by residences, and on the east by Hinesburg Road and
residences.
3. The owner of record of this property is Jacqueline Marceau.
4. Access: Access is proposed via a city street from Hinesburg Road, intersecting
opposite Van 5icklen Road. A city street is proposed to connect with Butler
Farms utilizing a reserved r.o.w. called Link 5treet on the plans. The applicant is
also proposing to reserve a r.o.w. to connect to the Old Cross Road r.o.w.
extension.
5. At a previous meeting, the Board requested the access shown through to the
Chittenden property to avoid the CO District/wetland buffer, indicated as
"wetland A" on the plan. The plan has not been revised to incorporate this
request.
6. Proposed access to the largest cluster of the multi -family housing i5 via a city
street. Multi -family units V,W, and X will have a single curb out off Old Cross
Road Extension.
Page #2
7. No Single family lot would exit onto Old Cross Road Extension. All Single family
units are Serviced by a 60 foot r.o.w. called Rebecca Drive, proposed aS a public
Street.
8. A 50 foot r.o.w. iS being reserved to provide access to an exiting two (2) acre lot
owned by Michael Marceau between lots #7 and #8. This access is noted on the
plan.
9. There has been Substantial discussion of how the proposed Marceau Meadows
Subdivision will be connected through to Dorset Street. The city'S official map
and the Southeast Quadrant zoning map both Show a connection through this
property between Hinesburg Road and the current dead-end of Old Cross Road
just east of Dorset Heights.
10. AS previous meetings, the applicant and DRD have discussed a two-part
approach to this issue: (1) creating a road connection between the proposed
Chittenden Cider Mill project and the Marceau Meadows project at the
Southeast corner of the Marceau property, and (2) reserving the right-of-way
between Link Street on the Marceau property and Old Cross Road, but requiring
the applicant to construct only the recreation path connection, and not the
roadway.
11. City Council has reviewed the Situation and recommends that the DRD require full
construction of the Old Cr000 Road connector aS part of preliminary plat
approval for the Marceau Meadows Subdivision. Council recognized that there will
be a Substantial change in traffic patterns from connecting Old Cross Road
through to Hinesburg Road independent of the impact of the residential
development itself, and that there will be issues at Act 250 over the road.
However, Council firmly believes that construction of the full connection to Old
Cr000 Road iS appropriate and necessary aS part of this subdivision.
12. 5taff recommended that the roadway connection to the Chittenden property be
required aS part of the preliminary plat approval. Creating Secondary roadway
connections within new neighborhoods has a host of traffic and planning benefits
and iS clearly Supported by the Comprehensive flan.
15. Coverage/5etback5: Proposed building coverage iS 2% (maximum allowed iS 20%).
Proposed overall coverage iS .05% (maximum allowed iS 40%). These numbers do
not include single family lot development. The coverage information accounts for
only the multi -family development. 5etbacko for all the multi -family units are
met.
14. Lot Size/Frontage: All single-family lots meet the minimum lot size requirement
of 12,000 Sq. ft. The applicant requested a waiver on the frontage requirement
of 85 feet for lot #16, which is proposed as 60 feet. The Board may modify this
requirement under Section 6.607 of the zoning regulations. All other frontage
requirements are met.
Page #3
15. Density: The applicant is proposing to transfer density from the 42.05 acres of
adjoining land to two (2) parcels equaling 61.2 acres and a five (5) acre parcel
resulting in a total of 103.25 acres. This result in a maximum density of 123
units (105.25 x 1.2 = 123.9). Since the June 18, 2002 DRB meeting, the
applicant adjusted the density to 125 units, one is an existing residence. The
proposed density complies with the density requirement of Section 6.405 of the
zoning regulations, (74.65 developable acres x 4=298.6 units).
16. View Protection Zone: A major portion of this development lies within the Dorset
Park View Protection Zone C. The maximum height of the proposed single family
residences has not been provided, but the applicant has previously stated the
residences will be below the elevations set for that area.
17. C.O. District/wetland buffer: Cathy O'Brien compiled a wetland report addressing
the criteria found in Section 3.505 of the zoning regulations. The applicant is
proposing C.O. District/wetland buffer encroachment with lots #9-15, #21-25,
#55-41. Triplex buildings F,O, and N also encroach into the C.O. District/wetland.
13. At their September 17, 2002 Natural Resource Committee meeting, the NRC
reviewed the proposed encroachment. The recommendations for approval include:
1) the addition of landscaping to denote the edge to the wetland, and 2) a legal
document approved by the City Attorney which clearly states the use of
pesticides on the multi -family lots, single-family lots, and reserved open space
lots is prohibited.
19, At final plat, the notes in the legend should be revised to indicate the wetlands
and buffers as C.O. District/wetland buffer on the overall site plan sheet and all
other applicable sheets.
20. Restricted Area: The applicant is proposing development within the restricted
area. The Board may approve this proposal if the criteria of Section 6.606 of
the zoning regulations are met.
21. 5chool Impact: For final plat submittal the applicant should provide
correspondence from the South Burlington 5chool District evaluating the
potential impact this project may have on the school system.
22. Parking: The minimum parking requirement for a 71 unit multi -family development
is 2.25 spaces per unit or 160 parking spaces. The site plan should be revised to
indicate if there is covered parking and note the location of guest parking. At a
minimum, four (4) bike racks should be provided for the multi -family units, with at
least one in Cluster 4 of the multi -family development. Section 26.553 ( c ) of
the zoning regulations states that recreational vehicle parking/storage shall be
provided in a multi -family development of over 25 units. The applicant will prohibit
the storage of recreational vehicles.
Page #4
23. 5treet Lights: The applicant Should provide streetlights along all public Street.
Details of the proposed exterior lights Should be provided. The location of the
street lights should be at least 15 feet away from the any proposed street tree.
24. Landscaping: The minimum landscaping requirement based on construction
costs of the multi -family development is $92,500. Staff will need additional
details to determine the proposed amount of landscaping. The plant list for the
street trees should be separated form the plant material used to satisfy the
minimum landscaping requirement.
25. The initial comments from the City Arborist dated June 5, 2002 are
accommodated in the new plan however a couple of issues have arisen and should
be addressed on the final plat plan. There are as follows:
- The choice of Catalpa as a street tree is unacceptable because of the
litter the tree drops which may obstruct use of the sidewalk.
- 5taff requests that blocks of street trees be no larger than 5 trees of
the same species in a row. This will do two things; 1) protect against
blight killing a single species of tree if they are mixed up with other, and 2)
be more attractive.
26. Impact Fees: The applicant was made aware that all impact fees will be
applicable to the proposed residential units.
27. Traffic: A traffic impact study was submitted. A technical review of the study,
which was requested by the Board at their 9/3/02 meeting, was performed by
Roger Dickinson.
28. Recreation Path: The Recreation Path Committee reviewed these plans on June
3, 2002.
29. South Burlington Fire Department: The applicant is aware they must comply with
all comments provided by the fire department. These comments include
automatic sprinkler installation in the multi -unit buildings, and location and
number of fire hydrants to be determined jointly with the 5BFD.
30.5outh Burlington Water Department: The applicant reviewed the plans to reflect
requested changes from the water department. The applicant is aware they
must comply with the specifications and details as outlined by the South
Burlington Water. The applicant is responsible for providing any updated details
and/or plans to the water department for review.
31. The applicant is working with the City and the water department to address
water storage and pressure issues for the project related to the City's water
system.
32.5outh Burlington City Engineer: The applicant has revised the plans to reflect
requested changes from the City Engineer. The City Engineer will review the plans
and note the changes to the plans and details.
Page #5
33.The pump Station Should be maintained by the homeowners association.
34. FUD Criteria: The applicant Should prepare a written report addressing the FLIP
criteria under Section 26.151 of the zoning regulations.
35.Other:
- The plan Should make provisions for mailbox clusters if needed. The
applicant Should consult with the post office on mail delivery options and
obtain written confirmation of a decision from the post office.
- The minimum Size of the proposed multi -family units Should be noted on
the preliminary plat plan.
- The applicant Should propose alternative Street names for "Old Cr000
Road Extension," "Link Road", and "Condo Road" at final plat.
- The final plat Survey Should note base flood elevations.
- The applicant Should provide, for review by the City Attorney, a legal
document to be incorporated into the homeowners associate documents,
which clearly states there will be no clearing of land or disturbance of land
within the C.O. District/wetland buffer except where approved by the DR13,
as Shown on the final plat plan.
PEC15ION &LONDITION5
Based on the above Findings of Fact, the 5outh 1urlington Development Review Board
approves preliminary plat application #5D-02-36 of John Larkin for a planned residential
development consisting of: 1) the transfer of density from 42.05 acres of adjoining land
to two (2) parcels totaling 61.2 acres, and 2) Subdividing a 56.2 acre parcel into 51
Single family lots and constructing 71 multi -family units in 24 buildings,1539 & 1545
Hinesburg Road, as depicted on a 22 page Set of plans, page one (1) entitled, "Marceau
Meadows Hinesburg Road 5outh Burlington Vermont", prepared by Llewellyn Howley, Inc.
dated March 2001, last revised on 10/28/02, with the following Stipulations:
1. All previous approvals and stipulations which are not superseded by this approval
shall remain in effect.
2. The plat plans Shall be revised prior to final plat Submittal as follows:
a. The plat plans Shall be revised to Show the location of the acceSS through
to the Chittenden property outside of the CO District/wetland buffer.
b. The plat plans Shall be revised to Show the construction of Old Cross
Road Extension to the westerly property line.
c. The plat plan Shall be revised to Show additional plantings to delineate the
wetland buffer and property lines of multi -family units A-F and Single
family lots #17-24.
Page #6
J. The plat plane Shall be revised to indicate that the multi -family units have
Sufficient parking for the residents and guests.
e. The plat plans Shall be revised to Show the locations of bike racks, and
recreational vehicle parking.
f. The plat plans Shall be revised to indicate the size of the multi -family
dwellings units.
g. The plat plans Shall be revised to indicate in the legend the wetland buffer
ae CO District.
h. The plat plans shall be revised to show the location of street lights at
least 15 feet from any street trees. Cut Sheets of the proposed light
fixtures shall be. Submitted with the final plat application.
i. The landscape plan Shall be revised to Show two Separate plant Schedules:
1) a plant lift for the multi -family buildings, and 2) a plant list for
proposed Street trees.
j. The landscape plan Shall be revised to Show the removal of Catalpa aS a
proposed Street tree.
k. The landscape plan Shall be revised to Show no more than 5 Street trees
of a Single Species in a row.
I. The landscape plan Shall be revised to Show Street trees located no closer
than 5 feet to the water and Sewer mains.
m. The plat plans shall be revised to show alternative names to the proposed
streets. The new Street names Shall be approved by Staff.
n. The plat plans shall be revised to address the comments of the City
Engineer (11/5/02) including: 1) showing a curb out for the pumping
station, 2) benchmarks shall be noted on the plans, 3) a 20'x20'triangle
easement at each intersection lot for sight clearance, and 4) all roads
shall be built to City standards and roadway section note on sheet 16
shall be. removed.
o. The plat plans shall be revised to place the fire hydrants in a location
approved by the 5outh Burlington Water Department.
p. The plat plans shall be revised to address the single family lots and multi-
family buildings using the E911 addressing system.
3. Prior to issuance of a zoning permit for the first lot or Start of utility or road
construction, all appropriate legal documents including easements
irrevocable offer of dedication and warranty deed for the proposed public roads,
utility, Sewer, drainage, water and recreation path, etc.) Shall be submitted to
the City Attorney for approval and recorded in the 5outh Burlington land
records.
Page #7
4. Prior to Start of construction of the improvements described in condition #3
above, the applicant Shall post a bond which covers the coot of said
improvements.
5. In accordance with Section 501.5 of the subdivision regulations, within 14 days of
- completion of required improvements (e.g., road, water mains, sanitary sewers,
storm drains, recreation path, etc.) the developer shall submit to the City
Engineer, "as -built" construction drawings certified by a licensed engineer.
6. The final plat submittal shall include building elevation measurements above mean
sea level for all structures within the Dorset Park Scenic View Protection Overlay
District. This information shall include the horizontal distance from each lot to
the baseline and the maximum elevation permitted for each lot expressed in
elevation above mean sea level.
7. All multi -family dwellings shall be furnished with automatic residential sprinklers.
8. The stormwater detention facilities and the pumping station shall be privately
owned and maintained by the homeowners association.
9. No structures shall be permitted in the PUD setback area provided in Section
26.154 (d) of the zoning regulations unless approved as part of this development
and shown on the approved plans.
10. Prior to issuance of the first zoning permit, the applicant shall submit
homeowners documents, approved by the City Attorney, which include language
as follows: 1) that the garages will not be turned into living spaces, 2) that there
will be no clearing of land or disturbance of land within the CO District/wetland
buffer except where approved by the DRD, and shown on the final plat plan, 3)
that the use of pesticides on the multi -family lots, single family lots, and
reserved open space is prohibited, and 4) that the homeowners association will
be responsible for maintaining stormwater retention ponds.
11. The applicant shall obtain written confirmation on location of mail delivery
(cluster or individual mailboxes) from the post office for the proposed planned
residential development prior to final plat submittal.
12. Pursuant to Section 6.607 of the South Burlington Zoning Regulations, the
board modifies the frontage requirement for lot #16. The modification consists
of reducing the frontage from 85 feet to 60 feet.
15. The applicant shall post a landscape bond prior to permit issuance in an amount
of $92,500 for the proposed landscaping for the multi -family housing. This bond
shall remain in effect for three (3) years to assure that the landscaping has
taken root and has a good chance of surviving. The amount of the landscaping
bond for the street trees shall be determined at final plat.
Page #8
14. Pursuant to 5ection 3.503 (a) — (e) of the zoning regulations, the Board
approves encroachment into the CO District/wetland buffer of wetlands b, d, e f,
g,harid 1.
15. Pursuant to 5ections 6.602 and 6.606 of the 5outh Durlington Zoning
Regulations, the Board approves development within the restricted area. It is
the Board's opinion that allowing residential development activities in the
restricted areas as shown on the approved plans is consistent with the intent
and purpose of the 5outheast Quadrant District.
16. The developer shall be responsible for purchase and installation of all traffic
signs.
17. The final plat submittal shall include correspondence from the South Burlington
5chool District evaluating the potential impact this project may have on the
school system.
18. The final plat submittal shall include a written report addressing the PUD/PRD
criteria under 5ection 26.151 of the zoning regulations.
19. There shall be no filling, mowing, disturbance, or destruction of that area of the
approved subdivision which is designated on the approved plat as wetland and
the 50 foot wide buffer adjoining the wetland except that the buffer may be
mowed once per year.
20. The fire hydrant number and locations shall be approved by the South Burlington
Water Department and the South Burlington Fire Department.
21. Pursuant to Section 6.604 (b) of the zoning regulations, the Board approves the
assignments of all the residential development density calculated from the
42.05 acre adjoining parcel to the south to the parcel being developed.
22. The specific traffic mitigation measures to be undertaken by the applicant and
the timing for the construction of these improvements shall be determined at
final plat.
25. The final plat application Shall be submitted within 12 months.
13
Chairzc� Date
5outh Burlington Development Review Board
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 V5A 4471 and VRCP 76 in writing, within 30 days of the date this
decision is issued. The fee is $150.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 V5A 4472 (d) (exclusivity of remedy;
finality).