Loading...
HomeMy WebLinkAboutSP-94-0000 - Decision - 0010 Gregory DriveFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN 5T - qq, pODC) CITY OF SOUTH BURLINGTON I Re: Findings of Fact, application of David and Barbara Flagg to amend a David and Barbara Flagg for previosly approved site plan to expand a parking area and make minor site modifications, 10 Gregory Drive. On the 28th of June, 1994, the South Burlington Planning Commission approved the request of David and Barbara Flagg for site plan review under Section 19.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of making some minor site revisions by expanding the parking area. The 4,608 square foot building is used for auto service and auto/marine sales. This site was last reviewed by the Planning Commission on 5/25/93. The Zoning Board of Adjustment on 6/27/94 granted a variance request from the applicant to increase front yard coverage. 2. This property located at 10 Gregory Drive lies within the I-C District. It is bounded on the east by an auto service and repair facility, on the south by Muddy Brook, on the west by a vacant lot and on the north by Gregory Drive. 3. Access/circulation: Access is provided by two (2) curb cuts. The easterly curb cut is for egress only and the westerly curb cut is for ingress only. Minor changes were made to the access drives. The 5/25/93 approval required the applicant to install "enter" and "exit" signs, these signs have yet to be installed. Circulation is adequate. 4. Coverage/setbacks: Building coverage is 30%). Overall coverage is 22% (maximum yard coverage is being increased from 39% is 30%). The applicant earlier obtained 39% coverage and just received another additional 3% increase to 42%. Setback requirements are being met. is 4.6% (maximum allowed allowed is 70%). Front to 42% (maximum allowed a variance to allow the variance to allow an 5. Parking: This project requires a total of 10 parking spaces for employee and customer parking and 23 spaces are being provided including one (1) handicapped space. 6. Landscaping: No changes. 7. Dumpster: The dumpster has been relocated to the westerly end 1 of the building. It will be screened with a fence. 8. Sewer: No additional allocation needed. 9. Lighting: No changes. 10. Other: Applicant has checked distance to nearest fire hydrant and finds that is approximately 300 feet from the building. No additional hydrant needed. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of David and Barbara Flagg to amend a previously approved site plan to expand a parking area and make minor site modifications, 10 Gregory Drive, as depicted on a plan entitled "Site Plan, Car Buff & Dave's Automotive, Gregory Drive Lot #4, South Burlington, Vermont" as prepared by Krebs & Lansing Consulting Engineers, Inc., dated May 14, 1994, with a last revision date of June 23, 1994, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. Any change to the site plan shall require approval by the South Burlington Planning Commission. 3. The plan shall be revised to show three additional spruce trees in a location approved by the City Planner. The plan shall be revised within 30 days. 4. The plan shall be revised, if necessary, within 30 days, to show the sidewalk in a location approved by the Public Works Director. 5. Applicant shall submit letter to the city from the property owner to the west approving the placement of a berm and water line on the adjoining owner's property. Chairman 'or Clerk South Burlington Planning Commission 26eiE�� Date K,