HomeMy WebLinkAboutSP-87-0000 - Decision - 0085 Meadowland DriveFINDINGS OF FACT
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of Orchard Lake Road
Properties, for construction of a 96,200 square foot
manufacturing facility at 1020 Hinesburg Road.
On the 25th of August 1987, the South Burlington Planning
Commission approved the request of Orchard Lake Road Properties
for site plan approval under Section 19.10 of the South
Burlington Zoning Regulations based on the following findings:
1. TRAFFIC ACCESS: A 30 foot wide access drive is shown from
the Driveway to Lane Press. Future access will be obtained from
the proposed extension of Swift Street. The intersection of the
Lane Press Road/Orchard Lake property road and Swift shall be
made at a right angle upon construction of Swift Street. This
revision shall be paid for by the developer and bonded prior to
permit. The amount of the bond shall be determined by the City
Engineer.
2. CIRCULATION AND PARKING: Circulation is shown around the
northwest and southwest of the building. The plans show 155
spaces which are adequate; the ordinance requires 100 for this
project.
3. LANDSCAPING & SCREENING: A $52,500 landscaping bond shall be
posted prior to permit. The plans must be revised prior to
permit to reflect this amount.
4. TRAFFIC: A $7968 contribution to the Hinesburg Road
intersection improvement fund shall be paid prior to permit based
on 125 peak hour trip ends. The width of the pavement at the
intersection of Hinesburg Road and the project is adequate to not
require extra turning lanes.
5. A 3170 gallon per day sewer allocation is granted and $2.50
per gallon shall be paid prior to permit. No permits shall be
issued until capacity is available.
6. The building permit shall be obtained within 6 months or this
approval is null and vdid.,-
Chairman,