HomeMy WebLinkAboutSD-08-49 - Decision - 1405 Hinesburg Road#SD-08-49
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
MARIE J. DUBOIS - 1405 HINESBURG ROAD
FINAL PLAT APPLICATION #SD-08-49
FINDINGS OF FACT AND DECISION
Marie J. Dubois, hereinafter referred to as the applicant, is seeking final plat approval to
subdivide a 4.59 acre parcel into two lots of 4.11 acres and 0.48 acres and add the 0.48
acre parcel to the adjoining 5.30 acre parcel to create a 5.78 acre parcel, 1405
Hinesburg Road.
The Development Review Board held a public hearing on Tuesday, October 21, 2008.
Richard Trudell represented the applicant.
FINDINGS OF FACT
1. The applicant is seeking final plat approval to subdivide a 4.59 acre parcel into
two lots of 4.11 acres and 0.48 acres and add the 0.48 acre parcel to the
adjoining 5.30 acre parcel to create a 5.78 acre parcel, 1405 Hinesburg Road.
2. The application was reviewed at the sketch plan level on August 19, 2008.
3. The owner of record of the subject property is Marie J. Dubois.
4. The subject property is located in the Southeast Quadrant — Neighborhood
Residential Zoning District.
5. The plans submitted consist of a two (2) page set of plans, page one (1) entitled,
"Boundary Line Adjustment Marie Dubois 1405 Hinesburg Road South
Burlington, Vt.", prepared by Trudell Consulting Engineers, dated 5/6/08.
Zoning District & Dimensional Requirements
The minimum lot size in the Southeast Quadrant is 12,000 sq. ft. The proposed lots are
well over the minimum lot size. There are no building proposed at this time so coverage
requirements do not apply at this time.
#SD-08-49
SUBDIVISION CRITERIA
Pursuant to Section 15.18 of the South Burlington Land Development Regulations,
subdivisions shall comply with the following standards and conditions:
The project is designed to be visually compatible with the planned development
patterns in the area, as specified in the Comprehensive Plan and the purpose of the
zoning district(s) in which it is located.
The standards for this criterion are found below in a review of the regulations of the
Southeast Quadrant.
The project is consistent with the goals and objectives of the Comprehensive Plan
for the affected district(s).
The proposed subdivision of this property is in conformance with the South Burlington
Comprehensive Plan.
Southeast Quadrant District
This proposed subdivision is located in the southeast quadrant district. Therefore it is
subject to the provisions of Section 9 of the SBLDR.
9.06 Dimensional and Design Requirements Applicable to All Sub -Districts. The
following standards shall apply to development and improvements within the
entire SEQ Zoning District.
A. Height.
(1) The maximum height of any occupied structure in the SEQ-NRP, SEQ-NRT, or
SEQ-NR sub -district shall not exceed forty-five feet (45'); the waiver provisions
of Section 3.07(E) shall not apply to occupied structures in these sub -districts.
(2) The maximum height of any occupied structure in the SEQ-VR or SEQ-VC
sub -district shall not exceed fifty feet (50'); the waiver provisions of Section
3.07(E) shall not apply to occupied structures in these sub -districts.
No new buildings are proposed as part of this application; therefore this criterion is not
applicable to this application.
B. Open Space and Resource Protection.
(1) Open space areas on the site shall be located in such a way as to maximize
opportunities for creating usable, contiguous open spaces between adjoining
parcels
The proposed subdivision & boundary line adjustment meets this criterion to the extent
necessary at this time.
-2-
#SD-08-49
(2) Building lots, streets and other structures shall be located in a manner
consistent with the Regulating Plan for the applicable sub -district allowing
carefully planned development at the average densities provided in this bylaw.
The proposed subdivision/boundary line adjustment is in compliance with this criterion. As
noted above, there is no development proposed as part of this application.
(3) A plan for the proposed open spaces and/or natural areas and their ongoing
management shall be established by the applicant.
At this time, no new development is proposed. Furthermore, there are no wetlands on the
site.
(4) Sufficient grading and erosion controls shall be employed during construction
and after construction to prevent soil erosion and runoff from creating unhealthy
or dangerous conditions on the subject property and adjacent properties. In
making this finding, the Development Review Board may rely on evidence that the
project will be covered under the General Permit for Construction issued by the
Vermont Department of Environmental Conservation.
At this time no construction is planned.
(5) Sufficient suitable landscaping and fencing shall be provided to protect
wetland, stream, or primary or natural community areas and buffers in a manner
that is aesthetically compatible with the surrounding landscape. Chain link
fencing other than for agricultural purposes shall be prohibited within PUDs; the
use of split rail or other fencing made of natural materials is encouraged.
At this time no construction is planned. This criterion is not applicable to this application.
C. Agriculture. The conservation of existing agricultural production values is
encouraged through development planning that supports agricultural uses
(including but not limited to development plans that create contiguous areas of
agricultural use), provides buffer areas between existing agricultural operations
and new development, roads, and infrastructure, or creates new opportunities for
agricultural use (on any soil group) such as but not limited to community -
supported agriculture. Provisions that enhance overall neighborhood and natural
resource values rather than preservation of specific soil types are strongly
encouraged.
This criterion is not applicable to this application.
D. Public Services and Facilities. In the absence of a specific finding by the
Development Review Board that an alternative location and/or provision is
approved for a specific development, the location of buildings, lots, streets and
utilities shall conform with the location of planned public facilities as depicted on
the Official Map, including but not limited to recreation paths, streets, park land,
schools, and sewer and water facilities.
(1) Sufficient water supply and wastewater disposal capacity shall be available to
meet the needs of the project in conformance with applicable State and City
-3-
#SD-08-49
requirements, as evidenced by a City water allocation, City wastewater allocation,
and/or Vermont Water and Wastewater Permit from the Department of
Environmental Conservation.
At this time no construction is planned.
Should development be applied for these properties at a future date, City sewer and water
is available.
(2) Recreation paths, storm water facilities, sidewalks, landscaping, utility lines,
and lighting shall be designed in a manner that is compatible with the extension of
such services and infrastructure to adjacent properties.
There is no infrastructure proposed as part of this application.
(3) Recreation paths, utilities, sidewalks, and lighting shall be designed in a
manner that is consistent with City utility plans and maintenance standards,
absent a specific agreement with the applicant related to maintenance that has
been approved by the City Council.
This is a subdivision of land. No infrastructure is proposed at this time.
(4) The plan shall be reviewed by the Fire Chief or his designee to insure that
adequate fire protection can be provided, with the standards for evaluation
including, but not limited to, minimum distance between structures, street width,
vehicular access from two directions where possible, looping of water lines, water
flow and pressure, and number and location of hydrants.
At this time no construction is planned and this criterion is not applicable.
E. Circulation. The project shall incorporate access, circulation and traffic management
strategies sufficient to prevent unsafe conditions on of adjacent roads and sufficient to
create connectivity for pedestrians, bicycles, vehicles, school transportation, and
emergency service vehicles between neighborhoods. In making this finding the
Development Review Board may rely on the findings of a traffic study submitted by the
applicant, and the findings of any technical review by City staff or consultants.
At this time no construction is planned and this criterion is not applicable.
(1) Roads shall be designed in a manner that is compatible with the extension of
such services and infrastructure to adjacent properties.
No new roads are planned as part of this application.
(2) Roads shall be designed in a manner that is consistent with City roadway
plans and maintenance standards, absent a specific agreement with the applicant
related to maintenance that has been approved by the City Council.
No new roads are planned as part of this application
-4-
#SD-08-49
(3) The provisions of Section 15.12(D)(4) related to connections between adjacent
streets and neighborhoods shall apply.
No new roads are planned as part of this application.
9.09 SEQ-NR Sub -District; Specific Standards
The SEQ-NR sub -district has additional dimensional and design requirements, as
enumerated in this Section.
A. Street, Block and Lot Pattern
(1) Development blocks. Development block lengths should range between 300
and 400 linear feet; see Figure 9-2 for example. If longer block lengths are
unavoidable blocks 400 feet or longer must include mid -block public sidewalk or
recreation path connections..
(2) Interconnection of Streets. Average spacing between intersections shall be 300
to 400 feet. Dead end streets (e.g. culs de sac) are discouraged. Dead end streets
may not exceed 200 feet in length. Street stubs are required at the end of dead end
streets to allow for future street connections and/or bicycle and pedestrian
connections to open space and future housing on adjoining parcels per section
15.12(D)(4).
(3) Street Connection to Adjoining Parcels. Street stubs are required to be built to
the property line and connected to adjacent parcels per section 15.12(D)(4) of
these Regulations. Posting signs with a notice of intent to construct future streets
is strongly encouraged.
(4) Lots shall maintain a minimum lot width to depth ratio of 1:2, with a ratio of
1:2.5 to 1:5 recommended.
B. Street, Sidewalk & Parking Standards
(1) Street dimensions and cross sections. Neighborhood streets (collector and
local) in the VR sub -district are intended to be low -speed streets for local use that
discourage through movement and are safe for pedestrians and bicyclists.
Dimensions for public collector and local streets shall be as set forth in Tables 9-3
and 9-4, and Figures 9-8 and 9-9 below.
(2) Sidewalks. Sidewalks must be a minimum of five feet (5') in width with an
additional minimum five-foot planting strip (greenspace) separating the sidewalk
from the street. Sidewalks are required on one side of the street, and must be
connected in a pattern that promotes walkability throughout the development. The
DRB may in its discretion require supplemental sidewalk segments to achieve this
purpose.
(3) Street Trees; see Section 9.08(B)(3)
-5-
#SD-08-49
Street trees are required along all streets in a planting strip a minimum of five feet
wide. Street tress shall be large, deciduous shade trees with species satisfactory
to the City Arborist. Street trees to be planted must have a minimum caliper size
of 2.5 to 3 inches DBH, and shall be planted no greater than thirty feet (30') on
center.
(4) On -street parking; see Section 9.08(B)(4).
(5) Intersection design. Intersections shall be designed to reduce pedestrian
crossing distances and to slow traffic; see Figure 9-6 and Section 9.08(B)(5).
(6) Street and sidewalk lighting. Pedestrian -scaled light fixtures (e.g., 12' to 14')
shall be provided sufficient to ensure pedestrian safety traveling to and from
public spaces. Overall illumination levels should be consistent with the lower -
intensity development patterns and character of the SEQ, with lower, smoother
levels of illumination (rather than hot -spots) and trespass minimized to the lowest
level consistent with public safety.
C. Residential Design
(1) Building Orientation. Residential buildings must be oriented to the street.
Primary entries for single family and multi -family buildings must face the street.
Secondary building entries may open onto garages and/or parking areas. (Special
design guidelines apply to arterial streets).
(2) Building Facades. Building facades are encouraged to employ a theme and
variation approach. Buildings should include common elements to appear unified,
but facades should be varied from one building to the next to avoid monotony.
Front porches, stoops, and balconies that create semi -private space and are
oriented to the street are encouraged.
(3) Front Building Setbacks. In pedestrian districts, a close relationship between
the building and the street is critical to the ambiance of the street environment.
Buildings should be set back fifteen feet (15') from the back of sidewalk.
(4) Porches, stoops, and balconies may project up to eight feet (8') into the front
setbacks. Porch, stoop and balcony areas within the front setback shall not be
enclosed or weatherized with glazing or other solid materials.
(5) Placement of Garages and Parking. See Section 9.08(C)(4) and Figure 9-7. The
front building line of the garage must be set behind the front building line of the
house by a minimum of eight feet.
(6) Mix of Housing Types. A mix of housing types is encouraged within
neighborhoods and developments. Housing types should be mixed within blocks,
along the street and within neighborhoods rather than compartmentalized into
sections of identical housing types.
At this time no construction is planned.
-6-
#SD-08-49
111 *44 W 1567l1
Motion by GA « G!*6 v, ,seconded by -- C-4 fm 4 to approve Fin I Plat Application #SD-08-49 of Marie J. Dubois, subject to the f Ilowing
conditions:
1. All previous approvals and stipulations shall remain in full effect except as amended
herein.
2. This project shall be completed as shown on the plat submitted by the applicant and
on file in the South Burlington Department of Planning and Zoning.
3. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility
lines, services, and service modifications shall be underground.
4. Any changes to the final plat plan shall require approval of the South Burlington
Development Review Board.
5. The final plat plan (survey plat) shall be recorded in the land records within 180 days
or this approval is null and void. The plan shall be signed by the Board Chair or Clerk
prior to recording. Prior to recording the final plat plan, the applicant shall submit a copy
of the survey plat in digital format. The format of the digital information shall require
approval from the South Burlington GIS Coordinator.
Mark Behr — ye�/nay/abstain/not present
Matthew Birmingham — ie nay/abstain/not present
John Dinklage
a /nay/abstain/not present
Roger Farley
a nay/abstain/not present
Eric Knudsen —
e nay/abstain/not present
Peter Plumeau
nay/abstain/not present
Re/rnay/abstain/not
Gayle Quimby —
present
Motion carried by a vote of -1- 6 - C'
Signed this l day of CJ 2008, by
/} r
John Dinklage, hair `
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRECP 5 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
-7-
#SD-08-49
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).