Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BATCH - Supplemental - 0011 Gregory Drive
ono PLANNING & ZONING f/ l.' f /' 4" L', '-' )i P%C I LPL: May 17, 2017 Re: #SP-17-33 Dear Applicant: Enclosed, please find a copy of the Findings of Fact and Decision rendered by the Administrative Officer concerning the above referenced application. Please note the conditions of approval including that a zoning permit must be obtained within six (6) months. If you have any questions, please contact me. Sincefe y, f i Re mond J. Belair Administrative Officer Encl. 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com fi south 1n:. PLANNING b ZONING Permit Number SP-/� A11111.1CM ION FOR SI FF PLAN REVIEW C_1Adin inistrative ❑Development Review Board All information requested on flits application must fie completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and it delay in the reN ieiv before (lie Development Review Board. 1. OWNER(5) OF RECORD (,Name(~) as shown on deed, mailing address. phone wid fax #): M&P Realtv LLC 11 Gregory Drive, So. Burlington, VT 2. LOCATION OF LAST RECORDED DEED(S) (Book arid page 4). 472 / 511-513 3. APPLICANT (Name. mailing address. phone and lax #): Steve Polli - Polli Construction, LLC / email steverra loiliconstruction.com 686 Magee Hill Road, Hinesburg, VT 05461/ P: 802.482.5777 4. CONTACT PERSON (person cNho will recei-c all correspondence frotn Staff. Include name, address. phone & fax # ) Steve Polli 686 Magee Hill Road, Hinesburg, VT 05461 P: 802.482.5777 4a. CONTACT EMAIL ADDRESS:: email: steven@polliconstruction.com 5. PROJECT STREET ADDRESS: 11 Gregory Drive, So. Burlington, VT b. TAX PARCEL 11) # (can he obtained at Assessor's Oft —ice) 0740-00011 57ti Dorset S,reet South Burlington VT 05403 tel 802 846.4106 fax 802.846 4101 www,sburi.c_Or 7. PROJECT DESCRIPTION a. Ocncral project description (explain What you want approval For): Contractor or Building Trade Facility b. Existing 1 Ises on Property (including description and size of each separate use): Vermont Boiler Office / Warehouse / Light Manufacturing c. Proposcd I'seS on property (include description and size ofeach new use and existing use.,, to r-emani) Contractor or Buiding Trade Facility d. Votal building ;square Footage on property (proposed buildings and existing buildings to remain). Existing: 5,000 square feet ""No proposed change in size C. I teight of huiddinu & number of doors ("proposed 11LI)WH1LS and existiM, Moldings to remain, speed} i('basement and mezzanine) Height is approximately 20" Buildings is a single story with a mezzanine space over existing office "*There will be no changes to existing laVOLIt f. Number of residential units (it applicable. new units and existing units to remain): N/A Nrtniher oFemployces (existing turd proposed, note office versus non -office employees): 4 Office. 15 non -office (out in field) h. Other (list an} other information pertinent to this application not specifically requested above, please note it Overlay Districts are applicable) 7 Site Plan Applicator, Fom. Rev. 12-2011 r S. LOT ('OVERAGE �. I�tailditl!�: 1`ot..1 Parccl Bile: 50,530 FYlyting 9.8 414a Proposed 9.8 Sq _ 1 ,. 5 000 sq. ft. 5,000 b. Overall impervious coverage (building. parking, Outside .storage. etc) Existing 30 % i 14,920 sq. ft. Proposed 30 n 14,920 sq. it. c. Front yard (along? each street) Existing 20 1- 4,4877 sq. tt Proposed 20 0A, 4,487.7 sq, ft. d. Voli l aria to he disturbed durim, construction (sq. ft.) 0 Pr01ccts disturhing, more than one-half acre Of land must fullo%v the City's specifications for erosion control in Article 16 ot'thc. Land Develohrnent Re"atiOn;. Projects disturbing snore than one acre require a permit from the Vermont Department of*En-ironniental COnserva oli. 9. COST F.S'i'UMATES a. Buildingg (including interior renovations): S b. I .andscapl ng S C. Other site improNcments (please list with cost): 10. ESTIIti1ATED 'TRAFFIC a. 11.M. Peak liot_ir for entire property (in and Out)- 12 11. PEAK HOURS OF OPERATION: lam - 4 30pm 12. PEAK DAYS OF OPERATION Monday throu(:)h Friday 13. Es'nMATF:1) PROJECT COMPLETION DATE 14. SITE PLAN :AND FEE A site plan h all be sul'n,itt(:d Mitch ihL, ,nt'Ornt ilon ieLluired l7o the C'itv's Land DC�,:10laut, nt Itegula'ions. Cite (5)1 re tilai .i/k, 4'4,pic,. otic .Op� t I I" x 1 7"t. and 013c di�,ital (PDI:-tormat) copy of the site plan must ?%e snbm0ft 'd \ its purl :glpli,:,ttiorl lee shall N.- paid to the C'ity at the time of'submitting the site plan application in accordance "with the city's fee schedule. 14 mil. /�694-44 I / Administrative site plan applications require three (3) regular size copies, one reduced copy (11' x 17"), and one digital (PDF-format) copy Site Plan Application Fotm Rev. 12-2011 NOTE: NOTIFICATION of ADJOINING PROPERTY OWNERS: Notification of adjoining property owners. in accordance with 24 V.S.A. §4464(a) and Section 17.06(B) of the South Burlington (_and Development Regulations, is the responsibility of the applicant. After deeming an application complete. the Administrative Officer will provide the applicant with a draft meeting agendas or public hearing notice and sample certificate of service. 'The sworn certificate of service shall be returned to the City prior to the start of any public hearing. I hereby certify that all %C fu,liton requested as part of this application has been submitted and is accurate: to the best of mtrt.,.�� l� F,\Ar;'RI/OF DATE. 017 St►1 MISSION JL c �\,ATUR ~ ;=:N1'I't WANT I � OWNFIt Do not ir-rite below this line RI VIEW AUTHORITY- L� Dev-aopment Review Board I have reviewed this site plan application and Lind it to be f Compie teIncompletc Administrative Officer Z _ 1G1 `17 PRINT NAME dministrative Officer Date The upplie:a"< or permittee retains the obligation to ident ,, applyfir. and obtain relevant state permits Jirr this proiect. Call (802) 879-5676 ro speak frith the regional Permit Specialist. Site Plan Application Form Rev 12-2011 ray From: Craig Lambert Sent: Tuesday, May 16, 2017 10:53 AM To: ray Subject: RE: 11 Gregory Drive Ray, The white cedars are fine. Craig Lambert South Burlington City Arborist 104 Landfill Rd South Burlington, VT 05403 Ph: 802-658-7961 Fax: 802-658-7976 email: clambert(a sburl.com Notice - Under Vermont's Public Records Act, all e-mail, e-mail attachments as well as paper copies of documents received or prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in error, please notify its immediately by return email. Thank you for your cooperation. From: ray Sent: Tuesday, May 16, 2017 8:57 AM To: Craig Lambert <clambert@sburl.com> Subject: FW: 11 Gregory Drive Craig, Would you please review the attached site plan, they are going to add 15 Eastern White Cedars 3' — 4' in height. If you need the hard copy, let me know. Thanks. Ray Belair Administrative Officer City of So. Burlington 575 Dorset Street So. Burlington, VT 05403 802-846-4106 www.sburl.com www.sbp6thtosustainability.com Notice - Under Vermont's Public Records Act,, all e-mail, e-mail attachments as well as paper copies of documents received or prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in error, please notify us immediately by return email. Thank you for your cooperation. From: Steven Polli[mailto:steven(c@polliconstruction.com] Sent: Friday, May 05, 2017 3:31 PM To: ray <ray@sburl.com> Subject: Fw: 11 Gregory Drive - SouM 5 .... I 3 GREEN TREE DRIVE O 2.7 — * E,ewtan Bend�mak 4'x4'rConcrete Monument t Elewtion: 505:98' AssumedJ` 1 \ 0 f ' ` O PIGEON fARMOPERRES 2 CREJ]J TREE OR/VE •' -0\ I fir+ r x � ' �18 Comet Ga7•r � . .... . ...... e ' C , • Loodk g Dock \ \ W.C. RUSSELL SUPPLY CORP. 9 GREGORY ON + --Wdi Mounted Light -- 7 + Bd/a da + Dumpdfer End ? i BuAding I i t Ir Condlti-Mg UNt I ® Co. Con 0- � r i +\ Pawd.' + I'••J I Wull Mounted Light ACCESSEW + , , SMP,itLYerticd O WVYM 1 16 'i + i BM RAcx I ; 01, WWW � Comet Flagpde� \ r '' .'• per, ... I 18, CM \e Ta Kimball Aw r' r� `\ O s\ \ ' Curb (tom. — Z. , ._.._ J ._." RECORY Ta 10110on R� GRAPHIC SCALE a so ( BI FEIVP 1 Inch - 20 tt Ia2BCd Subbct Property Llne — — — Other Property LMe — Underground E/ech/c — — Underground Gas - ... .. E/ewt/an Contour (mMw) --_. Elewt/on contour.( .pr) ® torah Bo.a, 0 Canmete Monument (CM) 0 /ran PP. F—d flag Pule t a J Existing Dedduooa lres/IrWM Edethg C.Ift ua T I'P"b drub Proposed Cm/t a r /Tree6nelShrub • Ah Conalt/onMg Unit Wdl Mounted Light R.&r Plana • Boundary /nformotion woe taken ham Plat entitled: 'Gruen 7 Park SubdHa/on' sheets SPY and Subd/Ns/an Plot by T dell ConsuitIng Englh— Inc., dated 3/16/67 • 'Site & Utility Plana - V moot Cuat— 8.#—' Sheaf 1 of 2, by Phrkh— Eng/neerMg A.eaciates, Inc., doted 8-88 ENIS77NG KEY 1988 QUANTITY A.P 7 C.5 4 E.A. 10 C. 3 2017 QUANTITY 12111929111113) 9 0 10 0 J.P. 6 P.N. 7 P.S. 5 O.P. 2 6 0 5 2 T.M. J T.O. 1 M.D. 2 1 10 1 PLANT LIST SC/FNOF/C NAME ACER PLATANCIDES COkINON NAME NORWAY MAPLE CORNUS STOLONIFERA RED-OMER DOGWOOD EUONYMUS AUKS COMPACTUS DWARF BURNING BUSH JUNIPERUS CHINENS/S SEA GREEN JUNIPER JUNIPER PROCUB£NS NANA JAPANESE GARDEN JUNIPER PINUS NIGRA AUSTRALIAN PINE P/NUS S7ROBUS NH/7E PINE OUERCUS PALUS7R/S PIN OAK TA)als MEDIA DENS/FORM/S DENSE SPREADING YEW 7HUJA OCC/DENTAL/S EASTERN KNITE CEDAR J-4• BAB MALUS CRABAPPLE The purpose of this p/an /s to show existing conditions on 4124/i7. 7hb /s not a Property __y.. Property fines shown are based on re/erenee plan. and monumentot/on round or .hewn. BEG/DAW Z0K,. B PRAIBV BEG SUMMIT ENGINEERING, INC Engineers • Surveyors • Planners . 1—d—,o. Arohltects CYYECN'EO DAW 1233 Shelburne Road C2 South Burlington, VT 05403 SCAE AS SHOWN (802) 658-5588 Owner../ Recce-d: M&P REAL7Y, LLC SITE PLAN oar 4/24/2017 OAA!WNG NO. POLLI CONSTRUC-nON si PRRMECT NO. DRIVE SOUTH BURLINGTON,VERMONT © 8378 18 Gregory Drive Planting Schedule 4/25/17 Missing from original 1988 planting plan Key jy.. Scientific Name Common Name Size Cost Ext. CS 4 Cornus sericeabaileyi Red Twig Dogwood 3 gal. 22.00 88.00 JC 3 Juniperus chinesis Sea Green Juniper 5 gal. 29.00 87.00 PN 7 Pinus nigra Austrian Pine 5-6' 116.00 812.00 TM 1 Taxus x media Densiformia Dense Spreading Yew 18-24" 29.00 29.00 Subtotal 1016.00 Tax 71.12 Shipping 304.80 Amendments 100.00 Mulch 125.00 Labor 10 hrs. @ 2 5. 00 250.00 Total $1866.92 Additional plantings from 1988 not on original plan Key QtL. Scientific Name Common Name Size Cost Ext. AP 2 Acer Platanoides Norway Maple 2-2.5" 264.00 528.00 MD 1 Malus Flowering Crabapple 15 gal. 131.00 Subtotal 659.00 Tax 46.13 Shipping 197.70 Amendments 25.00 Mulch 25.00 Labor 2.5 hrs. @ 25.00 62.50 Total $1015.33 Proposed plantings 2017 Key � t . Scientific Name Common Name Size Cost Ext. TO 15 Thuja occidentalis Eastern White Cedar 3-4' . 18.00 270.00 Tax 18.90 Shipping 81.00 Amendments 100.00 Mulch 100.00 Labor 12 hrs. @ 25.00 300.00 Total $869.90 ray From: Michael Koch < Michael. Koch @tcevt.com> Sent: Tuesday, March 21, 2017 4:30 PM To: ray Subject: 08-018 VT Boiler - stormwater CO Application Hi Ray, I reviewed the situation with Jeremy and we would like to withdraw our stormwater CO application for 1 1 Gregory Drive. Thanks, Mike Michael C. Koch, E.I. Staff Engineer e. Michael.Kochna,tcevt.com p. 802X 9.6331 x1 l3 PLANNING -ENVIRONMENTAL 478 Blair Park Road, 11"illiston, VT 05495 42 Mapleville Depot, St. Albans, VT 05478 1 j,N1P�r�� ��► A- Y SOjit.- PLANNING & ZONING Number- --.._. (i)lYec use only) _ APPLICATION FOR CERTIFICATE OF OCCUPANCY The undersigned herewith requests an inspection of the premises indicated below and issuance of a "Certificate of Occupancy", j:x:rs.u;1 it to Section 17.03 of City's Land Development Reg-ulations APPLICANT NAME: 1_ ''C V PROPERTY OWNER: MAILING ADDRESS:_. SUBJECT PROPERTY ADDRESS. _j f ; This application includes either the .RBES or CBFS Certificate or a statement horn the builder that this requirement does not apply (Energy Code). The work for which a Certificate of Occupancy is being requested was completed ml as autl:c r,iz under Zoning Permit 4 %P42k clated +l 1 r `gin,, t, c ; /date Application received (office use only) ❑ Temporary Certificate of Occupancy wit) expire on to complete the following improvements: ❑ Pennancnt Certificate of Occupancy ❑ Application denied for the following reasons: _ to provide the applicant time Administrative Officer's Signature Date The applicant or pernrittee retains the obligation to irlentily, apph, fur. and obtain relevant state permits .wr this prolecl. Call (802) 4%7-2241 to speak ivith the regional Permit Specialist. 575 Dorset Street South Burlington, VT 05403 tel 802.946.4106 fax 802.846.4101 %vww sburl.com Subject Property Line Other Property Line -----E— Underground Electric --- —a— Underground Gas ..__.___..__.__..__....... Elevation Contour (minor) ......... ..... _.. _... .... ...... .... . _. Elevation Contour (mojor) --:-------____—= Culvert z—x—x—x— Fenceline ® Catch Bosin O Concrete Monument (CM) O Iron Pipe Found 4 Flog Pole fff t��.oj Lasting Deciduous Tme/Tredine/Shrvb ���,,,,,,,� oExisting Coniferous Tree/Tredine/Shrub Proposed Conifrous TreelFreeline/Shrub 0 Air Conditioning Unit Wall Mounted Light Reference Plans: • Boundary Infw aUon was token from Plot entitled : "Green Tree Pork Subdivision" sheets SPl and Subdivision Plat, by Trudell Consulting Engineers Inc., dated J/16/87 • "Site & Utility Plans — Vermont Custom Bodes" Sheet I of 2, by Pinkhom Engineering Associates, Inc., dated 8-88 EXISTING - 1988 QUANTITY 2017 QUANTITY PROPOW rl A.P 5 9 C.S 2 0 E.A. 5 10 J. C. 3 0 J.P. 6 6 P.N. 6 0 O.P. 2 2 T.M. 3 2 T0. 1 10 M.D. 1 P.S. 5 PLANT LIST SCIENTIFIC NAME ACER PLATANOIDES CORNUS S70LOlVIFERA EUONYMUS ALATUS COMPACTUS ✓UNIPERUS CHINENSIS JUNIPER PROCUBENS NANA PINUS NIGRA QUERCUS PALUSTRIS TAXUS MEDIA DENSIFORMIS THU✓A OCC0ENTALIS MALUS PINUS STROBUS COMMON NAME NORWAY MAPLE RED —OSIER DOGWOOD DWARF BURNING BUSH SEA GREEN JUNIPER JAPANESE GARDEN JUNIPER AUSTRALIAN PINE PIN OAK DENSE SPREADING YEW EASTERN WHITE CEDAR 3-4' B&B CRABAPPLE W41TE PINE The purpose of this plan is to show existing conditions on 4/24/17. This is not a property survey. Property lines shown ore based on reference plans and monumentotion found as shown. Owners of Record r r :ii BOILi_R s12EMAIPCE t. I OF, `.� i � f'; I (1�.r", 2 4" G, f��t�' E_ 3-40 1 0 E U Ci Y t' i.,i'' ^,_ ,., T t ,. -:N J' ;IE ;;. UNDEN JIMIPE_R 2 CAn P t� tdtt,itiA P c 0 1Aq PINE 5-6 E�F;B. o OUEr W r i,EM 1 RI •� i 3 7 ! J j. E1 I rt e t TAWS �., �'s_NSI� 8B T.U. 1 �1 � D Y�IJ 1£�_24„ no J.E3 r. -r THUJA Ot:�_Ir?c,JtA1_I _... Gra;„a. RICA�d ;'-;ORVITAE 4-5, DErdSE l PfP Found IBa g S !h.. ... ...... ... y _ _...__ ..... AIDC.... .. J 6REEYJ TREE ORIV£ _..... _.. , r p O i 4 ` _ ._ _.. _ .._ I - - ._ �• \ N O PIGEON FARM PROP 2 GREEN TREE DRIVE O- � ` I M_ Pvmp sttloch i rO G r. r ' Lovding Dock '��Wall Mounted Lfghf ,� J I Baiords'.,., r T. DumPdtsr EnGoiry /r Bwiding i I ! �� `^v it CwrdlFlpring Unit ' Cas Con —tick } i P ved,' } I p I fi �I;✓ hca/ + Wa/ Mounted (9ght P O I O,JT. I c\\ Concrete Flogpa y \ CM Found To Kfmbal Ave ' r ` Curb (tw.l\ R E IG o R Y GRAPHIC SCALE ( IN FEET ) 1 Inch - 20 ft. 0 lj MWIF MED 9KE RAp( i i O RIFE To Williston Road Elerarion Benchmark' 4"x4' C.'—te M—ment Assumed E7ewtlon:505.98' N/P W.C. RUSSELL SUPPLY CORP. 9 GREGORY DRIVE 14CW Subject Property Une — — — Other Property Line — —� Underground Electric — —�— Underground Gas ..... ... ... .. E/evatl- Confaur (minor) ......... ...... .. Dewtlon Contour (mojor) ................. Culvert —x—x—x— — Fencd/ne ® Cotch Basin ❑ Concrete Monument (CM) O Iron Plpe Found Flag Pae Oaciduous rm,//r .Nin drub o�xS•+� Ex/stbg Conihraus re/r,edm drub y��•••j Proposed Con66— r e/rredm /Shrub All --mg Unrt Wolf Mounted Light Rehrmce Plans • Boundary InhnnoNan was taken from Plat entitled: "Gl'een Tree Pork SubdiNsion" sheets SIT and Subdf MI- Pfot, by Tiuddl Consulting Engineer Inc., dated J/16/87 • "SIFe & Utnity Pfans - V pit Custom Bailers" Sheet i of P, by Plnkhom Engineering Associates, Inc., dated 8-88 EXlSPNG PLANT LIST w.X r988 OUAN71TY 2017 OUANT17YPROPOSED SCIENTFlC NAME COMMON NAME A.P 5 9 ACER PLATANOIDES NORWAY MAPLE C.5 2 0 CORNUS STOLONIFERA RED -OSIER DOGWOOD E.A. 5 10 EUONYMUS ALATUS COMPACTUS DWARF BURNING BUSH J.C. 3 0 JVNIPERUS CHINENSIS SEA GREEN JUNIPER J.P. 6 6 JUNIPER PROCUBENS NANA JAPANESE GARDEN JUNIPER P.N. 6 0 PINUS NIGRA AUSTRALIAN PINE O.P. 2 2 OUERCUS PALUSTRIS PIN OAK T,M. 3 2 TAXUS MEDIA DENSIFORM/S DENSE SPREADING YEW T.0. 1 10 THU✓A OCCIDENTAUS EASTERN WHITE CEDAR 3-4' B&B M.O. 1 MALUS CRABAPPLE P.S 5 PINUS STROBUS WHITE PINE The pury— of this plan fs to show existing conditfms on 4/24/17, ih/s rs not a property survey Property lines shown are based m r,fw— plans and monumentotlon found os shown, Owners of R-1, M&P REALTY, LLC CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING DEVELOPMENT REVIEW BOARD Report preparation date: November 13, 2008 drb\misc\VTBoilerSpecialists\VTBoiler fill.doc Application received: October 17, 2008 11 GREGORY DRIVE Miscellaneous Application #MS-08-11 Meeting date: November 18, 2008 enda #6 Applicant Property Information Vermont Boiler Specialists Tax Parcel ID 0740-00011 11 Gregory Drive Mixed Industrial Commercial Zoning District South Burlington, VT 05403 Owners M&P Realty LLC 11 Gregory Drive South Burlington VT 05403 Location Map CITY OF SOUTH BURLINGTON 2 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drb\misc\VTBoiler fill.doc VT Spoiler Specialists, hereafter referred to as the applicant, is seeking miscellaneous approval to alter the existing grade by removing more than 20 cubic yards of fill to improve the stormwater treatment system, 11 Gregory Drive. Associate Planner Cathyann LaRose and Administrative Officer Ray Belair have reviewed the plans submitted on June 19, 2008 and have the following comments. This application shall be reviewed under Section 3.12 of the Land Development Regulations. The removal from land or the placing on land of fill, gravel, sand, loam, topsoil, or other similar material in an amount equal to or greater than twenty (20) cubic yards, except when incidental to or in connection with the construction of a structure on the same lot, shall require the approval of the Development Review Board. The Development Review Board may grant such approval where such modification is requested in connection with the approval of a site plan, planned unit development or subdivision plat. This section does not apply to the removal of earth products in connection with a resource extraction operation. Standards and Conditions for Approval: (1) The Development Review Board shall review a request under this Section for compliance with the standards contained in this sub -Section 3.12(B). An application under Section 3.12(A) above shall include the submittal of a site plan, planned unit development or subdivision plat application showing the area to be filled or removed, and the existing grade and proposed grade created by removal or addition of material. The plan which has been submitted is acceptable. The proposed change in grade is clearly delineated on the plan. (2) The Development Review Board, in granting approval may impose any conditions it deems necessary, including, but not limited to, the following: (a) Duration or phasing of the permit for any length of time. The applicant has noted that this fill is used to improve the existing stormwater treatment areas. This is a permanent change and staff does not recommend a time limit on the removal of the fill. (b) Submission of an acceptable plan for the rehabilitation of the site at the conclusion of the operations, including grading, seeding and planting, fencing drainage, and other appropriate measures. The proposed location of the fill will result in improved stormwater treatment. Staff does not recommend any further action with regards to this criterion. CITY OF SOUTH BURLINGTON 3 DEPARTMENT OF DEVELOPMENT REVIEW BOARD PLANNING & ZONING \drblmisc\VTBoiler fill.doc (c) Provision of a suitable bond or other security adequate to assure compliance with the provisions of this Section. Staff does not feel this requirement will be necessary for the subject application. (d) Determination of what shall constitute pre -construction grade under Section 3.07, Height of Structures. The pre -construction height for future development will be the existing grade. Staff does not anticipate any development occurring over the stormwater treatment areas. Staff recommends that the DRB approve miscellaneous application #MS-08-11. Respectfully submitted, CathyaJLaRose, As o iate Planner Copy to: William Park, Trudell Consulting Engineers, for Applicant SITE DATA 1. APPLICANT: VERMONT BOILER SPECIALISTS 11 ORE DRIVE SOUTH BURLINGTON. VT 05403 Z OWNER OF RECORD: M k P REALTY, LLC 3 TAX PARCEL ID: 0740-00011 4, PHYSICAL ADDRESS OF PROPERTY.11 ORE DRIVE SOUTH BURLINGTON, VERMONT 5. PARCEL SIZE: 1.15 AC.2 6, ZONING DISTRICT: MIXED INDUSTRIAL a COMMERCIAL SETBACK REQUIREMENTS: FRONT YARD 30' MIN SIDE YARD 10' MIN BACK YARD 30' MIN COVERAGE: EXIST. PROPOSED REQUIRED PAVEMENT/SIDEWALKS: 9,920 SF 9,920 SF BUILDING. 5,000 SF (IOX) 5,000 SF (TOR) 40S MAX TOTAL LOT: 14,920 SF (JOX) 1"20 SF (JOR) 70R MAX FRONT YARD: 833 SF (17R) 833 SF (17R) 30x MAX PARKING SPACES: Ems, PROPOSED: REGULAR: 17 17 HANDICAP: 1 1 TOTAL: 18 IB PLAN INTENT. - THE INTENT OF THIS PLAN IS TO ACCOMPANY AN APPLICATION FOR THE DEVELOPMENT REVIEW BOARD FOR SITE WORK INOLVED WITH MAINTENANCE OF THE STORMWATER TREATMENT SYSTEM PLAN REFERENCE- - EXISTING CONDITIONS BASED ON OBSERVATIONS FROM 02125100 SITE VISIT - NO BOUNDARY SURVEY PERFORMED, PROPERTY LINES APPROXIMATED FROM CITY OF SOUTH BURLINGTON TAX MAP ONLY - ORTHO PHOTO TAKEN IN 2004 - CONTOUR INFORMATION DERIVED FROM LIGHT DETECTION AND RANGING (LIDAR) CONTOURS LEBARDN LA0910 FIEANOUT RING AND COVER. NO LABEL —III—III—III—-1j=J)ll=1j(- 111=1 =1 =1I III—Jl—II1=1I =I =1 I1=1I I— I I 111=1 I I —I 1I- 111=III=III=III= —III=1_I1=III=1_I III III—III=1 I I III III —III III- III III —III —III= III=III III_ll —I I I_II I I=1 I CJ I I III —I 1 11 I I —I I I- 111=I =I I I=I I I=1 I EiL I F. 11-III-111I III-III-III-1I1- BACKFILLED STMM TRENCH __.-- 6- PVC SOR 35 MWR 6' PVC SDP 35 45' ELBOW 6' PVC SOP 35 PERFORATED 0 TYPICAL STORM DRAIN CLEANOUT _ V-0- u cwsu.nuc LxaxEEas wx1lrM TOPSOL a SEED SIDE SLC S ") AND BOTTOM, THEN APPLY DOUBLE NETIWG STRAW U78- N LAOBIO GLEANWI SION EROMATING TO SIDES RNG AND COVER. NO LABEL SLOPES AND BOTTOM EDGE OF PAWWNT SPKLWAT 6' PERFORATED Ow'., 95ER A�RDN WELL 3' 3- TOPSIx MIXED IN SOX SAND dJ FILTER FABRIC NTH 12- 12' OVERLAP (TYPICAL) 5' BANK RUN GRAVEL 3 1/2'-.' t2. -SHED STOVE 12' PVC GUI VERT FRGM LOADING DOCK CA TOL BARN � o 0 6' PERFORAlEO DRAIN 6 SAND MTER LOCATED AT HALF W HEIGHT OF TRENCH SEPARATED FROM INDURATION TRENCH BY FA, TER FABRIC 2 GRASS LINED INFILTRATION TRENCH r RFM�ED e��Il�ee i LOT 9 to N/T RUML NG CORP, v ¢¢,, -�—.-- TO 94MPWE ROAD Graphic Scale 20 0 20 40 60 Bo TRUDELL CONSULTING ENGINEERS (iCE) 478 BWr PWk god P.O. BM 308 (BD2) 879di31(pllwle) WI WN, Ve no:e 054% MM E79-DBEO((W VW Us on 81t Web 6C W W W.Tr deWona dn&I=n1 i U1AA OCT i?213 City of So. Burlington N. I Desc". DRte ft BeWebnR SE OF VEPN • R No. 3091� f Lt "hIS P10 0We Vermont Custom Boilers Lot 10 Green Tree Park Gregory Drive So. Burlington, VT Sheet 7Ble Stormwater Improvement Plan D—Ing N:ardw : 2008018-30 Extension, I I'Meu--g— — Drawn' WWP Dade: o2/24/2008 F.B. 000 Scale: I' = 20' P.*.d Il1— - xxx X4W• 2008018c1c Bench FBe: XXX Ap(XOJId STORM -:�Ou ( 14 DEVELOPMENT REVIEW BOARD 18 NOVEMBER 2008 Mr. Plumeau moved to approve Final Plat Application #SD-08-50 of William E. Dailey, III, subject to the stipulations in the draft motion as amended above. Mr. Farley seconded. Motion passed unanimously. 5. Continued Sketch Plan Application 4SD-08-12 of Allen Road Land Company for a planned unit development consisting of 30 multi -family dwelling units in four buildings, with two existing single family dwellings, 725 Hinesburg Road & 18 Derby Circle: Mr. Belair advised that the applicant had asked for a continuance until 16 December. Mr. Farley moved to continue Sketch Plan Application 4SD-08-12 of Allen Road Land Company until 16 December 2008. Mr. Knudsen seconded. Motion passed unanimously. 6. Site Plan Application 14SP-08-105 of David Simendinger to amend a previously approved plan for a 2056 sq. ft. convenience store with gas sales. The amendment consists of after -the -fact approval for: 1) outside storage of equipment, 2) revising the dumpster enclosure, and 3) altering the existing grade by adding more than 20 cubic yards of fill, 1118 Williston Road (gas station just east of Holiday Inn): Mr. McClellan said the fill was placed to the north of the building. Mr. Belair noted this plan corrects violations. Staff has no issues. Mr. Belair also noted that the sign issue has been dealt with by an application for a new sign. Mr. Plumeau moved to approve Site Plan Application #SP-08-105 of David Simendinger subject to the stipulations in the draft motion. Mr. Farley seconded. Motion passed 4-0. CMiscellaneous application #MS-08-11 of VT Boiler Specialists to alter the ) existing grade by removing more than 20 cubic yards of fill to improve the stormwater treatment system, 11 Gregory Drive: Mr. Morgan said they were found to be non -compliant with State runoff rules. They hired an engineer to address the issues. Mr. Belair said the Stormwater Superintendent is satisfied with the plan. Mr. Farley moved to approve Miscellaneous Application #MS-08-11 of VT Boiler Specialists subject to the stipulations in the draft motion. Mr. Knudsen seconded. Motion passed 4-0. -2- � � Will Park TrudeUConsulting Engineers POBox 308 Williston, VT 05495 Re, Minutes — 11 Gregory Drive Dear Mr. Park: For your records, enclosed iSecopy Ofthe approved November 18'2OOODevelopment Review Board meeting minutes. If you have any questions, feel free to contact me. GiOCe[e|y' &W&- Betsy McDonough B Planning 8.Zoning Assistant End. November 19, 2008 Jim Morgan VT Boiler 11 Gregory Drive South Burlington, VT 05403 Re: Miscellaneous Application #MS-08-11 Dear Mr. Morgan: Pursuant to 24 VSA 4464(b)(3), enclosed please find a copy of the Development Review Board decision regarding the above referenced matter. You are being provided a copy of this decision because you appeared or were heard at the hearing. If you have any questions, please feel free to contact this office. Sincerely, _&K?Uja SU Betsy McDonough Brown Planning & Zoning Assistant 673: Dursmt Street South Surlrngla t, YT 05403 tel R03 044.00@ tax 002..dM4101 n.sburl_com CITY OF SOUTH BURLINGTON Interested Persons Record and Service List Under the 2004 revisions to Chapter 117, the Development Review Board (DRB) has certain administrative obligations with respect to interested persons. At any hearing, there must be an opportunity for each person wishing to achieve interested person status to demonstrate compliance with the applicable criteria. 24 V.S.A. § 4461(b). The DRB must keep a written record of the name, address and participation of each person who has sought interested person status. 24 V.S.A. § 4461(b). A copy of any decision rendered by the DRB must be mailed to every person or body appearing and having been heard by the DRB. 24 V.S.A. § 4461(b)(3). Upon receipt of notice of an appeal to the environmental court, the DRB must supply a list of interested persons to the appellant in five working days. 24/V.S.A. § 4471(c). HEARING DATE: NAME MAILING ADDRESS PROJECT OF INTEREST v cau--i�-®�- �C�,t_'�S-or� 50 (fir rf e n Itt v (p0 5 f2iz (7, J�r tv '7 i LLLnv _iAwvle- 2 cJ t4' V1-V. b <,(A CA-& � �. yr i �.. r E/ southburlington PLANNING & ZONING November 19, 2008 William Park Trudell Consulting Engineers PO Box 308 Williston, VT 05495 Re: Miscellaneous Application #MS-08-11 Dear Mr. Park: Enclosed, please find a copy of the Findings of Fact and Decision rendered by the Development Review Board on November 18, 2008. Please note the conditions of approval including that a zoning permit must be obtained within six (6) months If you have any questions, please contact me. Sincerely, Betsy McDonough Brown Planning & Zoning Assistant Encl. CERTIFIED MAIL RETURN RECEIPT: 7008 0150 0003 6150 5225 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburt.com southburliton PLANNING & ZONING November 14, 2008 William Park Trudell Consulting Engineers PO Box 308 Williston, VT 05495 Re: Vermont Boiler, Gregory Drive Dear Mr. Park: Enclosed is the agenda for next Tuesday's Development Review Board meeting and staff comments to the Board. Please be sure that someone is at the meeting on Tuesday, November 18, 2008 at 7:30 p.m. If you have any questions, please give us a call. Sincerely, Betsy McDonough Brown Planning & Zoning Assistant Encl. 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com November 6, 2008 M&P Realty, LLC/Vermont Boiler Specialists 11 Gregory Drive South Burlington, VT 05403 Re: 11 Gregory Drive Dear Property Owner: Enclosed is the draft agenda for the November 18, 2008 South Burlington Development Review Board Meeting. It includes an application for development on your property. This is being sent to you and the abutting property owners to make aware that a public meeting is being held regarding the proposed development. The official agenda will be posted on the City's website (www.sburl.com) by the Friday prior to the meeting. Under Title 24, Section 4464 of State law, participation in a municipal regulatory proceeding is required in order to preserve your right to appeal a local development approval to the Vermont Environmental Court. State law specifies that "Participation in a local regulatory proceeding shall consist of offering, through oral or written testimony, a statement of concern related to the subject of the proceeding." If you would like to know more about the proposed development, you may call this office at 846-4106, stop by during regular office hours, or attend the scheduled public meeting. Sincerely, Betsy McDonough Brown Planning & Zoning Assistant Encl. cc: William Park 575 Duxsat Strat+t South Rurlinglenx VT 05483 6cl MAW*08 ful 80,2A46.4101 www.1hurl.cam November 6, 2008 Russell Supply Corp. c/o William E. Hoy, Registered Agent PO Box 2221 South Burlington, VT 05403 Dear Property Owner: Enclosed is a copy of the draft agenda for the November 18, 2008 South Burlington Development Review Board meeting. It includes a proposal that abuts property you own. The official agenda will be posted on the City's website (www.sburl.com) by the Friday prior to the meeting. Under Title 24, Section 4464 of State law, participation in a municipal regulatory proceeding is required in order to preserve your right to appeal a local development approval to the Vermont Environmental Court. State law specifies that "Participation in a local regulatory proceeding shall consist of offering, through oral or written testimony, a statement of concern related to the subject of the proceeding." If you would like to know more about the proposed development, you may call this office at 846-4106, stop by during regular office hours, or attend the scheduled public meeting. Sincerely, t* 60k7--, Betsy McDonough Brown Planning & Zoning Assistant Encl. fi-,45 Durxet street South Eurkiqlen, YT 054 r4 B02-84b.4t,D6 law 002-04 ,001 Maass . $a err Meru November 6, 2008 GD Enterprises, LLC 12 Gregory Drive South Burlington, VT 05403 Dear Property Owner: Enclosed is a copy of the draft agenda for the November 18, 2008 South Burlington Development Review Board meeting. It includes a proposal that abuts property you own. The official agenda will be posted on the City's website (www.sburi.com) by the Friday prior to the meeting. Under Title 24, Section 4464 of State law, participation in a municipal regulatory proceeding is required in order to preserve your right to appeal a local development approval to the Vermont Environmental Court. State law specifies that "Participation in a local regulatory proceeding shall consist of offering, through oral or written testimony, a statement of concern related to the subject of the proceeding." If you would like to know more about the proposed development, you may call this office at 846-4106, stop by during regular office hours, or attend the scheduled public meeting. Sincerely, Betsy McDonough Brown Planning & Zoning Assistant Encl. 575 Murst Stredt South YT 05403 tel '90_ 4 . ,06, tax. 80,2.846AW wwwa lzhuc _rso-m November 6, 2008 Green Mountain Delta Holdings, LLC c/o Lewis K. Sussman, Registered Agent 253 South Union Street Burlington, VT 05401 Dear Property Owner Enclosed is a copy of the draft agenda for the November 18, 2008 South Burlington Development Review Board meeting. It includes a proposal that abuts property you own. The official agenda will be posted on the City's website (www.sburi.com) by the Friday prior to the meeting. Under Title 24, Section 4464 of State law, participation in a municipal regulatory proceeding is required in order to preserve your right to appeal a local development approval to the Vermont Environmental Court. State law specifies that "Participation in a local regulatory proceeding shall consist of offering, through oral or written testimony, a statement of concern related to the subject of the proceeding." If you would like to know more about the proposed development, you may call this office at 846-4106, stop by during regular office hours, or attend the scheduled public meeting. Sincerely, Betsy McDonough Brown Planning & Zoning Assistant Encl. 576 Dorset Stre*t 5,v t Turlir o`io", WIF 06402 kfel 8D.2-046M,,06 fax, 002,946,4101 wve%v &,burI. a am CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 Permit #'w 5- 0'�-I � APPLICATION FOR THE DEVELOPMENT REVIEW BOARD All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development Review Board. I understand the presentation procedures required by State Law (Section 4468 of the Planning & Development Act). Also that hearings are held twice a month. That a legal advertisement must appear a minimum of fifteen (15) days prior to the hearing. I agree to pay a hearing fee which is to off -set the cost of the hearing. Type of application (check one): ( ) Appeal from decision of the Administrative Officer (includes appeals from Notice of Violation ( ) Request for a conditional use ( ) Request for a variance Other PROVISION OF ZONING ORDINANCE IN QUESTION (IF ANY): WHAT ACTION OF THE ADMINISTRATIVE OFFICER ARE YOU APPEALING ? G u , y C✓i o 1) OWNER OF RECORD (Name as shown on deed, mailing address, phone & fax #): It Crfe-,- P� C�iv2 65 -- l(�3Z �=Cfs�Z.i v�2^li-t�-lO 2) LOCATION OF LAST RECORDED DEED (book & page #) 3) APPLICANT (name, mailing address, phone and fax #) G--r-V t:k, f l . — 4 ,.-. \f Ti 4) CONTACT PERSON (person who will receive staff correspondence. Include name, mailing address, phone & fax # if different from above): / lnlll�iG..w.. 1"fwi� � �r.���� lyr�S.J��+.0 L✓�✓l.�-ys \T vs-ielS (". CSc,2_)'k1`t-6311 5) PROJECT STREET ADDRESS: 1 i Grc_Z 6) TAX PARCEL I D #: d --'-L U - U roc,= , \ 7) PROJECT DESCRIPTION A. Existing Uses on Property (including description and size of each separate use): l` YV'1 Yrl e__ - G B. Proposed Uses on Property (include description and size of each new use and existing uses to remain): C. Total building square footage on property (proposed buildings & existing building to remain): D. Height of building & number of floors (proposed buildings and existing buildings ` to remain, specify if basement & mezzanine): @1 f C � 4 V-1e_ , l A `� k de- 1 f_ E. Number of residential Units (if applicable, new units & existing units to remain): h L' r C F. Number of employees & company vehicll s (existing & proposed, note office vs. non -office employees): 10 �,N.�,_ S ( c-( V 4 G. Other (list any other information pertinInt to this application not specifically requested above, please note if overlay districts are applicable): 8) LOT COVERAGE A. Total parcel size: 90 -15'1 1. 6 Sq. Ft. B. Buildings: Existing 10 % / 'S, ov v Sq. Ft Proposed i 0 % / C.0 csv-y Sq. Ft. C. Overall impervious coverage (building, parking, outside storage, etc) Existing 3 % / 14 1 9 Z c% Sq. Ft. Proposed 3 ► `-t el 7_0 Sq. Ft, D. Total area to be disturbed during construction: '-i+ 00-0 A_ Sq. Ft. * * Projects disturbing more than one-half acre of land must follow the City's specifications for erosion control in Article 16 of the Land Development Regulations. Projects disturbing more than one acre require a permit from the Vermont Department of Environmental Conservation. 9) COST ESTIMATES A. Building (including interior renovations): $ N 1 B. Landscaping $_ A/A C. Other site improvements (please list with cost): l 10) ESTIMATED TRAFFIC: A. Average daily traffic for entire property (in and out): '-:L B. A. M. Peak hour for entire property (in and out): 1 C. P.M. Peak hour for entire property (in and out): 11) PEAK HOURS OF OPERATION ,.,A / 1 12) PEAK DAYS OF OPERATION VY1 v r� 13) ESTIMATED PROJECT COMPLETION DATE 11 14) LIST ABUTTING PROPERTY OWNERS: (list names and address of all abutting property owners, including those across any street or right-of-way. You may use a separate sheet of paper if necessary): I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. Do not write below this line DATE OF SUBMISSION: to M/b y REVIEW AUTHORITY: evelopment Review Board ❑ Director, Planning & Zoning I have reviewed this application and find it to be: 9-1'5OMPLETE ❑ Incomplete / Nt-j 1dfil r of Pla ing & Zoning or Designee Date C ABUTTING PROPERTY OWNERS Vermont Boiler Specialists 11 Gregory Drive South Burlington, VT 05403 Russell Supply Corp. 9 Gregory Drive South Burlington, VT 05403 GD Enterprises, LLC. 12 Gregory Drive South Burlington, VT 05403 Green Mountain Delta Holdings, LLC. 7 Green Tree Drive South Burlington, VT 05403 TRUDELL CONSULTING ENGINEERS (TCE) October 14, 2008 City of South Burlington Department of Planning & Zoning 575 Dorset Street South Burlington, VT 05403 RE: Vermont Boiler Specialists -11 Gregory Drive - South Burlington, VT Application for the Development Review Board Dear Sir or Madam: tel: 802-879-6331 fax: 802-879-0060 www.trudellconsulting.com On behalf of our client, Vermont Boiler Specialists, Trudell Consulting Engineers (TCE) is submitting an Application for the Development Review Board for a stormwater system maintenance project. The project involves over 20 cubic yards of cumulative cut and fill material for the installation of a subsurface infiltration trench. The purpose of this project is to get the project's Discharge Permit #1-0546 into compliance and to update the stormwater system to meet the 2002 Vermont Stormwater Management Manual. This design was approved by the State Water Quality Division - Stormwater Section on September 22, 2008. Enclosed is the signed Application for the Development Review Board, the application fee of $86.00, and the Stormwater Improvement Plan. Please do not hesitate to contact me with any questions or comments. Very truly yours, TRUDELL CONSULTING ENGINEERS (TCE). William W. Park, E.I. Encl. Signed Application for the Development Review Board Application Fee Stormwater Improvement Plan CC. Vermont Boiler Specialists SATCE PROJECTS\2008\018 VT Boiler\8018 DRB App Cover letter.doc P.O. Box 308 478 Blair Park Road Williston, Vermont 05495 Civil Engineering, Surveying, Land Planning, Water and Wastewater, Landscape Architecture. Roadway Design, Permitting C, I\v>;STORS CORPOILVrION OF VER ONT Mr. Ray Belair Zoning and Planning Administrative Officer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: 11 Gregory Drive February 14, 2002 Site Dimensions Dear Mr. Belair: Upon receipt of your telephone call regarding actual installed location of new dumpster enclosure at 11 Gregory Drive, ICV submits actual dimensions of installed unit. The present location is 121'-3" from Gregory Drive, 'North curb line, in lieu of application plan that showed the location being approximately 141'-0'. We have attached a site plan with the actual installed location for your review. Please advise if this is acceptable, or what conditions you would like corrected. 'ncerely, A. Skip Williams ICV Construction, Inc. I Mr. Ray Belair Zoning and Planning Administrative Officer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: 11 Gregory Drive Site Dimensions Dear Mr. Belair: INVESTORS CORPORATION OF VERMONT ICV Construction, Inc. February 14, 2002 Upon receipt of your telephone call regarding actual installed location of new dumpster enclosure at 11 Gregory Drive, ICV submits actual dimensions of installed unit. The present location is 12l'-3" from Gregory Drive, North curb line, in lieu of application plan that showed the location being approximately 141'-0'. We have attached a site plan with the actual installed location for your review. Please advise if this is acceptable, or what conditions you would like corrected. ncerely` A. Skip Williams ICV Construction, Inc. Suite 401, 30 Main Street Burlington, Vermont 05401 (802) 863-2311 FAX (802) 863-2313 cml 0 INVESTORS CORPORATION OF VERMONT ICV Construction, Inc _ Mr. Ray Belair Zoning and Planning Administrative Officer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: Request for Certificate of Occupancy Inspection February 5, 2002 Lot # 10 Green Tree Park 11 Gregory Drive South Burlington, Vermont Dear Mr. Belair: This letter shall serve as a request by ICV Construction, Inc. for the City of South Burlington to inspect the dumpster enclosure as constructed under zoning application ZP-02-018 at the 11 Gregory Drive location of Vermont Custom Boiler. With your acceptance of zoning compliance, we sincerely request a review of our completion of outstanding issues and request a Certificate Of Occupancy on the behalf of Mr. Joseph Lovering. We sincerely hope our request is in order, and want to thank you for your assistance. incerely-'� A. Skip Williams ICV Construction, Inc. Cc: Mr. Joseph Lovering ICV Construction, Inc. Suite 401, 30 Main Street Burlington, Vermont 05401 (802) 863-2311 FAX (802) 863-2313 I Mr. Ray Belair Zoning and Planning Administrative Officer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: Zoning Permit Application 11 Gregory Drive Dear Mr. Belair: 71m----1 INVESTORS CORPORATION OF VERMONT ICV Construction, Inc. January 28, 2002 ICV Construction, Inc. presents this letter as part of our application for zoning permit application for installation of dumpster enclosure at 11 Gregory Drive, in South Burlington, Vermont on behalf of Mr. Joseph Lovering. We enclose a combined fee of $18.00 ( Permit of $8.00 and Administrative fee of $10.00 ) based on cost of $1600.00. We sincerely hope our request is in order and please call if we may be of further assistance. Sincerely, Skip William S ICV Con truction, Inc. Suite 401, 30 Main Street Burlington, Vermont 05401 (802) 863-2311 FAX (802) 863-2313 l CITY OF SOUTH BURLI E TON DEPARTMENT OF PLANNING & ZONING 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 (802) 846-4106 FAX (802) 846-4101 October 3, 2001 Mr. Skip Williams ICT Construction, Inc. 30 Main Street, Suite 401 Burlington, VT 05401 Dear Mr. Williams, Enclosed are the Findings of pact approving the site plan application for the property at 11 Gregory Drive in South Burlington. Please be sure to apply for a Zoning Permit from our office vdthin six months of today, and call if you have any questions. Sincerely, e( 0 Cz'zf'--- uli Beth Hoover, AICP Director of Planning & Zoning cc: Joseph F. Lovering CITY OF SOUTH BURLINGTON DEaPARTM>I NT OE ]PLANI'-TING & ZONE14G 575 DORSET STREET SOUTH BURLINGTOi 1, VERMONT 05403 (802) 346-4106 AAA (802) 846-4I01 Permit Number SP--' - APPLICA ION FOR SITE PLAN REVIEW All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review before the Development review Board. p � %P Rt-Li *98 -/4 7" 1) OWNER OF RECORD (Maine as shown on deed, mailing address, Phone and 'C 2) LOCATION OF LAST RECORDED DEED (Book and page 3) APPLICANT (Name, mailing address, phone and fax # 4) CONTACT PE ON (Marne, mailing address, IC✓y'Ge�tlS r•tfC. ) 4i 14)C. • %in "t, t ,-A-- 5 5) PROJECT STREET ADDRESS: /1 �I2.Cc C.V fax #). k 6) TAX PARCEL ID # (can be obtained at Assessor's Office). L- 7) PROTECT DESCRIPTION a) Existing Uses on Property (including description and size of each separate use) use and existing uses to remain) e tJ e) Total building square footage on property (proposed buildings and existing buildings to remain) sOdy d) Height of building, & nuTnber of floors (proposed buildings andeexisting buildings to remain, specifyiffbasement and mezzanine)p,�pj�pS� �•+[ ��� LIM S i; \4-4W kXfi 1 c.t:6,1, b i IC f LS-o A e) Number of residential units (if applicable, new units and existing units to remain ') Number of employees & company vehicles ((existing and proposed, note office versus non -office employees) 1 g) Other (list any other infer -Mahon pertinent to this application not speelfcally requested above, pleas,-, note ff Overlay Districts are applicable): 8) LOT COVERAGE a) Building: Existing L0 % Proposed /C % b) Overall (building, parldng, outside storage, etc) t Existing 2n % Proposed 2jQ % c) Front yard (along each street) Existing % Proposed % 9) COST ESTRvfATES a) Building (including interior renovations): b) Landscaping: c),Other site improvements (piease list with cost): 10) EST3/1ATED TRAFFIC a) AVerage daffy traffic for entire property (in and out): b) A.1\/1. Peak liour for entire property (in and out): c) P.M. Peak hour for entire property (In and out): 11) PEAK HOURS OF OPERATION: 12) PEAK DAYS OF OPERATION: 13) ESTIIVLkTED PROJECT CONIPLETION DATE: 14) SITE PLAN AI,TD FEE A site plan shall be submitted which shows the information listed on Exhibit A attached. Five (5) regular size copies and one reduced copy (I I" x 17") of the site plan must be submitted. A site plan application fee shall be paid to the City at the time of submitting the site plan application (see Exhibit A). I hereby certify that all the information requested as part of this application has been submitted and is accurate to the best of my knowledge. SI ATURE OF APPLICANt SIGNATURE OF PROPERTY OWNER Do not write below this line DATE OF SUBMISSION: REVIEW AUTHORITY: ❑ Development Review Board Director, Planning & Zoning I have reviewed this site plan application and find it to be: Complete ❑ Incomplete J o L Director of Planning & or Designee Date Mr. Ray Belair Administrative Officer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: Application for Site Plan Review For 10 Green Tree Park South Burlington, Vermont Dear Mr. Belair: 0 INVESTORS CORPORATION OF VERMONT ICV Construction, Inc. September 11, 2001 This letter shall serve as a request by ICV Construction, Inc. for the City of South Burlington to complete a site plan review of Lot #10 Green Tree Park which present houses Vermont Custom Boilers. We have enclosed our site plan application, appropriate fees and site plans for your review and consideration. We sincerely hope all is in order and please do not hesitate to call if we can be of further assistance. Sincerely, a ' 1� ca�� A. Skip Williams ICV Construction, Inc. a�P 13 2 Suite 401, 30 Main Street Burlington, Vermont 05401 (802) 863-2311 FAX (802) 863-2313 State of Vermont Department of Fish and Wildlife Department of Forests, Parks and Recreation Department of Environmental Conservation August 30, 2001 Vermont Boiler Specialists 216 Battery Street South Burlington VT 05401 AGENCY OF NATURAL RESOURCES Department of Environmental Conservation Wastewater Management Division Essex Junction Regional Office 111 West Street Essex Junction, VT 05452 (802)879-5656 Permit # WW-4-0036, Green Tree Park -- Construction of 5,000 s.f. office/warehouse building on Lot 10 of EC-4-1120 located on Gregory Drive in South Burlington, Vermont. Dear Permitee: Our office has received an inspection report from Kenneth Pinkham, P.E. which satisfies Condition. #9 of the above referenced permit. The inspection report notes that the pump station controls were not functioning properly and it is important that the owners follow-up on the maintenance of the pump station to correct any problems with the controls. Thank you for your close attention to the permit conditions. Please note that any changes to the water or sewer lines/systems, or changes in use that increase the demands of the systems, may require a permit from this office. Sincerely, essanne Wyman Assistant Regional Engineer City of South Burlington Planning Commission Kenneth W. Pinkham CI Mr. Ray Belair Administrative Officer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: Request for Certificate of Occupancy Inspection Lot # 10 Green Tree Park Vermont Custom Boilers SB Permit #88-147 dated 11/4/88 Dear Mr. Belair: 0 INVESTORS CORPORATION OF VERMONT ICV Construction, Inc. August 13, 2001 This letter shall serve as a request by ICV Construction, Inc. for the City of South Burlington to review the attached site plan for Lot # 10 Green Tree Park which presently houses Vermont Custom Boilers. In our efforts to finalize the location of the dumpster enclosure the owners have requested the enclosure to be installed at the new location as indicated by current note on the attached site plan drawing. ICV Construction, Inc. is hopeful that your department can administratively confirm the new location as acceptable, an complete an inspection for final Certificate of Occupancy. We sincerely hope our request is in order, and specifically want to thank you for your assistance on our behalf. Sincerely, Skip W' ' s ICV Construction, Inc. Suite 401, 30 Main Street Burlington, Vermont 05401 (802) 863-2311 FAX (802) 863-2313 1DEPAR'1ITVIEI°`iT OF PLANNING & ZONENG 575 DORSET STREET SOUTH BURL,INGTON, VER1VIONT 05403 (802) 346-4106 FAX (802) 846-4101 March 27, 2001 A. Skip Williams ICV Construction, Inc. 30 Main Street, Suite 401 Burlington, VT 05401 Re: Certificate of Occupancy, 11 Gregory Drive Dear Mr. Williams: Per your request, I conducted a site inspection of the property at 11 Gregory Drive for the purpose of issuing a Certificate of Occupancy. The only discrepancy I found between the site and the plan approved on 10/18/88 relates to the dumpster. The approved plan called for a screened dumpster storage area at the northeast corner of the building. The dumpster is currently being stored at the southeast corner of the parking lot in a parking space and without any screening. In order for me to issue the Certificate of Occupancy, the screened dumpster enclosure must be constructed as shown on the approved plan or the plan amended to reflect a revised location. It may be possible to have an amended site plan approved by the Director of Planning & Zoning. If you have any questions, please give me a call. Sincerely,, ✓Yy� . a Raymond J. Belair, Administrative Officer RJB/mcp Mr. Ray Belair Administrative Officer City of South Burlington 575 Dorset Street South Burlington, Vermont 05403 Re: Request for Certificate of Occupancy Inspection Lot #10 Green Tree Park Vermont Custom Boilers SB Permit #88-147 dated 11/4/88 Dear Mr. Belair: INVESTORS CORPORATION OF VERMONT ICV Construction, Inc. CIVO'�40 i � kj March 22, 2001 ICV Construction, Inc. constructed a facility at Lot # 10 Green Tree Park in 1988 for Vermont Custom Boilers. It has been brought to our attention that ICV did not obtain a final inspection for Certificate of Occupancy on behalf of the owner Mr. Joseph Lovering. ICV Construction, Inc. with this letter, request an on site inspection of this facility, and we submit a copy of original Site and Utility plan by Pinkham Engineering Associates, Inc. dated August 1988. Mr. Lovering has notified ICV that he has sold his property and will close on the property April 6, 2001 and needs ICV assistance to complete this outstanding issue. We sincerely hope our request is in order, and specifically want to thank you for your assistance in establishing directives, for this request. Sincerely, Skip Willi ICV Cons ruction, Inc. Suite 401,30 Main Street Burlington, Vermont 05401 (802) 863-2311 FAX (802) 863-2313 CITY OF SOUTH BURLINGTON SITE PLAN APPLICATION 1) OWNER OF RECORD (name, address, phone 2) APPLICAN,r ( name, address, phone #) 3) CONTACT PERSON (name, address, phone f C, ' C' ,�— I-X C Ilu -k; a 4) PROJECT STREET ADDRESS: Ls-C.' 1,3 �l�o-•,.:�,,dn-._,��. _ 5) LOT NUMBER (if applicable) 6) PROPOSED USE (S)(.2, _.�-_,t"O-CIA- e,. of . Al_w— IZSO 7) SIZE OF PROJECT (i.e. total building square footage, # units, maximum height and # floors, square feet per floor) 8) NUMBER OF EMPLOYEES /'� 9) LOT COVERAGE: building /t.:> %; landscaped areas _% building, parking, outside storage � __% 10) COST ESTIMATES: Buildings $�c _, Landscaping $ 7.__, Other Site Improvements (please list with cost) 11 ) ESTIMATED PROJECT COMPLETION DATE: 1. 1 12) ESTIMATED AVERAGE DAILY TRAFFIC (in and out) 0,0 Estimated trip ends (in and out) during the following hours: Monday through Friday 11-12 noon; 12-1p.m._ ; 1-2 p.m. _; 2-3 p.m. 3-4 p.m.— 4-5 p.m.5n'1_—; 5-6 p.m. ; 6-7 p.m. ---- 13) PEAK HOURS OF OPERATION : 14) PEAK DAYS OF OPERATION: DAT OF SUBMISSION IGNATUR F APPIAXANT DATE OF HEARING r r PLEASE SUBMIT FOUR COPIES OF THE SITE PLAN WITH THE FOLLOWING INFORMATION Lot drawn to scale (20 foot scale if possible.) Location of streets, abutting properties, fire hydrants, existing buildings, existing landscaping. Existing and proposed curbcuts, pavement, walkways. Proposed landscaping plan (number, variety and size) equal to of greater than the required amount in the Zoning Regulations. Number and location of Parking Spaces: (9' x 18') with 22 or 24 foot aisles as required. Number and location of compact car spaces. ( This requires separate Planning Commission approval). Number and location of handicapped spaces as required. (13 feet by 20 feet in size, one per every fifty spaces) Location of septic tanks (if applicable). Location of any easements. Lot coverage information: Building footprint, building, parking and outside storage, and landscaped areas. Location of site (Street # and lot #). North arrow. Name of person or firm preparing site plan and date. F0 hicraiorandum -- Plariri i ng September 23, 1.988 Page 3 program and the expansion would allow enough capacity for 25 children. Access/Circulation: Access to the back parking lot is provided by a 23 foot wide driveway off of Victory Drive and a 14 foot wide one-way driveway off of Williston Road. The one-way drive runs along the eastern side of the building. Circulation is provided on the east and north sides of the building by these driveways. Chief Goddette would like the 14 foot wide driveway increased to 20 feet so that he may have sufficient room to set./ up equipment. This would require waiving the City policy of a 5 foot buffer strip along property lines and also require decreasing the 4 foot sidewalk along the northeast corner of the building to 3 feet wide. Setbacks/Coverage: The existing building does not meet side yard setback requirements or lot coverage requirements. Existing building coverage is 14.2% and proposed building coverage is 18.3% (maximum of 20% allowed). Existing lot coverage is 43.7% and proposed lot coverage is 60% (maximum of 40% allowed). Parking: By applying the parking space standards for "places of assembly containing fixed seats" the building, including additions, requires 52 parking spaces. The plan shows 58 parking spaces. The plan shows 11 additional spaces in front of the building and an expanded gravel lot in back. Apparently, there is currently a parking problem experienced at the church, particularly on Sundays. Eleven new parking spaces are proposed in front of the building. This would require losing existing green space., Bill Szymanski would like the applicant to consider moving these 11 spaces to the green area in back of the building so as to maintain the existing aesthetic quality of the front yard. Landscaping: The proposed additions require $6000 in new landscaping. The proposed plan shows new Red Pine in the parking lot which values $900. There is sufficient landscaping in the front of the building, however, I feel more landscaping should be put in along the north and west property lines to properly screen the parking lot. Other: See Bill Szymanski's and Chief Goddette's comments. Sue Messina of the Water Department has reviewed and approved the plan. G VERMONT BOILERS SPECIALISTS, INC., LOT #10, GREEN TREE PARK Vermont. Boilers proposes to construct a 5,000 square foot; 3 `t��moran�itzm - PI.ann i.rig Se�4�tc�uit,er 23 , 1988 Page 1 building for office, wholesale and distribution uses. The property is bounded by Green Tree Park lots on the north, west and south, and a vacant Gregory & Daughters Industrial Park lot on the east. The lot is zoned Industrial -Commercial. Access/Circulation: Access is shown from a 24 foot wide driveway from Gregory Drive. Circulation is shown along the east side of the building. Parking: The proposed use requires 14 parking spaces. The plan shows 18 spaces. This should be sufficient. Landscaping: The proposed building requires $1,500 in landscaping. The plan shows Norway Maple, Dogwood, Burning Bush, Juniper, Austrian Pine, Pin Oak and Spreading yew. The plan meets the required value. Traffic: This project is required to pay a contribution into the Williston Road Impact Area #1 improvement fund, which includes improvements to the Williston Road/Kennedy Drive/Airport Parkway intersection and the Kennedy Drive/Kimball Avenue intersection. Based on the 10 trip ends this project is expected to generate during the peak hour (ITE Trip Generation, 4th Edition), a $99 contribution will be required. Setbacks/Coverage: The plan meets all setback and coverage requirements. Sewer: A sewer allocation of 150 gpd will be needed to serve this building. This will be deducted from the approved allocation for the entire subdivision. The $2.50 per gallon fee must be paid prior to permit. Other: See Bill Szymanski's comments. Both Chief Goddette and Sue Messina of the Water Department have reviewed and approved the plan. 4 Cite ol''So«th B111-lintyton 575 DORSET STREET SOUTH BURUNGTON, VERMONT 05403 PLANNER 658-7955 March 15, 1988 Mr. Christopher D'elia ICV Construction Suite 2C, 126 College Street Burlingotn, VT 05401 Dear Mr. D'elia: ZONING ADMINISTRATOR 658-7958 Enclosed please find your copy of Findings of Fact. If you have any questions please call me. Sincerely, Joe Weith, City Planner JW/mcp 1 Encl PLANNING COMMISSION 27 SEPTEMBER 1988 PAGE 3 5. If any new lighting is added or if existing lighting is changed, new lighting will be downcast luminere. 6. There shall be no sale of individual items in the retail portion of the building. Only bulk items shall be sold. 7. During the 18 month period of overlapping use between Vermont Heating & Ventilating and Zachary's, Zachary's shall only be allowed to have storagc in this building. Motion passed unanimously. 3. Site Plan application of Community Lutheran Church to construct 2,432 square feet of new additions to the Church located at 1560 Williston Road. Mr. Webster, representing the Community Lutheran Church stated why -the Church wanoy,, to change the entrance from the south to the north. He said 1) it is hard to locate, the secretary/Pastor's office, 2) wedding parties etc. would have room to stand in a hallway, whereas now they have to stand outside, 3) want to enlarge original fellowship hall and 4) they don't have enough room for Sunday school classes. He also said that the Church doesn't want to change thesize of the seat;,,,, but instead wants to get the parking off Victory Drive. Ms. Maher expressed that she wanted to walk the lot before making a decision. A:. - agreed that more information was needed, including a landscaping plan from the Church and to eliminate the 11 parking spaces in front of the Church. A motion to postpone this agenda item until the Planning Commission has had an opportunity to review it was passed unanimously. 4. Site Plan application of Vermont Boiler Specialists, Inc. to construct a 5,C:; square foot building for office/wholesale/distribution uses, lot #10, Green ?rt, Park_ The problem of the sewer running uphill (pump) was raised and Mr. Burgess asked X: Weith to check into this. The parking, circulation of traffic (loading docks) seemed to present no problem. The issue of money allocated to landscaping however did pose a problem and Ms. Maher asked Mr. Weith to see if there was a mistake in the estimated cost of the building in relation to the amount of money alloca.e; for landscaping. PLANNING COMMISSION 27 SEPTEMBER 1988 PAGE 4 Ms. Peacock moved the South Burlington Planning Commission approve the Site Plan application of Vermont Boiler Specialists, Inc. for construction of a 5,000 square foot building for office/wholesale/distribution uses as depicted on a 2 page set of plans entitled, "Site & Utility Plans, Vermont," dated August, 1988, last revised 9/7/88 with the following stipulations: 1. The applicant shall post a $5,700 landscape bond prior to permit. The landscape plan shall be revised to reflect this $5,700 value and shall include more evergreens. The revised landscape plan shall be approved by the City Planner. 2. The applicant shall contribute, prior to permit, $99 to the Williston Road Impact Area #1 improvement fund. 3. The plan shall be revised prior to permit to show the following: a) a drainage swale along the east property line instead of a'retention basin. The grade shall slope downward toward theinlet in Gregory Drive, and b) a concrete depressed curb across the entrance drive. 4.' The existing unused service stub and valve shall be removed at t watarmain_ 5. A sewer allocation of 150 gpd is granted. The applicant shall pay the $2.50 per gallon fee prior to permit. 6. The revised plan shall be submitted to and approved by the City Planner and City Engineer prior to permit. 7. The building permit shall be obtained within 6 months or this approval is null and void. The motion passed unanimously. 5. Continue discussion on how to use the Act 200 money received by the City. It was decided among the Planning Commission members, after weighting 3 suggested uses, to send a proposal to the City Council. The 3 suggestions were (in order of priority): 1) City Center, 2) Intern and 3) T Model. 6. Discussion of the draft guidelines to assist municipalities in attaining consistency with Act 200. It was unanimously decided to postpone this agenda item until next week. As there was no further business to come before the Commission, the meeting adjourned at 10:15 p.m. 1 State of Vermont r Supply and Wastewater Disposal LAWS/REGULATIONS INVOLVED ENVIRONMENTAL PROTECTION RULES CASE NO. WW-4-0036 Chapter 4, Public Buildings APPLICA erttont Boiler Specialists - "Appendix A, Design Guidelines ADDRESS 22Satte����� Burlington, VT 05401 This project, consisting of constructing a 5,000 square foot office/warehouse building on Lot 10 previously approved in Subdivision Permit EC-4-1120 located along Gregory Drive in the City of South Burlington, Vermont is hereby approved under the requirements of the regulations named above, subject to the following conditions. This Permit does not constitute Act 250 approval under Case Number 4C0149-3. GENERAL (1) This permit does not constitute Act 250 approval (Title V.S.A., Chapter 151). The permittee is hereby reminded to procure all relevant State and local permits prior to proceeding with this project. (2) The project shall be completed as shown on the plans Project No. 6242 Sheet 1 of 2 "Site & Utility Plans" dated 8-88 revised 9-7-88 and Sheet 2 of 2 "Details" dated 8-17-88 last revised 10-27-88 prepared by Pinkham Engineering Associates, Inc. and which have been stamped "approved" by the Division of Protection. The project shall not deviate from the approved plans without prior written approval from the Division of Protection. (3) All conditions set forth in Subdivision Permit #EC-4-1120 dated August 5, 1987 and EC-4-1120-1 dated April 21, 1988 shall remain in effect except as modified or amended herein. (4) A copy of the approved plans and this Permit shall remain on the project during all phases of construction and, upon request, shall be made available for inspection by State or local personnel. (5) In the event of a transfer of ownership (partial or whole) of this project, the transferee shall become permittee and subject to compliance with the terms and conditions of this permit. (6) By acceptance of this permit, the permittee agrees to allow representatives of the State of Vermont access to the property covered by the permit, at reasonable times, for the purpose of ascertaining compliance with Vermont environmental/health statutes and regulations, and with this permit. WATER SUPPLY (7) The project is approved for water supply by construction and utilization of the municipal water service depicted on the approved plans. No other means of obtaining potable water shall be allowed without prior review and approval by the Division of Protection. Vermont Boiler Specialists WW-4-0036 Page 2 SEWAGE DISPOSAL (8) The project is approved for connection to the South Burlington Airport Parkway wastewater treatment facility for a maximum of 150 gallons of sewage per day. (9) The municipal sewer collection system herein approved shall be routinely and reliably inspected during construction by a Vermont -registered professional engineer who shall, upon completion and prior to occupancy of the subject establishment, report in writing to the Division of Protection that the installation was accomplished in accordance with the approved plans and permit conditions. PLUMBING (10) Prior to commencement of construction of the building(s), the applicant must submit to the Division one set of interior plumbing floor plans which match the exterior water and sewer services. Patrick A. Parenteau, Commissioner Department of Environmental Conservation By Ernest P. Christianson Regional Engineer Dated at Essex Jct., Vermont this 4th day of November, 1988. cc: Donald Robisky City Planning Commission Louis Borie Department of Health Department of Labor and Industry Pinkham Engineering Associates, Inc. Green Tree Park Associates City of South Burlington tn 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 PLANNER 658-7955 t i(.• I. O 6e I- i ri, I ii �-, 8 :,Ir. Christopher Wh:i is I.CV i;onst.r uct..i on Sui Le LC l l6 Co 1. 1.ege St r•ee t, Bur l.ington, \er•mon1- 06401 He : I,ot, # 10 , Grey(-�rl Tree Park Dear Mr. WEIia: /ONING ADMINISTRATOR 658.7958 Enclosed tare the September. 27, 1988 PL•,annin�: (.onuni -; ;ion meeting minutes. Please meet the stipulat..i.ons contained in t,h� approval motion before applying for a building permit. Flea!;♦- J.1 if ,you have any questions. Sincerely, Joe Wei.th, City Planner JW/mcp 1 Encl State of Vermont LAND USE PERMIT AMENDMENT CASE NO 4C0149-7.3.__ --..-.-- LAWS/REGULATIONS INVOLVED APPLICANTCiZPrmnn Rni 1 Pr eci ali s ..___ 10 V.S.A. , CHAPTER 151 ADDRESS 216 Battery Street (Act 250) and Vermont Burlington, VT 05402 State Environmental Protec- tion Rules AND Chapter 4, Public Buildings Chapter 7, Sewage Disposal Green Tree Park Assocs. Chapter 8, Water Supply 123 Industrial Avenue Williston, VT 05495 District Environmental Commission #4 hereby issues a Land Use Permit Amendment #4C0149-3, pursuant to the authority vested in it in 10 V.S.A., Chapter 151. This permit amendment applies to the lands identified in Book 257, Pages 367-379, of the land records of the Town of South Burlington, Vermont, as the subject of a deed to Green Tree Park Associates, the "Permittee" as "grantee". This permit specif- ically authorizes the Permittee to construct a 5,000 square foot office and warehouse building, to use municipal water services, on Lot #10 of Green Tree Park, located off Shunpike Road in South Burlington, Vermont. The Permittee, and its assigns and successors in interest, are obligated by this permit to complete, operate, and maintain the pro- ject as approved by the District Commission in accordance with the following conditions: 1. All the conditions of Land Use Permit #4C0149 and amendments are in full force and effect, except as amended herein. 2. The project shall be completed, operated and maintained as set forth in accordance with the plans and exhibits stamped "Ap- proved" and on file with the District Evi ronmental Commission, and in accordance with the conditions of this permit. No changes shall be made in the project without the written approval of the District Environmental Commission. Page 2 Land Use Permit Amendment #4C0149-3 3. The District Environmental Commission maintains continuing juris- diction during the lifetime of the permit and may periodically require that the permit holder file an affidavit certifying that the project is being completed, operated and maintained in accor- dance with the terms of the permit. 4. By acceptance of the conditions of this permit without appeal, the Permittee confirms and agrees for himself and all assigns and successors in interest that the conditions of this permit shall run wi th the 1 and and the 1 and uses herei n permi tted, and wi 1 1 be binding upon and enforceable against the Permittee and all as- signs and successors in interest. 5. The project is approved for the following maximum cumulative impacts: 18 vehicle parking spaces; 150 gallons per day of water and wastewater; 20 vehicle trips per day; 5.2 peak hour vehicle trips. 6. This permit hereby incorporates all of the conditions of the Water Supply and Wastewater Disposal Permit #WW-4-0036 issued on November 7, 1988 by the Regional Engineer, Division of Pro- tection, Department of Environmental Conservation, Agency of Natural Resources. Conditions #2, #7, #8, and #10 of said permit are as follows: 2) The project shall be completed as shown on the plans Project No. 6242 Sheet 1 of 2 "Site and Uti lity Plans" dated 8-88 revised 9-7-88 and Sheet 2 of 2 "Details" dated 8-17-88 last revised 10-27-88 prepared by Pi nkham Engineering Associates, Inc. and which have been stamped "approved" by the Division of Protection. The project shall not deviate from the approved plans without prior written approval from the Division of Protection. 7) The project is approved for water supply by construction and utilization of the municipal water service depicted on the approved plans. No other means of obtaining potable water shall be allowed without prior review and approval by the Division of Protection. 8) The project is approved for connection to the South Burlington Airport Parkway wastewater treatment facility for a maximum of 150 gallons of sewage per day. 10) Prior to commencement of construction of the bui 1 di ng (s) , the applicant must submit to the Division one set of interior plumbing floor plans which match the exterior water and sewer services. Page 3 Land Use Permit Amendment #4C0149-3 7. The Permittee shall apply and maintain chloride on all roadways or disturbed during construction and until pavement established to control dust. water and/or calcium areas within the project and/or vegetation is fully 8. The building approved herein is not approved for any manufac- turing use or the on -site disposal of any process wastes. The Permittee shall apply and receive approval for any change in the use of the buildings which involves the storage or handling of any regulated substances or the generation of hazardous wastes. 9. The floor drain shall empty into a holding tank which will periodically be pumped and the waste di posed in a certified disposal facility. 10. The Permittee shall apply to the District Environmental Commis- sion for approval for any change in the use of the building and land manufacturing processes which would cause noxious or un- healthy emissions into the air or injection of toxic wastes into the soils. 11. The Permittee and all assigns and successors in interest shall install and maintain water conserving plumbing fixtures. The plumbing fixtures shall operate with the following specifica- tions: (1) internal system water pressure of 50 psi maximum, (2) toilets with a maximum of 3.5 gallons per flush, (3) showerheads operating with a maximum of 3 gallons per minute, and (4) faucets on sinks and 1 ays shall operate at a maximum of 3 gallons per minute. An alternative water conservation plan may be presented to the Commission for approval before implementation. The ap- proved alternate shall be implemented and maintained by the Permittee for the duration of the permit. 12. The Permittee shall comply with Exhibits #7 and #14 for erosion control. Hay bale dams and silt fences shall be installed as depicted on the plans prior to commencement of construction. The Permittee shall prevent the transport of any sediment beyond that area necessary for construction approved herein. For all construction from October 15 to April 15 of the calendar year the Permittee shall abide by all winter erosion control measures outlined in the "Vermont Handbook for Soil Erosion and Sediment Control on Construction Sites." All erosion control devices shall be periodically cleaned, replaced and maintained until vegetatiein is permanently established on all slopes and dis- turbed areas. The Commission reserves the right to schedule hearings and site inspections to review erosion control and to evaluate and impose additional conditions with respect to erosion control as they deem necessary. Page 4 Land Use Permit Amendment #4C0149-3 13. In addition to conformance with the requirements of condition #12, the Permittee shall not cause, permit or allow the discharge of waste materials into any surface waters. Compliance with the requirements of this condition does not absolve the Permittee from compliance with 10 V.S.A., Chapter 47, Vermont's Water Pollution Control Law. 14. The Permittee and all assigns and successors in interest shall continually maintain the landscaping as approved in Exhibits # 7 and #14 by repl aci ng any dead or di seased pl anti ngs as soon as seasonably possible. 15. Prior to any site work, the Permittee shall install and maintain snow fencing along the tree line on the east side of the property to protect existing tree for the duration of construction. 16. The installation of exterior light fixtures is limited to those approved in Exhibit #15, and shall be mounted no higher than 20 feet above grade level. All exterior lighting shall be in- stalled or shielded in such a manner as to conceal light sources and reflector surfaces from view beyond the perimeter of the area to be illuminated. 17. The building colors will be as approved in Exhibit #20. 18. The Permittee must submit a color rendering of the proposed sign prior to installation to the Commission for review and approval. 19. All heated structures approved herein shall be constructed to comply with the ASHRAE 90-80 standards. 20. The installation and or use of electric resistance space heating is specifically prohibited without the prior written approval of the District Environmental Commission. 21. All construction on this project must be completed by October 15, 1989. 22. This permit shall expire on October 15, 2019 unless extended by the District Commission. Notwithstanding, this permit shall expire one year from date of issuance if the Permittee have not demonstrated an intention to proceed with the project. Page 5 Land Use Permit Amendment #4C0149-3 Failure to comply with all of the above conditions may be grounds for permit revocation pursuant to 10 V.S.A. Section 6090(b). Dated at Essex Junction, Vermont, this �ay of November, 1988. By M. Lynn Whalen, Acting Chairman District #4 Commission r jrrie Mau s- gh, s stant District # Coordin for Commissioners participating in this decision: Helen Lawrence Page 1 of 2 4CO149-3 EXHIBIT LIST FOR APPLICATION # E D R E A -APPLICANT X A E N T=TOWN H T C T TPC=TOWN PLANNING COMMISSION I E E E RPC=REGIONAL PLANNING COMMISSION B I R AEC=AGENCY OF ENVIRONMENTAL CONSERVATION I V E T E D D N B 0. Y NATURE OF EXHIBIT 2 it to 3 it it 4 it it 5 it it 6 it it DATE ENTERED Application for Land Use Permitamendment (9/13/88) Notice: Commemcement of construction requires a permit (9/13/88) Certificate of Service (9/13/88) Color chips Protective Covenants -Green Tree Commercial Park LUP Amendment 4C0149-1 (11/30/87) and Findings of Fact Act 250 - Schedule B information Letter- by Eugene L. Shlatz, Director of Engineering & Maintenance, Green Mountain Power, to Christopher D'Elia, ICV Construction, Inc. re: Power supply (9/7/88) Letter- byPaul A. Goddette, Manager, Residential Sales, Vt. Gas Co.- to Christopher D'Elia, ICV Construction re: :service ( 9/7/88) Letter - by James W. Fay, Water Supply, Operations Manager, Champlain Water District, to ICV Re;Act 250 review - (8/30/88) Netter by James Goddette, Sr,., Chief So. Burlington Fire Department, Re: Fire service (8/30/88) Letterby John Race, Chief, SBPD, to ICV, re: Police Service (8/26/88) Letter - by Kenneth Desmond, President, Green Tree Park, Inc., to ICV, re: Lot #10 (8/22/88) Page 2 of 2 4CO149-3 EXHIBIT LIST FOR APPLICATION # E D R E A=APPLICANT X A E N T=TOWN H T C T TPC=TOWN PLANNING COMMISSION I E E E RPC=REGIONAL PLANNING COMMISSION B I R AEC=AGENCY OF ENVIRONMENTAL CONSERVATION I V E T E D D N B 0. Y NATURE OF EXHIBIT DATE ENTERED 14 9/16/88 15 It 16 it 17 It 18 it 19 it 20 9/28/88 21 10/24/88 22 10/19/88 23 10/21/ 88 24 10/24/88 25 10/28/88 A Plan: Site utility plans (8/88) sheet 1 of 2 " Plan: Foundation Plan & Details (undated) A-1 it Plan: Detail Sheet (8/17/88) sheet 2 of 2 " Plan: Floor plan (undated) A-2 " Plan: Exterior elevations (undated) A3 " Plan: 1/4'" building sections (undated) A4 A Color chart A Letter (10/13/88) regarding access from Agency of Transportation ANZ Entry of Appearance ANR Document-- STormwater review 10/14/88 A Letter (10/20/88) - fromAApplicant regarding Criterion 1(B) AN Letter (1.0/25/88) regarding no needs for stormwater discharge permit 26 1 7/7/88 1 AN Water Supply & Wastewater Disposal Permit #WW-4-0036 CERTIFICATE OF SERVICE I hereby certify that I, Carrie Mauhs-Pugh, Assistant District Coordinator for the #4 District of the Environmental Board, sent a copy of the foregoing Land Use Permit Amendment #4CO149-3 by U.S. Mail, postage paid, to the following: Vermont Boiler Specialists 216 Battery Street Burlington, VT 05401 Green Tree Park Associates 123 Industrial Avenue Williston, VT 05495 Margaret Picard, Town Clerk 575 Dorset Street South Burlington, VT 05403 Chairman, Board of Selectman c/o Town Clerk's Office 575 Dorset Street South Burlington, VT 05403 Chairman, Town Planning Commission c/o Town Clerk's Office 575 Dorset Street South Burlington, VT 05403 Chittenden County Regional Planning Commission PO Box 108 Essex Junction, VT 05453 Mark Sinclair, Esq. Representative, State Agencies Agency of Natural Resources 103 South Main St. - 2 Center Waterbury, VT 05676 Executive Officer Environmental Board State Office Building P.O. Montpelier, VT 05602 Page 2 Land Use Permit Amendment #4C0149-3 HEALTH DEPARTMENT 60 Main Street Burlington, Vermont 05401 District Commissioners: Helen Lawrence Lynn Whalen 111 West Street Essex Junction, VT 05452 Regional Engineer Ernie Christiansen 111 West Street Essex Junction, VT 05452 Mr. Chris D'Elia ICV Construction Inc. Suite 2C 126 College Street Burlington, VT 05401 r ! B Y a rie M s-Pu Assista t District #4 Coordinator Dated at Essex Junction, Vermont, this 9th day of November, 1988. I State of Vermont Department of Fish and Wildlife Department of Forests, Parks and Recreation Department of Water Resources & Environmental Engineering Natural Resources Conservation Council Green Tree Park 123 Industrial Ave. Williston, VT 05495 RE: WW- t-00-18 Construction of 14,000 sq ft office/warehouse on Lot g6 of Green free Park. Greetings: AGENCY OF ENVIRONMENTAL CONSERVATION Department of Water Resources and Environmental Engineering Essex J unction Regioual Office II I West Street Essex Junction, Vermont 05452 October- 31, 1988 We received your completed application for the referenced permit on October 28, 1988, :including a fee of W60. This application falls under the Water/Wastewater: Less than 500 GPU Program Area, and under the Performance Standards for this program area, we have a maximum of 30 days of 'in-house' time for our review of your application. Based upon the present workload, we anticipate review of your project within the nett 3-I weeks. If we need further information from you in order to react► a decision on your application, the time we wait for your submittal of that information does not count against the allowable in-house time specified in the performance standards. If you have any questions about the review process, or it' you have not received a decision on your application within the permitted time of 30 days in-house, please contact this office at 879-6563. Sincerely, Ernest P. Christianson Regional Engineer cc: Trudell Consulting South Burlington Planning Commission State of ti,.,rniont Department of Fish and Wildlife Department of Forests, Parks and Recreation Department of Water Resources & Environmental Engineering Natural Resources Conservation Council Vermont Boiler Specialists 216 Battery Street South Burlington, VT 05401 RE: WW-4-0036 Green Tree Park Construction of 5,000 s.f. office/warehouse building on Lot 10 of EC-4-1120 Greetings: AGENCY OF ENVIRONMENTAL CONSERVATION Department of Rater Resources and Environmental Engineering Essex Junction Regional Office 111 West Street Essex Junction, Vermont 05452 September 29, 1988 We received your completed application for the referenced permit on September 28, 1988, including a fee of $60. This application falls under the Water/Wastewater: Less than 500 GPD Program Area, and under the Performance Standards for this program area, we have a maximum of 30 days of 'in-house' time for our review of your application. Based upon the present workload, we anticipate review of your project within the next 3-4 weeks. If we need further information from you in order to reach a decision on your application, the time we wait for your submittal of that information does not count against the allowable in-house time specified in the performance standards. If you have any questions about the review process, or if you have not received a decision on your application within the permitted time of 30 days in-house, please contact this office at 879-6563. Sincerely, �- Ernest P. Christianson Regional Engineer cc: Christopher D'Elia South Burlington Planning Commission ✓� 16 1$ L,a,j D &cai� C,ALcs (vlse.0 P �/l3v/Y�� NOR7 . �ef) Dwq,c.,F 7.► a,►eev-( (P—ly" SArv,v�es� ��aK-'0�► �j�n1 � P�12 /4-J3T21AAJ PIrJF- S—(, U/4 r TC PlNE5 (5-_ 6 r ) 32 s� P/N OAK' CZ L ) baseball field, 1 football field, 1 field hockey area, and 1 running track. COMMERCIAL 1. Twin Oaks Tennis Center: 4 outdoor and 6 indoor tennis courts, outdoor pool, volleyball court, and 1 paddle ball court, racquet and squash courts. 2. The Olympiad: 7 racquetball courts, 2 squash courts, jogging trails, and outdoor pool. 3. Quarry Hill Club: 5 tennis courts and 2 pools, all outdoors. 4. Burlington Tennis Club: 8 tennis courts and 1 pool, all outdoor, and community building. PRIVATE 1. Ridgewood Estates: 2 tennis courts and pool, all outdoor, and community building. 2. Swift Estates: 1 outdoor tennis court on a 1.4 acre private park area. 3. Meadowood at Spear: 1.5 acre private park, undeveloped. 4. Meadowbrook Condominiums: 2 tennis courts and pool, all outdoor. 5. Horizon heights apartments: 1 tennis court and pool, both outdoor. 6. 435 Dorset Apartments: 1 outdoor pool and tot lot. 7. Forest Park Condominiums: 1 outdoor pool and tot lot. 8. Georgetown Condominiums: 1 outdoor pool. 9. Manor Woods: 1 outdoor pool and tot lot. 10. Treetops Condominiums: 1 pool and 2 tennis courts, all outdoor, and community buildings. 11. Country Park Apartments: common meeting room. 12. Country Club Estates: 2 tennis courts and pool, all outdoor.- 13. Indian Creek: swimming pool, 2 tennis courts, all outdoors. 14. Twin Oaks Condominiums: 1 outdoor pool. 15. Stonehedge: 2 outdoor pools, 2 tennis courts. 16. The Landings: outdoor pool. 44 Lf� : c j P, ,,j G vQ L-U& GAL-C-u( .7-t on s vw 'T/z 7,1 pr Abrew�.� M,4 vjooD (3-4 /) pwA {3u2iJ in1Cx bus li- SE�a C ajF&tJ ju,ji PEr',- C/ 8 — a.,f " ) �v5 21..128 STREET, COLLECTOR --- A street that is used or will be used primarily for connecting local street traffic to the arterial street system. These streets are del gnated in the transportation chapter of the 1 �80 Comprehensive Pl.an.. 21.129 STREET, LOCAL -- A street. used primarily for direct access to property and not for throuch traffic flow,. These streets are all those not designated as arterial or collector 21..130 STRUCTURE: - Any construction, erection, assemblage or other combination of materials upon the land, including but not limited to swimming pools, tennis courts, antennas, and utility sheds. necessitating pilings, footings or a foundation attached to the land, or exceeding 100 square feet in floor area. 21..131 USE - The specific purpose for which a 'structure or land is or may be occupied, maintained, designated, or intended. The term "permitted use'' or its equivalent shall not be deemed to include any non --conforming use. 21.132 YARD _,. An open space on a lot, unoccupied and unobstructed from the ground upward, except: as otherwise provided in these regulations. 21.133 YARD, FRONT -- A yard on the same lot with a principal building, extending the full width of the lot and situated between the street line and the front line of the building extended to the side line of the lot. 21,134 YARD, REAR -- A yard on the same lot with a principal building between the rear l.inu of the building and the rear line of the lot extending the full width of the lot. 21.13S YARD, ::SIDE -.- A yard situated between the principal building and a side line and extending from the front yard to the rear side line shall be measured from the building to the nearest point on the side line. ARTICLE XXI:II DISTRICT BOUNDARIES 22.00 Interpretation of District Boundaries � Where uncertainty exists as to the boundaries of districts as shown on the Official Zoning Map, the Planning Commission shall, determine the location, aided by the rules set forth in 71 I Investors Corporation of Vermont ICV Construction, Inc. Investors Corporation of Vermont/ Connecticut -n -1 7 IC Do Suite 2C, 126 College Street Burlington, Vermont 05401 (802) 863-2311 Building 1, 160 Oak Street Glastonbury, Connecticut 06033 (203) 659-8472 9/26/88 JW MOTION OF APPROVAL I move the South Burlington Planning Commission approve the Site Plan application of Vermont Boiler Specialists, Inc. for construction of a 5,000 square foot building for office/wholesale/distribution uses as depicted on a 2 page set of plans entitled, "Site & Utility Plans, Vermont Custom Boilers, Gregory Drive, South Burlington, Vermont," dated August, 1988, .last revised 9/7/88 with the following stipulations: *S7ov 1. The applicant shall post landscape bond prior t permit. 2. The applicant shall contribute, prior to permit, $99 to the Williston Road Impact Area #1 improvement fund. 3. The plan shall be revised prior to permit to show the following: a) a drainage swale along the east property line instead of a retention basin. The grade shall slope downward toward the inlet in Gregory Drive) b) A concrete depressed curb across the entrance drive. 4. The existing unused service stub and valve shall be removed at the watermain. 5. A sewer allocation of 150 gpd is granted. The applicant shall pay the $2.50 per gallon fee prior to permit. 6. The revised plan shall be submitted to and approved by the City Planner and City Engineer prior to permit. 7. The building permit shall be obtained within 6 months or this approval is null and void. City of South Bur iuetoll 575 DORSET STREET SOUTH BURLINGTON, VERMONT 05403 PLANNER 658-7955 September 23, 1988 Mr. ChristopherD'Elia ICV Construction Suite 'LC 126 College Street Burlington, Vermont 05401 Re: Lot #10, Green Tree Park Dear Mr. D'Elia: ZONING ADMINISTRATOR 658.7958 Enclosed is the agenda and my comments to the Planning Commission. Also enclosed are Bill Szymanski's comments. Please be sure someone is present on Tuesday, September 27, 1988 at 7:30 P.M. to represent ,your request. Sincerely, Joe Weith, City Planner JW/mcp Encls ®FF i LF, SrA�c NC>p - or c.c F- rj::.7m eL-o '5, -Sf' SrA 4X qJz JgC? this section. 22.001 Boundaries indicated as approximately following the center lines of streets or highways shall be construed to follow such center lines. 22.002 Boundaries indicated as:; approximately following platted lot lines shalt be construed to follow such lot lines. 22.003 Boundaries indicated as following railroad lines shall be construed to follow the center line of the railroad right-of-way. 22.,004 Boundaries indicated as following Shore lines shall be construed to follow such Shore lines, , and in the event of change in the shore line Shall be construed as moving with the actual Shore line; boundaries indicated as, approximately following v the center lines of streams, rivers1canals, lakes, or other bo f waiver shall be construed to fcl .ow Qch center Lines., 22.005 Boundaries indicated as parallel to or extensions of features indicated in subsections I through 4 above shall be so construed. Distances not specifically indicated on the Official Zoning flap or described under each zone Shall be determined by the scale of the map. 22.006 Where physical or cultural features existing on the ground are at variance with those shown on the Official Zoning Map, or in other circumstances not covered by subsections I through 5 above, the Planning Commission Shall interpret; the district: boundaries. 22.007 Where a district boundary line divides a lot which was in a single ownership at the time of passage of these regulations, the Board of Adjustment may permit, as a conditional use, the extension of the regulations for either portion of the lot not to exceed fifty feet beyond the district line into the remaining portion of the lot. 22.10 Description of ;specific Districts 22.101 Flood Plain District The boundaries of the Flood Plain District shall include those areas alone the Winooski River and a portion of Muddy Brook in the proximity of Khe airport that are identified as areas:, of special flood hazard (AI--A30 zones) on the Federal Insurance Administration (FIA) Flood Insurance 72 �. 0001 � z t X 'o-3-D /�Lv-x A) Co,l'q�D -VA* - --l`d n(WN N©u.�a-t�2t�—'� d ►-yl� � �, -�, It Ian. 19.152 Density Calculations Maximum density for a Planned Unit Development shall not exceed the permitted density for the district in which the development is located. Permitted density for a development shall be determined as follows: a. A base density shall be established by estimating the buildable area of the land to be developed (excluding areas with excessively steep jr slopes, ^,,p. excessive: /,^, wetness, and within floodplain and GO districts), subtracting 15% for roadways, and multiplying the remaining.area times the pyrmitted density per acre fore` the district. V Density increases may be permitted up to the normal maximum per dAt.rict according to the degree to which the deve:l.opment satisfies the general standards listed in Section 1.9.151 and the specific standards for a PUD in a given district. 19.IS5 Open Space Open space or common land shall be in a location or locations, size and shape approved by the Planning Commission, Any open space resulting from a Planned Unit Development shall be protected by appropriate legal mechanisms to insure its maintenance and appropriate use. Such mechanisms include but are not limited to covenants and a homeowners' association, transfer or dedication for compatible municipal use (e.g. paokland, underground utility easements, pedestrian ease- ments, etc.) or long term lease for recreational uses or for commercial agriculture. 19.154 Specific Standards A Planned Unit Development shall be reviewed under the specific: standards for the distract :in which it is proposed. 19.155 Other Conditions a. The application for a Planned Unit De: shall :.specify reasonable time ;::per:; which each section of do may be started and completed m _itable shall be approved by the Commission. b. Each � shall be prepared in acCO12 Aith the specifications of the City 55