Loading...
HomeMy WebLinkAboutAgenda 06_SD-19-29_1840 Spear St_South Village_FP 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com               TO:    South Burlington Development Review Board    FROM:   Marla Keene, Development Review Planner    SUBJECT:   SD‐19‐29 1840 Spear Street    DATE:    December 17, 2019 Development Review Board meeting      South Village Communities, LLC has submitted Final Plat application #SD‐19‐29 to amend Phase IIIB of a  previously approved multi‐phase 334 unit planned unit development.  The amendment consists of removing  the master plan condition requiring construction of a left hand turn lane at the southernmost entrance from  Spear Street onto South Jefferson Road, 1840 Spear Street.    At the November 5, 2019 hearing the Board continued the hearing to November 19, 2019 to allow the applicant  to correct defects in public noticing.   The November 19, 2019 hearing was rescheduled due to lack of a  quorum.  On November 13, the applicant submitted a revised traffic memorandum which attempts to address  comments provided in the packet for the November 19, 2019 hearing (Staff comments were provided to the  applicant in advance).  The following staff comments reflect the applicant’s revised traffic memorandum, and  the revised traffic memorandum is included in the packet for the Board.  The previous traffic memorandum is  also included in the packet for the Board.  #SD‐19‐29  1 CITY OF SOUTH BURLINGTON  DEVELOPMENT REVIEW BOARD  SD‐19‐29_1840 Spear St_South Village Communities  LLC_FP_2019‐11‐19.docx  DEPARTMENT OF PLANNING & ZONING   Report preparation date: November 13, 2019  Plans received: September 25, 2019  1840 Spear Street  Final Plat Application #SD‐19‐29  Meeting date: December 17, 2019  Owner/Applicant  South Village Communities, LLC  P.O. Box 2286  South Burlington, VT 05407  Engineer  Civil Engineering Associates  10 Mansfield View Ln  South Burlington, VT 05403  Property Information  SEQ‐NRP and SEQ‐NR zoning districts  ± 224 acres      Location Map    #SD‐19‐29  2   PROJECT DESCRPTION    Final Plat application #SD‐19‐29 of South Village Communities, LLC to amend Phase IIIB of a previously  approved multi‐phase 334 unit planned unit development.  The amendment consists of removing the  master plan condition requiring construction of a left hand turn lane at the southernmost entrance from  Spear Street onto South Jefferson Road, 1840 Spear Street.    PERMIT HISTORY  The Master Plan application (#MP‐05‐02) for this project was approved by the Board on February 10,  2006 and later amended (#MP‐14‐01) on May 23, 2014.  #MP‐14‐01 represents a very slight amendment  to the approved review process.  #MP‐05‐02 includes the bulk of the conditions applicable to the  development.  The Phase 2 plan application (#SD‐13‐44) for this project was approved by the Board on  March 10, 2014, and the Phase 3 final plat application (#SD‐17‐18) on February 22, 2018.  The condition the applicant is requesting to be modified is in approval #MP‐05‐02 and reads as follows.  The applicant shall construct southbound left‐turn lane on Spear Street at the “South Entrance” of  the project, prior to issuance of the first zoning permit for a dwelling unit in Phase 3 (The Ridge).   The Director of Public Works shall review and approve all plans prior to construction.    The project has master plan approval which includes conditions allowing the applicant to go directly to  final plat for this requested amendment.    COMMENTS    Development Review Planner Marla Keene and Director of Planning and Zoning Paul Conner (“Staff”) have  reviewed the plans submitted on 9/25/2019 and offer the following comments. Numbered items for the  Board’s attention are in red.    DIMENSIONAL STANDARDS    No changes are proposed to the dimensional standards.    SOUTHEAST QUADRANT STANDARDS    No changes are proposed to the zoning district standards.    PLANNED UNIT DEVELOPMENT STANDARDS  Pursuant to Section 15.18 of the South Burlington Land Development Regulations, PUDs shall comply  with the following standards and conditions:    (A)(1) Sufficient water supply and wastewater disposal capacity is available to meet the needs of  the project.     (A)(2) Sufficient grading and erosion controls will be utilized during and after construction to  prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject  property and adjacent properties.  #SD‐19‐29  3   Staff considers compliance with these two criteria not affected by the requested amendment.    (A)(3) The project incorporates access, circulation, and traffic management strategies sufficient to  prevent unreasonable congestion of adjacent roads.    The applicant has provided a traffic memo, prepared by RSG,dated August 6, 2018, and an updated  traffic memo dated November 12, 2019 in support of their request to remove the condition  requiring a left‐turn lane on Spear Street at the southernmost entrance from Spear Street onto  South Jefferson Road.  This traffic memo uses traffic data collected on August 1, 2018 to evaluate  whether a left turn lane is warranted.  Staff notes that as of the date of the study, Phase 1,  approved for 116 dwelling units, is mostly built out, while Phase 2, approved for 91 dwelling units,  is approximately 75% built out, and no homes have been constructed in Phase 3, approved for 60  dwelling units.  The project is also approved for an additional 67 units whose locations are still to be  determined but the applicant has indicated are tentatively programmed for Phases 1 and 2.   Overall, Staff estimates that the project is approximately 55% constructed and that trips from the  remaining units will be distributed between the two entrances to the development.  The updated  memorandum attempts to estimate the additional 60 units approved for Phase 3, but does not  appear to include the 67 units approved in the master plan but as yet unprogrammed, nor does it  include the potential for trip capture from Dorset Farms which will be accessible once the Midland  Avenue connection is complete.      1. Based on the updated memorandum, Staff continues to recommend the Board consider  whether to request the applicant include full‐build of the 334‐unit development and the  potential for trip capture from Dorset Farms in their traffic analysis.    The memo states that in order for a left turn lane to be warranted, the southbound left turning  volume would need to exceed 55 vehicles per hour (assuming all other volumes remain constant).   The evaluated build scenario results in 25 vehicles per hour.      2. Given the relatively low number of trips compared to the warrant, Staff does not necessarily  believe that a left turn lane will become necessary, but recommends the Board consider  deferring the timeline for construction of the left turn lane to such a time as prior to issuance of  the zoning permit for the 30th unit in Phase III or 240 zoning permits overall, rather than fully  releasing the applicant from the obligation to build the turn lane at this time.  If at the 30th unit  in Phase III or 240th unit overall the applicant considered a turn lane was still unnecessary, Staff  considers the applicant could again request Board approval to remove the requirement for it’s  construction.    The applicant notes in their cover letter, included in the packet for the Board, that they no longer  anticipate building a 100‐student school on Lot 11.  In reviewing minutes from the original master  plan approval, Staff considers the approved school was intended to be an anchoring element of the  community.      3. While Staff is not opposed to the applicant not constructing a school, Staff considers that should  the Board approve this application, they should require Lot 11 to include a replacement  community anchoring element, of a type to be determined at the time of that application.    #SD‐19‐29  4 (A)(4) The project’s design respects and will provide suitable protection to wetlands, streams,  wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the  site.    (A)(5) The project is designed to be visually compatible with the planned development patterns in  the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which  it is located.     (A)(6) Open space areas on the site have been located in such a way as to maximize opportunities  for creating contiguous open spaces between adjoining parcels and/or stream buffer areas.     (A)(7) The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure  that adequate fire protection can be provided.    Staff considers compliance with these four criteria not affected by the requested amendment.    (A)(8)  Roads,  recreation  paths,  stormwater  facilities,  sidewalks,  landscaping,  utility  lines  and  lighting have been designed in a manner that is compatible with the extension of such services and  infrastructure to adjacent landowners.    (A)(9) Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that  is consistent with City utility and roadway plans and maintenance standards, absent a specific  agreement with the applicant related to maintenance that has been approved by the City  Council.     The applicant is proposing to complete the roadway cross section at the South Jefferson intersection  to be consistent with the approved cross section for the remainder of South Jefferson Road.  Staff  considers these two criteria met.    (A)(10) The project is consistent with the goals and objectives of the Comprehensive Plan for the  affected district(s).    (A)(11) The project’s design incorporates strategies that minimize site disturbance and integrate  structures, landscaping, natural hydrologic functions, and other techniques to generate less runoff  from developed land and to infiltrate rainfall into underlying soils and groundwater as close as  possible to where it hits the ground.    Staff considers compliance with these two criteria not affected by the requested amendment.    SITE PLAN REVIEW STANDARDS    14.06 General Standards  A.  Relationship of Proposed Development to the City of South Burlington Comprehensive Plan. Due  attention by the applicant should be given to the goals and objectives and the stated land use policies  for the City of South Burlington as set forth in the Comprehensive Plan.    Staff considers compatibility with the comprehensive plan not affected by the requested amendment.    #SD‐19‐29  5 B.  Relationship of Proposed Structures to the Site.  C.   Relationship of Structures and Site to Adjoining Area.  Staff considers compliance with these criteria not affected by the requested amendment.    14.07 Specific Review Standards    A.  Access to Abutting Properties.   B.  Utility Services.   C.  Disposal of Wastes.   D. Landscaping and Screening Requirements.   E. Modification of Standards.   F. Low Impact Development.     Staff considers compliance with these criteria not affected by the requested amendment.    G.  Standards for Roadways, Parking and Circulation. Standards of Section 15.12 Standards for  Roadways, Parking, and Circulation shall be met.    Staff considers the proposed roadway configuration complies with the standards of Section 15.12, which  pertain to roadway geometry and construction.    RECOMMENDATION    Staff recommends the Board discuss the project with the applicant and close the hearing.  MEMO RSG 180 Battery Street, Suite 350, Burlington, Vermont 05401 www.rsginc.com TO: Robin Jeffers, Development Director, SD Ireland Development LLC FROM: Corey Mack, PE CC: DATE: November 12, 2019 SUBJECT: South Jefferson Road Left Turn Lane – Updated Warrant Analysis RSG has updated a warrant analysis for a southbound left turn lane on Spear Street at South Jefferson Rd. This location provides access to the South Village development in South Burlington. RSG originally performed a left turn lane warrant analysis in August 2018 using existing traffic volumes. In this August 2018 analysis, South Village Phase 1 and Phase 2 had largely been constructed and occupied. This update to the South Jefferson Road left turn lane warrant analysis estimates the traffic demand associated with complete construction and occupancy of Phase 3 of South Village, representing the full build-out of the entire South Village Planned Used Development (PUD). Background The South Village PUD and study intersection are depicted in Figure 1 below. The primary development entrance is provided at the traffic signal at Allen Road on Spear Street, to the north of the Spear Street / South Jefferson Road study intersection. FIGURE 1: PROJECT AREA 2 Observed Traffic Volumes RSG performed traffic counts at the study intersection via CountCam counters on Wednesday, August 1st, 2018. Volume adjustments were considered for this count time and location. Based on data provided by VTrans, typical urban or rural counts at this time of the year would be adjusted down to represent Average Annual Daily Traffic (AADT). As a conservative consideration, no adjustments were made to the counts used in the analysis. FIGURE 2: OBSERVED PM PEAK HOUR TRAFFIC VOLUME (4:45 - 5:45) As the southbound left turn volume peaked in a slightly different period, these volumes were analyzed as well, as shown in Figure 3. FIGURE 3: OBSERVED PEAK SOUTHBOUND LEFT TURN HOURLY TRAFFIC DEMAND (4:30 - 5:30). The southbound left turning traffic is assumed to be entirely associated with Phase 1; Phase 1 constructed 150 residential units south of East Allen Road, resulting in an estimated trip generation of 53 entering trips1. Using the peak observed left turn volume, 27% (14 / 53) of the estimated trips entered into South Village Phase 1 via a southbound left turn at South Jefferson Road. 1 ITE Trip Generation, 10th Edition, PM peak hour of adjacent street traffic trip generation using 150 units of Land Use Code 220 – Multifamily Housing (Low-Rise); this land use trip generation rate results in the highest proportion of the southbound left turning vehicles (most conservative estimate for subsequent calculations). 647 9 7 3 So Jefferson Rd 412 12 Spear St 608 14 0 5 So Jefferson Rd 413 6 Spear St 3 Estimated Phase 3 Traffic Demand Construction and occupancy of Phase 3 of the South Village PUD will likely result in a minor increase to the southbound left turn traffic demand at South Jefferson Road on Spear Street. Most southbound vehicles destined to Phase 3 will utilize the existing primary development entrance at the Allen Road traffic signal. However, some traffic may choose to enter the Phase 3 development via South Jefferson Road. The proportion of southbound Phase 3 traffic using the South Jefferson Road entrance may be estimated using the observed southbound left turn demand from Phase 1 at South Jefferson Road. Phase 3 of the Sough Village PUD will construct 60 units of mixed residential housing types, resulting in an estimated entering volume of 31 vehicles in the PM peak hour of adjacent street traffic2. Assuming 27% of the entering traffic uses the South Jefferson Road entrance (the same as the Phase 1 entering traffic proportion), this will result in an additional 8 southbound left turns at South Jefferson Road in the PM peak hour of adjacent street traffic. In addition, the northbound right turn, westbound right turn and westbound left turn traffic volume would increase by an estimated +12, +4, and +3 vehicles in the peak hour, respectively. For a conservative analysis, RSG has used the highest observed hourly volumes from both the peak through and turning movements to represented the Design Hour Volume (DHV). Additionally, RSG has applied a 1.04 growth factor to the through volumes to estimate 2025 future year conditions. The 2025 estimated DHV at Spear Street and South Jefferson Road representing full build-out of the South Village PUD is presented in Figure 4. FIGURE 4: ESTIMATED 2025 PM PEAK HOUR FULL BUILD-OUT TRAFFIC VOLUMES 2 ITE Trip Generation, 10th Edition, PM peak hour of adjacent street traffic trip generation using 22 units of Land Use Code 210 – Single-Family Detached Housing and 38 units of Land Use Code 220 – Multifamily Housing (Low-Rise), resulting in an estimated 31 entering and 18 exiting trip ends. 673 22 11 8 So Jefferson Rd 430 24 Spear St 4 Volume Warrant Update Since the development of the initial left turn lane warrant analysis, the Vermont Agency of Transportation has issued guidance updating the preferred volume warrant for a left turn lane. This latest volume warrant guidance recommends the Kikuchi and Chakraborty (K&C) model when evaluating left turn lanes. The K&C model uses the speed limit and estimated traffic volume to determine the probability of a through vehicle approaching a left turning vehicle, with consideration to intersection delay and level of service. VTrans further recommends using 85% of the DHV to estimate average conditions. The K&C left turn lane volume warrant analysis for this intersection follows: A left turn lane is not warranted based on South Village full build-out volumes. The southbound left turning volume would need to exceed 55 vehicles per hour (assuming all other volumes remain constant) to for the left turn lane volume warrant to be met. Source: YEAR:2025 TIME:PM Peak Hour SPEED:35 mph Exclusive right-turn lane in the Va direction (Y/N)?N Exclusive left-turn lane in the Vo direction (Y/N)?N ENTER TRAFFIC VOLUMES (vph): Vadv.Vopp. Left-Turn =19 0 Thru =573 366 Right-Turn =0 21 Va =592 vph Vo =387 vph L =3.2% Va = exp(6.9017-0.001151*Vo+(exp(0.383-0.118*L)-0.01816*SP))(Eq. 3.3) Warranting Va =921 vph Va =592 <921 THEREFORE,LEFT-TURN LANE NOT WARRANTED Kikuchi and Chakroborty's "Modified Harmelink/AASHTO Model" from Method for Prioritizing Intersection Improvements, Washington State Transportation Center Research Report, January 1997 5 Other Turn Lane Warranting Criteria As documented in the August 2018 memo, no other left turn lane warranting criteria are met: • Sight distance along Spear Street exceed design recommendations. • Only one crash was recorded between from 2012 through 2018. It was a single vehicle crash with no injuries reported (June 2013). The conditions leading to these conclusions are unchanged and the evaluation remains valid. Conclusion The intersection of Spear Street and South Jefferson Road in South Burlington does not have any apparent safety defects in terms of sight lines or reported crash history. The traffic count, conducted in August 2018 and adjusted to represent 2025 South Village full build-out conditions, does not meet the volume warrants for the installation of an exclusive southbound left turn lane. The installation of a southbound left turn lane along Spear Street at South Jefferson Road is not recommended at this time.