Loading...
HomeMy WebLinkAboutSP-94-0000 - Decision - 0055 Green Mountain DriveFINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of Fact, application of Pizzagalli Realty Company to amend a previously approved site plan to expand a parking lot on a site containing an office/warehouse, 55 Green Mountain Drive. On the 29th of November, 1994, the South Burlington Planning Commission approved the request of Pizzagalli Realty Company for site plan review under Section 26.10 of the South Burlington Zoning Regulations based on the following findings: 1. This project consists of amending a previously approved site plan to expand a parking lot on a site containing an office/warehouse. The last review of this site by the Planning Commission was on 4/28/87. 2. This property located at 55 Green Mountain Drive lies within the C2 District. It is bounded on the north by the access drive to the UVM Horticultural Farm, on the south by a retail building, on the east by the UVM Horticultural Farm and on the west by Green Mountain Drive. 3. Access/circulation: Access is provided by a 27 foot wide curb cut on Green Mountain Drive. No change proposed. Circulation is adequate. 4. Coverage/setbacks: Building coverage is 13.1% (maximum allowed is 30%). Overall coverage is 30.7% (maximum allowed is 70%). Front yard coverage is 13.5% (maximum allowed is 30%). Setback requirements are met. 5. Parking: The site requires a total of 40 parking spaces and 44 spaces are being provided including two (2) handicapped spaces. A bike rack is being provided as required under Section 26.253(b) of the zoning regulations. 6. Landscaping: There is no minimum landscaping requirement, based on building costs, for this project. Applicant planted only $1700 worth of landscaping of the $3000 that was required as part of the addition approved in 1987. This plan shows $1300 worth of new landscaping to comply with the 1987 requirement. Plantings include Juniper and Flowering Crabapple. 7. Sewer: Since the 1987 approval, the applicant has added 19 employees for which sewer allocation was never approved. Therefore, 285 gpd of additional allocation should be approved as part of this project. The applicant will be required to pay the per gallon fee prior to issuance of a zoning/building permit. 8. Dumpsters: A screened dumpster storage area is being provided. 9. Lighting: Existing exterior lighting consists of the following: --- two (2) downcasting building mounted 250 watt metal halide fixtures. --- two (2) 70 watt walkway lights mounted on poles. --- one (1) 400 watt pole mounted floodlight. The floodlight should be replaced with a downcasting and shielded fixture. DECISION & CONDITIONS Based on the above Findings of Fact, the South Burlington Planning Commission approves the site plan application of Pizzagalli Realty Company to amend a previously approved site plan to expand a parking lot on a site containing an office/warehouse, 55 Green Mountain Drive, as depicted on a plan entitled "Proposed Site Improvements, 55 Green Mountain Drive, So. Burlington, VT", prepared by Donald L. Hamlin Consulting Engineers, Inc. dated 10/12/94 with a last revision date of 11/17/94, with the following stipulations: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. The applicant shall post a $1300 landscape bond prior to issuance of a zoning permit. The bond shall remain in effect for three (3) years to assure that the landscaping takes root and has a good change of surviving. 3. Any new exterior lighting or change in existing lighting shall consist of downcasting shielded fixtures so as not to cast light beyond the property line. Any change in lighting shall be approved by the City Planner prior to installation. The 400 watt floodlight shall either be removed or replaced with a shielded downcasting fixture. The City Planner shall approve any replacement light fixture prior to installation. 4. An additional sewer allocation of 285 gpd is approved. The applicant shall pay the per gallon fee prior to issuance of a zoning permit for the parking area expansion. 5. The applicant shall obtain a zoning permit for the parking area expansion within six (6) months or this approval is null and void. 6. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to use 2 of the expanded parking area. 7. Any change to the site plan shall require approval by the South Burlington Planning Commission. 8. The plan shall be revised prior to issuance of a zoning permit to show Bradford Pear substituted for the proposed Crabapple trees. Three copies of the revised plan shall be submitted to the City Planner. Chairman or Clerk South Burlington Planning Commission ";/OL-�-o" T' Date 3