Munson Earth Moving Corp, hereinafter referred to as the applicant, is seeking
preliminary and final plat approval for a planned unit development to: 1) subdivide a
46.42 acre parcel into two (2) lots of 6.92 acres and 39.50 acres and 2) develop the 6.92
acre parcel with two general and/or medical office buildings comprised of one single
story 15,000 sq. ft. building and one (1) two story 33,600 sq. ft. building, 1200 Hinesburg
Road.
The Development Review Board held a public hearing on March 17, 2009. David
Marshall represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking preliminary and final plat approval for a planned unit
development to: 1) subdivide a 46.42 acre parcel into two (2) lots of 6.92 acres and
39.50 acres and 2) develop the 6.92 acre parcel with two general and/or medical office
buildings comprised of one single story 15,000 sq. ft. building and one (1) two story
33,600 sq. ft. building, 1200 Hinesburg Road.
3. The owner of record of the subject property is Munson Earth Moving Corporation.
3. The application was received on February 23, 2009
4. The subject property is located in the Industrial & Open Space Zoning District.
5. The plan submitted consists of a 32 page set of plans, page two (2) entitled,
"Subdivision of Lot 1 B from Lot 1 Meadowland Business Park for: Munson Earth Moving
Corp. VT Rte. 116 & Meadowland Drive City of South Burlington, Vermont, prepared by
Civil Engineering Associates, Inc., dated February 23, 2009.
Zoning District & Dimensional Requirements
Table 1. Dimensional Requirements
10 Zoning District
Required
Proposed (at full build -
out on Lot 1 B)
Min. Lot Size
3 acres
6.92 acres
Max. Density
n/a
n/a
I:\Development Review Boa rd\Findings_Decisions\2009\Munson\HinesburgRdOff ice Park_SD0912_SDO913_ffd.doc
#SD-09-12
#SD-09-13
� Max. Building
Coverage
30%
10.6%
Max. Overall Coverage
50%
45.6%
Min. Front Setback
50 ft.
140 ft.
Min. Side Setback
35 ft.
41 ft.
�l Min. Rear Setback
50 ft.
73 ft.
�l Max. Building Height**
35 ft.
25 ft
�l Front Yard Coverage
30%
5.4%
zoning compliance
n/a no residential units proposed
** the buildings lie within a scenic view protection zone; as
such the height limitations are subject to that district. See
comments below on this matter.
The subject property is part of a previous subdivision which contains a requirement that a
200 foot open space buffer be maintained along the boundary with the residential district.
This buffer is being respected with the closest building proposed at over 500 feet from the
district boundary. This line is also shown on the plans.
SUBDIVISION CRITERIA
Pursuant to Section 15.18 of the South Burlington Land Development Regulations,
subdivisions shall comply with the following standards and conditions:
Sufficient water supply and wastewater disposal capacity is available to meet the
needs of the project.
According to Section 15.13 of the South Burlington Land Development Regulations, the
existing public water system shall be extended so as to provide the necessary quantity of
water, at acceptable pressure.
The entire Meadowland Business Park has been preliminarily approved for water
allocation. The South Burlington Water Department has reviewed the plans and provided
comments in a letter dated February 26, 2009. Most of the comments are standard
specifications made by the department and no changes to the plans are necessary. The
applicant shall adhere to these comments.
According to Section 15.13 of the South Burlington Land Development Regulations, the
subdivider or developer shall connect to the public sewer system or provide a community
wastewater system approved by the City and the State in any subdivision where off -lot
wastewater is proposed.
The original subdivision received a 51,272 gpd sewer allocation which is still in effect. To
date there is 41,519 gpd available. The applicant has applied for and received preliminary
wastewater approval given this allocation.
2
I:\Development Review Boa rd\Findings_Decisions\2009\Munson\HinesburgRdOff ice Park_SD0912_SDO913_ffd.doc
#SD-09-12
#SD-09-13
Sufficient grading and erosion controls will be utilized during and after construction
to prevent soil erosion and runoff from creating unhealthy or dangerous conditions
on the subject property and adjacent properties.
The applicant has submitted sufficient grading and erosion control plans. Furthermore, with
4.5 acres of area to be disturbed during construction, and over 130,000 sf of new
impervious surface, the proposed development will be subject to both the State of Vermont
Construction General permit and the Operational Stormwater permit.
The project incorporates access, circulation, and traffic management strategies
sufficient to prevent unreasonable congestion of adjacent roads.
Access to this property is proposed via one 24' drive off of Hinesburg Road. This complies
with the minimum requirement for an entry drive. This entry drive has been located south of
the proposed buildings such that it may also serve as a shared access for future
development on the southern portion of this parcel.
The applicant has completed a traffic report for the proposed development (attached,
completed by Lamoureux & Dickenson). The report confirms the need for a dedicated left
turn lane into the site upon completion of the second (East) building.
Verbal approval of this proposed curb cut has been issued by VTrans with final approval
pending the review of the technical details associated with the proposed turn lane.
According to the ITE Trip Generation Manual, 71h Edition and using the fitted curve, the
proposed medical/dental office use (land Use Code 720) is estimated to generate 54 vtes
(the one story building) and 114.9 vtes (two story building) for a total of 168.9 PM peak hour
tip ends.
The project's design respects and will provide suitable protection to wetlands,
streams, wildlife habitat as identified in the Open Space Strategy, and any unique
natural features on the site.
The subject property is surrounded by a narrow band of wetlands along a small stream
corridor (unnamed tributary of Potash Brook) that drains through the project site from
southwest to northeast. The project grading respects the wetlands associated with the
stream corridor; there is some encroachment of grading into the buffer, as well as a small
portion of pavement, where the access drive circulates around the two story building. This
is minimal. Furthermore, the site has been designed so that the new development areas
are below the existing grade.
The project is designed to be visually compatible with the planned development
patterns in the area, as specified in the Comprehensive Plan and the purpose of the
zoning district(s) in which it is located.
According to Section 6.04(A) of the Land Development Regulations, the Industrial -Open
Space 10 District is established to provide suitable locations for high -quality, large -lot
office, light industrial and research uses in areas of the City with access to major arterial
routes and Burlington International Airport. The 10 District regulations and standards are
intended to allow high -quality planned developments that preserve the generally open
character of the district, minimize impacts on natural resources and water quality, and
I:\Development Review Boa rd\Fi nd i ngs_Decisions\2009\Mu nson\H inesbu rg Rd Off icePark_SD0912_SDO913_ffd.doc
#SD-09-12
#SD-09-13
enhance the visual quality of approaches to the City while providing suitable locations for
employment and business growth. The location and architectural design of buildings in a
manner that preserves these qualities is strongly encouraged.
The proposed project is in compliance with the stated purpose of the 10 District, as outlined
in the Land Development Regulations.
Open space areas on the site have been located in such a way as to maximize
opportunities for creating contiguous open spaces between adjoining parcels and/or
stream buffer areas.
There are significant portions of open space running along the western portions of the
property, so this requirement is met.
The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee)
to ensure that adequate fire protection can be provided.
The South Burlington Fire Chief has reviewed the plans and provided comments in a letter
dated March 12, 2009. He has recommended that the applicant increase the width of the
access drive around the building from 18 feet to 20 feet (comment number 12). He has also
stated that the trees and fences shall not be placed in any manner that may interfere with
the deployment of hoses (comment number 10). The Board has reviewed the landscaping
plan and no changes are necessary with respect to this criterion. No changes to the
landscaping plan shall be made with respect to this comment. The turning radii and other
road widths are acceptable.
Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines
and lighting have been designed in a manner that is compatible with the extension of
such services and infrastructure to adjacent landowners.
The water main has been designed to allow it to be extended as additional development is
permitted on the remaining sections of Lot 1 in support of the interconnection goals set forth
by the Water Department.
Stormwater and sanitary sewer connections will be tied into the existing Meadowland
Business Park infrastructure which was designed to handle the post -development flows
from all of Lot 1.
The subject property (Lot 1) contains a 20' wide recreation path easement which runs
through the southern landscaped berms in the east -west direction. The Recreation Path
Committee has also stated that they request an easement in the north -south direction
parallel to Hinesburg Road similar to the easement which exists on two properties to the
north: 10 Mansfield View Lane (CEA) and 1100 Hinesburg Road (VT Eye Laser). The
applicant has shown this on the survey plat but not the site plans. The site plans should be
revised to show a 20 foot wide recreation path easement along the length of the property's
boundary with Hinesburg Road.
The applicant is also showing a pedestrian path along the northern property line which
connects Hinesburg Road and the parking areas.
4
I:\Development Review Board\Findings_Decisions\2009\Munson\HinesburgRdOfficePark_SD0912_SD0913_ffd.doc
#SD-09-12
#SD-09-13
Furthermore, the Recreation Path Committee submitted comments to staff in a memo
dated March 3, 2009 which outlines their wishes.
Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner
that is consistent with City utility and roadway plans and maintenance standards.
The subdivision plans for the entire Meadowland Business Park show details on street
utilities, lighting, and stormwater management.
The City Engineer has reviewed the plans and provided comments in a memo dated March
12, 2009. Item number 2 refers to a sewer line which connects to the subject parcel from
Meadowland Drive. It is a private sewer line and the Director of Public Works has stated
that it is to remain private. The applicant may strike item number 2 of these comments. No
gravel drive shall be required.
A lighting point by point plan for the proposed project has been submitted for this proposal
and meets the requirements in Appendices A.9 and A.10 of the Land Development
Regulations. In addition, the applicant has submitted exterior lighting details (cut -sheets) for
the proposed lighting on the subject parcel. The proposed lighting fixtures are in
compliance with Appendix D of the Land Development Regulations.
The project is consistent with the goals and objectives of the Comprehensive Plan
for the affected district(s).
The Board finds the proposed development of this property is in conformance with the
South Burlington Comprehensive Plan.
SITE PLAN REVIEW STANDARDS
Pursuant to Section 14.03(A)(6) of the Land Development Regulations, any PUD shall
require site plan approval. Section 14.06 establishes the following general review standards
for all site plan applications:
The site shall be planned to accomplish a desirable transition from structure to site,
from structure to structure, and to provide for adequate planting, safe pedestrian
movement, and adequate parking areas.
The plans for the proposed development include a 20 foot wide recreation path along
Hinesburg Road, a path connecting Hinesburg Road and the parking areas, and mid -island
pedestrian connections through the parking areas. Walkways are present on the two sides
of each building where parking is present. The plans adequately address this criterion.
According to Table 13-1 in Section 13.01(B) of the Land Development Regulations, and
based on a possible 48,600 square feet of medical office, the two buildings will require 243
spaces. The plans depict 249 parking spaces.
According to Table 13-7 of the Land Development Regulations, a property with 201-300
parking spaces requires seven (7) handicapped -accessible parking spaces. The plans
currently depict twelve (12) handicapped -accessible spaces. When the two buildings are
5
I:\Development Review Boa rd\Findings_Decisions\2009\Munson\HinesburgRd Off icePark_SD0912_SDO913_ffd.doc
#SD-09-12
#SD-09-13
analyzed separately, the west building (76 to 100 spaces) requires 4 spaces (4 are
provided) and the east building (151 to 200 spaces) requires six (6) spaces (8 are
provided).
The dimensions of the proposed parking areas meet the requirements in Table 13-8 of the
Land Development Regulations.
Section 13.01(G)(5) requires that bicycle parking or storage facilities are provided for
employees, residents, and visitors to the site. Two bicycle racks have been depicted on the
plans; is located at each building.
Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
The majority of the proposed parking is located on the rear of the west building. A small
amount of parking is on the south side of this building, but still not within the front yard. The
grading of the site places the parking below the existing grade thereby providing suitable
screening of the vehicles when viewed from Hinesburg Road. This criterion is being met.
Without restricting the permissible limits of the applicable zoning district, the height
and scale of each building shall be compatible with its site and existing or adjoining
buildings.
The applicant has submitted sketch elevations of the building. The bottom floors of the
buildings have been set down below existing grade as a means of lowering the profile of
the buildings. The closest commercial buildings to the project site are comprised of two
story structures. This project proposes one single story and one two story building. The
heights of the buildings are well within the limits of the district.
The proposed project is located in a business park in an area where both office and
industrial uses exists, so the scale of the proposed buildings is compatible with existing
buildings in the area.
Newly installed utility services and service modifications necessitated by exterior
alterations or building expansions shall, to the extent feasible, be underground.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
The DRB shall encourage the use of a combination of common materials and
architectural characteristics, landscaping, buffers, screens and visual interruptions
to create attractive transitions between buildings of different architectural styles.
The applicant has submitted sketch elevations of the proposed buildings. The Board finds
that they are visually appealing and very much harmonious with adjacent buildings in the
district. Landscaping plans and final grading plans have assisted in the determination of
compliance with this requirement.
Proposed structures shall be related harmoniously to themselves, the terrain and to
existing buildings and roads in the vicinity that have a visual relationship to the
proposed structures.
6
I:\Development Review Boa rd\Findings_Decisions\2009\Munson\HinesburgRdOffice Park_SD0912_SDO913_ffd.doc
#SD-09-12
#SD-09-13
The Board has already addressed this criterion in other sections of this report
In addition to the above general review standards, site plan applications shall meet the
following specific standards as set forth in Section 14.07 of the Land Development
Regulations:
The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce curb cuts
onto an arterial of collector street, to provide additional access for emergency or
other purposes, or to improve general access and circulation in the area.
Provisions for the extension of utilities have been integrated into the plan. The applicant is
proposing future access for the undeveloped portions of Lot 1 via the shared entry drive for
this proposal. The applicant and the Board agree that it is preferable to have the remaining
portions of Lot 1 which are closer to Meadowland Drive utilize that roadway for access to
the (eventual) controlled access at Route 116 rather than overburden this projects driveway
or provide an uncontrolled access between Meadowland Drive and Hinesburg Road.
Electric, telephone and other wire -served utility lines and service connections shall
be underground. Any utility installations remaining above ground shall be located so
as to have a harmonious relation to neighboring properties and to the site.
Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
All dumpsters and other facilities to handle solid waste, including compliance with
any recycling or other requirements, shall be accessible, secure and properly
screened with opaque fencing to ensure that trash and debris do not escape the
enclosure(s).
The plans do show dumpsters. Any waste facilities proposed on site shall be shown and
shown to be adequately screened. The applicant is proposing stockade fencing to surround
the facilities.
Landscaping and Screening Requirements
Based on building cost projections of $4,617,000, the minimum landscaping budget is
$53,670. The applicant has submitted a proposed landscaping budget of $53,890 which
meets this criterion. The applicant is requesting a $7,500 credit for 12 existing Norway
Spruce trees along the northerly property line.
The City Arborist has reviewed the proposed landscaping plans and provided comments in
a memo dated March 6, 2009. This plan was particularly challenging given the height
restrictions of the view protection overlay. The applicant worked with the arborist to achieve
this. The arborist made a few minor notes for change.
The applicant is proposing to build the development in two phases.
Pursuant to Section 13.O6(B) of the Land Development Regulations, snow storage area
must be specified and located in an area that will minimize the potential for run-off.
7
I:\Development Review Board\Findings_Decisions\2009\Munson\Hinesburg RdOfficePark_SD0912_SD0913_ffd.doc
#SD-09-12
#SD-09-13
The plans depict snow storage areas.
Pursuant to Section 13.06(C)(1) of the SBLDR, any utility cabinets on the site shall be
effectively screened to the approval of the Development Review Board. The plans depict
proper screening of the proposed utility cabinets on the site.
View Protection Zone
The subject property is located within the Hinesburg Road -North Scenic View Protection
Overlay District and thus subject to Section 10.03(H) of the SBLDR. Specifically, no part
of any structure within the zone shall exceed an elevation of 393.5 feet above mean sea
level plus 5.8 feet for each 1000 feet that said part of said structure is horizontally distant
from the Hinesburg Road -North View Protection Zone Base Line shown on the Scenic
View Protection Overlay District Map.
The applicant has submitted elevations as part of this application which depicts the
proposed buildings against the limits of the view protection zone. The elevations clearly
demonstrate that the buildings are within the limits of the view protection zone.
Other
The applicant is proposing to phase the building over 5 years. The board has no
concerns regarding this request. A condition to this effect will appear in the Decision.
/1
DECISION
Motion by 6' C q%aseconded by 46-,'
to approve Preliminary Plat App ication #SD-09-12 & Final Plat Application#SD-09-13 of
Munson Earth Moving Corporation, subject to the following conditions:
1. All previous approvals and stipulations shall remain in full effect except as amended
herein.
2. This project shall be completed as shown on the plat submitted by the applicant and
on file in the South Burlington Department of Planning and Zoning.
3. The plat shall be revised to show the changes below and shall require approval of the
Administrative Officer. Three (3) copies of the approved revised plans shall be submitted
to the Administrative Officer prior to recording the mylar.
3a. The plans shall be revised to widen the employee parking access road to 20
feet on the east side of the two (2) story building.
3b. The site plan shall be revised to show a 20 foot wide recreation path easement
along the length of the property's boundary with Hinesburg Road.
3c. The landscaping plan shall be revised to adhere to the comments of the City
Arborist per the memo dated March 6, 2009. Specifically, the species of
crabapple shall be changed to a narrower species.
I:\Development Review Board\Findings_Decisions\2009\Munson\Hinesburg RdOfficePark_SD0912_SD0913_ffd.doc
#SD-09-12
#SD-09-13
3d. The survey plat shall be revised to include the seal and signature of the land
surveyor.
4. The applicant shall adhere to the comments of the South Burlington Water Department
per the letter dated March 12, 2009 with the exception of item #7.
5. The applicant shall obtain final wastewater allocation prior to issuance of a zoning permit
6. The proposed project shall adhere to standards for erosion control as set forth in Section
16.03 of the South Burlington Land Development Regulations. In addition, the grading plan
shall meet the standards set forth in Section 16.04 of the South Burlington Land
Development Regulations.
7. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility
lines, services, and service modifications shall be underground.
8. The applicant shall adhere to the comments of the City Engineer per the memo dated
March 12, 2009, with the exception of items number 1 and 2.
9. The applicant shall adhere to the recommendations of the Fire Chief in his memo
dated 3/12/09 with the exceptions of items # 7 and 10.
10. The landscaping schedule and budget shall be revised to separate the landscaping
and costs for each phase of the project.
11. The applicant shall comply with the requests of the South Burlington Water
Department as outlined in a letter dated February 26, 2009.
12. Prior to occupancy of the 33,600 sq. ft. building, the applicant shall construct a south
bound left turn lane on Hinesburg Road.
13. The applicant shall adhere to the comments of the City Arborist dated 3/6/09.
14. Pursuant to Section 12.02 (E)(3) of the Land Development Regulations, the Board
approves encroachment into the class III wetland buffer.
15. All new exterior lighting shall consist of downcasting, shielded fixtures. Any change
to approved lights shall require approval of the Administrative Officer prior to installation.
16. Prior to recording the final plat plan, the applicant shall record an easement deed
approved by the City Attorney, for the 20 foot recreation path.
17. The Board approves a $7,500 credit for existing trees to remain.
18. Prior to permit issuance, the applicant shall post a landscaping bond for each phase
as indicated in the landscaping budget for a total of $53,670. These bonds shall remain
in full effect for three (3) years to assure that the landscaping has taken root and has a
good chance of survival.
19. The applicant shall obtain a zoning permit for the first building within six (6) months
of this approval. The Development Review Board grants a period of five (5) years for
9
I:\Development Review Boa rd\Findi ngs_Decisions\2009\1V1unson\HinesburgRdOfficePark_SD0912_SDO913_ffd.doc
#SD-09-12
#SD-09-13
approval of phase 2 of the proposed development. At such time as the five years is
reached and the applicant has not sought a zoning permit for phase 2, they shall be
eligible, per Section 17.04 of the South Burlington Land Development Regulations, for
one (1) extension to an approval if the application takes place before the approval has
expired and if the Development Review Board determines that conditions are essentially
unchanged from the time of the original approval. In granting such an extension, the
Development Review Board may specify a period of time up to one (1) year for the
extension.
20. The mylar shall be recorded prior to permit issuance
21. For the purpose of calculating road impact fees under the South Burlington Impact
Fee Ordinance, the Development Review Board estimates that the 15,000 sq. ft. building
(as medical office use) will generate 54 vehicle trip ends during the pm peak hour and
the 33,600 sq. ft. building (as medical office use) will generate 114.9 vehicle trip ends
during the pm peak hour.
22. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer
prior to occupancy of each building.
23. Any changes to the final plat plan shall require approval of the South Burlington
Development Review Board.
24. The final plat plans (survey plat and sheet C-1.1) shall be recorded in the land
records within 180 days or this approval is null and void. The plan shall be signed by the
Board Chair or Clerk prior to recording. Prior to recording the final plat plan, the applicant
shall submit a copy of the survey plat in digital format. The format of the digital
information shall require approval of the Director of Planning and Zoning.
Mark Behr — oeanay/abstain/not presen _
Matthew Birmingham — yea/nay/abstain not present
John Dinklage — ea/nay/abstain not resent
Roger Farley — ye nay/abstain/not present
Eric Knudsen — e nay/abstain/not present
Peter Plumeau — /nay/abstain/not present
Gayle Quimby — e /nay/abstain/not present
Motion carried by a vote of 7
1 r 1
Signed this � day �f 2009, by
is
Mark Behr, Vice Chairman
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRECP 5 in writing, within 30 days of the date this
decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to
challenge this decision at some future time may be lost because you waited too long.
You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy;
finality).
10
I:\Development Review Boa rd\Findings_Decisions\2009\Munson\Hinesburg Rd Office Park_SD0912_SD0913_ffd.doc