R.E.M. Development, LLC, hereinafter referred to as the applicant, is seeking approval
to amend a previously approved plan for a 27,500 sq. ft. general office/manufacturing
building. The amendment consists of: 1) construction of a 1250 sq. ft. addition for
municipal facility use, 2) conversion of 26,850 sq. ft. of general office use to municipal
facility use (police station), 3) related site improvements including parking and drive
changes, new sidewalks, building entries, security fence, and exterior lighting, 19
Gregory Drive.
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking to amend a previously approved plan for a 27,500 sq. ft.
general office/manufacturing building. The amendment consists of: 1) construction of a
1250 sq. ft. addition for municipal facility use, 2) conversion of 26,850 sq. ft. of general
office use to municipal facility use (police station), 3) related site improvements including
parking and drive changes, new sidewalks, building entries, security fence, and exterior
lighting, 19 Gregory Drive.
2. The owner of record of the subject property is REM Development, LLC.
3. The subject property is located in the Mixed Industrial & Commercial (Mixed IC)
Zoning District.
4. The application was received on November 5, 2009.
5. The plans submitted consist of a two (2) page set of plans. Page one (1) is entitled,
"19 Gregory Drive R.E.M. Development Company, LLC Lot 2 — Green Tree Park South
Burlington, VT", prepared by Lamoureux & Dickinson Consulting Engineers, Inc., dated
10/19/09, with a last revised date of 11/16/2009.
DIMENSIONAL REQUIREMENTS
6. Building coverage will increase from 15% to 15.7% (40% is maximum). Overall
coverage will increase from 52.9% to 54.4% (70% is maximum). Front yard coverage will
remain unchanged at 29.4% (30% is maximum) and will remain unchanged.
7. Setback requirements are being met.
- 1 -
#SP-09-88
SITE PLAN REVIEW STANDARDS
Vehicular access
8. Access is provided via a curb cut off Gregory Drive. No changes are proposed.
Circulation
9. Circulation on the site is adequate
Parking
10. This lot has frontage on two public roads and is thus considered a through lot with two
front yards, and two side yards. There are no rear yards.
Parking is located to the side of the building, with some existing parking in the front yard
along Gregory Drive. The applicant is proposing no changes to the existing number of
parking spaces. 153 parking spaces are now shown on the plan, and 153 parking
spaces are required.
11. Pursuant to Section 13.01(G)(5) of the Land Development Regulations, bicycle
parking shall be provided on the subject property. A bicycle rack is shown on the plan.
12. Pursuant to Section 13.01(13) of the Land Development Regulations, internal
landscaping of the parking area does not apply to this application.
Landscaping
13. Landscaping changes will total $2,675, which is above the $2,250 required by the
addition to the building.
14. Pursuant to Section 13.06(B)(7) of the Land Development Regulations, snow storage
areas must be shown on the plan. The plan does not indicate the snow storage area.
Outdoor Lighting
15. Changes to outdoor lighting conform to requirements for safety and downward
shielding.
Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations, the
following review standards shall apply to site plan applications:
Traffic
16. Traffic will not be affected as a result of this application.
(a) The relationship of the proposed development to goals and objects set forth in
the City of South Burlington Comprehensive Plan.
17. The Comprehensive Plan states that the City should encourage development while
protecting natural resources and promoting a healthy and safe environment. The
-2-
#S P-09-88
proposed project is in keeping with the recommended actions of the Comprehensive
Plan.
(b) The site shall be planned to accomplish a desirable transition from structure to
site, from structure to structure, and to provide for adequate planting, safe
pedestrian movement, and adequate parking areas.
18. The proposed addition is in keeping with this requirement, as are proposed
crosswalks and alterations to existing drives.
(c)Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
19. As noted above, parking is located to the side of the building, with some existing
parking in the front yard along Gregory Drive.
20. As noted above, a bicycle rack location is noted on the plan.
(d) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and existing or
adjoining buildings.
21. The proposed addition is in keeping with this requirement.
(e) Newly installed utility service modifications necessitated by exterior alterations
or building expansions shall, to the extent feasible, be underground.
22. The proposed utilities service modifications will be underground.
(0 The combination of common materials and architectural characteristics,
landscaping, buffers, screens, and visual interruptions to create attractive
transitions between buildings or different architectural styles shall be
encouraged.
23. The proposed addition is in keeping with this requirement
(g) Proposed structures shall be related harmoniously to themselves, the terrain
and to existing buildings and roads in the vicinity that have a visual relationship
to the proposed structures.
24. The proposed addition is in keeping with this requirement
In addition to the above general review standards, site plan applications shall meet the
following specific standards set forth in Section 14.07 of the Land Development
Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce curb
cuts onto an arterial or collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation in the
area.
-3-
#SP-09-88
25. The reservation of land is not necessary.
(b) Electric, telephone, and other wire -served utility lines and service connections
shall be underground. Any utility installations remaining above ground shall be
located so as to have a harmonious relation to neighboring properties and to the
site.
26. As noted above, the proposed utilities service modifications will be underground.
(c) All dumpsters and other facilities to handle solid waste, including compliance
with any recycling or other requirements, shall be accessible, secure, and
properly screened with opaque fencing to ensure that trash and debris do not
escape the enc/osure(s).
27. Pursuant to Section 13.06(C)(1) of the Land Development Regulations, screened
dumpster locations must be shown on the plans. Screened dumpster locations are
shown on the plan.
I91 344 Wre i, I
Based on the above Findings of Fact, the Administrative Officer herby approves Site
Plan Application #SP-09-88 of R.E.M. Development Company, LLC, to amend a
previously approved plan for a 27,500 sq. ft. general office/manufacturing building. The
amendment consists of: 1) construction of a 1250 sq. ft. addition for municipal facility
use, 2) conversion of 26,850 sq. ft. of general office use to municipal facility use (police
station), 3) related site improvements including parking and drive changes, new
sidewalks, building entries, security fence, and exterior lighting, 19 Gregory Drive.
1. All previous approvals and stipulations which are not superseded by this approval
shall remain in effect.
2. This project shall be completed as shown on the plan and shall be on file in the South
Burlington Department of Planning and Zoning.
3. The plan shall be revised to show the changes below and shall require approval of the
Administrative Officer. Three (3) copies of the approved revised plan shall be submitted
to the Administrative Officer prior to permit issuance.
a. The plan shall be revised to depict snow storage area(s).
3. The applicant shall obtain a zoning permit within six (6) months pursuant to Section
17.04 of the Land Development Regulations or this approval is null and void.
4. The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to occupancy of the addition and the newly converted space.
5. Any change to the site plan shall require approval by the South Burlington
Development Review Board or the Administrative Officer.
#SP-09-88
Signed on this
of by/� Cl--0 , 2009 by
nd J. Belair, Administrative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this
decision by filing a Notice of Appeal with the secretary of the Development Review
Board. This Notice of Appeal must be accompanied with a $113 filing fee and be filed
within 15 days of the date of this decision.
-5-