Loading...
HomeMy WebLinkAboutSD-08-06 - Decision - 0010 Mansfield View Lane#SD-08-06 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING CEA PROPERTIES, LLC - 10 MANSFIELD VIEW LANE FINAL PLAT APPLICATION #SD-08-06 FINDINGS OF FACT AND DECISION CEA Properties, LLC, hereinafter referred to as the applicant, is seeking to amend a previously approved planned unit development consisting of three (3) 7200 sq. ft. general office buildings and a 1000 sq. ft. detached accessory structure. The amendment consists of a waiver to increase the height of the detached accessory structure by 1.2 feet for a total height of 16.2 feet, 10 Mansfield View Lane. The Development Review Board held a public hearing on Tuesday, February 19, 2008. David Marshall represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1) The applicant is seeking to amend a previously approved planned unit development consisting of three (3) 7200 sq. ft. general office buildings and a 1000 sq. ft. detached accessory structure. The amendment consists of a waiver to increase the height of the detached accessory structure by 1.2 feet for a total height of 16.2 feet, 10 Mansfield View Lane. 2) The owner of record of the subject property is CEA Properties, LLC. 3) The subject property is located in the Industrial & Open Space (10) Zoning District. 4) The plans submitted consist of a two (2) page set of plans, page one (1) entitled, "CEA Office Planned Unit Development Lot 1A Meadowland Business Park South Burlington Vermont Site Landscaping Plan", prepared by Civil Engineering Associates, dated Feb., 2007. 5) The detached accessory structure has already been reviewed by the Board as an element of the existing planned unit development. Section 3.10 of the South Burlington Land Development Regulations states that accessory structures shall not exceed fifteen feet in height. This application seeks to increase the height of the accessory structure by 2.4 feet, or 1.2 additional feet to the mid point of the eaves, for a total height of 16.2 feet. 6) The applicant has submitted a letter dated January 28, 2008 detailing their reasons for this request, as well as an elevation of the structure. -1- #SD-08-06 7) The Board has no concerns regarding this request but will require that the elevations be revised to show the total height of the structure, as well as to detail the height of the structure from the pre -construction grade to the mid point of the eaves. pv_-Te� Nlilmq DECISION Motionb seconded b CA � ����'� to YY approve Final Plat Application #SD-08-06 of CEA Properties, LLC, subject to the following conditions: All previous approvals and stipulations shall remain in full effect, except as amended herein. 2. This project shall be completed as shown on the plat submitted by the applicant, and on file in the South Burlington Department of Planning and Zoning. 3. The plans shall be revised to show the changes below and shall require approval of the Administrative Officer. Three (3) copies of the approved revised plans shall be submitted to the Administrative Officer prior to permit issuance. a. The elevations depicting the accessory structure shall be revised to detail the total height of the structure as well as the height of the structure from the pre -construction grade to the mid -point of the eaves. 4. The Board approves a height waiver of 1.2 feet for the detached accessory structure for a total height from pre -construction grade of 16.2 feet. 5. Any change to the final plat plan shall require approval of the South Burlington Development Review Board. Mark Behr ye nay/abstain/not present Matthew Birmingham — yea/nay/abstain/not present John Dinklage — ea/nay/abstain4d presen Roger Farley — ay/abstain/not present Eric Knudsen — ?enay/abstain/not present Peter Plumeau /nay/abstain/not present Gayle Quimby — #-eVnay/abstain/not present -2- #SD-08-06 Motion carried by a vote of & - D - D �f Signed this `day of fvk'` 2008, by A/ Mark Behr, Vice Chairman Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality). -3-