HomeMy WebLinkAboutSP-15-17 - Decision - 0003 Green Tree Drive#SP-15-17
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
NEAGLEY & CHASE CONSTRUCTION COMPANY — 3 GREEN TREE DRIVE
SITE PLAN APPLICATION #SP-15-17
FINDINGS OF FACT AND DECISION
Neagley & Chase Construction Company, hereafter referred tows the applicant, is seeking to
amend a previously approved plan for a 24,000 sq. ft. light manufacturing facility. The
amendment consists of constructing a 7900 sq. ft. addition, 3 Green Tree Drive.
The Development Review Board held a public hearing on May 19, 2015. David Conger
represented the applicant.
Based on testimony provided at the above mentioned public hearing and the plans and
supporting materials contained in the document file for this application, the Development
Review Board finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking to amend a previously approved plan for a 24,000 sq. ft. light
manufacturing facility. The amendment consists of constructing a 7900 sq. ft. addition, 3
Green Tree Drive.
2. The proposed project is for the construction of a 7,900 square foot addition to an existing
building. This addition was most recently approved on September 19, 2006; however the
approval has since expired and the applicant must appear for review.
3. The owner of record of the subject property is M & D, LLC.
4. The application was received on April 3, 2015.
5. The subject property is located in the Mixed Industrial & Commercial (Mixed IC) Zoning
District.
6. The plans submitted consist of a two (2) page set of plans, page one (1) entitled, "3
Green Tree Dr., So. Burlington, VT 05403", prepared by Dubois & King, Inc. dated Apr.
2015
Zoning District & Dimensional Requirements:
Table 1. Dimensional Requirements
IC Zoning District
Required
Proposed
Min. Lot Size
40,000 SF
7,500 SF
Max. Building Coverage
40%
29.9%
- 1 -
#SP-15-17
Max. Overall Coverage
70%
52.5%
Max. Front Yard Coverage
30%
30%
Min. Front Setback
30'
>30'
Min. Side Setback
10,
15'
Min. Rear Setback
30'
>30'
zoning compliance
Site Plan Review Standards
A. Relationship of Proposed Development to the City of South Burlington Comprehensive
Plan. Due attention by the applicant should be given to the goals and objectives and the
stated land use policies for the City of South Burlington as set forth in the Comprehensive Plan.
The Board finds the proposed building and uses to be consistent with the Comprehensive Plan.
B. Relationship of Proposed Structures to the Site.
(1) The site shall be planned to accomplish a desirable transition from structure to
site, from structure to structure, and to provide for adequate planting, safe pedestrian
movement, and adequate parking areas.
With regards to parking, after completion of the addition, the total gross floor area will be
31,400 SF. Parking requirements would be calculated as follows: 31.4 x 0.5 = 15.7 plus 1 space
for employee for a total of 46 required spaces.
There are 33 existing spaces on the site and the applicant is proposing to add two (2) more
spaces on the side of the building for a total of 35 spaces. The applicant is requesting a 25%
waiver (11 spaces) to the required 46 spaces resulting in a total of 35 spaces minimum.
The applicant's justification for the waiver is as follows:
The justification for the parking waiver relates to the high warehousing component of the sites
light manufacturing operation. Thus the parking utilization is primarily required for the 30
employees with minimal parking needs for visitors. With 35 designated spaces, the additional 5
spaces exceeds the daily requirement for employees and visitors on site. In the event this total is
exceeded, additional parking could be accommodated in the northwest corner of the parking
area.
The Board finds that given the low level of visitors to the site a waiver of parking space
requirements is justified.
The Board grants a waiver of eleven (11) space or 25 % to the minimum parking space
requirement of 46 spaces for a total of 35 spaces provided.
2) Parking:
-2-
#SP-15-17
(a) Parking shall be located to the rear or sides of buildings. Any side of a building
facing a public street shall be considered a front side of a building for the purposes of
this subsection.
This criterion is met. There are 3 spaces in front of the building but these were constructed prior
to establishment of this criterion. The two (2) additional spaces will be placed on the side of the
building.
(b) The Development Review Board may approve parking between a public street
and one or more buildings if the Board finds that one or more of the following criteria
are met. The Board shall approve only the minimum necessary to overcome the
conditions below.
(i) ...............
(ii) ..............
ON..................
(iv) The lot contains one or more existing buildings that are to be re -used and
parking needs cannot be accommodated to the rear and sides of the existing
building(s);
(v) ...........................
(vi) ........................
(c)................................
(d).................................
This requirement is being met as the additional parking spaces will be placed on the side of the
building.
(3) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with its site and existing or
anticipated adjoining buildings.
The proposed addition is 22 ft. high and will be matched to the existing building height and lines.
The Board finds that this criterion to be met.
(4) Newly installed utility services and service modifications necessitated by exterior
alterations or building expansion shall, to the extent feasible, be underground.
The plans indicate that such services are located underground. The Board finds that this
criterion has been met.
C. Relationship of Structures and Site to Adjoining Area.
(1) The Development Review Board shall encourage the use of a combination of
common materials and architectural characteristics (e.g., rhythm, color, texture, form or
detailing), landscaping, buffers, screens and visual interruptions to create attractive
transitions between buildings of different architectural styles.
The addition will be to the one existing building on the site. Planting of thirty (30) trees is
proposed along the northern and southwestern edge of the property. The Board finds that this
criterion has been met.
-3-
#SP-15-17
(2) Proposed structures shall be related harmoniously to themselves, the terrain and
to existing buildings and roads in the vicinity that have a visual relationship to the
proposed structures.
The proposed addition will match the height and lines of the existing building and will be similar
to the others in the area. The Board finds that this criterion has been met.
14.07 Specific Review Standards
A. Access to Abutting Properties. The reservation of land may be required on any lot for
provision of access to abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial or collector street, to provide additional access for emergency or
other purposes, or to improve general access and circulation in the area.
No reservation of land is required.
B. Utility Services. Electric, telephone and other wire -served utility lines and service
connections shall be underground insofar as feasible and subject to state public utilities
regulations. Any utility installations remaining above ground shall be located so as to have a
harmonious relation to neighboring properties and to the site.
The plans indicate that such services are located underground. The Board finds that this
criterion has been met.
C. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including
compliance with any recycling or other requirements, shall be accessible, secure and properly
screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s).
Small receptacles intended for use by households or the public (ie, non-dumpster, non -large
drum) shall not be required to be fenced or screened.
The plans show an existing screened dumpster enclosure. The Board finds that this criterion has
been met.
D. Landscaping and Screening Requirements. See Article 13, Section 13.06 Landscaping,
Screening, and Street Trees.
Building construction cost is estimated at $368,000. Required minimum landscaping is calculated as
follows:
First $250,000 x 3% = $7,500
Next 250,000 x 2% ($118,000 x 0.02) = $2,360
Balance over $500,000 x 1% = -$0-
Minimum required landscaping budget = $9,860. The applicant has proposed $10,000 in new
landscaping.
In an email to staff on April 27, 2015, the City Arborist commented as follows:
#SP-15-17
• Include Tree Planting Details and Specifications in plans
• Recommend changing Austrian Pine to a different species due to increased disease
pressure on Austrian Pine in recent years
The Board finds that the applicant shall comply with the City Arborist's recommendations and
amend the plan and its drawings accordingly.
E. Modification of Standards. Where the limitations of a site may cause unusual hardship
in complying with any of the standards above and waiver therefrom will not endanger the
public health, safety or welfare, the Development Review Board may modify such standards as
long as the general objectives of Article 14 and the City's Comprehensive Plan are met.
However, with the exception of side yard setbacks in the Central District 1, in no case shall the
DRB permit the location of a new structure less than five (5) feet from any property boundary
and in no case shall be the DRB allow land development creating a total site coverage
exceeding the allowable limit for the applicable zoning district in the case of new
development, or increasing the coverage on sites where the pre-existing condition exceeds the
applicable limit.
No waivers are required.
STORMWATER
The Public Works Department provided the following comments to staff on April 27, 2015.
I reviewed the site plan for the property at 3 Green Tree Drive prepared by Dubois and King Inc.,
dated April 2015 with no updates. I would like to offer the following comments:
This property is covered by a previously issued State stormwater permit (3409-9010). Due to the
size of the addition, the applicant should update/amend the previously issued State stormwater
permit prior to starting construction. Information regarding this permit and any updates should
be sent to the City for review. The City is a co-permittee on the State stormwater permit.
Thank you for the opportunity to comment
-Tom
Thomas J. DiPietro Jr.
Deputy Director
Department of Public Works
The Board finds that the applicant shall comply with the recommendations of the Department of
Public Works.
FIRE DEPARTMENT COMMENTS
-5-
#SP-15-17
In an email to staff dated May 14, 2015 the Fire Chief provided the following comments:
May 14, 2015
Dear Ray:
We have reviewed the plans for the proposed changes to the addition to the National
Chimney building at 3 Green tree Drive. We have the following recommendations:
1. Compliance with all requirements of South Burlington fire safety codes and standards.
2. Fire Alarm and Fire suppression system upgrades as required by South Burlington fire
safety codes and standards.
3. Trees, fences and floral outcroppings should be placed so as not to interfere with the
deployment of the aerial ladder, hoselines, portable ladders and other firefighting
equipment.
4. All construction plans shall be reviewed and permitted by the South Burlington Fire
Marshal.
At this point these seem to be the major issues which present themselves. As this project
moves forward additional items may surface which could be dealt with as needed with the
assistance of the developer and the South Burlington Fire Marshal.
Should you need any further assistance on this project please feel free to contact me.
Sincerely,
Douglas S. Brent
Douglas S. Brent
Fire Chief
The Board finds that the applicant shall comply with the recommendations of the Fire Chief.
Traffic Generation
The property's current allocation of trip ends VTEs as established in a prior Findings of Fact &
Decision signed on April 14, 1998 is 24 VTEs. The current building size in gross floor area is
23,500 SF. The proposed addition would result in a new gross floor area of 31,400 SF.
Based upon a final construction total of 31,400 SF of a manufacturing facility use (ITE LUC #140),
the weekday PM Peak Hour average vehicle trip ends is calculated as follows: 0.73 (trip
generation per 1,000 SF g.f.a.) x 31.4 = estimated number of vehicle trip ends is 22.92 trip ends.
The Board finds that the current allocation of 24 VTEs will not be exceeded and that no
additional traffic is expected from the expansion.
M
#SP-15-17
DECISION
Motion by Bill Miller, seconded by David Parsons, to approve Site Plan Application #SP-15-17 of
Neagley & Chase Construction Company, subject to the following conditions:
1) All previous approvals and stipulations, which are not superseded by this approval, shall
remain in effect.
2) This project shall be completed as shown on the plans submitted by the applicants and on
file in the South Burlington Department of Planning and Zoning.
3) The plans shall be revised to show the changes below and shall require approval of the
South Burlington Administrative Officer. Three (3) copies of the approved revised plans shall
be submitted to the Administrative Officer prior to permit issuance.
a) The site plan shall be revised to incorporate the changes recommended by the City Arborist
in his email of April 27, 2015.
4) Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications shall be underground.
5) For the purpose of calculating road impact fees under the South Burlington Impact Fee
Ordinance, the Development Review Board estimates that the project will generate zero (0)
additional trip ends during the P.M. peak hour.
6) The Board grants a waiver of eleven (11) spaces or 25 % to the minimum parking space
requirement of 46 spaces for a total of 35 spaces provided.
7) All exterior lighting shall be downcast and shielded, and otherwise comply with Section
13.07 of the SBLDR.
8) The proposed project shall adhere to standards for erosion control as set forth in Section 16.03
of the South Burlington Land Development Regulations. In addition, the grading plan should
meet the standards set forth in Section 16.04 of the South Burlington Land Development
Regulations. The South Burlington Stormwater Superintendent shall visit the site as
construction progresses to ensure compliance with this criterion.
9) The applicant shall comply with the recommendations of the Department of Public Works
outlined in its email dated April 27, 2015.
10) The applicant shall comply with the recommendations of the Fire Chief outlined in its email
dated May 14, 2015.
11) The applicant shall regularly maintain all stormwater treatment and conveyance infrastructure.
12) Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines,
services, and service modifications should be underground.
-7-
#SP-15-17
13) Any exterior light fixture which does not comply with Section 13.07 of the LDRs, shall be
removed and if replaced, the replacement fixture shall comply with this section. Approval for
any replacement fixture shall be obtained from the Administrative Officer prior to installation.
14) Prior to zoning permit issuance for construction of the project, the applicant shall post a $9,860
landscaping bond. This bond shall remain in full effect for three (3) years to assure that the
landscaping has taken root and has a good chance of survival.
15) Prior to issuance of a zoning permit for the addition, the applicant shall submit to the
Administrative Officer a final set of project plans as approved in digital (PDF) format.
16) The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of
the Land Development Regulations or this approval is null and void.
17) The applicant shall obtain Certificate of Occupancy from the Administrative Officer prior to
the use of the new addition.
18) Any change to the site plan shall require approval by the South Burlington Development
Review Board or the Administrative Officer.
Tim Barritt
Yea
Nay
Abstain
Not Present
Mark Behr
Yea
Nay
Abstain
Not Present
Brian Breslend
Yea
Nay
Abstain
Not Present
Bill Miller
Yea
Nay
Abstain
Not Present
David Parsons
Yea
Nay
Abstain
Not Present
Jennifer Smith
Yea
Nay
Abstain
Not Present
John Wilking
Yea
Nay
Abstain
Not Present
Motion carried by a vote of 5— 0 — 1.
Signed this day of m 2015, by
Tim Barritt, Chair
Please note: You have the right to appeal this decision to the Vermont Environmental Court,
pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is
issued. The fee is $225.00. If you fail to appeal this decision, your right to challenge this
decision at some future time may be lost because you waited too long. You will be bound by the
decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality).