HomeMy WebLinkAboutSP-13-23 - Decision - 0003 Green Tree Drive#SP-13-23
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
NATIONAL CHIMNEY/TIM DRAGON — 3 GREEN TREE DRIVE
SITE PLAN APPLICATION #SP-13-23
FINDINGS OF FACT AND DECISION
National Chimney/Tim Dragon, hereinafter referred to as the applicant, is seeking after -
the -fact approval to amend a previously approved plan for a 24,000 sq. ft. light
manufacturing facility. The amendment consists of relocating two (2) storage trailers, 3
Green Tree Drive.
Based on the plans and materials contained in the document file for this application, the
Administrative Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking after -the -fact approval to amend a previously approved plan
for a 24,000 sq. ft. light manufacturing facility. The amendment consists of relocating
two (2) storage trailers, 3 Green Tree Drive.
2. The owner of record of the subject property is M & D, LLC.
3. The subject property is located in the Mixed Commercial - Industrial Zoning District.
4. The application was received on April 26, 2013.
5. The plan submitted is entitled, "Proposed Site Plan Amendment 3 Green Tree Drive
So. Burlington Vermont", prepared by Civil Engineering Associates, Inc., dated April 9,
2013.
DIMENSIONAL REQUIREMENTS
6. The proposed site modifications will be in compliance with the dimensional
requirements.
7. Setback requirements are being met.
SITE PLAN REVIEW STANDARDS
Vehicular access
8. Access is provided via a curb cut on Green Tree Drive. No changes proposed.
FAUSERS\Planning & Zoning\Development Review
Board\Findings_Decisions\2013\SP_13_23_3GreenTreeDrive_NationalChimney_ffd.doc
#SP-13-23
Circulation
9. Circulation on the site is adequate.
Parking
10. The relocation of the storage trailers results in a three (3) parking space increase for
a total of 33 spaces provided. The Development Review Board as part of #SP-10-59
granted the applicant a parking waiver of seven (7) spaces or 18.9%. This increase
reduces the parking shortfall from seven (7) spaces to four (4) spaces for a parking
waiver reduction of 18.9% to 10.8%.
11. Pursuant to Section 13.01(G) (5) of the Land Development Regulations, bicycle
parking shall be provided on the subject property. A bicycle rack is shown on the plan.
12. Pursuant to Section 13.01(B) of the Land Development Regulations, internal
landscaping of the parking area does not apply to this application.
Landscaping
13. No landscaping changes proposed.
14. Pursuant to Section 13.06(B) (7) of the Land Development Regulations, snow
storage areas must be shown on the plan. The plan indicate the snow storage areas.
Outdoor Lighting
15. There are no changes to outdoor lighting proposed.
Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations, the
following review standards shall apply to site plan applications:
Traffic
16. Traffic will not be affected as a result of this application.
(a) The relationship of the proposed development to goals and objects set
forth in the City of South Burlington Comprehensive Plan.
17. The Comprehensive Plan states that the City should encourage development while
protecting natural resources and promoting a healthy and safe environment. The
proposed project is in keeping with the recommended actions of the Comprehensive
Plan.
(b) The site shall be planned to accomplish a desirable transition from
structure to site, from structure to structure, and to provide for adequate
planting, safe pedestrian movement, and adequate parking areas
-2—
FIUSERS\Planning & Zoning\Development Review
Board\Findings_Decisions\2013\SP_13_23_3GreenTreeDrive_NationalChimney_ffd.doc
#SP-13-23
18. This criterion will continue to be met.
(c) Parking shalt be located to the rear or sides of buildings
19. No changes are proposed. This requirement is being met.
20. As noted above, a bicycle rack location is noted on the plan.
(d) Without restricting the permissible limits of the applicable zoning district,
the height and scale of each building shall be compatible with its site and
existing or adjoining buildings,
21. No changes are proposed.
(e) Newly installed utility service modifications necessitated by exterior
alterations or building expansions shalt, to the extent feasible, be
underground.
22. No changes are proposed.
(f) The combination of common materials and architectural characteristics,
landscaping, buffers, screens, and visual interruptions to create attractive
transitions between buildings or different architectural styles shalt be
encouraged,
23. This requirement is being met.
(g) Proposed structures shalt be related harmoniously to themselves, the
terrain and to existing buildings and roads in the vicinity that have a visual
relationship to the proposed structures
24. No changes are proposed.
In addition to the above general review standards, site plan applications shall meet the
following specific standards set forth in Section 14.07 of the Land Development
Regulations:
(a) The reservation of land may be required on any tot for provision of access
to abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial or collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation in
the area.
25. The reservation of land is not necessary.
-3-
FIUSERS\Planning & Zoning\Development Review
Board\Findings_Decisions\2013\SP_1 3_23_3GreenTreeDrive_NationalChimney_ffd.doc
#SP-13-23
(b) Electric, telephone, and other wire -served utility lines and service
connections shall be underground, Any utility installations remaining above
ground shall be located so as to have a harmonious relation to neighboring
properties and to the site,
26. No changes proposed.
(c) AY dumpsters and other facilities to handle solid waste, including
compliance with any recycling or other requirements, shall be accessible,
secure, and properly screened with opaque fencing to ensure that trash and
debris do not escape the enclosure(s).
27. A screened dumpster enclosure is shown on the plan.
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves site
plan application #SP-13-23 of National Chimney/Tim Dragon subject to the following
conditions:
1. All previous approvals and stipulations which are not superseded by this approval
shall remain in effect.
2. This project shall be completed as shown on the plan and shall be on file in the
South Burlington Department of Planning and Zoning.
3. The applicant shall obtain a zoning permit within six (6) months pursuant to
Section 17.04 of the Land Development Regulations or this approval is null and
void.
4. The applicant shall obtain a Certificate of Occupancy from the Administrative
Officer prior to occupancy or use of the relocated storage trailers.
5. Any change to the site plan shall require approval by the South Burlington
Development Review Board or the Administrative Officer.
/> 'Z
Signed on this (/ day of , 2013 by
ymond 1. Belair, Administrative Officer
-4—
FAUSERS\Planning & Zoning\Development Review
Board\Findings_Decisions\2013\SP_13_23_3GreenTreeDrive_NationalChimney_ffd.doc
#SP-13-23
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision
by filing a Notice of Appeal with the secretary of the Development Review Board. This
Notice of Appeal must be accompanied with a $233 filing fee and be filed within 15 days
of the date of this decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain
relevant state permits for this project. Call 802.879.5676 to speak with the regional
Permit Specialist.
-5—
FAUSERS\Planning & Zoning\Development Review
Board\Findings_Decisions\2013\SP_13_23_3GreenTreeD rive_NationalC hi mney_ffd. doc