HomeMy WebLinkAboutSD-04-31 - Decision - 0700 Hinesburg RoadCITY of SOUTH BURLINGTON
DEPARTMENT of PLANNING & ZONING
BARBARA NEFF- 700 HINESBURG ROAD
FINAL PLAT APPLICATION #SD-04-31
FINDINGS of FACT AND DECISION
Barbara Neff, hereafter referred to as the applicant, is requesting final plat approval to
subdivide a 17.09 acre parcel into two (2) lots consisting of 0.92 acres (Lot A) and 16.17 acres
(Lot B), 700 Hinesburg Road. The South Burlington Development Review Board held a public
hearing on June 1, 2004. Tim Downey represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is requesting final plat approval to subdivide a 17.09 acre parcel into two (2)
lots consisting of 0.92 acres (Lot A) and 16.17 acres (Lot B), 700 Hinesburg Road.
2. The owner of record is Russell Tilley.
3. The subject property contains 17.09 acres and is located in the Residential One (R1) Zoning
District.
4. The plans consist of two (2) sheets, sheet one (1) entitled, "Subdivision Plat Estate of
Russell T. Tilley 700 Hinesburg Road South Burlington, Vermont", prepared by Button
Professional Land Surveyors, PC, dated 4/1/04.
Zoning District & Dimensional Requirements
Table 1. Dimensional Requirements
R1 Zoning District
Required
Proposed
J Min. Lot Size
40,000 SF
40,104 SF
♦ Max. Density
1 unit/acre
1.09 units/acre
Max. Building Coverage
15%
Lot A: 3.83%
Lot B: 1.12%
Max. Overall Coverage
25%
Lot A: 15.05%
Lot B: 1.97%
4 Min. Front Setback
50 ft.
Lot A: 22 ft.
Lot B: 98 ft.
♦ Min. Side Setback
25 ft.
Lot A: 38 ft.
Lot B: 5 ft.
-1 -
�l Min. Rear Setback
30 ft.
Lot A: >30 ft.
Lot B: >30 ft.
Max. Building Height
40 ft.
n/a
�l zoning compliance
♦ zoning non-compliance
A preexisting zoning non-compliance
The maximum density of one (1) unit/acre is being exceeded on Lot A. To address this issue,
staff recommends that a condition be imposed on Lot B that when it is developed, the acreage
and the residence on Lot A be included in the density calculations. Thus, the density for the
entire parcel will not exceed one (1) unit/acre, or four (4) units/acre through the PUD provision.
SUBDIVISION CRITERIA
Pursuant to Section 15.18 of the South Burlington Land Development Regulations, subdivisions
shall comply with the following standards and conditions:
Sufficient water supply and wastewater disposal capacity is available to meet the needs of
the project.
According to Section 15.13 of the South Burlington Land Development Regulations, the existing
public water system shall be extended so as to provide the necessary quantity of water, at
acceptable pressure.
The Superintendent of the City of South Burlington Water Department reviewed the plans for the
proposed project. Since there is no additional development proposed for the subject property, he
did not have any issues with the plan.
According to Section 15.13 of the South Burlington Land Development Regulations, the subdivider
or developer shall connect to the public sewer system or provide a community wastewater system
approved by the City and the State in any subdivision where off -lot wastewater is proposed. The
subject property is served by an on -site septic system.
The plans depict the location of the on -site septic system serving the existing single-family dwelling.
Sufficient grading and erosion controls will be utilized during and after construction to
prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the
subject property and adjacent properties.
The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of
the South Burlington Land Development Regulations. In addition, the grading plan shall meet the
standards set forth in Section 16.04 of the South Burlington Land Development Regulations.
-2-
The project incorporates access, circulation, and traffic management strategies sufficient to
prevent unreasonable congestion of adjacent roads.
Access to Lots A and B will remain via the existing curb -cut serving the single-family dwelling. This
is a sufficient for access to these lots for the time being. However, when development is proposed
on Lot B, the applicant shall access that development off of Tilley Drive, which runs directly south of
the subject property. In addition, at the time development is proposed on Lot B, Lot A shall also be
accessed from Tilley Drive. The plans depict a 20' access easement extending from Tilley Drive to
Lot A, which will facilitate this future access. Thus, when the subject property is fully developed, the
curb -cut on Hinesburg Road will be eliminated. It is the City's desire that Tilley Drive be a collector
street with an 80' wide right-of-way. The right-of-way is currently 60' wide. The plans should be
revised to show an additional 20' added to the width of the existing right-of-way.
The project's design respects and will provide suitable protection to wetlands, streams,
wildlife habitat as identified in the Open Space Strategy, and any unique natural features on
the site.
The South Burlington Wetland Map indicates that there is a wetland on the subject property. No
development is proposed on the subject property at this time, so feel this project does not require
review by the Natural Resources Committee.
The project is designed to be visually compatible with the planned development patterns in
the area, as specified in the Comprehensive Plan and the purpose of the zoning districts) in
which it is located.
According to Section 4.01 of the Land Development Regulations, the R1 Zoning District is formed to
encourage low -density single-family residential uses.
The proposed subdivision includes one (1) existing single-family dwelling and associated structures
(3 barns and a greenhouse), so the project is in compliance with this requirement.
Open space areas on the site have been located in such a way as to maximize opportunities
for creating contiguous open spaces between adjoining parcels and/or stream buffer areas.
There is no additional development proposed through this project, so open space considerations
are not an issue at this time. However, if and when the applicant submits plans for additional
development on the subject property, open space issues should be addressed.
The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to
ensure that adequate fire protection can be provided.
There iS no additional development proposed at this time so this project does not nePri to be
reviewed by the Fire Chief at this time. However, the Fire Chief shall review any plans for additional
development on the subject property.
Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and
lighting have been designed in a manner that is compatible with the extension of such
services and infrastructure to adjacent landowners.
-3-
The South Burlington Recreation Path Committee reviewed the sketch plans for the proposed
project at its meeting on Monday February 2, 2004. They requested that a 20' wide recreation path
easement be established along the northerly side of Tilley Drive to facilitate a recreation path.
However, this recreation path was already established during the approval of the subdivision that
created Tilley Drive. So, a recreation path with be constructed along Tilley drive in place of a
sidewalk.
Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is
consistent with City utility and roadway plans and maintenance standards.
Any new utility lines, services, and service modifications shall be underground.
The project is consistent with the goals and objectives of the Comprehensive Plan for the
affected district(s).
The proposed subdivision of this property is in conformance with the South Burlington
Comprehensive Plan.
Landscaping.
No development is proposed through this project and therefore no additional landscaping will be
required.
Lot Layout.
According to Section 15.10 of the South Burlington Land Development Regulations, a minimum
width to length ratio of one to five (1:5) shall be used as a guideline by the Development Review
Board in evaluating lot proportions. Square or roughly square lots shall not be approved.
With regard to this requirement, staff has a minor concern with Lot A, as it appears to be a roughly
square lot. However, this requirement is intended to regulate the layout of lots comprising larger
subdivisions. Therefore, the proposed plan is fine, but that this requirement shall be complied with
when further development of the property is proposed.
Other
The City Engineer reviewed and approved the final plat plans. He provided comments dated
May 20, 2004.
Planned Unit Development
As the subject lot is over 5 acres and is designated "R1-PRD", the applicant could apply for a
planned unit development. This would allow the applicant to develop a maximum of four (4)
units per acre, subject to the applicable provisions of Article 15 in the Land Development
Regulations.
DECISION
Motion by Mark Boucher, seconded by Gayle Quimby, to Final Plat Application #SD-04-31 of
Barbara Neff, subject to the following conditions:
1. All previous approvals and stipulations shall remain in full effect, except as amended herein.
2. This project shall be completed as shown on the plans submitted by the applicant, as
amended by this decision, and on file in the South Burlington Department of Planning &
Zoning.
3. The plat plans shall be revised to show the following changes and shall require approval from the
Administrative Officer. Four (4) copies of the approved revised plat plans shall be submitted to the
Administrative Officer prior to recording:
a) The plans shall be revised to show an additional 20' added to the width of the existing
right-of-way for Tilley Drive on Lot B.
4. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03
of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the
standards set forth in Section 16.04 of the South Burlington Land Development Regulations.
5. At the time that development is proposed for Lot B, the acreage and the residence on Lot A
shall be included in the density calculations for the entire parcel.
6. At the time that Lot B is developed, the existing access to Lot A off of Hinesburg Road shall
be eliminated (closed and seeded).
7. Prior to recording the final plat plans, the applicant shall record the appropriate legal documents,
approved by the City Attorney, for the 20' wide addition to the existing right-of-way.
8. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
9. Any changes to the final plat plans shall require approval of the South Burlington
Development Review Board.
10. The final plat plan (survey plat) shall be recorded in the land records within 90 days or this
approval is null and void. The plan shall be signed by the Board Chair or Clerk prior to
recording. Prior to recording the final plat plans, the applicant shall submit a copy of the
survey plat in digital format. The format of the digital information shall require approval of the
Director of Planning and Zoning.
-5-
Chuck Bolton - Yea/nay/abstain/not present
Mark Boucher - yea/nay/abstain/not present
John Dinklage - yea/nay/abstain/not present
Roger Farley - yea/nay/abstain/not present
Michele Kupersmith - yea/nay/abstain/not present
Larry Kupferman - yea/nay/abstain/not present
Gayle Quimby - yea/nay/abstain/not present
Motion Carried by a vote of 7-0-0.
Signed this day of June, 2004 by
r
/f,John Dinklage, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental Court,
pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is
issued. The fee is $150.00. If you fail to appeal this decision, your right to challenge this
decision at some future time may be lost because you waited too long. You will be bound by
the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality).