HomeMy WebLinkAboutSD-17-06 - Decision - 0025 Harbor Ridge Road#SD-17-06 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING DONALD R. CUMMINGS-1811 SPEAR STREET & 25 HARBOR RIDGE ROAD PRELIMINARY & FINAL PLAT APPLICATION #SD-17-06 FINDINGS OF FACT AND DECISION Preliminary & final plat application #SD-17-06 of Donald R. Cummings for a planned unit development consisting of two (2) lots, each developed with a single family dwelling. The project consists of: 1) subdividing the 1.16 acre parcel into two (2) parcels of 0.6 acres (lot #1) and 0.56 acres (lot #2), and 2) relocating the zoning district boundary between the R-1 and R-2 Zoning Districts in conjunction with the planned unit development, 1811 Spear Street & 25 Harbor Ridge Road. The Development Review Board held a public hearing on April 18, 2017. The applicant was represented by Donald Cummings and David Marshall. Based on the plans and materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT The applicant, Donald R. Cummings, seeks preliminary and final plat approval for a planned unit development consisting of two (2) lots, each developed with a single family dwelling. The project consists of: 1) subdividing the 1.16 acre parcel into two (2) parcels of 0.6 acres (lot #1) and 0.56 acres (lot #2), and 2) relocating the zoning district boundary between the R-1 and R-2 Zoning Districts in conjunction with the planned unit development, 1811 Spear Street & 25 Harbor Ridge Road. 2. The owner of record of the subject properties is Donald R. Cummings. 3. The subject properties are located in the Residential 1 and Residential 2 Zoning Districts. 4. The application was received on February 24, 2017. 5. The plans submitted consists of six (6) pages with the first page titled "Plat of Survey Donald Cummings," prepared by Civil Engineering Associates, Inc., and dated 12/5/2016. A) Density The zoning district boundary between R1 and R2 cuts through the existing Harbor Ridge Road parcel. By adjusting the boundary line as proposed (i.e. in a westerly direction on Lot 1 and an easterly direction on Lot 2) the existing house on Harbor Ridge Road and the existing house on Spear Street will both be in the R1 Zoning District. The total R1 Zoning District area within the PUD and within which the existing houses will be located is proposed to be 2.05 acres, which is sufficient to accommodate the proposed density of two (2) housing units in that zoning district (1 unit/acre). The total R2 Zoning District area within the PUD is proposed to be 0.73 acres, which is sufficient to accommodate one (1) housing unit in #SD-17-06 that district (2 units/acre). The Board finds that the zoning district boundary line adjustment is necessary to advance the project as a PUD and therefore the Board finds the adjustment acceptable. B) PLANNED UNIT DEVELOPMENT STANDARDS Pursuant to Section 15.18 of the South Burlington Land Development Regulations, PUDs shall comply with the following standards and conditions: (A)(1) Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project. A condition of plat approval will be that the applicant receive any necessary permits related to water and wastewater supply from the appropriate permitting agencies. (A)(2) Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. This is criterion is covered by the discussion below on stormwater. (A)(3) The project incorporates access, circulation, and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. All two (2) proposed lots will be accessible from public roads. The existing two (2) houses already have driveways connecting them to either Spear Street (1811 Spear St.) or Harbor Ridge Road (25 Harbor Ridge Rd.) and when a house is developed on Lot 2 it will have access to Harbor Ridge Road via a shared driveway with 25 Harbor Ridge Road. The Board finds this criterion met. (A)(4) The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. The Board finds that none of the features listed in this criterion are present at the site. (A)(5) The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. The project is located in low density residential zoning districts with many single family houses. The proposed dwelling unit that could be accommodated on Lot 2 would also be single family. The Board finds this criterion met. (A)(6) Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces beftoveen adjoining parcels and/or stream buffer areas. The subdivision of the property and the proposed location of a future house would preserve the expanse of open space behind the existing house at 1811 Spear Street. That backyard open space continues through #SD-17-06 the yards of several other houses to the north to Westview Drive and to the south to Allen Road. The Board finds this criterion met. (A)(7) The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided. The Fire Marshall received project plans and no comments were submitted. (A)(8) Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. The Board finds this criterion met. (A)(9) Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards, absent a specific agreement with the applicant related to maintenance that has been approved by the City Council. For Transect Zone subdivisions, this standard shall only apply to the location and type of roads, recreation paths, and sidewalks. The Board received the following comment from the Public Works Department in an email dated March 27, 2017: My only comment is to have the applicant pave the bottom portion of their driveway that is within the road ROW. Gravel always gets deposited in our road from this property, I'd like to clean it up as much as possible. The Board finds that this decision will contain a condition requiring the paving of the bottom portion of the driveway within the City right-of-way. (A)(10) The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). The project is located in the Southwest Quadrant where the Comprehensive Plan states future land use should remain principally residential and care should be taken to maintain and improve stormwater runoff. The project is residential and stormwater is discussed below. The Board finds the proposed project meets this criterion. C) SITE PLAN REVIEW STANDARDS Pursuant to Section 14.03(A)(6) of the South Burlington Land Development Regulations, any PUD shall require site plan approval. Section 14.06 of the South Burlington Land Development Regulations establishes the following general review standards for all site plan applications: A) Relationship of Proposed Development to the City of South Burlington Comprehensive Plan. Due attention by the applicant should be given to the goals and objectives and the stated land use policies for the City of South Burlington as set forth in the Comprehensive Plan. 3 #SD-17-06 The Board finds that this criterion is being met as discussed above. B) Relationship of Proposed Structures to the Site. (1) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. (2) Parking (3) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or anticipated adjoining buildings. (4) Newly installed utility services and service modifications necessitated by exterior alterations or building expansion shall, to the extent feasible, be underground. D) Relationship of Structures and Site to Adjoining Area. (1) The Development Review Board shall encourage the use of a combination of common materials and architectural characteristics (e.g., rhythm, color, texture, form or detailing), landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. (2) Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. At present no building is being proposed, the plans only show where a single family dwelling could possibly be located on Lot 2. The Board finds the existing mature trees will help create desirable transitions when a building is constructed on the site. The Board finds that the height and scale of the future single family dwelling should be compatible with the site and the neighboring houses, the utilities should be underground to the extent feasible, and the structures within the PUD should relate harmoniously to themselves and the terrain. In addition to the above general review standards, site plan applications shall meet the following specific standards as set forth in Section 14.07 of the Land Development Regulations: 1. Access to Abutting Properties. The reservation of land maybe required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. The Board does not consider the reservation of land to be necessary. 2. Utility Services. Electric, telephone and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications must be underground. 4 #SD-17-06 3. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). The applicant is not proposing any new dumpsters or other facilities at this time. 4. Landscaping and Screening Requirements. (See Article 13, Section 13.06) No construction is proposed as part of this application. The Board finds this criterion inapplicable. D) SUBDIVISION STANDARDS 15.10 Lot Layout A. Lots shall be laid out in such a way that they can be developed in full compliance with these land development regulations, and giving consideration to topography, soils, and drainage conditions. B. Except within the City Center FBC District, the following standards shall apply: Corner lots shall have extra width to conform to setbacks on each street. No subdivision showing any reserved strips shall be approved. A width to length ratio of one to five (1:5) shall be used as a guideline by the Development Review Board in evaluating lot proportions. Developments consisting predominantly of square or roughly square lots or lot with an excessive length to width ratio (i.e. spaghetti lots) shall not be approved. Existing Lot 3 will have a ratio of approximately 1:3 and Lots 2 and 3 a ratio of approximately 1:2.5. The existing lot on Harbor Ridge Road currently has a ratio of close to 1:1, therefore the subdivision will create two (2) lots with ratios closer to the recommended 1:5. The existing lot on Spear Street will maintain the same ratio. In combination with the applicant's request to change the location of the zoning district boundary lines, the proposed lots can be developed in compliance with the land development regulations. The Board finds these criteria to be met. E) WAIVERS The applicant is requesting that the side setback on the north side of Lot 1 be reduced from the required 25 feet to 15 feet to allow for a future possible expansion to the existing house on Lot 1. The side setback along the north side of Lot 1 abuts Lot 2, which is mostly in the R2 Zoning District where only a 10 foot side setback is required. The Board finds the requested 15 foot side setback to be compatible with development patterns of the neighborhood. F) STORMWATER The Board received the following comments from the Stormwater Section in an email dated 4/14/2017: 1. This project is located in the Bartlett Brook watershed. This watershed is listed as stormwater impaired by the State of Vermont Department of Environmental Conservation (DEC). 2. It is understood that the applicant has proposed to install a bioswale to treat stoomwater runoff from the proposed development. 3. While not a requirement, the applicant could consider installing a gutter along the back roof of the proposed house in order to direct odditional runoff toward the bioswale. 5 #SD-17-06 Thank you for the opportunity to comment. The Board encourages, but does not require, the applicant to consider the advice of the Stormwater Section regarding the installation of a gutter if a new dwelling unit is ever built. DECISION Motion by Matt Cota, seconded by Jennifer Smith, to approve preliminary & final plat application #SD- 17-06 of Donald R. Cummings subject to the following conditions: 1. All previous approvals and stipulations will remain in full effect except as amended herein. 2. This project must be completed as shown on the plat submitted by the applicant and on file in the South Burlington Department of Planning and Zoning. 3. The plans must be revised to show the changes below and will require approval of the Administrative Officer. Three (3) copies of the approved revised plans must be submitted to the Administrative Officer prior to recording the plat plans. a. The survey plats must be revised to include the signature and seal of the land surveyor. b. Proposed Site Plan (C1.0) must be revised to have a title different from Proposed Site Plan (C1.1). c. The plans must be revised to show the portion of the proposed shared driveway in the right-of-way being paved at 25 Harbor Ridge Road. d. The plans must be revised to show arrows with single heads indicating the direction in which the zoning district boundary line will be adjusted rather than the two -headed arrows currently shown. e. The Stormwater Worksheet plan must be revised to show the arrows (which indicate the location of a grass swale) to the east of the possible house on Lot 2 pointing south rather than north 4. The Board approves the following waiver: a. Side setback of 15 feet on the north side of Lot 1 5. The applicant must receive final wastewater and water allocations prior to issuance of a zoning permit. 6. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications must be underground. 7. The proposed project must adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan must meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. 8. The applicant will be responsible to regularly maintain all stormwater treatment and conveyance structures on -site. 9. The mylars must be recorded prior to any zoning permit issuance. 0 #SD-17-06 10. The applicant must submit to the Administrative Officer a final set of project plans as approved in digital (PDF) format prior to recording the final plat plans. 11. The final plat plans (Proposed Site Plan (C1.1) and the Subdivision Plats) must be recorded in the land records within 180 days or this approval is null and void. The plats & plan must be signed by the Board Chair or Clerk prior to recording. Prior to recording the final plat plans, the applicant must submit a copy of the survey plats in digital format. The format of the digital information will require approval of the South Burlington GIS Coordinator. Mark Behr Yea Nay Abstain Matt Cota Yea Nay Abstain Frank Kochman Yea Nay Abstain Bill Miller Yea Nay Abstain David Parsons Yea Nay Abstain Jennifer Smith Yea Nay Abstain John Wilking Yea Nay Abstain Motion carried by a vote of 5— 0 — 0. Signed this 19 day of April 2017, by Bill Miller, Chair Not Present Not Present Not Present Not Present Not Present Not Present Not Present Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this decision, a notice of appeal and the required fee by certified mail to the Superior Court, Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed to the City of South Burlington Planning and Zoning Department at 575 Dorset Street, South Burlington, VT 05403. See V.R.E.C.P. 5(b) (4)(A). Please contact the Environmental Division at 802-828-1660 or http://vermontjudiciary.org/GTC/environmental/default.aspx for more information on filing requirements, deadlines, fees and mailing address. The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist. 7