Loading...
HomeMy WebLinkAboutCU-00-18 SP-00-28 - Decision - 0005 Green Tree Drive#CU-00-18 #SP-00-28 FINDINGS OF FACT AND DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, site plan application and conditional use application under Section 26.05, Conditional Uses of the South Burlington Zoning Regulations and a site plan application to construct a 20,160 square foot warehouse and light manufacturing building. On the Ith of July, 2000, the South Burlington Development Review Board approved the conditional use application under Section 26.05 and site plan application under Section 26.10 of the South Burlington Zoning Regulations of Chase Properties based on the following findings: 1. This project consists of a conditional use application under Section 26.05, Conditional Uses of the South Burlington Zoning Regulations and a site plan application to construct a 20,160 square foot warehouse and light manufacturing building. 2. The owner of record is Chase Properties. 3. Access/circulation: Access is to be provided via two curb cuts on Green Tree Drive. The northern most curb cut will be 24 feet wide leading to a 13 foot access drive. The southern curb cut will be 21 feet wide leading to a 13 feet wide access drive. The access drive around the building will be designated as one-way although each curb cut will be for two-way access. Section 26.103(a) of the Zoning Regulations states that "unless specifically approved, there shall be a maximum of one driveway per lot accessing a public street". Staff recommended that the northerly access drive is ingress only and the southerly access be for egress only. The plans should show enter and exit signs to designate the access drives. Circulation on the site is adequate. 4. Coverage/setbacks: The proposed building coverage will be 28.3 percent (30% maximum). Overall lot coverage will be 69.6 percent (70% maximum). The proposed front yard coverage will be the maximum of 29 percent (30% maximum). All setbacks are being met. 5. Landscaping_ The minimum landscaping requirement, based on uuilding costs, of $11,500 is being met. Proposed plantings include red maples, white pines, white spruce, and cedars. 6. Lighting: Cut sheets have been submitted. All lights must be downwardly shielded and approved by the Director of Planning and Zoning. Proposed lighting consists of: -five (5) 175-watt metal halide building mounted lights with cutoff fixtures -two (2) 100 watt metal halide round Bollard fixture with clean lens & louvers -two (2) 175-watt metal halide cutoff pole mounted fixtures 15 f-et in height 7. Parkin&: The required number of parking spaces is 14 spaces and 23 spaces are proposed. Two handicapped spaces are required and two are proposed. The applicant stated that if a company vehicle is required, then it will be stored inside the building. A bike rack is also being proposed. 8. Sewer: The sewer allocation requested for this development is 240 gpd. The applicant will be required to pay the per gallon fee prior to permit issuance. 9. Traffic: The proposed uses will generate 13 additional P.M. peak hour vehicle trip ends. The applicant shall pay the appropriate road impact fees prior to permit issuance. 10. Dumpsters: Two dumpsters are proposed along the western edge of the proposed building. The applicant has indicated that due to the berm with evergreen screening and the topography created by the retaining wall, that these dumpsters will not be visible from the adjacent residences. Staff recommended a condition that the dumpsters not be picked up between the hours of 12 AM midnight and 7:00 AM. 11. Conditional Use Criteria: The proposed use complies with the stated purpose of the Mixed Industrial/Commercial District to encourage "general industrial activity and office buildings". The proposed use will not adversely affect: a) the capacity of existing or planned community facilities. No affect expected. b) the character of the area affected. The applicant should address the possibility of noise and other impacts on the adjacent residential area. The board should consider limiting the hours of operation. c) traffic on roads or highways in the vicinity. The proposed use is not expected to impact traffic. d) bylaws in effect. The proposal is in conformance with the zoning regulations. e) utilization of renewable energy resources. There is no utilization of renewable energy resources to be affected. f) general public health and welfare. No adverse affect expected. PA DECISION AND CONDITIONS Based on the above Findings of Fact, the South Burlington Development Review Board approves the conditional use application #CU-00-015 and site plan application #SP-00-28 of Chase Properties and Development, LTD to construct a 20,160 sq. ft. building to be used for light manufacturing use in conjunction with warehousing, storage, and distribution use, 5 Green Tree Drive, as depicted on a two page set of plans, page one entitled "Lot 5 — Green Tree Park Green Tree Drive South Burlington, Vermont," prepared by Lamoureux & Dickinson Consulting Engineers, Inc., dated 5/8/00, last revised on 6/22/00, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The site plans shall be revised to show the changes listed below and shall require approval of the Director of Planning & Zoning (hereinafter Director). Three copies of the approved revised site plans shall be submitted to the Director prior to permit issuance. a. The northerly access drive shall be ingress only and the southerly access shall be for egress only. The plans shall show enter and exit signs to designate the access drives. 3. The Development Review Board approves a sewer allocation of 240 gpd. The applicant shall pay the per gallon fee prior to permit issuance. 4. All new exterior lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the Director prior to installation. The Board shall retain the right to require changes to the light fixtures mounted on the west side of the building if, in the opinion of the Board, they create lighting problems for adjoining residential properties. 5. The applicant shall post a $11,500 landscape bond prior to issuance of a zoning permit. The bond shall remain in effect for three years to assure that the landscaping takes root and has a good chance of surviving. 6. For the purpose of calculating road impact fees under the South Burlington Impact Fee Ordinance, the Development Review Board estimates that the building will generate 13 vehicle trip ends during the P.M. peak hour. 7. The building shall be sprinklered with four inch Startz FD Connection/alarm panel with lock box on the exterior of the building. 8. The dumpsters shall not be emptied between the hours of 10 p.m. and 7 a.m. 9. The applicant shall obtain a zoning permit within six months pursuant to Section 27.302 of the zoning regulations or this approval is null and void. 10. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to occupancy of the building. 11. Any change to the site plan shall require approval by the South Burlington Development Review Board. 12. Parking will be prohibited on the north and south sides of the building for fire protection safety. 13. Movement, loading and unloading of tractor trailers and trucks shall be limited to 7 a.m. to 10 p.m. hair or Clerk Date South Burlington Development Review Board