Loading...
HomeMy WebLinkAboutAgenda 05_MS-19-03_1840 Spear St_South Village 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com               TO:    South Burlington Development Review Board    FROM:   Marla Keene, Development Review Planner    SUBJECT:   MS‐19‐03 1840 Spear Street    DATE:    December 17, 2019 Development Review Board meeting      South Village Communities, LLC has submitted miscellaneous application #MS‐19‐03 for approval of an overall  affordability plan for a previous‐approved multi‐phase 334 unit planned unit development, 1840 Spear Street.    At the November 5, 2019 hearing the Board continued the hearing to November 19, 2019 to allow the applicant  to correct defects in public noticing.   The November 19, 2019 hearing was rescheduled due to lack of a  quorum.  The materials included in the November 19, 2019 packet are unchanged with the exception of  additional public comment letters received after the packet was published.  All public comment letters are now  included in the packet, from newest to oldest.    STREETCity of So. BurlingtonTown of Shelburne"MIDLAND AVE."ALLEN ROADR. M. & D. M.V. 141 P. 6P. & J. CliffordVol. 165 Pg. 130Homeowners Assoc.Vol. 426 Pg. 101W. R. & G. S. LangVol. 131 Pg. 299D. V. DerridingerVol. 583 Pg. 137L. A. & J. G. DemersVol. 171 Pg. 286L. & C. LongVol. 411 Pg. 307L. & C. LongVol. 85 Pg. 67SPEAR n/fn/fn/fn/fn/fn/fn/fn/fDorset Farms Vol. 426 Pg. 101n/fValleeDorset Farms Homeowners Assoc.ALLEN RD. EASTN. JEFFERSON RD.S. JEFFERSON RD.S. JEFFERSON RD.PRESERV E R O A DCHURCHILLCHURCHILL NORTH JEFFERSON PRESERVE RD.PHASE 135.3± AcresCHIPMAN STREETMADISON LANECHIPMAN STREETS. JEFFERSON RD.AIKEN ST.PHASE 219.26± Acres11312510212312112412912812712611912011210811110710911011411511611811710510110410612211B1113567891012141316171518252627283433323130292435363738394041424443454647481921222320515253545657596061625A5B5C5D5E5F11A210A10B27A7A31A26A494B11A4A2A551N2N3N4N5N6N7N8N9N10N11N12N13N14N15N16N17N18N19N21N20N22N23N24N25N26N27N28N29N30N31N32N33N34N35N36N37N38N39N40N41N42N43N44N45N46N47N48aN49aN50N51N52N53N54N55N66N67N68N-79N80N-91N56N57N58N59N60N61N62N63N64N65NMIDLAND AVENUESTAFFOR D S T R E E T STAFFORD STRE E T 48NS.F. (CARRIAGE LOTS)S.F. (CARRIAGE LOTS)S.F. (CARRIAGE LOTS)S.F. (CARRIAGE LOTS)S.F. (CARRIAGE LOTS)Not to Scale- Location Map -PROJECTLOCATIONSPEAR ST.ALLEN RD.BARSTOW RD.DORSET ST.City of So. BurlingtonTown of ShelburneSouth Village Communities, LLCSouth Burlington Vol. 801 Pg. 465CEA1" = 200'01243.16DP 1- Legend -Shelburne Vol. 348 Pg. 416Areas by SurveySEPT. 24, 2019 223.14 acres (South Burlington) + 2.61 acres (Shelburne) 225.75 acres TotalSouth VillageConceptualAffordableAllocation PlanSouth Burlington, VermontTRCTRC# Staff note: These are the approved and recorded design review standards for the South Village development. 1 Marla Keene From:hale cochran <hale.cochran@gmail.com> Sent:Wednesday, December 11, 2019 12:22 PM To:Marla Keene Subject:South Village Affordability Plan Attachments:SV Affordability Plan.pdf Dear Ms Keene:  I am on the Board of Directors of the South Village Community  Association (SVCA).  We had our annual meeting last night where the  Overall Affordability Plan, South Village Communities LLC submitted to  you on September 24, 2019 by Scott Ireland was discussed.     I have attached a letter dated October 24, 2019 to Paul Conner from Nick  Andrews that details the history of the development and affordable  housing issues at South Village.  All of the participants at our annual  meeting last night were apposed to all options presented in Scott  Ireland's letter of September 24, 2019.    I and a number of South Village residents plan to attend the  Development Review Board meeting.  We hope there can be a better  solution to affordable housing than outlined in Mr. Ireland's letter of  September 24, 2019.  Sincerely,  Hale Cochran        1 Marla Keene From:Nicholas Andrews Sent:Tuesday, November 19, 2019 2:05 PM To:Paul Conner Cc:Marla Keene; Andrews Betty Subject:Statement for 11/19 DRB meeting Mr. Connor and the DRB      It is my hope that this committee will fairly review the history of the South Village development.       To be clear, at no time during the last 7 and 1/2 years that my family has lived in So Village have I ever demeaned the  value of affordable housing in this or any community. As a matter of fact I have consistently asked the developer publicly  and privately and the City publicity when the intent of the master plan for integrated and similar affordable housing  would be addressed.       In my family, myself, my wife, and 5 of our 7 children have been considered workforce people. I say that proudly and  with no disdain for those working for good housing within our community.      Only one of the three options before the DRB this evening has been discussed with the hundreds of people in So  Village and yet the developer sent the notice for this meeting to those people abutting our community. Even as a  resident member of the So Village HOA I was never personally notified by the developer of this meeting.       I am curious as to whether the DRB had ever seen the plan that had overwhelming acceptance within the community.  That plan included reasonable density considerations based on the remaining open space in So Village, accommodation  for some but not all of the bonus affordable housing units, and a realization on the part of the developer’s investors that  it was too late to meet the spirit of the original master plan for “bonus” units.       I believe that those of us who purchased homes in So Village and have paid taxes to the City of So Burlington could  have expected that the developer and the City could have escrowed some of those premium costs. Those funds could  then be used towards the subsidizing of affordable housing, that is if affordable housing  had been seriously considered  and not an afterthought. With an eye to future developments that escrowing of funds might be a way to put the money  where the good intentions are.   Nick Andrews  358 So Jefferson Rd  South Burlington 05403            Sent from my iPhone nwa       On Nov 19, 2019, at 10:03 AM, Paul Conner <pconner@sburl.com> wrote:     Dear neighbors:     Below please find the link to this evening’s Development Review Board meeting.      http://sbvt‐records.info/WebLink/Browse.aspx?id=40952&dbid=0&repo=sburl     Paul     <image001.jpg>     2 Paul Conner, AICP  Director of Planning & Zoning  City of South Burlington  575 Dorset Street  South Burlington, VT 05403  (802) 846‐4106  www.sbvt.gov     Notice ‐ Under Vermont’s Public Records Act, all e‐mail, e‐mail attachments as well as paper copies of documents received or  prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City  business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made  confidential by law. If you have received this message in error, please notify us immediately by return email. Thank you for your  cooperation.         Mr. Paul Connor   South Burlington Planning and Zoning  Development Review Board  City of South Burlington, Vermont 05403  Saturday, November 16, 2019  Dear Mr. Connor,  I am writing to express my deep concern over the most recent proposed plan by the developer of South  Village Communities.  My family and I bought our home in this community over seven years ago.  We  were drawn to the unique vision of the original master plan—a village style neighborhood centered  around a working farm and shared preserved common land with an emphasis on environmental  stewardship.  During these seven years, we have watched the neighborhood grow with many new  families drawn to this community for the same reasons we were.  We have seen the farm also grow and  flourish.  And, unfortunately we have seen the future development plans constantly change.    The plans have changed so much recently that it is hard to keep track.  I do know at one point about one  or two years ago, representatives from SD Ireland met with members of the community and listened to  our input and concerns regarding the future development of the neighborhood.  A small working group  of neighbors and representatives of SD Ireland was created to brainstorm options for future  development plans.  As I recall, after this collaborative process with members of our community, the  developer and their investors proposed a new plan that scaled back the total number of units to 279.  This included the 269 approved units in the original plan plus 10 bonus units (5 market and 5  affordable).  This plan had overwhelming support from the residents of South Village.  As I understand it, the City rejected that plan and is now requiring the developer to meet the 334  threshold (269 units, plus 33 affordable plus 32 market rate).  As I also understand it, in one early  decision regarding this community, 4C1160, 15.07(c)(3) the units beyond 269 were considered a density  bonus for the developer and were never mandated. The developer continually held up the 334 units as a  goal for the development. That goal included 156 units in phase 1, 99 units in phase 2, and 79 units in  phase 3.    To make a long story short, it now seems like the City is mandating the developer reach this 334 number  of units including the bonus affordable units.  While I have no problem with incorporating affordable  housing units in the neighbor as originally planned, I do have a problem with this new proposed plan by  the developer in which 50 percent of the affordable units will be placed in Lot 11.  The original master  plan called for the affordable units to be dispersed throughout all three phases.  Now seventeen  duplexes (34 units) of identical design are planned to be concentrated in the center of our community  right next to the farm.  This is the wrong place for this kind of dense development.  Why wasn’t the city  paying attention throughout the development of our neighborhood to ensure that these needed  affordable housing units were spread though out each phase more evenly in keeping with the original  master plan?  The addition of 50 percent of these units on one big lot in one phase seems like an  afterthought.  Please understand, I am not against the addition of affordable housing in our  neighborhood.  I am troubled by the high density of it in one central area that is already a busy highly  trafficked area in our neighborhood.      In my mind, 17 identical clustered duplexes on this one large lot do not satisfy the affordable plans for  this development or for developments in general or for section 15.18(B)(c) of the South Burlington Land  Development regulations. The wording of those regulations require maximization and protection of the  open character of the SEQ identified in the comprehensive plan. The wording goes on to say; allowing  "carefully" planned development at the overall least densities provided within the regulations.  As I  mentioned, this plan seems like an afterthought.  As one of my neighbors said, “Careful developer  planning for integrated affordable housing along the way and true oversight by the City of South  Burlington in making sure the City's interests were followed during the 15 year path of this development  could have averted this current situation.”    Thank you for taking the time to read my concerns.  My wife and I both work full time and have three  kids.  While we are deeply invested in our community, it can be hard to stay on top of all the details in  the changing plans and all the legal language and regulations.  I have done my best to express my  concerns regarding this situation as I understand it.  I hope the City will keep in mind the interests and  concerns of homeowners like me, my wife and others in our neighborhood.    Sincerely,    Jerry Swope  368 South Jefferson Rd.  1 Marla Keene From:Paul Conner Sent:Monday, November 4, 2019 8:30 AM To:Marla Keene; Dalila Hall Subject:FW: Resolution to be forwarded to the DRB        Paul Conner, AICP  Director of Planning & Zoning  City of South Burlington  575 Dorset Street  South Burlington, VT 05403  (802) 846‐4106  www.sbvt.gov    Notice ‐ Under Vermont’s Public Records Act, all e‐mail, e‐mail attachments as well as paper copies of documents received or prepared for use in  matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as  public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in  error, please notify us immediately by return email. Thank you for your cooperation.       From: John Simson <simsonjohn0840@gmail.com>   Sent: Sunday, November 3, 2019 10:48 AM  To: Paul Conner <pconner@sburl.com>  Subject: Resolution to be forwarded to the DRB     Hi Paul,    At our last meeting we adopted the following motion intending that it be shared with the DRB and contribute to their  deliberations at their meeting November 5.    John        “Following discussion with Patrick O’Brien and Robin Jeffers, of the Ireland company, about South Village, committee members passed the following motion. Sandy (Dooley) moved and Leslie (Black-Plumeau) seconded that the committee (1) supports the proposed addition of 28 affordable dwelling units to the South Village development off Spear Street; (2) supports all four options for distribution of the affordable units among the market units; and (3) notwithstanding support stated in (2) immediately 2 preceding, prefers that the affordable units be dispersed among the market units over having all of the affordable units located in one area of South Village. Motion passed: 5-0-0. The intent is for John (Simson), committee chair, to communicate this motion to the DRB at or prior to its meeting on November 5, 2019.”    ‐‐   I have changed my email address.  Please send future mail to:  simsonjohn0840@gmail.com      Public Comments received on Master Plan Amendment  Application SD‐18‐31  1 Marla Keene From:Joanne Soncrant <joanne.soncrant@gmail.com> Sent:Monday, November 12, 2018 8:55 AM To:Marla Keene Subject:SV Lot #48 - Question Good morning, Marla.   I am probably repeating myself but am very concerned about the proposed plan for 3 Triplex  buildings behind our homes on N. Jefferson.   Many neighbors have the same concerns and I will write a letter with more  detail that can be distributed to the DRB but would like to have this info for the community.     It is my understanding that there are 3 Triplex buildings being proposed with each middle unit being proposed as   an affordable home?   It is, also, my understanding that their original permit states something like the affordable homes  must be spread equally across phase 1, 2, and 3 and must represent each style of home.    At this time, there are no  affordable homes in the development!   Phase 1 and 2 are just about built out and most lots not developed at this time  are spoken for.   Question:  Did the developer amend the the original permit to change the plan for affordable homes?  If not,  can they come forward and ask for a proposal that is different than the parameters of the original permit?      The majority of owners on N. Jefferson and Preserver Road purchased homes based on a map that called for single  family homes on lot #48.  I do understand that a developer can change the plan throughout the planning of each phase  but it seems unfair and unethical to change a plan once owners have purchased their home based on a map that  indicated single family village homes.  As I mentioned in another letter, we are all in favor of a proposal that reflects the  original plan of single  family village homes and would appreciate the DRB holding the developer  to this plan.   We all   have an investment in South Village and are passionate about the farm and our community.  The  location and future of  this lot can make a big difference in the integrity of the community and the farm.     Thank you for your time and consideration of our concerns.       Joanne Soncranat    1 Marla Keene From:Marla Keene Sent:Wednesday, November 14, 2018 3:13 PM To:Joanne Soncrant Subject:RE: SV Lot #48 - Question Hi Joanne,  First, please let me know if you'd like this message included in the packet for the Board.    To answer your question below, the purpose of the current application scheduled for Nov 20 is to amend the approved  master plan, specifically to change the approved layout to the one they are proposing and to amend the number of  required affordable homes.  They can absolutely change their proposal as part of an amended master plan; the question  is whether the Board will approve their request for amendment.      Marla Keene, PE   Development Review Planner   City of South Burlington    (802) 846‐4106     ‐‐‐‐‐Original Message‐‐‐‐‐  From: Joanne Soncrant <joanne.soncrant@gmail.com>   Sent: Monday, November 12, 2018 8:55 AM  To: Marla Keene <mkeene@sburl.com>  Subject: SV Lot #48 ‐ Question    Good morning, Marla.   I am probably repeating myself but am very concerned about the proposed plan for 3 Triplex  buildings behind our homes on N. Jefferson.   Many neighbors have the same concerns and I will write a letter with more  detail that can be distributed to the DRB but would like to have this info for the community.     It is my understanding that there are 3 Triplex buildings being proposed with each middle unit being proposed as   an affordable home?   It is, also, my understanding that their original permit states something like the affordable homes  must be spread equally across phase 1, 2, and 3 and must represent each style of home.    At this time, there are no  affordable homes in the development!   Phase 1 and 2 are just about built out and most lots not developed at this time  are spoken for.   Question:  Did the developer amend the the original permit to change the plan for affordable homes?  If not,  can they come forward and ask for a proposal that is different than the parameters of the original permit?      The majority of owners on N. Jefferson and Preserver Road purchased homes based on a map that called for single  family homes on lot #48.  I do understand that a developer can change the plan throughout the planning of each phase  but it seems unfair and unethical to change a plan once owners have purchased their home based on a map that  indicated single family village homes.  As I mentioned in another letter, we are all in favor of a proposal that reflects the  original plan of single  family village homes and would appreciate the DRB holding the developer  to this plan.   We all   have an investment in South Village and are passionate about the farm and our community.  The  location and future of  this lot can make a big difference in the integrity of the community and the farm.     Thank you for your time and consideration of our concerns.       Joanne Soncranat    November 15, 2018 Ms. Marla Keene City of South Burlington Development Review Planner 575 Dorset Street So Burlington, VT 05403 Subject: Proposed Plan for Lot #48/Phase 2 in South Village Dear Marla: Champ and I want to voice our concerns, again, regarding the proposed plan for three triplex buildings behind our home. Some of the questions we have are as follows: It is our understanding the developer is calling the road a “driveway” that would service each triplex and their driveways would pull off the main driveway. It is my understanding that the original permit requires each home to have a front walk that connects the owner to the community. These triplex buildings are not on a main road. How will they be connected to the community and be within the parameters of the original permit? If the “driveway” becomes a road, will it be public or private? Who will maintain it? Will Emergency Vehicles be able to maneuver on this road? Will trash pickup trucks be able to service the owners on this “driveway” or road? On trash day there will be a minimum of 18 trashcans on that road…in our backyards! Per the map that was distributed to the community, it shows only one driveway per triplex. I assume there will be a driveway per unit? This would mean nine driveways off the main “driveway” or road. This literally is in the backyards of owners on No. Jefferson Road. We did not anticipate this nor did we have an opportunity to be included in the planning process for this lot. It seems unethical to us that we were shown a map, we purchase a lot based on that map, and later, the developer makes a decision that effects our home investment. And to add to this frustration, the center units are being proposed as affordable housing. This is not what the original permit allowed. Affordable homes were supposed to be planned equally throughout Phase 1, 2, and 3 and represent each style home. How can this be considered if the requirements are not being considered? Note: Phase 1 triplex units fit within the community and are on alleyways. Unlike lot #48 this lot borders the farm and looks like a stand-alone neighborhood. Last but not least, we are concerned about the farm. Lot #48 borders the farm and their planting could be effected because these three large buildings could block the sun rising in the East. How will this affect the produce that sustains the farm? Has this been considered? Would these buildings be within the Land Management Plan? In my opinion, the location of this lot on the farm makes these concerns ecologically a real consideration. We ask the DRB to consider holding the developer to the original plan of single family village homes and respect the investments of those of us who have invested in South Village. Thank you. Joanne and Champ Soncrant 107 No. Jefferson Road S. Burlington, VT 05403 1 Marla Keene From:Stuart and Delia Mowat <delistu@msn.com> Sent:Wednesday, October 31, 2018 4:28 PM To:Marla Keene Subject:RE: South Village - Latest proposals Attachments:garbage 2.JPG Good afternoon Marla.         Again, thank you very much for forwarding the plans to us. As you will remember, we are most concerned about the  lots now renumbered as 66N, 67N and 68N. Most of the other changes proposed by the developer look fine to us.          On the aforementioned lots, our concerns are the following:    When 9 dwellings are present on a single driveway, as seems to be the proposal, that will mean large  numbers of garbage and recycling bins in Preserve Road, ugly and obstructive. When Vermont institutes  food recycling / composting in 2020, that will mean up to 27 bins in the street. I am attaching a  photograph of what two bins per house look like on a driveway of only four houses, for illustration of the  obstruction it can cause. Perhaps the developer has a better solution than this?   Equally, 9 dwellings mean up to 18 cars sharing a single driveway, a recipe for cars littering Preserve  Road. Both of these create safety issues, we believe. Again, perhaps the developer has a better solution  for parking. Note that three of the dwellings will have only single garages.    Thirdly, the routing of the bike path seems to be an afterthought. It is unclear where it will go after the  houses are built. It would again be a safety issue if it were to share tarmac with the driveway for these  houses. And it seems to disappear once it has passed these houses. Can the developer describe where it  will be placed on North Jefferson Road?  Prior to this proposal, it was to run alongside North Jefferson  Road, in front of where the lots now designated 104 through 108 would now be.   Finally, we cannot help but reiterate that the proposal that was shown to us two years ago when we  bought our house remains the most appropriate option, that is, for five single family homes in that  section. Cannot the developer simply revert to that configuration?   Thank you again for the opportunity to view the ongoing plans. Hopefully we can get these items resolved  before they come to the DRB and we can have a smooth approval process!    Stuart & Delia Mowat    Sent from Mail for Windows 10    From: Marla Keene <mkeene@sburl.com>  Sent: Wednesday, October 31, 2018 8:08:11 AM  To: 'Stuart and Delia Mowat'  Subject: RE: South Village ‐ Latest proposals      Good morning Stuart,  As requested, I’ve compiled the plans I have thus far.  At this point we’re still working with them to provide plans that  more fully illustrate what they’re trying to do, so it may be worth checking in again at the end of the week, though the  plans I’ve requested show the existing configuration, and since you’re familiar with the property they may not be that  helpful to you.    Marla Keene, PE   Development Review Planner   City of South Burlington    2 (802) 846‐4106     From: Marla Keene   Sent: Friday, October 26, 2018 1:26 PM  To: Stuart and Delia Mowat <delistu@msn.com>  Subject: RE: South Village ‐ Latest proposals    Hi Stuart,  The plans will not be posted on the website until the Friday before a hearing.  I have not yet gotten organized with this  application’s files, but I would be happy to share the plans with you once I am, early next week.  If the files are too large  to email, I will let you know and you can come take a look in person & if you’d like I am able to place a copy on a USB  drive for you as well.    Marla Keene, PE   Development Review Planner   City of South Burlington    (802) 846‐4106     From: Stuart and Delia Mowat <delistu@msn.com>   Sent: Friday, October 26, 2018 1:22 PM  To: Marla Keene <mkeene@sburl.com>  Subject: South Village ‐ Latest proposals    Good Afternoon Marla,                  We understand that the developer of South Village has submitted new plans for the development as a whole  and that they are to be discussed on November 20th at the DRB.  Is it possible for you to share the plans with us, as I  cannot see them on the South Burlington web site, where they would normally be in the DRB Agenda.    Thanks very much.    Stuart Mowat   1 Marla Keene From:Robin Jeffers <robin@SDIRELAND.COM> Sent:Wednesday, November 7, 2018 3:39 PM To:Marla Keene Subject:RE: Mowat letter Hi Marla,  Regarding the Mowat’s letter,    We are grateful for the opportunity to respond to this letter.  As this is sketch plan, these are all good questions to be  worked through in this process.  Please see below replies to the context of the Mowats points;  1. Each dwelling is intended to have it’s own parking directly adjacent to the units just like the triplex units in Phase  1,  2. Each dwelling unit is intended to place their toter for trash and recycling at the end of their driveway, not on  Preserve Road, if this is not feasible for the hauler, a shared bin system would be recommended, there is no plan  for toters on Preserve Road.  3. Each dwelling will have driveway and garage parking for their cars, again, the same as in Phase 1 existing  construction.  Same as already constructed triplex units, the two end units have two car garages and two car  parking space adjacent to the unit, same as all other homes at South Village, the center units are proposed with  a one car garage and two parking spaces, again, same as phase 1. Unit Owner parking is not intended for  Preserve Road.    4. The bike path is where it intended and will not be moved.  It runs through a what will become a common area  green, as we have shown on the drawings.  The common area lot by current permits is to have fencing on the lot  line of the existing homes to segregate and clarify the bounds of the common area from the lots of home  ownership.  A similar treatment would be put in place on the western boundary of the common strip which the  bike path travels through.  This will be attractive and inviting and suitable place for the rec path.  5. The five unit plan was found not viable and turned down in earlier permitting.  We have and are moving forward  with this plan. The actual MP1 plat with the HOA Declaration for the lot was and is for 16 units, 9 is significantly  lesser units and a very big concession from the two twelve plex units proposed to the neighborhood by the  developer last year at this time.  The triplex units are very much in keeping with South Village design.  Thank you,  Respectfully,  Robin J    From: Marla Keene [mailto:mkeene@sburl.com] Sent: Wednesday, November 07, 2018 2:36 PM To: Robin Jeffers Subject: RE: Mowat letter   Hi Robin,  Here you go. Sorry about that; I printed to PDF but apparently never launched it to you.    Marla Keene, PE   Development Review Planner   City of South Burlington    (802) 846‐4106     From: Robin Jeffers <robin@SDIRELAND.COM>   Sent: Wednesday, November 7, 2018 2:34 PM  2 To: Marla Keene <mkeene@sburl.com>  Subject: Mowat letter    Hi Marla,  You mentioned forwarding Stuart Mowats letter, please do, so we can reply. Thank you.  Robin    Robin Jeffers S D Ireland PO Box 2286 S. Burlington, VT 05407 802‐863‐6222  Cell: 802‐316‐6004  robin@sdireland.com