HomeMy WebLinkAboutSP-85-0000 - Decision - 0003 Gregory DriveFIN-iNGS OF FACT
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
Re: Findings of Fact, application of Robert and Lynn Charlier for
Park and Fly, lot #2 and 3, Gregory Industrial Park.
On the 6th of August 1985, the South Burlington Planning Commission
approved the request of Robert and Lynn Charlier for site plan approval
under Section 19.10 of the South Burlington Zoning Regulations based
on the following findings:
1. TRAFFIC ACCESS: Access is from the west side of Gregory Drive with
two curb cuts, one for ingress and one for engress as shown on the plan.
2. CIRCULATION AND PARKING: Circulation is adequate around the proposed
buildino and t;roughout the parking lot. 227 parking spaces are
approved with 208 for patron parking and 19 for public use. The aisles
will be delineated by concrete bumpers or other method approved by the
City Engineer. The gravel area shall be of a so called plant -mix
type that is not subject to washouts.
3. LANDSCAPING & SCREENING: Plan is sufficient. A $7600 landscaping
bond shall be posted prior to permit.
4. Site shall include drainage inlets with traps to intercept runoff.
Runoff shall be piped to the street system.
5. Occupancy permit shall not be issued until the street and utilities
are completed to the satisfaction of the City Engineer.
6. The building permit shall be obtained within 6 months.
South Burlington Planning Commission
No Text