Loading...
HomeMy WebLinkAboutSP-88-0000 - Decision - 0011 Gregory DriveFINDINGS OF FACT STATE OF VERMONT COUNTY OF CHITTENDEN �"�✓ _ C7 CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Vermont Boiler. Specialists, Inc. for construction of a 5,000 square foot building for office/wholesale/distribution on lot #10, Green Tree Park. On the 27th of September, 1988, the South Burlington Planning Commission approved the request of Vermont Boiler Specialists, Inc. for site plan approval under Section 19.10 of the South Burlington Zoning Regulations based on the following findings: 1. TRAFFIC ACCESS: Access is shown from a 24 foot wide driveway on Gregory Drive. This project is required to contribute to the Williston Road Impact Area #1 improvement fund (See OTHER). 2. CIRCULATION AND PARKING: Circulation is shown along the east side of the building. Eighteen parking spaces are approved. 3. LANDSCAPING & SCREENING: A $5,700 landscape bond shall be posted prior to permit. The landscaping plan shall be revised prior to permit to reflect this $5,700 value and include more evergreens. 4. OTHER: The plan shall be revised prior to permit to show: (a) a drainage swale along the east property line sloping towards the inlet on Gregory Drive, (b) a concrete depressed curb across the entrance drive. The revised plan shall be submitted to and approved by the City Planner and City Engineer prior to permit. 5. OTHER: Additional requirements to be satisfied prior to permit are: (a) payment of a $2.50 per gallon (150 gpd sewer allocation is granted) sewer fee, (b) contribution of $99 to the Williston Road Impact Area #1 improvement fund and (c) removal of the existing unused service stub and valve at the watermain. The building permit shall be obtained within 6 months or this approval is null and void. Chairman or Jerk, South Burlington Planning Commission