HomeMy WebLinkAboutSP-97-0002 - Decision - 0075 Green Mountain DriveFINDINGS OF FACT & DECISION
STATE OF VERMONT
COUNTY OF CHITTENDEN
CITY OF SOUTH BURLINGTON
5P- 17, vo02.
Re: Findings of Fact, application of Wiemann -Lamphere Architects to amend a
previously approved plan to convert 12,000 square feet of a 20,000 square foot
research and testing laboratory to an educational facility and construct a 36 square
foot addition for the educational facility. The amendment consists of relocating the
proposed addition and enlarging it to 95 square feet, 75 Green Mountain Drive.
On the 8th day of July, 1997, the South Burlington Planning Commission approved
the request of Wiemann-Lamphere Architects for site plan review under Section 26.10
of the South Burlington Zoning Regulations based on the following findings:
1. This project consists of amending a plan previously approved on 5 / 13 / 97 to
convert 12,000 square feet of a 20,000 square foot research and testing laboratory
to an educational facility and construct a 36 square foot addition for the educational
facility. The amendment consists of relocating the proposed addition and enlarging
it to 95 square feet. The only issues affected are coverage and setbacks.
2. This property located at 75 Green Mountain Drive lies within the C2 District. It
is bounded on the north by a vacant building, on the west by Green Mountain Drive,
on the east by the UVM Horticultural Farm and on the south by the access driveway
to the UVM Horticultural Farm.
3. Coverage / setbacks : Building coverage is 22.0% ( maximum allowed is 30 0) .
Overall coverage is 56.4% (maximum allowed is 70%) . Front yard coverage is 52. 2%
(maximum allowed is 30 0) . Front yard coverage is an existing situation which will
not be made worse by this application.
Setback requirements are met.
DECISION & CONDITIONS
Based on the above Findings of Fact, the South Burlington Planning Commission
approves the application of Wiemann-Lamphere Architects to amend a previously
approved plan to convert 12,000 square feet of a 20,000 square foot research and
testing laboratory to an educational facility and construct a 36 square foot addition
for the educational facility. The amendment consists of relocating the proposed
addition and enlarging it to 95 square feet, as depicted on plan entitled, "Addition
and Remodel for Acquatec Inc South Burlington, VT.", prepared by Wiemann-
Lamphere, Architects, Inc., dated 4/24/97, last revised 6/24/97, with the following
stipulations:
1. All previous approvals and stipulations which are not superseded by this
approval shall remain in effect.
2. The applicant shall obtain a zoning permit within six (6) months pursuant to
Section 27.302 of the zoning regulations or this approval is null and void.
3. The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to the use of the addition.
4. Any changes to the site plan shall require approval by the South Burlington
Planning Commission.
Chairman or Clerk
South Burlington Planning Commission