Loading...
HomeMy WebLinkAboutAgenda 08_SP-19-35_1200 Airport Dr_Burlington Intl Airport_garage 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com               TO:    South Burlington Development Review Board    FROM:    Marla Keene, Development Review Planner    SUBJECT:   SP‐19‐35 1200 Airport Drive    DATE:     November 5, 2019 Development Review Board meeting      The City of Burlington/Burlington International Airport has submitted site plan application #SP‐19‐35 to amend  a previously approved plan for an airport complex.  The amendment consists of constructing a 5,400 sq. ft.  addition to an existing maintenance building to provide covered storage for snow removal equipment, 1200  Airport Drive.     At the October 15, 2019 hearing the Board indicated that there were several topics that needed additional  attention.  A summary of the status of each of these topics is as follows.  Numbered items for the Board’s  attention are in red.    ZONING DISTRICT & DIMENSIONAL REQUIREMENTS     At the previous hearing, the applicant acknowledged their overall coverage calculation was incorrect.  They  have provided an impervious area calculation table indicating the proposed lot coverage after construction of  the garage is 34.3%, which is below the maximum overall coverage of 50%.  Staff considers this criterion met.    AIRPORT DISTRICT STANDARDS  (4)   All uses shall comply with all applicable provisions of the Federal Aviation Administration, and any  other federal or state regulations pertaining to airports.    The applicant has provided documentation demonstrating they have applied for FAA approval of the proposed  work.  Staff considers this criterion met.    SITE PLAN REVIEW STANDARDS  14.6 General Review Standards  B. Relationship of Proposed Structures to the Site.  (1) The site shall be planned to accomplish a desirable transition from structure to site, from structure  to structure, and to provide for adequate planting, safe pedestrian movement, and adequate  parking areas.    The applicant has provided documentation that the parking spaces whose configuration are proposed to be  revised meet the required minimum dimensions of 13.01.  Staff considers this criterion met.    #SP‐19‐35  2  D.  Landscaping and Screening Requirements. See Article 13, Section 13.06 Landscaping, Screening, and  Street Trees.    13.06 Landscaping, Screening, and Street Trees    A.   Purpose. The City of South Burlington recognizes the importance of trees, vegetation, and well‐planned  green spaces in bringing nature into the city and using these as a resource in promoting the health, safety,  and welfare of city residents through improved drainage, water supply recharge, flood control, air quality,  sun control, shade, and visual relief. Landscaping and screening shall be required for all uses subject to site  plan and planned unit development review. Street tree planting shall be required for all public streets in a  subdivision  or  planned  unit  development.  In  evaluating  landscaping,  screening,  and  street  tree  plan  requirements,  the  Development  Review  Board  shall  promote  the  retention  of  existing  trees  while  encouraging the use of recommended plant species.  In making its decisions, the Development Review  Board may refer to the Vermont Tree Selection Guide, published by the Vermont Urban & Community  Forestry Program and/or the recommendation of the City Arborist.   Pursuant to Table 13‐9 of the South Burlington Land Development Regulations, the applicant is required to  provide a minimum of $7,500 in new landscaping.  In evaluating landscaping requirements, some credit may  be granted for existing trees or for site improvements other than tree planting as long as the objectives of  13.06G(3) are not reduced.      At the previous hearing, the applicant indicated they wish to provide four beehives and pollinator plants to be  located on the roof of the parking garage near the main terminal.  The beehives would be located within the  solar array but visible from the publicly accessible green roof.  At the previous hearing, the Board expressed  they were interested in hearing more about how the beehives and pollinator garden would be maintained.    At the previous hearing, the Board was reminded that LDR 13.06(G)(2) requires “…a mix of large canopy tree  species within each landscaping plan.”  Staff recommends the Board consider the airport PUD as a whole  when considering compliance with this requirement.    1. Staff considers that in order for the proposed hives and plants to be considered as contributing to the  required minimum landscape value, the applicant may not obtain an agricultural exemption from local  regulation for the proposed hives.  Staff recommends the Board include this as a condition of approval.      Staff has done a limited amount of research on pollinator gardens at airports.  It appears the most successful  schemes are when large areas are given over to pollinator friendly species, and careful species selection is  made.      2. Staff recommends the Board require the applicant to provide evidence their proposed beehives and  pollinator plans will be designed and managed by a qualified professional prior to issuance of a zoning  permit.    3. Staff continues to recommend the Board include a condition requiring the applicant to submit an overall  plan for future landscaping at the airport as part of the next application requiring additional landscaping  for the property.      SECTION 12.02 WETLAND PROTECTION STANDARDS  #SP‐19‐35  3  (2) Encroachment into Class II wetlands is permitted by the City only in conjunction with issuance  of a Conditional Use Determination (CUD) by the Vermont Department of Environmental Conservation  and positive findings by the DRB pursuant to the criteria in (3) below.    The applicant has provided correspondence documenting that the DEC Wetlands Program will require  them to obtain coverage under the wetlands general permit for their proposed impacts.      4. Staff recommends the Board require evidence of coverage under the wetlands general permit prior to  issuance of a zoning permit.    Recommendation  Staff recommends the Board discuss the project with the applicant and close the hearing.  ƵƌůŝŶŐƚŽŶŝƌƉŽƌƚ/ŵƉĞƌǀŝŽƵƐƌĞĂĂůĐƵůĂƚŝŽŶƐĨŽƌ^Ž͘ƵƌůŝŶŐƚŽŶWĞƌŵŝƚƚŝŶŐϭϬͬϵͬϮϬϭϵŚƌŝƐƚŽƉŚĞƌ'ĞŶĚƌŽŶŝƌƉŽƌƚWĂƌĐĞů^ŝnjĞ;džĐůƵĚĞƐĐƋƵŝƌĞĚZĞƐŝĚĞŶƚŝĂů>ŽƚƐͿс ϵϰϮ ĐƌĞƐĐƌĞƐ ^& йŽǀĞƌĂŐĞ ĐƌĞƐ ^& йŽǀĞƌĂŐĞ ĐƌĞƐ ^& йŽǀĞƌĂŐĞdĂdžŝǁĂLJdžƚĞŶƐŝŽŶƉƉůŝĐĂƚŝŽŶ;ϮϬϭϲͿ Ϯϵϱ͘ϬϬ ϭϮ͕ϴϱϬ͕ϮϬϬ ϯϭ͘ϯй Ϯ͘ϬϮϴϴ͕ϬϬϬ ϯϭ͘ϱй Ϯϵϳ͘ϬϮ ϭϮ͕ϵϯϴ͕ϮϬϬ ϯϭ͘ϱй WƌŽũĞĐƚƉĞƌŵŝƚƚĞĚďƵƚŶŽƚĐŽŶƐƚƌƵĐƚĞĚdĂdžŝǁĂLJ'ZĞůŽĐĂƚŝŽŶΘ,ŽůĚŝŶŐĂLJƉƉůŝĐĂƚŝŽŶ;ϮϬϭϲͿ Ϯϵϳ͘ϬϮ ϭϮ͕ϵϯϴ͕ϮϬϬ ϯϭ͘ϱй ϳ͘Ϯϲ ϯϭϲ͕Ϯϰϲ ϯϮ͘ϯй ϯϬϰ͘Ϯϴ ϭϯ͕Ϯϱϰ͕ϰϰϲ ϯϮ͘ϯйsdE'dĂdžŝǁĂLJƐ͕͕&ΘƉƌŽŶZĞĐŽŶƐƚƌƵĐƚŝŽŶ;ϮϬϭϳͲϮϬϭϴͿ ϯϬϰ͘Ϯϴϭϯ͕Ϯϱϰ͕ϰϰϲ ϯϮ͘ϯй ϭϱ͘ϰϵ ϲϳϰ͕ϱϲϲ ϯϯ͘ϵй ϯϭϵ͘ϳϳ ϭϯ͕ϵϮϵ͕ϬϭϮ ϯϯ͘ϵйZĞŶƚĂůĂƌYd;ϮϬϭϴͿ ϯϭϵ͘ϳϳ ϭϯ͕ϵϮϵ͕ϬϭϮ ϯϯ͘ϵй ͲϬ͘ϭϭ Ͳϰ͕ϵϬϬ ϯϯ͘ϵй ϯϭϵ͘ϲϱ ϭϯ͕ϵϮϰ͕ϭϭϮ ϯϯ͘ϵй ZĞĚƵĐƚŝŽŶŝŶŶĞƚŝŵƉĞƌǀŝŽƵƐdĂdžŝǁĂLJ'ZĞůŽĐĂƚŝŽŶŵĞŶĚĞĚWůĂŶ;ϮϬϭϴͿ ϯϭϵ͘ϲϱ ϭϯ͕ϵϮϰ͕ϭϭϮ ϯϯ͘ϵй ϯ͘ϱϮ ϭϱϯ͕ϮϱϬ ϯϰ͘ϯй ϯϮϯ͘ϭϳ ϭϰ͕Ϭϳϳ͕ϯϲϮ ϯϰ͘ϯй ϯ͘ϱϮĂĐƌĞŶĞƚŝŵƉĞƌǀŝŽƵƐŝŶĐƌĞĂƐĞĨƌŽŵϮϬϭϲĂƉƉƌŽǀĞĚƉůĂŶds,ŽƚĞů ϯϮϯ͘ϭϳ ϭϰ͕Ϭϳϳ͕ϯϲϮ ϯϰ͘ϯй Ϭ͘ϯϰ ϭϰ͕ϴϰϱ ϯϰ͘ϯй ϯϮϯ͘ϱϭ ϭϰ͕ϬϵϮ͕ϮϬϳ ϯϰ͘ϯйdsDĂŝŶƚĞŶĂŶĐĞ'ĂƌĂŐĞĚĚŝƚŝŽŶ ϯϮϯ͘ϱϭ ϭϰ͕ϬϵϮ͕ϮϬϳ ϯϰ͘ϯй ͲϬ͘Ϭϭ Ͳϰϴϯ ϯϰ͘ϯй ϯϮϯ͘ϱϬ ϭϰ͕Ϭϵϭ͕ϳϮϰ ϯϰ͘ϯйKǀĞƌĂůů/ŵƉĞƌǀŝŽƵƐƌĞĂdžŝƐƚŝŶŐ EĞƚŶĞǁ/ŵƉĞƌǀŝŽƵƐŽŵŵĞŶƚƐWĞƌŵŝƚƚĞĚEĞǁ/ŵƉĞƌǀŝŽƵƐ