HomeMy WebLinkAboutSD-02-83 - Decision - 0725 Hinesburg RoadCITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING & ZONING
DEVELOPMENT REVIEW BOARD
WOLF RUN 9- UNIT PLANNED RESIDENTIAL DEVELOPMENT
FINAL PLAN #SD 02-83
FINDINGS OF FACT & DECISION
Re: Final plat application #SD-02-83 of Lawrence Chetti for a Planned Residential
Development (PRD) on 4.98 acres consisting of 8 duplex units and 1 existing
single family unit at 725 Hinesburg Road.
On the 18th day of February the South Burlington Development Review Board (DRB)
approved the request of Lawrence Chetti for final plat approval under Section 204 of the
South Burlington Subdivision Regulations based on the following findings:
This project consists of a planned residential development on 4.98 acres with an
existing single family dwelling and constructing four (4), 2 family dwellings. The
preliminary plat approval was granted on 10/15/02.
2. This project located at 725 Hinesburg Road is within the Residential 7 and
Conservation and Open Space Districts. It is bounded on the west and on the
north by a residential neighborhood, on the east by Hinesburg Road, and on the
south by 1-89.
3. The owner of record of this property is Lawrence Chetti.
4. Coverage/Setbacks- Building coverage is 6.49% (maximum allowed building
coverage is 20%). Overall coverage is 15.78% (the maximum allowed overall
coverage is 40%). The buildings meet all setback requirements.
5. Access/Circulation: Access is provided by a 24 foot wide private road off
Hinesburg Road. This proposed private road complies with Sections 401.1 (k)
(1) (h) (1), and 401.1 (k) (2) of the subdivision regulations.
6. A five (5) foot wide sidewalk is proposed as requested by the City Engineer for
pedestrian circulation.
7. Density: Normal Maximum Base Maximum Proposed
R7 34 UNITS 14 UNITS 9 UNITS
8. Other: The applicant has obtained approval from the US Postal Service
regarding mail delivery. A street name and E-911 address have been provided.
The draft condominium documents include conditions prohibiting the storage of
RV'S and the conversion of garages to living space.
9. Parking: The parking requirement is 20 spaces, which is being met. The
applicant proposes two (2) car garages for each of the duplex units, and two (2)
FINDINGS OF FACT & DECISION
FINAL PLAN #SD-02-83
guest parking spaces which are shown on the plan. A bike rack is shown on the
plan.
10. Traffic: The traffic generated by the project would be minimal. The impacts will
be offset by the payment of impact fees.
11. Landscaping: The minimum landscaping requirement based on estimated
construction costs is $13,500 which is being met. Proposed plantings include
American cranberry bush, silver leaf linden, white pine, white cedar, and creeping
juniper. The landscaping along the northerly boundary was increased after
consultation with the City Arborist as required.
12. Recreation Path: The Recreation Path Committee reviewed the application at
their August 22, 2002 meeting. No additional changes are proposed.
13. Dumpsters: No dumpsters are proposed for this development.
14. C.O. District/wetland buffers: This property includes C.O. District along the 1-89
r.o.w. and C.O. District/wetland buffers associated with wetlands. Some
encroachment is proposed. The comer of unit #4A is proposed to be constructed
two (2) feet from the C.O. District with some grading taking place within the C.O.
District. There should be no grading or disturbance of vegetation within the C.O.
District.
15. Lighting: No exterior lighting is proposed for this project.
16. Impact Fees: The applicant was made aware that school, road, recreation, and
fire protection impact fees are required for this development pursuant to the
South Burlington Impact Fee Ordinance.
17. South Burlington Fire Department: The applicant should comply with all
comments from the Fire Chief prior to issuance of a zoning permit. The
preliminary plat approval required that the new buildings include residential
sprinklers.
18. South Burlington Water Department: The water department has reevaluated its
position regarding water availability. They have determined that the project is
"grandfathered" so water availability is not an issue.
19. PUD Report: The applicant submitted a report addressing the PUD criteria under
Section 26.151 of the zoning regulations.
DECISION & CONDITIONS
Based on the above findings of fact, the DRB approves final plat application #SD-02-83
of Lawrence Chetti for a planned residential development on 4.98 acres with an existing
single family dwelling and consisting of constructing four (4) two-family dwellings, 725
Hinesburg Road, as depicted on a seven (7) page set of plans, page two (2) entitled,
"Wolf Run Hinesburg Road South Burlington, VT", prepared by O'Leary -Burke Civil
Associates, PLC, dated 1/18/02, last revised on 10/4/02, with the following stipulations:
d rb\s u b\S D#02-83. f cd. d oc
2
FINDINGS OF FACT & DECISION
FINAL PLAN #SD-02-83
All previous approvals and stipulations which are not superseded by this
approval shall remain in effect.
2. The plat plans shall be revised to show the changes below and shall require
approval of the Director of Planning & Zoning. Four (4) copies of the approved
revised plat plans shall be submitted to the Director of Planning & Zoning prior to
recording.
a. The final plat plans shall be revised to move building #4 further away from
the C.O. District to prevent encroachment during construction.
b. The tree planting details on page 5 of the final plat plans shall be revised
to incorporate the recommendations of the City Arborist.
C. The final plat plans shall be revised to show the sidewalk continuous
across the driveways at a uniform grade.
d. The final plat plans shall be revised to show the sidewalk in the road
typical section.
e. The final plat plans shall be revised to show the gas main, which shall be
constructed on the opposite side of the street from the water main.
f. The final plat plans shall be revised to show a hedge or fence along the
CO District boundary adjacent to building #4 to Staff's satisfaction.
3. The new residential buildings shall be constructed to include residential
sprinklers or other fire suppression system approved by the Fire Chief. The Fire
Department sprinkler connection location shall be as specified by the Fire
Department.
4. Any exterior lighting shall consist of downcasting and shielded fixtures approved
by the Director of Planning & Zoning prior to installation.
5. Prior to issuance of the first zoning permit, an easement for the sewer line shall
be submitted to the City Attorney for approval and recorded in the South
Burlington land records.
6. No structures shall be permitted in the PUD setback area provided in Section
26.154 (d) of the zoning regulations unless approved as part of this development
and shown on the approved plans.
7. The applicant shall post a landscape bond prior to permit issuance in an amount
of $13,500. This bond shall remain in effect for three (3) years to assure that the
landscaping has taken root and has a good chance of surviving.
8. Prior to issuance of a zoning permit, the applicant shall submit final homeowner's
documents which include language that the garages will not be turned into living
spaces.
9. The water and sewer mains shall be private and maintained by the homeowners.
10. Any change to the final plat plans shall require approval of the South Burlington
Development Review Board.
drb\s ub\SD#02-83.fcd.doc
3
FINDINGS OF FACT & DECISION
FINAL PLAN #SD-02-83
11. The final plat plans (survey plat & sheet # 1) shall be recorded within 90 days or
this approval is null and void. The plans shall be signed by the Board Chair or
Clerk prior to recording. Prior to recording the final plat plans, the applicant shall
submit a copy of the survey plat in digital format. The format of the digital
information shall require approval of the Director of Planning & Zoning.
-C�c
Signed this day of 2003, by
John Dinklage, Chair
South Burlington Development Review Board
d rb\s u b\S D#02- 83 . f cd . d oc
4
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING Er ZONING
DEVELOPMENT REVIEW BOARD
WOLF RUN 9-UNIT PLANNED RESIDENTIAL DEVELOPMENT
FINAL PLAT #SD-02-83
FINDINGS OF FACT Er DECISION
Re: Final plat application #SD-02-83 of Lawrence Chetti for a Planned
Residential Development (PRD) on 4.98 acres consisting of 8 duplex
units and 1 existing single family unit at 725 Hinesburg Road.
On the 1st day of July 2003, the South Burlington Development Review
Board reapproved the request of Lawrence Chetti for final plat
approval under Section 15.08 of the South Burlington Land
Development Regulations based on the following findings:
1) This project consists of a planned residential development on 4.98
acres with an existing single-family dwelling and constructing four (4),
2 family dwellings. The preliminary plat approval was granted on
10/15 /02.
2) This project located at 725 Hinesburg Road is within the Residential
7 and Conservation and Open Space Districts. It is bounded on the
west and on the north by a residential neighborhood, on the east by
Hinesburg Road, and on the south by I-89.
3) The owner of record of this property is Lawrence Chetti.
4) Coverage/Setbacks: Building coverage is 6.49% (maximum allowed
coverage is 20%). Overall coverage is 15.78% (maximum allowed
overall coverage is 40%). The buildings meet all setback requirements.
5) Access/Circulation: Access is provided by a 24-foot wide private
road off Hinesburg Road. This proposed private road complies with
Sections 15.12 ( c ) (3) AND 15.12 (D) (3) of the Land Development
Regulations.
6) A five (5) foot wide sidewalk is proposed as requested by the City
Engineer for pedestrian circulation.
Page #2
7) Density: Normal Maximum Base Maximum Proposed
R7 34 UNITS 14 UNITS 9 UNITS
8) Other: The applicant has obtained approval from the US Postal
Service regarding mail delivery. A street name and E-911 address have
been provided. The draft condominium documents include conditions
prohibiting the storage of RV'S and the conversion of garages to living
spaces.
9) Parma The parking requirement is 20 spaces, which is being met.
The applicant proposes two (2) car garages for each of the duplex
units, and two (2) guest parking spaces, which are shown on the plan.
A bike rack is shown on the plan
10) Traffic: The traffic generated by the project would be minimal.
The impacts will be offset by the payment of impact fees.
11) Landscaping: The minimum -landscaping requirement based on
estimated construction cost is $13,500, which is being met. Proposed
plantings include American cranberry bush, silver leaf linden, white
pine, white cedar, and creeping juniper. The landscaping along the
northerly boundary was increased after consultation with the City
Arborist as required.
12) Recreation Path: The Recreation Path Committee reviewed the
application at their August 22, 2002, meeting. No additional changes
are proposed.
13) Dumpsters: No dumpsters are proposed for this development.
14) C.O. District/wetland buffers: The property includes C.O. District
along the I-89 r.o.w. and C.O. District/wetland buffers associated with
wetlands. Some encroachment is proposed. The corner of unit #4A is
proposed to be constructed two (2) feet from the C.O. District with
some grading taking place within the C.O. District. There should be no
grading or disturbance within the C.O. District.
Page #3
15) Lighting_ No exterior lighting is proposed for this project.
16) Impact Fees: The applicant was made aware that school, road,
recreation, and fire protection impact fees are required for this
development pursuant to the South Burlington Impact Fee Ordinance.
17) South Burlington Fire Department: The applicant should comply
with all comments from the Fire Chief prior to issuance of a zoning
permit. The preliminary plat approval required that the new buildings
include residential sprinklers.
18) South Burlington Water Department: The water department has
reevaluated its position regarding water availability. They have
determined that the project is "grandfathered" so water availability is
not an issue.
19) PUD Report: The applicant submitted a report addressing the PUD
criteria under Section 26.151 of the zoning regulations.
DECISION Er CONDITIONS
Based on the above findings of fact, the Development Review Board
approves final plat application #SD-02-83 of Lawrence Chetti for a
planned residential development on 4.98 acres with an existing single
family dwelling and consisting of constructing four (4) two-family
dwellings, 725 Hinesburg Road, as depicted on a seven (7) page set of
plans, page two (2) entitled, "Wolf Run Hinesburg Road South
Burlington, VT", prepared by O'Leary -Burke Civil Associates, PLC, dated
1/18/02, last revised on 10/4/02, with the following stipulations:
1) All previous approvals and stipulations, which are not superseded by
this approval shall remain in effect.
2) The plat plans shall be revised to show the changes below and shall
require approval of the Director of Planning Er Zoning. Four (4) copies
I
Page #4
of the approved revised plat plans shall be submitted to the Director of
Planning Fr Zoning prior to recording.
a. The final plat plans shall be revised to move building #4 further
away from the C.O. District to prevent encroachment during
construction.
b. The tree planting details on page 5 of the final plat plans shall be
revised to incorporate the recommendations of the City Arborist.
c. The final plat plans shall be revised to show the sidewalk
continuous across the driveways at a uniform grade.
d. The final plat plans shall be revised to show the sidewalk in the
road typical section.
e. The final plat plans shall be revised to show the gas main, which
shall be constructed on the opposite side of the street from the
water main.
f. The final plat plans shall be revised to show a hedge or fence
along the C.O. District boundary adjacent to building #4 to
staff s satisfaction.
3) The new residential buildings shall be constructed to include
residential sprinklers or other fire suppression system approved by the
Fire Chief. The Fire Department sprinkler connection location shall be
as specified by the Fire Department.
4) Any exterior lighting shall consist of downcasting and shielded
fixtures approved by the Director of Planning £r Zoning prior to
installation.
5) Prior to issuance of the first zoning permit, an easement for the
sewer line shall be submitted to the City Attorney for approval and
recorded in the South Burlington land records.
6) No structures shall be permitted in the PUD setback area provided
in Section 26.154 (d) of the zoning regulations unless approved as part
of this development and shown on the approved plans.
Page #5
7) The applicant shall post a landscape bond prior to permit issuance
in an amount of $13,500. This bond shall remain in effect for three
(3) years to assure that the landscaping has taken root and has a good
chance of surviving.
8) Prior to issuance of a zoning permit, the applicant shall submit final
homeowner's documents, which include language that the garages will
not be turned into living spaces.
9) The water and sewer mains shall be private and maintained by the
homeowners.
10) Any change to the final plat plans shall require approval of the
South Burlington Development Review Board.
11) The final plat plans (survey plat Er sheet #1) shall be recorded
within 90 days or this approval is null and void. The plans shall be
signed by the Board Chair or Clerk prior to recording. Prior to
recording the final plat plans, the applicant shall submit a copy of the
survey plat in digital format. The format of the digital information
shall require approval of the Director of Planning Er Zoning.
Signed this 1st day of July, 2003, by
---------------- - -----------
John Dinklage, Chair
South Burlington Development Review Board
Please note: You have the right to appeal this decision to the Vermont Environmental
Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date
this decision is issued. The fee is $150.00. If you fail to appeal this decision, your
right to challenge this decision at some future time may be lost because you waited
too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d)
(exclusivity of remedy; finality).