HomeMy WebLinkAboutSP-95-0000 - Decision - 0090 Allen RoadFINDINGS OF FACT & DECISION
STATE OF VERMONT 0
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of John Larkin for construction
of a 60 unit nursing/convalescent home, 90 Allen Road.
On the 14th of February, 1995, the South Burlington Planning
Commission approved the request of John Larkin for site plan review
under Section 26.10 of the South Burlington Zoning Regulations
based on the following findings:
1. This project consists of the construction of a 60 unit
nursing/convalescent home on a 2.55 acre lot.
2. This property located at 90 Allen Road lies within the C2
District. It is bounded on the north by a nursing/convalescent
home (Pillsbury Manor II) and a vacant lot, on the east by a group
home, on the west by a commercial building, and on the south by
Allen Road.
3. Access/circulation: Access is via a 24 foot wide curb cut on
Allen Road.
Circulation is adequate.
4. Coverage/ setbacks: Building coverage is 18.5% (maximum allowed
is 30%). Overall coverage is 40.2% (maximum allowed is 70%).
Front yard coverage is 7.4% (maximum allowed is 30%).
Setback requirements are met.
5. Landscaping: The minimum landscaping requirement, based on
building costs, is $28,500 which is not being met. Plantings
proposed are $3700 short of the requirement. Applicant should
propose additional landscaping or larger sizes to meet the minimum
requirement. Plantings will include Littleleaf Linden, Amur Maple,
Hawthorn, Ash, Spruce, Arborvitae, Pine, Dogwood, Rhododendron, and
Burning Bush.
6. Parking: This project requires a total of 27 spaces and 46
spaces including four (4) handicapped spaces are being provided.
The plan includes a bike rack as required under Section 26.253(b)
of the zoning regulations. Applicant has proposed angled parking
spaces which meet the parking lot dimension standards. Plans
should be revised to show the depth of a parking stall to be 19.8
feet instead of 18 feet. The minimum aisle width allowed is 15
feet.
7. Sidewalk: Applicant is proposing a sidewalk along the
property's frontage. This sidewalk should be constructed prior to
occupancy of the building. Plans should be revised to show the
sidewalk continuous across the driveway.
8. Traffic: ITE estimates that this project will generate 14.3
vehicle trip ends during the P.M. peak hour. The applicant will be
required to pay the road impact fee of approximately $1000.
9. Sewer: The sewer allocation needed for this project is 6750
gpd. The applicant will be required to pay the per gallon fee
prior to permit issuance.
10. C.O. Zone: The applicant is proposing to cross the C.O. Zone
created by a tributary of Bartlett Brook with a pedestrian access,
including a bridge, to the adjacent Pillsbury Manor II. This
crossing is permitted under Section 3.204 of the zoning
regulations. Section 3.405 of the zoning regulations requires that
the plans for crossing the stream be reviewed by the Natural
Resources Committee (NRC). Details of the crossing were submitted
and reviewed by the NRC at their 2/9/95 meeting. The NRC needs
additional information before it can make a recommendation.
11. Recreation Path: The plan shows a recreation path easement
running north -south along the southerly property boundary and
continuing along the northerly boundary and then running north -
south across the adjoining Pillsbury Manor II property to Harbor
View Road. The location of this path is in agreement with the
recommendations of the Recreation Path Committee. The legal
documents for this easement should be reviewed and approved by the
City Attorney and recorded prior to issuance of the zoning permit.
12. Bartlett Brook Watershed: This property is located in the
Bartlett Brook Watershed Protection Overlay District. This project
is therefore subject to the evaluation procedure for stormwater
management under Section 23.20 of the zoning regulations. The
applicant submitted a report from Wagner, Heindel and Noyes with
the results from the computer model. The analysis indicated that
with the construction of a proposed stormwater retention structure
on the site, that the peak stormwater discharge rate in the south
fork of Bartlett Brook for the 25 year design storm will not
increase appreciably as a result of the project. The City Engineer
has reviewed the stormwater plans and finds them acceptable.
13. Lighting: Exterior lighting will consist of the following:
--- seven (7) 250 watt high pressure sodium lights with
downcasting cut-off luminaires mounted on 12 foot poles.
--- 17 100 watt building mounted incandescent lights.
14. Dumpster: A screened dumpster area is shown on the plan.
Applicant should indicate type of fence to be used.
15. other: The landscape plan should be revised to use commas
2
instead of periods in the numbers listed under "Lot Information".
DECISION & CONDITIONS
Based on the above Findings of Fact, the South Burlington Planning
Commission approves the site plan application of John Larkin for
construction of a 60 unit nursing/ convalescent home, 90 Allen Road,
as depicted on a seven (7) page set of plans, page one (1) entitled
"Allen Road Community Care, 90 Allen Road, South Burlington, VT
For: Larkin Realty" prepared by Gregory Rabideau, Architect, dated
12/14/94, last revised 2/6/95, subject to the following
stipulations:
1. All previous approvals and stipulations which are not
superseded by this approval shall remain in effect.
2. The plan shall be revised prior to issuance of a zoning permit
to show the changes listed below and shall require approval by the
City Planner. Three (3) copies of the approved revised site plan
shall be submitted to the City Planner prior to permit issuance.
a) The landscape plan shall be revised to: 1) show
additional landscaping and/or larger species to meet the
minimum requirement, 2) indicate type of fence to be used to
screen dumpster, and 3) use commas instead of periods in the
numbers listed under "Lot Information".
b) The landscape plan and the engineering plan shall be
revised to show the sidewalk continuous across the driveway.
c) The landscape plan and the engineering plan shall be
revised to show the depth of all parking stalls to be 19. 8
feet instead of 18 feet.
d) The handicapped parking space shall be located closer to
the building.
e) The area identified as "future expansion" shall be removed
from the plan.
3. The applicant shall construct the sidewalk along the property's
frontage in a location approved by the City Engineer. This
sidewalk shall be constructed prior to occupancy of the building.
Prior to issuance of a zoning permit, the applicant shall post a
bond for the sidewalk in an amount approved by the City Engineer.
This sidewalk shall be constructed to the specifications approved
by the Public Works Director.
4. The applicant shall post a $28,500 landscape bond prior to
issuance of a zoning permit. The bond shall remain in effect for
three (3) years to assure that the landscaping takes root and has
3
a good chance of surviving.
5. For the purposes of calculating required road impact fees under
the South Burlington Impact Fee Ordinance, the Planning Commission
estimates that the proposed nursing/convalescent home will generate
14.3 vehicle trip ends during the P.M. peak hour.
6. A sewer allocation of 6750 gpd is approved. The applicant
shall pay the per gallon fee prior to issuance of a zoning permit.
7. Prior to permit, the applicant shall submit for review and
approval by the Natural Resources Committee the plans for crossing
the C.O. District which shall include details of the proposed
bridge.
8. All new exterior lighting shall consist of downcasting shielded
fixtures so as not to cast light beyond the property line. Any
change in lighting shall be approved by the City Planner prior to
installation.
9. The applicant shall submit for review and approval by the City
Attorney the legal documents for the recreation path easement.
These documents shall be recorded in the land records prior to
permit issuance.
10. The applicant shall obtain a zoning permit for the building
within six (6) months or this approval is null and void.
11. The applicant shall obtain a Certificate of
Occupancy/Compliance from the Administrative Officer prior to
occupancy of the building.
12. Any change to the site plan shall require approval by the
South Burlington Planning Commission.
13. Prior to issuance of a zoning permit, the applicant shall
resolve with the City Engineer the issue regarding access to the
stormwater detention facility. If necessary, the plan shall be
revised as recommended by the City Engineer.
2e-'ZZ& 4 ZA"/-L-d-
Chakrinan or tierk
South Burlington Planning Commission
0' ."
L1664; t
1�ate
4