Loading...
HomeMy WebLinkAboutSP-89-0000 - Decision - 0019 Gregory DriveFINDINGS OF FACT STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Resolution Realty Partner- ship for construction of a 27,500 square foot building for corpo- rate headquarters and manufacturing use, lot #2, Green Tree Park, Shunpike Road. On the 21st of March 1989, the South Burlington Planning Commission approved the request of Resolution Realty Partnership for site plan approval under Section 19.10 of the South Burling- ton Zoning Regulations based on the following findings: 1. TRAFFIC ACCESS: Access is shown from a 48 foot driveway from Gregory Drive. This narrows to a 24 foot wide drive approaching the building. 2. CIRCULATION AND PARKING: Circulation is shown along the southeast and east sides of the site. The proposed use requires 57 parking spaces. The plan shows 67 spaces, with provision for 81. 3. LANDSCAPING & SCREENING: Landscape value required is $20,500. A 3 year bond of that amount shall be posted prior to permit. A revised landscaping plan shall be submitted to the City Planner showing: 1) More plantings along the north-west corner of the building and 2) an additional $8,278 worth of landscaping to meet the proposed landscaping as shown on the subdivision plat. 4. OTHER: 1) The applicant shall contribute $356 toward the Williston Road Impact Area #2 Improvement Fund based on the 36 peak hour trips to be generated by this project. 2) A sewer allocation of 825 gpd is granted and will be subtracted from the entire Green Tree Park sewer allocation. The $2.50 per gallon fee shall be paid prior to permit. 3) The plan shall. be revised to show a depressed concrete curb across the entrance drive, and shall be submitted to the City Planner for approval prior to permit. 4) The driveway and loading area shall be constructed with a gravel base of at least 18 inches and a 3 inch bituminous surface. 5) Applicant shall add another fire hydrant at a location to be determined by the Fire Chief. This shall be reviewed by the City Planner prior to permit. OTHER: This approval is based upon the expressed representation by the applicant that a) all shipping and receiving shall be between 8:00 A.M. and 5:00 P.M., and b) no trailers shall be used for storage or be present on -site for more than 24 hours without the approval of the Planning Commission. OTHER: A zoning permit shall be obtained within 6 months or this approval is null and void. X� r Chairmak or South Burlington Planning Commission