Loading...
HomeMy WebLinkAboutSP-93-0000 - Decision - 0010 Gregory DriveFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of David and Barbara Flagg for construction of a 4,608 square foot building for automobile and marine sales and service, 10 Gregory Drive. On the 25th of May, 1993, the South Burlington Planning Commission approved the request of David and Barbara Flagg for site plan reivew under Section 19.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of the construction of a 4,608 square foot building for auto service and auto/marine sales use. The Zoning Board on April 12, 1993 granted the applicant a variance to allow a front yard coverage of 63% and on May 24, 1993 the Zoning Board granted a request from the applicant for a conditional use permit for the uses and for a variance to allow a 39% front yard coverage. 2. This property located at 10 Gregory Drive lies within the IC District. It is bounded on the east by Barry's Transmissions, on the south by Muddy Brook, on the west by a vacant lot and on the north by Gregory Drive. 3. Access/circulation: Access will be via two (2) curb cuts. The westerly curb cut is for ingress only and will be 18 feet in width and the easterly curb cut is for egress only and will be 20 feet in width. "Entrance only" and "Exit only" signs should be provided to direct traffic to the appropriate access. Circulation is adequate. 4. Parking: This project requires a total of 10 parking spaces for employee and customer parking and 17 spaces are being provided including one (1) handicapped space. 5. Landscaping: The minimum landscaping requirement for this project is $4,350 which is being met. Plantings will include Juniper, Red Oak, Crabapple and Norway Spruce. 6. Traffic: The applicant should contribute $1,746 to Williston Road Traffic Impact Fund (Area 2) based on 12.1 P.M. peak hour trip ends expected to be generated by this project. 7. Coverage/setbacks: Building coverage is 4.6% (maximum allowed is 30%). Overall coverage is 19% (maximum allowed is 70%). Front yard coverage is 39% (maximum allowed is 30%). The applicant is seeking a variance to exceed the front yard coverage. 1 Setback requirements will be met. 8. Sewer: Sewer allocation needed for this project is 120 gpd based on eight (8) employees. The per gallon fee should be paid prior to permit. 9. Lighting: Exterior lighting will consist of two (2) 35 watt high pressure sodium lights mounted on the building over the entrances and five (5) 70 watt high pressure sodium lights with photo controls mounted on the ends and front of the building. 10. Sidewalk: The applicant should either construct a sidewalk along the frontage of the property or contribute $4,905 for the 327 feet of frontage calculated at $15 per linear foot. 11. Other: Dumpster will be enclosed by a fence. DECISION & CONDITIONS Based on the above Findings of Fact, the Planning Commision approves the site plan application of David and Barbara Flagg for construction of a 4,608 square foot building for automobile and marine sales and service as depicted on a plan entitled "Site Plan, Car Buff & Dave's Automotive", prepared by Krebs and Lansing Consulting Engineers, Inc. and dated 5/14/93 with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The applicant shall post a $4,350 landscaping bond prior to issuance of a zoning/building permit. The bond shall remain in effect for three (3) years to assure that the planted landscaping takes root and has a good chance of surviving. 3. A sewer allocation of 120 g.p.d. is granted. The applicant shall pay the required sewer allocation fee prior to issuance of a zoning/building permit. 4. All exterior lighting shall be downcasting and shielded and shall not cast light beyond the property line. Any change in existing lighting or new lighting shall be approved by the City Planner prior to installation. 5. The applicant shall contribute $1,746 to the Williston Road Area 2 Improvement Fund based on the 12.1 pm peak hour trip ends estimated to be generated by this project. 6. The applicant shall install "enter" and "exit" signs to properly identify which drive is for ingress and which drive is for egress. 2 7. The plan shall be revised prior to issuance of a zoning/building permit to show the proposed sidewalk continuous across the driveways. The sidewalk shall be constructed prior to occupancy. 8. The applicant shall obtain a zoning/building permit within six (6) months or this approval is null and void. 9. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to occupancy of the building. 10. Any changes to the site plan shall require approval by the South Burlington Planning Commission. 11. There shall be no vehicles parked in designated green space. 1L` Chairman or Clerk South Burlington Planning Commission 5l� (/1,g3 Date 3