Loading...
HomeMy WebLinkAboutSP-97-0000 - Decision - 0550 Hinesburg RoadFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of HFB Realty Partnership to amend a previously approved plan for an 18,000 square foot general office building. The amendment consists of converting 950 square feet of general office use to medical office use, 550 Hinesburg Road. On the 26th day of August, 1997, the South Burlington Planning Commission approved the request of HFB Realty Partnership for site plan review under Section 26.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of amending a plan previously approved on 4/13/93 for a 18,000 square foot general office building. The amendment consists of converting 950 square feet of general office use to medical office use. The ZBA on 8/25/97 approved a request from the applicant for a conditional use permit for the proposed use. 2. This property located at 550 Hinesburg Road lies within the R7 District. It is bounded on north, east and south by the common land which is part of the Winding Brook residential development and on the west by Hinesburg Road. 3. Access/circulation: Access is provided by a 30 foot curb cut on Hinesburg Road. No changes proposed. Circulation on the site is adequate. 4. Coverage/setbacks: Building coverage is 7.4% (maximum allowed is 25%). Overall coverage is 60% (maximum allowed is 60%). Front yard coverage is 26.7% (maximum allowed is 30%). 5. Landscaping: There is no minimum landscaping requirement, based on building costs, for this project. The site is well landscaped and no additional landscaping recommended. 6. Sewer: The additional sewer allocation requested is 240 gpd. The applicant will be required to pay the per gallon fee prior to permit issuance. 7. Parking: A total of 73 spaces are required and 69 spaces including three (3) handicapped spaces are being provided. This represents a four (4) space shortfall. The Commission as part of the 4/13/93 approval granted a four (4) space waiver. The plan should be revised to include a bike rack as required under Section 26.253(b) of the zoning regulations. 8. Traffic: This property is located in Traffic Overlay Zone 5 which allows this property to generate a maximum of 50 vehicle trip ends (vte's) during the P.M. peak hour. ITE estimated that the 18,000 square foot office building would generate 52.5 vte's and the Planning Commission as part of the 4/13/93 approval determined that the building would generate no more than 50 vte's during the peak hour due to the unique configuration of the building in that a large portion of the building would be devoted to stairway and elevator use. ITE estimates that the proposed change in use would generate 1.1 additional vte's during the P.M. peak hour. The Planning Commission may approve peak hour traffic volumes above the normal standards if the Commission determines that other site improvements will produce a net benefit for traffic flow in the vicinity. Traffic counts submitted by the applicant of other similar developments indicate that the proposed change in use will generate zero (0) additional vehicle trip ends during the P.M. peak hour. 9. Lighting: No changes proposed. 10. Dumpster: A screened dumpster area is provided. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of HFB Realty Partnership to amend a previously approved plan for an 18,000 square foot general office building. The amendment consists of converting 950 square feet of general office use to medical office use, 550 Hinesburg Road, as depicted on a plan entitled, "Wright & Morrissey Hinesburg Road Office Building Site Plan So. Burlington Vermont," prepared by Civil Engineering Associates, Inc., dated September, 1993, last revised 8/15/97, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. Any new exterior lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. 3. The Planning Commission approves an additional 240 gpd of sewer allocation. The applicant shall pay the per gallon fee prior to permit issuance. 4. The Planning Commission approves 69 parking spaces for this development. This represents a waiver of 4 spaces or 5.5% of the total required. It is the Commission's opinion that 69 spaces will adequately serve the project since a significant portion of the 2 adequately serve the project since a significant portion of the gross square footage of the building will be devoted to stairway and elevator space and therefore will not be devoted to uses which typically generate parking demand. 5. This property is located in Traffic Overlay Zone 5 which permits this property to generate a maximum of 50 trip ends during the peak hour. Based on I.T.E., it is estimated that a building with 17,050 square feet of general office use and 950 square feet of medical office use will generate 53.6 trip ends during the peak hour. This estimate is based on gross square footage. Based on traffic counts submitted by the applicant of other similar developments, it is the Commission's opinion that the building will generate no more than 50 vte's during the P.M. peak hour. 6. For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Planning Commission estimates that the change in use will generate zero (0) additonal vehicle trip ends during the P.M. peak hour. 7. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 8. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to occupancy by the medical office. 9. Any changes to the site plan shall require approval by the South Burlington Planning Commission. cu 4 , u---- Chairman or Clerk South Burlington Planning Commission z.1 7 Date' 3