Loading...
HomeMy WebLinkAboutAgenda - City Council - 12/11/2019 - Special MeetingAGENDA SOUTH BURLINGTON CITY COUNCIL South Burlington City Hall Champlain conference room (2nd Floor) 575 Dorset Street SOUTH BURLINGTON, VERMONT Special Meeting 7:00 P.M. Wednesday, December 11, 2019 1.Pledge of Allegiance. (7:00 – 7:01 PM) 2.Instructions on exiting building in case of emergency. Kevin Dorn (7:01 – 7:02 PM) 3.Agenda Review: Additions, deletions or changes in order of agenda items. (7:02 – 7:03 PM) 4.Comments and questions from the public not related to the agenda. (7:03 – 7:08 PM) 5.***Continued discussion with Dept. Managers on the Capital Improvement Plan (7:08 – 8:30 PM) 6.Other Business (8:30 – 8:35 PM) 7. Adjourn (8:35 PM) Respectfully Submitted: Kevin Dorn Kevin Dorn, City Manager *** Attachments Included 575 Dorset Street South Burlington, VT 05403 tel 802.846.4107 fax 802.846.4101 www.southburlingtonvt.gov To: Kevin Dorn, City Manager From: Martha Machar, Deputy Finance Officer Subject: Draft FY2021-2030 Capital Improvement Program Date: November 15, 2019 Background: This draft CIP adds Fiscal Year 2030 and incorporates proposed changes due to new information or priorities. City department heads also solicited comments from City committees last summer while preparing their portion of the CIP. This draft amendment is proposed to replace in its entirety the existing FY2020-2029 CIP as the City’s adopted Capital Improvement Program. It is recommended that the City Council hold a public hearing on this draft CIP on December 16, 2019. The CIP reflects cost estimates and information available in the summer of 2019. The first year (FY21) of the FY2021-2030 CIP will be incorporated into the City’s 2020-2021 budget for approval in March. A digital copy of the draft CIP may be viewed online and has been provided in Council’s folder. . Upon request, a hard copy of the draft CIP (144 pages) may be provided for Council review at the meeting on Monday. Capital Improvement Program History A Capital Improvement Program (CIP) is a tool used to improve coordination in the timing of major projects, plan for capital replacement and future major maintenance costs, and reduce fluctuations in the tax rate. The attached draft CIP reflects the following potential capital expenditures: 1)Forecasted big ticket costs related to maintaining South Burlington’s current level of service through refreshing, rebuilding and replacingexisting capital equipment and infrastructure such as repaving roadways,replacing vehicles, emergency apparatus and roofs, and routine upgrades toCity utility infrastructure. 2)Estimated spending related to building public infrastructure that will result in a new downtown – City Center – including those projects eligible forTIF District financing such as new roadways, streetscapes and bridges,municipal facilities, parks, structured parking, wetland mitigation and stormwater management systems. 3) Projects (generally related to transportation and parks) that are included in impact fee ordinances, funded through specific voter authorizations such as Penny for Paths or Open Space, requested by committees or thecommunity, or shown in long range plans or studies that improve the levelof service, respond to growth or changes in service demands such asreconstructing Spear Street, connecting recreation paths on Dorset Street and expanding recreation fields. A CIP is a road map to guide budget preparation based on an estimate of future projects and costs consistent with current City priorities and fiscal outlook. The CIP incorporates Council priorities; committee recommendations which are solicited annually; adopted plans and ongoing projects; and equipment and facility maintenance, replacement and upgrade needs. As a financial planning tool, the CIP responds to the estimated fiscal capacity for each year going forward. It is not a static document and changes from year to year. Attachments: •Summary Pages for the proposed FY2021-2030 CIP •(link to online document) Draft Capital Improvement Program forFY2021-2030 Recommendation Listen to the presentation and provide any feedback. Consider a motion to “duly warn a public hearing for the regular council meeting on December 16, 2019 at 8:30 p.m. for public comment on the proposed amendment to the Capital Improvement Program and authorize staff to complete any tasks needed to accomplish same on Council’s behalf.” FY 2021‐2030 CAPITAL IMPROVEMENT PROGRAMI.GENERAL FUNDOverview of Totaled Expenditure Costs & Funding Sources (Revenue) summed by TypeOverview broken out by Department/Service Area of Totaled Expenditure Costs & Funding Sources summed by TypeCIP Projects (Expenditures) Listed by Department/Service Area or Category & Cost Per YearIndividual Project Detail SheetsHighways/ParksFire and Ambulance DepartmentRoad ImprovementsPolice DepartmentRecreation and ParksOpen Space ProjectsBicycle and Pedestrian ImprovementsITAdministrationLibraryCity CenterEnergy ProjectsII.SEWER FUNDIII.STORMWATER FUNDIV.WATER FUNDA Capital Improvement Program is a tool used to improve coordination in the timing of major projects, plan for capital replacement and major maintenance costs, and reduce fluctuations in the tax rate.A program is not a budget, but a road map to guide budget preparation based on an estimate of future projects and costs consistent with City priorities and fiscal outlook.  The Capital Improvement Program  is prepared yearly during the budget process but is adopted after the approval of the budget.  DRAFT SUMMARY PAGES I. GENERAL FUNDDRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEGENERAL FUND CAPITAL IMPROVEMENT PROGRAM OVERVIEW:SUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Costs Subtotaled:Studies, Design, Eng., Inspection, GC, Legal3,340                3,794                2,441                1,235                902                   545                   310                   421                   2                        2             12,992            Land/ROW/Easement Acquisition ‐                   20                    50                    ‐                   ‐                   ‐                   50                    50                    4,221               ‐          4,391              Construction15,093             23,594             37,203             14,068             8,552               2,326               4,295               1,899               2,508                1,068     110,606          Furniture & Equipment1,457               1,964               1,609               3,308               1,390               2,438               643                  1,213               1,117               986         16,125            Bond Payment Obligations (aggregate)729                  609                  590                  570                  550                  457                  440                  423                  405                   387         5,160              Note Repayments677                  1,399               1,396               1,960               1,956               1,953               1,949               1,630               1,630                1,630     16,180            City Center Bond Anticipated Repayment971                  989                  1,005               995                  985                  972                  961                  952                  939                   924         9,693              TIF District Debt Repayment467                  1,234               1,997               3,206               3,268               3,634               3,616               3,596               3,676                3,665     28,359            To City Center Reserve Fund 860                   860                   860                   860                   860                   860                   860                   860                   860                   860         8,600              Total CIP Costs:23,593             34,463             47,151             26,203             18,464             13,185             13,124             11,044             15,358             9,522     212,107          Funding Sources Subtotaled:General Fund (sourced from Property Taxes) 3,525                4,296                4,314                3,239                3,997                4,661                2,713                3,089                3,493                2,862     36,190            CIP Reserve Fund 1,939                1,846                1,863                1,854                1,845                1,833                1,823                1,815                1,803                1,790     18,413            Penny for Path Debt Proceeds 580                   433                   163                   300                   170                   100                   200                   230                   150                   ‐          2,326              Sewer Fund 90                     170                   100                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                    ‐          360                 Grant/Donation/Developer1,462               3,583               7,517               2,262               549                  808                  531                  830                  4,811               ‐          22,354            Open Space Debt Proceeds474                  200                  57                    ‐                   ‐                   ‐                   ‐                   ‐                   ‐                    ‐          731                 Anticipated Debt Proceeds30                    40                    10                    ‐                   400                  250                  2,596               ‐                   ‐                    ‐          3,326              City Center Debt Proceeds10,418             13,350             19,350             7,720               ‐                   ‐                   ‐                   ‐                   ‐                    ‐          50,839            Highway Impact Fee381                  ‐                   ‐                   ‐                   115                  275                  ‐                   120                  ‐                    ‐          891                 Recreation Impact Fee295                  263                  176                  137                  100                  108                  108                  50                    100                   ‐          1,337              Public Facility Impact Fee 131                   205                   204                   203                   202                   201                   200                   199                   198                   196         1,938              Police Impact Fee 110                   110                   110                   110                   110                   97                     80                     63                     45                     27           861                 TIF District Financing ‐ Proceeds 3,017                8,099                10,560              5,974                6,455                ‐                   ‐                   ‐                   ‐                    ‐          34,106            Trade‐In Generated Revenues3                       4                       3                       4                       4                       4                       4                       4                       4                        4             38                    Other ‐ Open Space, Rents, Facility use fees, Energy etc.670                   630                   725                   1,193                1,248                1,213                1,253                1,048                1,078                978         10,037            TIF District Revenues (Increment) 467                   1,234                1,997                3,206                3,268                3,634                3,616                3,596                3,676                3,665     28,359            Total CIP Revenues23,593             34,463             47,151             26,203             18,464             13,185             13,124             11,044             15,358             9,522     212,107          This page totals all General Fund capital expenditure (CE) costs by summed by cost types and funding sources annually.   Information reflected on this page includes bond payments for prior capital projects.  The City makes cash payments for maintenance and replacement in lieu of debt where possible in order to preserve debt capacity to undertake larger City priorities, i.e. the envisioned City Center.  The General Fund has reserve fund related to capital projects: City Center Reserve Fund, for City Center expenditures. Costs below fall into three categories: project related (studies, property rights, construction, furniture & equipment), debt (payment on financing) and funding CIP reserve funds.  NOTE that this is a program of planned expenditures and revenues and all costs are estimated and time tables are tenative and subject to change.DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Justin RabidouxSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Costs Subtotaled:Studies, Design, Eng., Inspection, GC, Legal 25                      ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    25                    Land/ROW/Easement Acquisition‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                   Construction1,240                1,200                1,450                1,200                1,200                1,150                1,000                1,000                1,000                1,000                11,440             Furniture & Equipment250                   300                   250                   300                   300                   350                   320                   325                   325                   325                   3,045               Bond ObligationsTotal CIP Costs:1,515               1,500               1,700               1,500               1,500               1,500               1,320               1,325               1,325               1,325               14,510             Funding Sources Subtotaled:General Fund1,490                1,500                1,660                1,500                1,500                1,500                1,320                1,325                1,325                1,325                14,445             Grant/Donation/Developer‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                   Secured Bond‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                   Anticipated Bond‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                   Highway Impact Fee‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                   Trade‐In Generated Revenues‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                   Other‐Fueling Station Reserve Fund25                     ‐                    40                     ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    65                     Total Funding Sources:1,515               1,500               1,700               1,500               1,500               1,500               1,320               1,325               1,325               1,325               14,510             The Highway/Parks CIP includes identified maintenance needs throughout the City for general operations and  maintenance such as paving, fleet replacement, a garage and salt/sand shed expansion, replacement of fuel pumps, etc. HIGHWAYSPARKS CIP PROJECTS OVERVIEW:DRAFT SUMMARY PAGES GENERAL FUNDHIGHWAYS OVERVIEW BY EXPENDITURECIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Justin RabidouxChanges from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Paving1,000       1,000       1,000       1,000       1,000       1,000       1,000      1,000            1,000       1,000      10,000   Fleet Replacement250          300          250          300          300          350          320         325                325          325         3,045     Garage Expansion40            ‐           ‐           ‐           ‐           ‐           ‐          ‐                 ‐           ‐          40           Fueling System Replacement25            ‐           250          ‐           ‐           ‐           ‐          ‐                 ‐           ‐          275        Removal of infected ash trees200          200          200          200          200          150          ‐          ‐                 ‐           ‐          1,150     TOTAL ESTIMATED CIP EXPENDITURES:1,515      1,500      1,700      1,500      1,500      1,500      1,320     1,325            1,325      1,325     14,510   0The HIGHWAY/PARKS CIP includes identified maintenance needs to keep current levels of service throughout the City.  These include general operations and highway maintenance such as paving, fleet replacement, a garage and salt/sand expansion, and the replacement of fuel pumps.  0DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Justin RabidouxSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Costs Subtotaled:Studies, Design, Eng., Inspection, GC, Legal ‐               ‐               50                 ‐               315              325              100              369              ‐               ‐               1,159          Land/ROW/Easement Acquisition‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐                4,221           ‐               4,221          Construction‐               ‐               ‐               200              200              ‐                2,596           ‐               ‐               ‐               2,996          Furniture & Equipment‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              Bond ObligationsTotal CIP Costs:‐              ‐              50                200              515              325               2,696          369               4,221          ‐              8,376          Funding Sources Subtotaled:General Fund‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐                            Secured Debt Proceeds (Penny for Path Projects  ‐               ‐               10                 50                 10                 ‐               ‐               ‐               ‐               ‐               70                Grant/Donation/Developer‐               ‐               30                  100              160              ‐               ‐               179               4,121           ‐               4,590          Anticipated Bond‐               ‐               ‐               ‐               ‐               ‐                2,596           ‐               ‐               ‐               2,596          Highway/Road Impact Fee‐               ‐               ‐               ‐               115              275              ‐               120              ‐               ‐               510              Recreation Impact Fee‐               ‐               ‐               ‐               100              ‐               ‐               ‐               ‐               ‐               100              Trade‐In Generated Revenues‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐               ‐              Other‐               ‐               10                 50                  130              50                  100              70                  100              ‐               510              Total Funding Sources:‐              ‐              50                200              515              325               2,696          369               4,221          ‐              8,376          ROAD IMPROVEMENTS CIP PROJECTS OVERVIEW:The Road IMPROVEMENTS CIP projects (not including City Center which are presented seperately) address long range road projects related to transportation studies.  DRAFT SUMMARY PAGES GENERAL FUND ROAD IMPROVEMENTS OVERVIEW BY EXPENDITUREROADS IMPROVEMENTS CIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Justin RabidouxChanges from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Intersection Improvements Airport Parkway‐Lime Kiln  ‐              ‐             50               200             200            ‐              ‐              ‐              ‐              ‐             450           Williston Road Street Improvements (Road)‐              ‐              ‐              ‐              ‐              ‐              100             369             4,221        ‐             4,690        Spear Street Widening (Road)‐              ‐              ‐              ‐              315             325             2,596        ‐              ‐              ‐             3,236        ‐            TOTAL ESTIMATED CIP EXPENDITURES:‐            ‐            50              200           515           325            2,696        369            4,221        ‐            8,376       The Road IMPROVEMENTS CIP projects (not including City Center which are presented seperately) address long range road projects related to transportation studies.  DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Terry FrancisSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Costs Subtotaled:Studies, Design, Eng., Inspection, GC, Legal‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Land/ROW/Easement Acquisition‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Construction59                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     500                    ‐                     559                   Furniture & Equipment10                      414                    792                    69                      774                    1,701                12                      498                    450                    282                    5,002               Debt Repayment216                    212                    208                    205                    201                    197                    194                    ‐                     ‐                     ‐                     1,433               Debt Repayment (WPC Note for Pumper)‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    To Fire/Ambulance Reserve Fund‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Total CIP Costs:285                   626                   1,000               274                   975                   1,898               206                   498                   950                   282                   6,993               Funding Sources Subtotaled:General Fund285                    626                    1,000                274                    975                    1,898                206                    498                    950                    282                    6,993               Fire Impact Fee‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Grant/Donation/Developer‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Secured Bond‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Anticipated Bond‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    ‐                    Trade‐In Generated Revenues‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Other‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Total Funding Sources:285                   626                   1,000               274                   975                   1,898               206                   498                   950                   282                   6,993               The ten‐year projection of capital expenditures for the Fire Department includes replacement costs for all rolling stock, replacement of equipment and gear.FIRE DEPARTMENT CIP PROJECTS OVERVIEW:DRAFT SUMMARY PAGES GENERAL FUNDFIRE DEPARTMENT OVERVIEW BY EXPENDITURECIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Terry FrancisChanges from FY 19‐28 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Communication Tower216           212           208           205           201           197           194           ‐            ‐           ‐                1,433           Vehicle Replacement‐Fire ‐                ‐                740               ‐                730                1,350            12                 40                 40                 40                 2,952           Vehicles‐AMB‐            359           ‐            ‐            ‐            275           ‐            350           350          ‐                1,334           Fire and Ambulance Equipment10                 55                 52                 69                 44                 76                 ‐                108               60                 142               616              Fire Stations59                 ‐                ‐                ‐                ‐                ‐                ‐                ‐                500               100               659              TOTAL ESTIMATED CIP EXPENDITURES:285          626          1,000      274          975          1,898      206          498          950          282         6,993      0FIRE DEPARTMENT:  Vehicle and equiptment replacement schedule and cost estimates for all rolling stock and major equipment assigned to Fire  Department and building improvementsThis excludes note payments and transfers to Reserve Funds (see Costs and Funding Summary).   Specifically replacing staff vehicle0Updated cost estimates/pricingDRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Shawn BurkeSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Estimated Costs Subtotaled:Studies, Design, Engineering, Inspection, GC, Legal‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Land/ROW/Easement Acquisition‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Construction50                      50                      50                      50                      50                      50                      50                      50                      50                      50                      500                   Furniture & Equipment326                    420                    357                    276                    280                    271                    274                    359                    277                    280                    3,120               Current Bond Obligations536                    521                    506                    490                    473                    457                    440                    423                    405                    387                    4,637               Total CIP Costs:912                   991                   913                   816                   803                   778                   764                   832                   732                   717                   8,257               Funding Sources Subtotaled:General Fund (sourced from Property Taxes)389                    467                    390                    292                    279                    267                    270                    355                    273                    276                    3,257               Grant/Donation/Developer‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Secured Bond‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Anticipated Bond‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Police Impact Fee110                    110                    110                    110                    110                    97                      80                      63                      45                      27                      861                   Trade‐In Generated Revenues3                        4                        3                        4                        4                        4                        4                        4                        4                        4                        38                     Other‐Rooms & Meals Tax & 19 Gregory Lease Rev410                    410                    410                    410                    410                    410                    410                    410                    410                    410                    4,100               Total Funding:912                   991                   913                   816                   803                   778                   764                   832                   732                   717                   8,257               The Police Department capital improvement program is almost entirely equipment replacement.  Projections have been made to take into account the normal life cycle of the more expensive equipment utilized in police operations.  Funds are designated for anticipated building repairs and improvements.POLICE CIP PROJECTS OVERVIEW:DRAFT SUMMARY PAGES GENERAL FUNDPOLICE DEPARTMENT OVERVIEW BY EXPENDITURECIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact: Shawn P. BurkeChanges from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Police Station Financing Debt Service536            521            506            490            473            457            440            423            405            387           4,637       Vehicle Replacement163            155            155            188            189            144            147            192            147            150           1,630       Building Stewardship Fund50               50               50               50               50               50               50               50               50               50              500           Taser/Handgun Replacement ‐            35               40               ‐             ‐             ‐             ‐            40               ‐             ‐            115           Security and Building Access Equiptment65               ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            65             Communications, Computers, Electronics98               230            162           88               91               127            127            127            130            130           1,310       TOTAL ESTIMATED CIP EXPENDITURES:912            991            913            816            803            778            764            832            732            717           8,257       0The POLICE DEPARTMENT capital improvement program is almost entirely equipment replacement.  Projections have been made to take in to account the normal life cycle of the more expensive equipment utilized in police operations.  Funds are designated for anticipated building repairs and improvements.0DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Holly ReesSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Estimated Costs Subtotaled:Studies, Design, Engineering, Inspection, GC, Leg‐                     100                    ‐                     50                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     150                   Land/ROW/Easement Acquisition‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Construction460                    655                    210                    165                    765                    250                    ‐                     ‐                     ‐                     ‐                     2,505               Furniture & Equipment40                      95                      70                      ‐                     ‐                     50                      ‐                     ‐                     ‐                     60                      315                   Bond Obligations‐                    Debt Payment‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Total CIP Costs:500                   850                   280                   215                   765                   300                   ‐                    ‐                    ‐                    60                     2,970               Funding Sources Subtotaled:General Fund (sourced from Property Taxes)275                    685                    210                    150                    250                    50                      ‐                     ‐                     ‐                     60                      1,680               Grant/Donation/Developer‐                     ‐                     ‐                     50                      100                    ‐                     ‐                     ‐                     ‐                     ‐                     150                   Secured Debt Proceeds (Open Space Projects Fun‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Anticipated Debt Proceeds‐                     ‐                     ‐                     ‐                     400                    250                    ‐                     ‐                     ‐                     ‐                     650                   Recreation Impact Fee195                    150                    10                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     355                   Trade‐In Generated Revenues‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Other‐Facility Use fees30                      15                      60                      15                      15                      ‐                     ‐                     ‐                     ‐                     ‐                     135                   Total Funding Sources500                   850                   280                   215                   765                   300                   ‐                    ‐                    ‐                    60                     2,970               The Recreation & Parks Department is responsible for planning for future active and passive recreational needs for the community, including the purchase and development of additional land for parks, and expanding and improving facilities and equipment.  RECREATION & PARKS PROJECTS OVERVIEW:DRAFT SUMMARY PAGES GENERAL FUNDRECREATION AND PARKS OVERVIEW BY EXPENDITURERECREATION AND PARKS CIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Holly ReesChanges from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:145             125            ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐             270           35               ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐             35             ‐              ‐              ‐             50               500             250            ‐              ‐              ‐              ‐             800           10               ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐             10             15               ‐             45               ‐              ‐              ‐              ‐              ‐              ‐              ‐             60             20               ‐              ‐              ‐              ‐             50               ‐              ‐              ‐              ‐             70             ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐             60              60             ‐              500            ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐             500           120            ‐              ‐              ‐              100            ‐              ‐              ‐              ‐              ‐             220           ‐              ‐             50               ‐              ‐              ‐              ‐              ‐              ‐              ‐             50             ‐              ‐              150             150             150            ‐              ‐              ‐              ‐              ‐             450           15               15               15               15               15               ‐              ‐              ‐              ‐              ‐             75             ‐             15               ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐             15             60               ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐             60             ‐              100            ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐             100           30               70               10               ‐              ‐              ‐              ‐              ‐              ‐              ‐             110           50               25               10               ‐              ‐              ‐              ‐              ‐              ‐              ‐             85             TOTAL ESTIMATED CIP EXPENDITURES:500           850           280           215           765           300           ‐            ‐            ‐            60             2,970       Fleet ReplacementDog Park‐ AmmenitiesRecrowning of Athletic Fields at VetBaseball Field Dugout ReplacementVeteran Memorial Park UpgradesVet Memorial Basketball CourtsParks System Master PlanIrrigation System UpgradesJaycee Park Neighborhood FacilityBleacher ReplacementJaycee Park ImprovementsSzymanski Park ImprovementsFarrell Playground ReplacementRed Rocks Facility ReplacementWheeler House ImprovementsOverlook Park0The Recreation & Parks Department is responsible for planning for future active and passive recreational needs for the community, including the purchase and development of additional land for parks, as well as  maintaining, expanding and improving facilities and equipment.  0South Village Soccer FieldDRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Ashley ParkerSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Estimated Costs Subtotaled:Studies, Design, Engineering, Inspection, GC, Leg220                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     220                   Land/ROW/Easement Acquisition‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Construction359                    350                    57                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     766                   Furniture & Equipment‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Bond Obligations‐                    Debt Payment125                    125                    125                    125                    125                    125                    125                    ‐                     ‐                     ‐                     876                   Total CIP Costs:704                   475                   182                   125                   125                   125                   125                   ‐                    ‐                    ‐                    1,862               Funding Sources Subtotaled:General Fund (sourced from Property Taxes)‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    ‐                    Secured Debt Proceeds (Penny for Path)50                      75                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     125                   ‐                    Grant/Donation/Developer5                         ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     5                       Secured Debt Proceeds (Open Space Projects Fun474                     200                     57                       ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     731                   Anticipated Debt Proceeds‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    ‐                    ‐                    Recreation Impact Fee50                      75                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     125                   ‐                    ‐                    ‐                    Trade‐In Generated Revenues‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Open Space Funds125                    125                    125                    125                    125                    125                    125                    ‐                     ‐                     ‐                     876                   Total Funding Sources704                   475                   182                   125                   125                   125                   125                   ‐                    ‐                    ‐                    1,862               OPEN SPACE CIP PROJECTS OVERVIEW:The Recreation & Parks Department is responsible for planning for future active and passive recreational needs for the community, including the purchase and development of additional land for parks, as well as  maintaining, expanding and improving facilities and equipment. DRAFT SUMMARY PAGES GENERAL FUNDOPEN SPACE PROJECTS OVERVIEW BY EXPENDITUREOPEN SPACE CIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Ashley ParkerChanges from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Open Space Debt Payment125             125             125             125             125             125             125            ‐              ‐              ‐             876           Underwood Property 270             225            17               ‐              ‐              ‐              ‐              ‐              ‐             ‐             512           Red Rocks Improvements 159            75               20               ‐              ‐              ‐              ‐              ‐              ‐              ‐             254           Wheeler Homestead & Nature Park Upgrades 150            50               20               ‐              ‐              ‐              ‐              ‐              ‐             ‐             220           TOTAL ESTIMATED CIP EXPENDITURES:704           475           182           125           125           125           125           ‐            ‐            ‐            1,862       0The Recreation & Parks Department is responsible for planning for future active and passive recreational needs for the community, including the purchase and development of additional land for parks, as well as  maintaining, expanding and improving facilities and equipment. 0DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Ashley ParkerSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Estimated Costs Subtotaled:Studies, Design, Eng., Inspection, GC, Legal 290                   130                   189                   125                   ‐                   208                   208                   50                     ‐                   ‐                  1,200                 Land/ROW/Easement Acquisition ‐                   20                     50                     ‐                   ‐                   ‐                   50                     50                     ‐                   ‐                   170                  Construction 440                   476                   400                   1,349               449                   808                   581                   831                   940                   ‐                   6,274              Furniture & Equipment ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  Total CIP Costs:730                  626                  639                  1,474              449                  1,016              839                  931                  940                  ‐                   7,644             Funding Sources Subtotaled:General Fund (sourced from Property Taxes) ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                  Secured Debt Proceeds (Penny for Path Fund) 530                   358                   153                   250                   160                   100                   200                   230                   150                   ‐                   2,131              ‐                  Grant/Donation/Developer 150                   230                   320                   1,087               289                   808                   531                   651                   690                   ‐                   4,756              Secured Debt Proceeds ‐                  Bond_Future ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  ‐                  Highway Impact Fee ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  Recreation Impact Fee 50                     38                     166                   137                   ‐                   108                   108                   50                     100                   ‐                   757                  ‐                  ‐                  ‐                  Trade‐In Generated Revenues ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                  Other ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   ‐                   Total Funding Sources:730                  626                  639                  1,474              449                  1,016              839                  931                  940                  ‐                   7,644             The BIKE/PED IMPROVEMENT CIP projects (not including those listed as part of the City Center, Open Space and Roads CIP that are listed separately) address identified facility needs in the City's bicycle and pedestrian transportation and recreational infrastructure.  BIKE/PEDS IMPROVEMENT CIP PROJECTS OVERVIEW: GENERAL FUNDBIKE/PED IMPROVEMENTS OVERVIEW BY EXPENDITUREBIKE/PED IMPROVEMENTS CIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Ashley ParkerChanges from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Williston Road Crosswalk Locations (TBD) 150            150            ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            300           Allen Rd. Shared Use Path (Upper) 100            100            ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            200           S. Dorset Street Shared Use Path 100            50               350            360            ‐             ‐             ‐             ‐             ‐             ‐            860           Kennedy Dr/Twin Oaks Crosswalk 100            10               ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            110           Spear Street Jug Handle Sidewalk 100            ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            100           Hinesburg Road Crosswalk Locations 80               30               ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            110           Airport Drive/Parkway Sidewalk & On‐Road Bike Lanes to Lime Kiln Road40               186            ‐             ‐             ‐             100            100            300            300            ‐            1,026       RRFB Upgrades 30               ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            30             Dorset Street Barriers 20               ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            20             City Rec Path Wayfinding Project 10               ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            10             Spear Street Bike/Ped Improvements ‐             50               100            500            ‐             ‐             50               100            300            ‐            1,100       Queen City Park Road Sidewalk ‐             50               50               ‐             ‐             ‐             ‐             ‐             ‐             ‐            100           Kimball Avenue Shared Use Path ‐             ‐             66               304            159            ‐             ‐             ‐             ‐             ‐            529           Hinesburg Rd Bike Facilities ‐             ‐             50               50               150            250            ‐             ‐             ‐             ‐            500           Shelburne Rd Crosswalk Imp ‐             ‐             23               93               ‐             ‐             ‐             ‐             ‐             ‐            116           Allen Rd. Sidewalks (Lower) ‐             ‐             ‐             167            140            ‐             ‐             ‐             ‐             ‐            307           Shelburne Road Ped/Bike Facilities ‐             ‐             ‐             ‐             ‐             58               289            231            ‐             ‐            578           Queen City Park Road Shared Use Path ‐             ‐             ‐             ‐             ‐             50               250            ‐             ‐             ‐            300           Vale to Spear/Swift Streets  Path ‐             ‐             ‐             ‐             ‐             558            ‐             ‐             ‐             ‐            558           Spear Street/UVM Bike/Ped Infrastructure ‐             ‐             ‐             ‐             ‐             ‐             150            300            340            ‐            790           ‐           TOTAL ESTIMATED CIP EXPENDITURES:730            626            639            1,474        449            1,016        839            931            940            ‐           7,644       The BIKE/PED IMPROVEMENT CIP projects (not including those listed as part of the City Center, Open Space and Roads CIP that are listed separately) address identified facility needs in the City's bicycle and pedestrian transportation and recreational infrastructure.   OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Al ReedSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Estimated Costs Subtotaled:Studies, Design, Engineering, Inspection, GC, Legal‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Land/ROW/Easement Acquisition‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Construction‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Furniture & Equipment29                      35                      30                      63                      37                      66                      37                      31                      65                      39                      432                   ‐                    Anticipated Debt Repayment‐                    Debt Repayment ‐ 19 Gregory Fit UP‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Public Art‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Total CIP Costs:29                     35                     30                     63                     37                     66                     37                     31                     65                     39                     432                   Funding Sources Subtotaled:General Fund29                      35                      30                      63                      37                      66                      37                      31                      65                      39                      432                                       Grant_Donation_Developer Contribution‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Bond_Existing‐                     ‐                    Bond_Future‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    ‐                     ‐                    Trade‐In Generated Revenues‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    19 Gregory Drive Lease Payment‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Total Funding Sources29                     35                     30                     63                     37                     66                     37                     31                     65                     39                     432                   IT CIP PROJECTS OVERVIEW:IT projects include purchase of computers for new employees, and replace and upgrade computers that have reached End of Life. Replacement of existing servers as they reach End of Life.  Includes all departments except Police Department.DRAFT SUMMARY PAGES GENERAL FUNDIT OVERVIEW BY EXPENDITURECIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Changes from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:IT Hardware17             17             18             18             18             19             19             19             20             20            185         Servers12             18             12             45             19             47             18             12             45             19            247         TOTAL ESTIMATED CIP EXPENDITURES:29             35             30             63             37             66             37             31             65             39            432         IT capital projects  DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Varies, see indiv sheetsSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Project  ten‐years:Financing ten‐years:Estimated Costs Subtotaled:Studies, Design, Engineering, Inspection, GC, Legal186                 1,652              2                       122                 2                      2                      2                      2                      2                      2                       1,974              Land/ROW/Easement Acquisition‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  Construction6,003              11,033           20,018           6,018              18                   18                   18                   18                   18                   18                    43,180           Furniture & Equipment‐                  700                 ‐                  2,600              ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  3,300              Debt Repayment 336                 1,062              1,062              1,630              1,630              1,630              1,630              1,630              1,630              1,630              13,871          To CIP Reserve FundTotal CIP Costs:6,525             14,447          21,082          10,370          1,650             1,650             1,650             1,650             1,650             1,650             48,454          13,871          Funding Sources Subtotaled:General Fund5                      35                   20                   20                   20                   20                   20                   20                   20                   20                   200                 Reserve Fund303                 956                 956                 956                 956                 956                 956                 956                 956                 956                 8,906             Grant_Donation_Developer Contribution‐                  ‐                  1,000              1,000              ‐                  ‐                  ‐                  ‐                  ‐                  2,000              Bond_ExistingCity Debt Proceeds6,184              13,350           19,000           7,720              ‐                  ‐                  ‐                  ‐                  ‐                  ‐                   46,254           ‐                  Public Facility Impact Fee34                   106                 106                 106                 106                 106                 106                 106                 106                 106                 990                Trade‐In Generated Revenues‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  ‐                  Other‐                  ‐                  ‐                  568                 568                 568                 568                 568                 568                 568                 3,976             Total Funding Sources6,525             14,447          21,082          10,370          1,650             1,650             1,650             1,650             1,650             1,650             48,454          13,871          ADMINISTRATION CIP PROJECTS OVERVIEW:The Administration portion of the CIP includes the expenses for the fit‐up of 19 Gregory and public art for the new city center.DRAFT SUMMARY PAGES GENERAL FUNDADMINISTRATION OVERVIEW BY EXPENDITURECIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Changes from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Indoor Recreation Facility6,184        13,350     ‐            ‐            ‐            ‐            ‐            ‐            ‐            ‐           19,534    Public Art5                35             20             20             20             20             20             20             20             20            200         Performing Arts Facility‐            ‐            20,000      8,720       ‐            ‐            ‐            ‐            ‐            ‐           28,720    TOTAL ESTIMATED CIP EXPENDITURES:6,189       13,385     20,020    8,740      20             20             20             20             20             20            48,454    ADMINISTRATION includes capital projects managed by the City Manager's Office but excluding those in City Center, Parks, and recreation paths and sidewalks.The indoor recreation facility has been moved from the City Center portion of the CIP to the Administration.  DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEBOND OBLIGATIONS CIP PROJECT:Department Contact:  City Manager's Office ‐ Tom HubbardFINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Estimated Costs:Studies, Design, Engineering, Inspection, GC, Legal‐                    Land/ROW/Easement Acquisition‐                    Construction‐                   Furniture & Equipment ‐                    Bond Obligations193                   88                     84                     81                     77                     ‐                    ‐                    ‐                    ‐                    523                   TOTAL ESTIMATED COSTS:193                  88                    84                    81                    77                    ‐                   ‐                   ‐                   ‐                   ‐                   523                  Funding Sources:General Fund (sourced from Property Taxes)193                   88                     84                     81                     77                     ‐                    ‐                    ‐                    ‐                    ‐                    523                  ‐                    Grant/Donation/Developer Contribution‐                    Bond_Existing‐                    Bond_Future‐                    ‐                    ‐                    ‐                    ‐                    Trade‐In Generated Revenues‐                    Other‐                    TOTAL FUNDING SOURCES:193                  88                    84                    81                    77                    ‐                   ‐                   ‐                   ‐                   ‐                   523                  Includes all bond obligations for which there are no other sources of funding.  This includes the Public Works Facility (2000), Emergency Communications (2003), Dorset Street Fire Station Improvements (2004), Kennedy Drive (2004), Lime Kiln Bridge Replacement (2004). It excludes the Police Station which has funding sourced from impact fees and local option tax and is shown within the Police Department portion of the Capital Improvement Program and the 2017 TIF District Bond which is shown on the City Center portion.  DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Library‐Jennifer MurraySUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Estimated Costs Subtotaled:Studies, Design, Engineering, Inspection, GC, Lega‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Land/ROW/Easement Acquisition‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Construction‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Furniture & Equipment‐                     ‐                     110                    ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     110                   ‐                    ‐                    ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Total CIP Costs:‐                    ‐                    110                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    110                   Funding Sources Subtotaled:General Fund‐                     ‐                     60                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     60                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Grant_Donation_Developer Contribution‐                     ‐                     50                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     50                     Bond_Existing‐                    Bond_Future‐                    ‐                    ‐                    Trade‐In Generated Revenues‐                    19 Gregory Drive Lease Payment‐                    Total Funding Sources‐                    ‐                    110                   ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    ‐                    110                   Replace the Bookmobile in order to coninue providing library materials to summer camps and special events, and begin delivery to housing for older adults.LIBRARY CIP PROJECTS OVERVIEW:DRAFT SUMMARY PAGES GENERAL FUNDLIBRARY OVERVIEW BY EXPENDITURECIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Changes from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Bookmobile replacement‐            ‐            110           ‐            ‐            ‐            ‐            ‐            ‐            ‐           110         ‐          TOTAL ESTIMATED CIP EXPENDITURES:‐           ‐           110         ‐           ‐           ‐           ‐           ‐           ‐           ‐          110         Library ‐Replace the Bookmobile in order to coninue providing library materials to summer camps and special events, and begin delivery to housing for older adults.Intention that BKM will last through summer 2020. Fundraising for new book van will begin in FY21 towards a purchase in FY 22.  DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCEDepartment Contact:Lou BreseeSUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Estimated Costs Subtotaled:Studies, Design, Engineering, Inspection, GC, Leg170                     110                     10                       ‐                     ‐                     10                      ‐                     ‐                     ‐                     ‐                     300                   Land/ROW/Easement Acquisition‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Construction100                    950                    300                    50                      ‐                     50                      50                      ‐                     ‐                     ‐                     1,500               Furniture & Equipment‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Bond Obligations‐                    Debt Payment‐                    Total CIP Costs:270                   1,060               310                   50                     ‐                    60                     50                     ‐                    ‐                    ‐                    1,800               Funding Sources Subtotaled:General Fund (sourced from Property Taxes)‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    ‐                    Current Bond‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                    Solar Credits Funds90                      170                    100                    ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     360                   Sewer Fund70                      770                    120                    25                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     985                                       Anticipated Debt Proceeds30                      40                      10                      ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     ‐                     80                     ‐                    Recreation Impact Fee‐                                        Other ‐ Energy Revolving Fund80                      80                      80                      25                      ‐                     60                      50                      ‐                     ‐                     ‐                     375                   ‐                    Total Funding Sources270                   1,060               310                   50                     ‐                    60                     50                     ‐                    ‐                    ‐                    1,800               ENERGY CIP PROJECTS OVERVIEW:These projects are designed to reduce both the cost and use of energy in the City. The funds include study contracts and implementation costs if the studies indicate an appropriate benefit.DRAFT SUMMARY PAGES GENERAL FUNDENERGY PROJECTS OVERVIEW BY EXPENDITURECIP PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:Lou BreseeChanges from FY 2019‐2028 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Facility Stewardship60            50            ‐           ‐           ‐           60            50            ‐            ‐           ‐          220        Adaptive Signal Control110          110          110          50            ‐           ‐           ‐           ‐            ‐           ‐          380        Sewer Outfall Turbine100          900          200          ‐           ‐           ‐           ‐           ‐            ‐           ‐          1,200     ‐         TOTAL ESTIMATED CIP EXPENDITURES:270         1,060     310        50            ‐          60            50            ‐           ‐          ‐         1,800     0ENERGY PROJECTS CIP: These projects are designed to reduce both the cost and use of energy in the City. The funds include study contracts and implementation costs if the studies indicate an appropriate benefit.0DRAFT SUMMARY PAGES OVERVIEW OF GENERAL FUNDCAPITAL IMPROVEMENT PROGRAM EXPENDITURES TOTALED BY EXPENDITURE COSTS AND FUNDING SOURCECITY CENTER CIP PROJECTS OVERVIEW:Department Contact:Economic & Community Development/Ilona BlanchardSUMMARY FINANCIALS  (in $1,000)Prior YearsFY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Reserve ten‐years:Project  ten‐years:Financing ten‐years:Estimated Costs Subtotaled:Studies, Design, Eng., Insp., GC, Legal5,775                 2,449            1,802            2,190            938               585               ‐              ‐               ‐              ‐               ‐               7,964       1,092                 ‐                ‐                ‐                ‐                ‐                ‐              ‐               ‐              ‐               ‐               ‐           Construction21,128               6,382            8,880            14,718          5,036            5,870            ‐              ‐               ‐              ‐               ‐               40,886     Furniture & Equipment‐                     802               ‐                ‐                ‐                ‐                ‐              ‐               ‐              ‐               ‐               802          ‐           City Debt Service583                    971               989                1,005            995               985               972             961              952             939              924              9,693       TIF District Debt Service390                    467                1,234            1,997            3,206            3,268            3,634          3,616          3,596          3,676           3,665           28,359     To City Center CIP Reserve Fund3,821                 860               860               860               860               860               860             860              860             860              860              8,600        8,600       38,053    Total Project Costs (Estimated): 28,578               9,633           10,682         16,908         5,974           6,455           ‐             ‐              ‐              ‐              ‐               49,652    Funding Sources Subtotaled:General Fund3,821                 860               860               860               860               860               860             860              860             860              860              8,600        City Center CIP Reserve Fund589                     1,637            890               907               899               889               877             867              859             847              834              763           8,745       Grant, Capital Campaign, Developer Contribution6,155                 1,237            2,583            5,997            ‐                ‐                ‐              ‐               ‐              ‐               ‐               9,818       ‐           City Debt Proceeds10,756               4,234            ‐                350               ‐                ‐                ‐              ‐               ‐              ‐               ‐               4,585       Highway Impact Fee1,780                 381               ‐                ‐                ‐                ‐                ‐              ‐               ‐              ‐               ‐               381          Recreation Impact Fee110                    ‐                ‐                ‐                ‐                ‐                ‐              ‐               ‐              ‐               ‐               ‐            ‐           Public Facility Impact Fee‐                     97                  99                  98                  97                  96                  95               94                93                91                90                 949          TIF District Financing Proceeds9,032                 3,017            8,099            10,560          5,974            6,455            ‐              ‐               ‐              ‐               ‐               34,106     Trade‐In Generated Revenues‐           Other156                    ‐                ‐                ‐                ‐                ‐                ‐              ‐               ‐              ‐               ‐               ‐            ‐           TIF District Revenues (Increment)390                    467                1,234            1,997            3,206            3,268            3,634          3,616          3,596          3,676           3,665           28,359     Total Project Funding:28,578               9,633           10,682         16,908         5,974           6,455           ‐             ‐              ‐              ‐              ‐              49,652    Total Debt Service:390                    1,438           2,222           3,002           4,202           4,253           4,606         4,577         4,548         4,615          4,589          38,053    Total Reserve Funding Sourced From General Fund3,821                 860               860               860               860               860               860            860             860             860             860              8,600       Summary of costs and expenditures for TIF District elibible capital City Center projects including stormwater/wetland impact mitigation.  FY19 includes the Market Street construction,  and design for Garden Street (may also be construction),  Library and City Hall, Wlliston Road Streetscape, and a pedstrian bicycle facility over I‐89/Exit 14. Funding is a mix of TIF Financing, Reserve Funds, Impact Fees and anticipated or secured debt.  Grants are included for Market Street (secured), Williston Road Streetscape (secured) and the pedstrian bridge over I‐89 (unsecured).  Capital campaigns are also be required for building projects.DRAFT SUMMARY PAGES GENERAL FUNDCITY CENTER OVERVIEW BY EXPENDITURECITY CENTER PROJECTS OVERVIEW:Total Estimated Revenues:Total Estimated Savings:Department Contact:   Ilona BlanchardChanges from FY 2020‐2029 CIP:SUMMARY CIP EXPENDITURES  (in $1,000) Prior YearsFY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total*Library, Senior Center, City Hall15,577             6,510            ‐               ‐               ‐                  ‐               ‐               ‐               ‐               ‐               ‐               6,510        Williston Road Streetscape316                 142               951               1,051           ‐                  ‐               ‐               ‐               ‐               ‐               ‐               2,144        Garden Street795                  1,560            5,182           ‐               ‐                  ‐               ‐               ‐               ‐               ‐               ‐               6,743        Pedestrian/Bicycle Access at I‐89 Exit 14180                  1,300            2,979           8,568           ‐                  ‐               ‐               ‐               ‐               ‐               ‐               12,847     City Center Park1,233               ‐                ‐               190              1,032              ‐               ‐               ‐               ‐               ‐               ‐               1,222        Urban Park & Festival Streets‐                  ‐                300               3,249           813                  ‐               ‐               ‐               ‐               ‐               ‐               4,362        Parking Garage‐                  ‐                170               2,750           3,140              6,315           ‐               ‐               ‐               ‐               ‐               12,375     Stormwater & Wetland Mitigation‐                  120                1,100           1,100           990                  140              ‐               ‐               ‐               ‐               ‐               3,450        Market Street9,893               ‐                ‐               ‐               ‐                  ‐               ‐               ‐               ‐               ‐               ‐               ‐            PROJECT TOTAL EXPENDITURES:27,995        9,633          10,682     16,908     5,974            6,455        ‐             ‐             ‐             ‐             ‐            49,652     NOTES:  * Total excludes prior years; the estimated total expenditure for all years (prior & future) is:77,647$        See City Center Grand Total forTransfers from the General Fund to the Reserve Fund.0CITY CENTER:  Expenditures are proposed in FY2021 for the construction of a  Library, Senior Center and City Hall, reinitiated design for Garden Street and potential construction, continued engineering (ROW acquisition/final design) for the streetscape on the south side of Williston Road.   A placeholder for expenditures for  design costs related to a pedestrian/bicycle improvement at Exit 14 and Phase II of City Center Park is included.  Funding is a mixture of reserve funds, impact fees, grants, capital campaigns, and debt proceeds backed by TIF District increment, reserve funds, and impact fees.  See the Grand Total City Center CIP page or individual project pages for fund source breakdown.  All TIF Debt must be incurred by March 30, 2022 in FY 22.0Project expenditures reflect best information available.  DRAFT SUMMARY PAGES II. SEWERDRAFT SUMMARY PAGES SEWERCAPITAL IMPROVEMENT PROGRAM EXPENDITURES AGGREGATED BY COSTS AND FUNDING SOURCECIP PROJECTS OVERVIEW:Department Contact:SUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Costs Subtotaled:Current Bond Payments 1,272         1,272         1,272         1,272         1,272         1,272         1,272         1,272         1,272         1,272        12,721     Studies, Design, Eng., Inspection, GC, Legal450            450            350            150           50               ‐             ‐             ‐             ‐             ‐            1,450       Land/ROW/Easement Acquisition‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            ‐            Construction260            280            3,430         9,500         7,900         1,850        700            500            200           ‐            24,620     Furniture & Equipment (Fleet Purchase)40               70               135           80               ‐            75               ‐            80               ‐             ‐            480           Revolving Loan Repayment (New BB & Kennedy 3)‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            0‐            Total CIP Costs:2,022       2,072       5,187        11,002     9,222       3,197       1,972       1,852       1,472       1,272       39,271     Funding Sources Subtotaled:Colchester portion of Airport Parkway Bond742            742            742            742            742            742            742            742            742            742           7,423       State Revolving Loan Fund250            470            580            9,650         7,750         1,850        500            500           ‐            21,550     Sewer Fund (Raised by Fees)1,030        860            3,865        610            730            605            730            610            730           53010,298     Total Funding Sources:2,022        2,072        5,187        11,002     9,222        3,197        1,972        1,852        1,472        1,272       39,271     Sewer Capital Expenditures are replacement and maintenance based to keep levels of service consistant, improve the quality of service or reduce maintenance costs from year to year.  Capital Expenditures related to Barlett Bay  upgrades may include a capacity expansion  to meet future demand increases.Justin Rabidoux | Public WorksDRAFT SUMMARY PAGES SEWERCAPITAL IMPROVEMENT PROGRAM EXPENDITURES AGGREGATED BY COSTS AND FUNDING SOURCECIP PROJECTS OVERVIEW:Department Contact:Justin RabidouxChanges from FY 2018‐2027SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Fleet Replacement40              70              135            80               ‐             75               ‐             80              ‐                 ‐                   480                 Airport Parkway Outfall50              270          230            ‐              ‐              ‐              ‐              ‐             ‐                 ‐                   550                 Bartlett Bay Updgrade400           400           3,200          8,000          6,000         ‐              ‐              ‐             ‐                 ‐                   18,000           Hinesburg Rd. PS and Dorset St. FM ‐            ‐            100             150             1,750          1,700         ‐              ‐             ‐                 ‐                   3,700              Lane Press Pump Station & Force Main‐            ‐           50               1,500         ‐              ‐              ‐              ‐             ‐                 ‐                   1,550              Inflow & Infiltration Reduction‐            ‐           ‐              ‐              ‐              150            ‐              ‐             ‐                 ‐                   150                 Gravity Sleeves‐            ‐           ‐              ‐              ‐              ‐              500             500            ‐                 ‐                   1,000              Pump Station Telemetry60              60              ‐              ‐              ‐              ‐              ‐              ‐             ‐                 ‐                   120                 Pump Station Upgrades 200           ‐            200            ‐              200            ‐              200            ‐             200                ‐                   1,000              TOTAL ESTIMATED CIP EXPENDITURES:750           800           3,915        9,730        7,950        1,925        700           580           200               ‐                  26,550           Sewer Capital Expenditures are replacement and maintenance based to keep levels of service consistant, improve service quality or reduce maintenance costs from year to year.  Capital Expenditures related to Barlett Bay  upgrades may include a capacity expansion to meet future demand increases.NoneDRAFT SUMMARY PAGES III. STORMWATERDRAFT SUMMARY PAGES STORMWATERCAPITAL IMPROVEMENT PROGRAM EXPENDITURES  AGGREGATED BY COSTS AND FUNDING SOURCECIP PROJECTS OVERVIEW:Department Contact:SUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Costs Subtotaled:Current Note‐                Studies, Design, Eng., Inspection, GC, Legal‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            ‐                Land/ROW/Easement Acquisition‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            ‐                Construction1,481         1,930         1,250         1,000         1,576         2,047         2,000         2,200         2,000         2,000        17,484          Furniture & Equipment56              4                 306            254           ‐             ‐             ‐             ‐             ‐             ‐            620               To Reserve Fund115            115            115            520            150            200            200            200            200            200           2,015            Total Storm Water CIP Costs:1,652       2,049       1,671       1,774       1,726       2,247       2,200       2,400       2,200       2,200       20,119          Funding Sources Subtotaled:Reserve Fund61              9                 366            574           70               120            120            120            200            200           1,840            Grant_Donation_Developer Contribution725            819            324            250            125            125            125            125            125            125           2,868            TIF District Financing‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐             ‐            ‐                Other‐ Revenues (Water repayment)‐             ‐             ‐             ‐            80               80               80               80               ‐             ‐            320               Other‐Shelburne Intermunicipal Agreement80               80               80               80               80               80               80               80               80               80              800               Stormwater Fund (Raised by Stormwater Fees)786            1,141        901            870            1,371         1,842         1,795         1,995         1,795         1,795        14,291          Total Identified Stormwater Funding Sources:1,652       2,049       1,671       1,774       1,726       2,247       2,200       2,400       2,200       2,200       20,119          The Stormwater CIP includes upgrades to the Stormwater management capacity of the City, specialized fleet vehicles used in maintenance operations. Funding is a mix of Stormwater Fund (raised by fees), reserve funds, grants and special assessments.Justin RabidouxDRAFT SUMMARY PAGES STORMWATERCAPITAL IMPROVEMENT PROGRAM EXPENDITURE (BY PROJECT)CIP PROJECTS OVERVIEW:Department Contact:Justin RabidouxChanges from FY 2018 ‐2027 CIP:SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Fleet Replacement171           119             421             774               150            200            200            200            200            200            2,635          Stormwater Projects1,481       1,930          1,250          1,000            1,576         2,047        2,000        2,200        2,000         2,000        17,484        ‐              TOTAL ESTIMATED CIP EXPENDITURES:1,652       2,049          1,671          1,774            1,726         2,247        2,200        2,400        2,200         2,200        20,119        The Stormwater CIP includes upgrades to the Stormwater management capacity of the City and specialized fleet vehicles used in maintenance operations.  Funding is a mix of Stormwater Fund (raised by fees), grants and special assessments , and reserve funds.NoneDRAFT SUMMARY PAGES IV. WATERDRAFT SUMMARY PAGES WATERCAPITAL IMPROVEMENT PROGRAM EXPENDITURES AGGREGATED BY COSTS AND FUNDING SOURCECIP PROJECTS OVERVIEW:Department Contact:SUMMARY FINANCIALS  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:Costs Subtotaled:Current Bond Payments 138            112            107            102           97              557           Studies, Design, Eng., Inspection, GC, Legal33               ‐             ‐            43               20               ‐             ‐             ‐             ‐             ‐            96             Land/ROW/Easement Acquisition‐             ‐             ‐            10               ‐             ‐             ‐             ‐             ‐             ‐            10             Construction123            490           ‐             300            300            150           ‐             ‐             ‐             ‐            1,363       Furniture & Equipment‐             ‐             ‐             ‐             ‐             ‐            40               ‐             ‐             ‐            40             Revolving Loan Repayment (New BB)‐             ‐             ‐             ‐            80               80               80               80               ‐             ‐            320           Total CIP Costs:294            602            107            455            497            230            120           80              ‐             ‐            2,386       Funding Sources Subtotaled:‐            State Revolving Loan Fund‐Interfund borrowing‐             ‐             ‐             320            300           ‐             ‐             ‐             ‐            620           Water Fund (Raised by Fees) 294            602            107            135            197            230            120           80               ‐             ‐             1766Total Funding Sources:294            602            107            455            497            230            120           80              ‐             ‐            2,386       Water Capital Expenditures are maintenance, replacement, or improvement based to sustain or improve levels of service, improve the quality of service or, reduce maintenance costs from year to year.Justin Rabidoux | Public WorksDRAFT SUMMARY PAGES WATERCAPITAL IMPROVEMENT PROGRAM EXPENDITURES AGGREGATED BY COSTS AND FUNDING SOURCECIP PROJECTS OVERVIEW:Department Contact:Justin RabidouxChanges SUMMARY CIP EXPENDITURES  (in $1,000)FY 21FY 22FY 23FY 24FY 25FY 26FY 27FY 28FY 29FY 30Total:High Service 2 By‐Pass5                   50                 ‐              ‐              ‐              ‐              ‐              ‐              55               AMR & Meter Replacement123             90                 ‐              213             Dorset Street East Tank Booster Station‐              ‐              ‐              353             380             80                 120             80                 ‐              1,013         National Guard Avenue PRV Vault‐              ‐              ‐              ‐              20                 150             ‐              ‐              170             U‐Mall Flow Control Valve Vault20                 150             ‐              ‐              ‐              ‐              ‐              ‐              ‐              170             Dorset to Spear Interstate Crossing Line8                   200             ‐              ‐              ‐              ‐              ‐              ‐              ‐              ‐              208             ‐             ‐             ‐             ‐             ‐             TOTAL ESTIMATED CIP EXPENDITURES:156             490             ‐             353             400             230             120             80               ‐             ‐             1,829         Water Capital Expenditures are replacement, maintenance, and improvement based to keep levels of service consistent, improve service quality or reduce maintenance costs from year to year.NoneDRAFT SUMMARY PAGES