Loading...
HomeMy WebLinkAboutSP-08-18 - Decision - 0635 Hinesburg Road#SP-08-18 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING O'BRIEN BROTHERS AGENCY - 629-633 HINESBURG ROAD SITE PLAN APPLICATION #SP-08-18 FINDINGS OF FACT AND DECISION The O'Brien Brothers Agency, hereinafter referred to as the applicant, is seeking to amend a previously approved Planned Unit Development consisting of a 76 unit elderly housing project and 24 multi -family units in three (3) buildings. The amendment consists of revising the dumpster enclosure, 629-633 Hinesburg Road. Based on the plans and materials contained in the document file for this application, the Administrative Officer finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is seeking to amend a previously approved Planned Unit Development consisting of a 76 unit elderly housing project and 24 multi -family units in three (3) buildings. The amendment consists of revising the dumpster enclosure, 629-633 Hinesburg Road. 2. The owner of record of the subject property is CPA Partnership. 3. The subject property is located in the Residential 7 (R7) Zoning District. 4. The application was received on March 10, 2008. 5. The plan submitted is entitled, "Chatham Green Proposed Apartment Buildings As -Built Plan South Burlington Vermont", prepared by Civil Engineering Associates, Inc., dated April 1996, last revised on 1/2/08. DIMENSION REQUIREMENTS 6. Dimensional requirements are not changing as a result of this application. 7. Setback requirements are being met. SITE PLAN REVIEW STANDARDS Vehicular access 8. Access is provided via a curb cut off Farrell Street. No changes are proposed. - 1 - #SP-08-18 Circulation 9. Circulation on the site is adequate. Parking 10. There are no changes to parking. 11. Pursuant to Section 13.01(G)(5) of the Land Development Regulations, bicycle parking shall be provided on the subject property. A bicycle rack is not shown on the plan. The plan shall be revised to show a bicycle rack. 12. Pursuant to Section 13.01(B) of the Land Development Regulations, internal landscaping of the parking area does not apply to this application. Landscaping 13. There are no landscaping changes proposed. 14. Pursuant to Section 13.06(B)(7) of the Land Development Regulations, snow storage areas must be shown on the plan. The plan indicates only one (1) snow storage area. The plan should be revised to show all snow storage areas. Outdoor Lighting 15. There are no changes to outdoor lighting proposed. Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations, the following review standards shall apply to site plan applications: Traffic 16. Traffic will not be affected as a result of this application. (a) The relationship of the proposed development to goals and objects set forth in the City of South Burlington Comprehensive Plan. 17. The Comprehensive Plan states that the City should encourage development while protecting natural resources and promoting a healthy and safe environment. The proposed project is in keeping with the recommended actions of the Comprehensive Plan. (b) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. 18. The buildings are existing and no changes are proposed. -2- #SP-08-18 (c)Parking shall be located to the rear or sides of buildings to the greatest extent practicable. 19. Parking is located on the front of the building. All parking is existing and no changes are proposed. 20. As noted above, a bicycle rack location is not noted on the plan. (d) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. 21. The buildings are existing and no changes are proposed. (e) Newly installed utility service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. 22. The plan does not indicate a change in utility service. (0 The combination of common materials and architectural characteristics, landscaping, buffers, screens, and visual interruptions to create attractive transitions between buildings or different architectural styles shall be encouraged. 23. The buildings are existing and no changes are proposed. (g) Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. 24. The buildings are existing and no changes are proposed. In addition to the above general review standards, site plan applications shall meet the following specific standards set forth in Section 14.07 of the Land Development Regulations: (a) The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. 25. The reservation of land is not necessary. (b) Electric, telephone, and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. 26. As noted above, there are no changes to utility service with this application. -3- #SP-08-18 (c) All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure, and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). 27. Pursuant to Section 13.06(C)(1) of the Land Development Regulations, screened dumpster locations must be shown on the plans. The applicant is proposing to screen the front and rear of the dumpster area so as to block its view from the public right-of-way while offering easy access to the elderly residents for the disposal of their trash. This is acceptable. DECISION Based on the above Findings of Fact, the Administrative Officer herby approves Site Plan Application #SP-08-18 of O'Brien Brothers Agency, to amend a previously approved Planned Unit Development consisting of a 76 unit elderly housing project and 24 multi -family units in three (3) buildings. The amendment consists of revising the dumpster enclosure, 629-633 Hinesburg Road, subject to the following conditions: 1) All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2) This project shall be completed as shown on the plan and shall be on file in the South Burlington Department of Planning and Zoning. 3) The plans shall be revised to show the changes below and shall require approval of the Administrative Officer. Three (3) copies of the approved revised plans shall be submitted to the Administrative Officer prior to permit issuance. a. The plans shall be revised to show the location of ALL snow storage areas. b. The plans shall be revised to show the location of a bicycle rack. 4) The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. 5) The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to the use of the revised dumpster area. 6) Any change to the site plan shall require approval by the South Burlington Development Review Board or the Administrative Officer. #S P-08-18 S� Signed on this day ofJRA 2008 by FA onda9,/Belair, Administrative Officer PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal must be accompanied with a $110 filing fee and be filed within 15 days of the date of this decision. -5-