Loading...
HomeMy WebLinkAboutSP-05-24 - Decision - 0002 Gregory DriveCITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING & ZONING MICHAEL DUGAN — 2 GREGORY DRIVE SITE PLAN #SP-05-24 FINDINGS OF FACT AND DECISION Michael Dugan, hereinafter referred to as the "Applicant", is requesting site plan approval to amend a previously approved site plan located at 2 Gregory Drive for site modifications to previously approved 24,000 sq. ft. building used for wholesale/retail/storage and distribution facility. The amendment consists of changing the total retail, warehouse & wholesale space and adjusting the parking coverage, adding two (2) additional parking spaces. Based on the plan and supporting material contained in the document file for this application, the Acting Administrative Officer finds, concludes, and decides the following: FINDINGS OF FACT 1. This project consists of amending a previously approved site plan located at 2 Gregory Drive for site modifications to previously approved 24,000 sq. ft. building used for wholesale/retail/storage and distribution facility. The amendment consists changing the total retail, warehouse & wholesale space and adjusting the parking coverage, adding two (2) additional parking spaces. 2. The owner of record of this property is David J. and Victoria C. Ross. 3. This property is located within the Mixed industrial & Commercial District (IC). DIMENSIONAL REQUIREMENTS 1. Building coverage is 14.8% (maximum allowed is 40%). Overall coverage is 49.1% (maximum allowed is 70%). Williston Road front yard coverage is 6.7% and. Gregory Drive front yard coverage is 17.9% (maximum allowed is 30%). 2. The building meets the setback requirements. SITE .PLAN REVIEW STANDARDS Vehicular access 3. There currently is one ingress and egress curb cut on the property from Gregory Drive. No changes are proposed. -1- Circulation 4. Circulation on the site is adequate. Parking 5. A total of 39 parking spaces are required for the existing site with the increase in square footage (mezzanine). A total of 39 spaces are provided including two handicapped spaces and a bike rack. Landscaping 6. There is no minimum landscaping requirement, based on building costs. 7. The existing site plan complies with all requirements pursuant to Section 13.06(B) of the Land Development Regulations. 8. According to the plans provided snow storage complies with requirements pursuant to Section 13.07(A) of the Land Development Regulations. Outdoor Lighting 9. Pursuant to Section 13.07(A) of the Land Development Regulations, all exterior lighting must be shielded and downcasting to prevent light from spilling onto adjacent properties and rights -of -way. No lighting changes are proposed. Traffrc 1, 0. There are no anticipated changes in traffic generation resulting from this amendment. GENERAL REVIEW STANDARDS (a) The relationship of the proposed development to goals and objects set forth in the City of South Burlington Comprehensive Plan. 11. The Comprehensive plan states that the city should encourage development while protecting natural resources and promoting a healthy and safe environment. The proposed project is in keeping with the recommended actions of the Comprehensive Plan. -2- (b)The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. 12. The building on this site exists with no changes proposed. The site has adequate planting and adequate parking. (c) Parking shall be located to the rear or sides of buildings to the greatest extent practicable. 13. Parking spaces are currently located at the front and south side of the building on the subject lands. The location of the parking remains unchanged. (d) Without restricting the permissible limits of the applicable zoning district, the height and scale of each building shall be compatible with its site and existing or adjoining buildings. 14. The existing building is a 2-story building, which is compatible with its site, and the adjoining buildings. (e) Newly installed utility service modifications necessitated by exterior alterations or building expansions shall, to the extent feasible, be underground. 15. The plans do not indicate changes in utility services. (/) The combination of common materials and architectural characteristics, landscaping, buffers, screens and visual interruptions to cerate attractive transitions between buildings or different architectural styles shall be encouraged. 16. No changes are proposed to the exterior of the building. (g) Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. 17. There are no new proposed structures. All buildings exist according to a previous application. In addition, to the above general review standards, site plan applications shall meet the following specific standards set forth in Section 14.07 of the Land Development Regulations: (a) The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto -3- I an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. 18. The reservation of land is not necessary. (b) Electric, telephone, and other wire -served utility lines and service connections shall be underground. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. 19. No changes to existing underground utilities are proposed. (c) All dumpsters and other facilities to handle solid waste, including compliance with any recycling or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). 20. A screened dumpster storage area is located at the southeast corner of the building on the subject lands. DECISION Based on the above Findings of Fact, the South Burlington Acting Administrative Officer hereby approves site plan application #SP-05-24 by Michael Dugan to amend a previously approved site plan located at 2 Gregory Drive for site modifications to previously approved 24,000 sq. ft. building used for wholesale/retail/storage and distribution facility. The amendment consists of changing the total retail, warehouse & wholesale space and adjusting the parking coverage, adding two (2) additional parking spaces. The proposed changes are depicted on a plan entitled "ADD -ON ACCESSCORY OUTLET 2 Gregory Drive South Burlington, Vermont", prepared by Michael Dugan, Architect, date amended 5/21 /04, with the following stipulations: 1) All previous approvals and stipulations, which are not superseded by this approval, shall. remain in effect. 2) Any new exterior lighting shall consist of downcasting shielded fixtures. Any change to approved lights shall require approval by the Administrative Officer prior to installation. 3) The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. 4) The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to use of the changes in the coverage area. -4- 5) Any change to the site plan shall require approval by the South Burlington Development Review Board. Signed on thisc�day of UMe, , 2005 by Please note: Pursuant to 24 VSA § 4465, an interested person may appeal this decision by filing a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal must be accompanied with a $110 filing fee and be filed within 15 days of the date of this decision. -5-